Indian River County MPO Transportation Improvement Program FY 2018/19 FY 2022/23

Similar documents
Indian River County MPO Transportation Improvement Program FY 2018/19 FY 2022/23

Public Information Workshop

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

2030 Multimodal Transportation Study

MPO Staff Report Technical Advisory Committee: July 12, 2017

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

FY Transportation Improvement Program (TIP)

Transportation Sustainability Program

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

DRAFT Subject to modifications

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES

Business Advisory Committee. November 3, 2015

TRANSPORTATION - DISTRICT ONE

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

FY 2012 FY 2016 TRANSPORTATION IMPROVEMENT PROGRAM

Parking Management Element

City of Lake Oswego Transportation System Plan Update PLAN AND POLICY REVIEW, PART 1

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Waco Rapid Transit Corridor (RTC) Feasibility Study

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

SAN RAFAEL CITY COUNCIL AGENDA REPORT

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

August 2, 2010 Public Meeting

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Dixie Transportation Planning Office

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

TRAFFIC REGULATION APPROVAL PROCESS

Balancing the Transportation Needs of a Growing City

Attachment C: Benefit-Cost Analysis Spreadsheet

Major Widening/New Roadway

2030 Comprehensive Plan Goals, Objectives, and Policies Mobility Working Document

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

DRAFT Evaluation Scores. Transit

Transportation Demand Management Element

CITY OF OAKLAND INTRODUCTION

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION January 20, :30 P.M. 1) APPROVAL OF AGENDA 1 min.

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

Sales and Use Transportation Tax Implementation Plan

City of Grand Forks Staff Report

West Broadway Reconstruction/LRT Design. March 19, 2015

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Transportation Coordination Toolkit

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Energy Technical Memorandum

MEMORANDUM. Proposed Town of Chapel Hill Green Fleets Policy

Attachment D Environmental Justice and Outreach

Green Line LRT: Beltline Segment Update April 19, 2017

USDOT CMAQ Program. Southeast Diesel Collaborative Annual Conference September, 2017

STH 60 Northern Reliever Route Feasibility Study Report

City of Palo Alto (ID # 6416) City Council Staff Report

Incentives for Green Fleets

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

Executive Summary EXECUTIVE SUMMARY Parking Issues Trenton Downtown Parking Policy and Sidewalk Design Standards E.S. Page 1 Final Report 2008

LACEY CITY COUNCIL MEETING July 09, 2015

Draft Results and Open House

Redefining Mobility Ready or not: Autonomous and connected vehicle planning and policy, now and in the future

Corridor Management Committee. March 7, 2012

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Dear New Clean Cities Stakeholder:

Pupil Transportation Safety

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

The Case for. Business. investment. in Public Transportation

Peninsula Corridor Electrification Project (PCEP)

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017.

Draft Results and Recommendations

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Highway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

An Introduction to Automated Vehicles

4 COSTS AND OPERATIONS

Redefining Mobility. Randy Iwasaki. Executive Director Contra Costa Transportation Authority January 18, 2018

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION

Northeast Autonomous and Connected Vehicle Summit

Anderson Area Transportation Study ANATS Transportation Improvement Plan FY

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

ACTION TRANSMITTAL No

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Ketchum Energy Advisory Committee Annual Update and Recommendation for Electric Vehicle Charging Station

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific

Call for Projects Congestion Mitigation and Air Quality (CMAQ) Emissions Formulas Technical Advisory Committee

The Georgia CMAQ Program. Practice Makes Perfect

4.0 TIER 2 ALTERNATIVES

Transcription:

Indian River County MPO Transportation Improvement Program FY 2018/19 FY 2022/23 Indian River County Metropolitan Planning Organization 1801 27th Street Vero Beach, FL 32960 DRAFT

The preparation of this report has been financed in part through grants from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation, under the Metropolitan Planning Program, Section 104(f) of Title 23, U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation. Revision History: May 22, 2018 Draft for MPO, TAC, & CAC Review ii

TABLE OF CONTENTS ENDORSEMENT RESOLUTION... iv Glossary... vi Abbreviations... xi Phases... xii Fund Codes... xii INTRODUCTION... 1 Purpose... 1 Financial Plan... 1 Project Selection... 2 Transportation Disadvantaged... 2 Consistency with Other Plans... 2 Project Priorities... 3 Implemented Projects... 5 Previous Conforming Projects... 5 Public Involvement... 5 Efficient Transportation Decision Making (ETDM)... 5 Management Systems... 6 Amendments... 6 State Certification... 6 Strategic Intermodal System (SIS)... 6 Safety Performance Measures... 7 How to Obtain Project Cost Information from the TIP... 8 Projects Located Outside the MPO Planning Area... 9 Map of MPO TIP Projects for FY 2018/19-2022/23... 10 Roadway Projects Index... 11 Financial Summary... 13 TRANSPORTATION IMPROVEMENT PROGRAM PROJECTS FOR FY 2018/19-2022/23 A. Roadway Capacity Projects... A-1 B. Traffic Operations, Maintenance, and Safety Projects... B-1 C. Transit and Transportation Disadvantaged Projects... C-1 D. Bicycle, Pedestrian, and Transportation Alternatives Projects... D-1 E. Aviation Projects... E-1 F. Transportation Planning/Studies... F-1 APPENDICES A. Indian River County Capital Improvements Element Information Only... A iii

MPO RESOLUTION NO. 2018-02 A RESOLUTION OF THE INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION APPROVING THE FY 2018/19-2022/23 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) WHEREAS, the Florida Statutes require that each MPO annually prepare a Transportation Improvement Program (TIP); and WHEREAS, the Florida Department of Transportation (FDOT) has coordinated with the Indian River County MPO in transportation improvement project selection; and WHEREAS, project selection has been carried out in conformance with applicable federal requirements, specifically 23 USC 134 (h) (2) and (i) (4); and WHEREAS, the MPO Technical Advisory Committee (TAC) and the MPO Citizens Advisory Committee (CAC) have reviewed the draft Transportation Improvement Program and recommended that the MPO approve the TIP; NOW, THEREFORE, BE IT RESOLVED THAT THE MPO APPROVES THE FY 2018/19-2022/23 TRANSPORTATION IMPROVEMENT PROGRAM THIS RESOLUTION was moved for adoption by, and the motion was seconded by, and, upon being put to a vote, the vote was as follows: Susan Adams, Indian River County Ed Dodd, City of Sebastian Joseph Flescher, Indian River County Shawn Frost, School District of Indian River County Dick Haverland, Town of Indian River Shores Laura Moss, City of Vero Beach Bob McPartlan, City of Sebastian Peter D. O Bryan, Indian River County Sara Savage, City of Fellsmere Bob Solari, Indian River County Lange Sykes, City of Vero Beach Tim Zorc, Indian River County iv

The Chairperson thereupon declared the resolution duly passed and adopted this 13th day of June, 2018. INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION Mayor Bob McPartlan, Chairman ATTEST: APPROVED AS TO FORM AND LEGAL SUFFICIENCY: COUNTY ATTORNEY v

GLOSSARY Access Management The regulation and control of vehicular access to public roads to insure the safe and efficient operation of the roadway system. Advanced Traffic Management Systems (ATMS) This is an intelligent transportation system (ITS) approach using advanced technology tools such as closed-circuit television cameras, radar detectors and communication devices to monitor traffic, optimize signal timing and control traffic flow. Americans with Disabilities Act (ADA) A federal law that requires public facilities and services to be accessible to persons with disabilities, including those with mental disabilities, temporary disabilities and conditions related to substance abuse. Average Daily Traffic (ADT) The number of vehicles passing a fixed point in a day, averaged over a number of days. The number of count days included in the average varies with the intended use of the data. Bicycle Pedestrian Advisory Committee (BAC) An MPO appointed committee comprised of representatives of various government agencies, law enforcement officials and private citizens interested in bicycle and pedestrian issues. The BAC advises the MPO in the process of planning and developing bicycle and pedestrian facilities. Bicycle Facilities Any travel corridor designed to accommodate non-motorized traffic, including bike and pedestrian paths and bike lanes on roadways. Bridges Management System (BMS) Process for analyzing existing conditions and identifying future needs with respect to bridges designated as part of the National Capital Improvements Element (CIE) A required element of local comprehensive plans which evaluates the need for public facilities and associated costs and construction schedules. The required content of CIEs is stipulated in Rule 9J-5.016 of the Florida Administrative Code and Chapter 163.3177(3), Florida Statutes. Capital Improvement Program (CIP) A five/six year schedule of capital improvements adopted by local governments and transportation agencies. Chapter 163, Florida Statutes (F.S.) Requires local governments to develop comprehensive plans assessing existing and future public service and facility needs and identifies policies and capital improvement projects necessary to address them. Citizen s Advisory Committee (CAC) Private citizens representing municipal area and at-large membership appointed by the MPO to review transportation issues and topics that will be considered by the MPO. The CAC forwards recommendations to the MPO regarding these vi

issues and topics. Community Traffic Safety Teams (CTST) Community Traffic Safety Teams are locally based groups of highway safety advocates who are committed to solving traffic safety problems through a comprehensive, multi-jurisdictional, multi-disciplinary approach. Members include local city, county, state, and occasionally federal agencies, as well as private industry representatives and local citizens. Community Transportation Coordinator (CTC) Agency responsible for delivering coordinated transportation services to the transportation disadvantaged population in the designated service area. Concurrency Management System (CMS) The process local governments use to ensure that level of service standards on public services and facilities are adopted and maintained. In addition, CMS require that public services and facilities necessary to accommodate the impacts of development projects are in place prior to their approval. Congestion Management Process (CMP) A federally mandated program within metropolitan planning areas to address and manage congestion through the implementation of strategies not calling for major capital investments. The CMP was formerly known as Congestion Management System (CMS). Designated Official Planning Agency (DOPA) Agency designated by the state Commission for the Transportation Disadvantaged to provide planning services to the local transportation disadvantaged service area. The MPO is the DOPA. Development Of Regional Impact (DRI) Any land development that, because of its character, magnitude, or location, would have a substantial effect upon the health, safety, or welfare of citizens of more than one county. These developments are governed by the provisions of Chapter 380.06, F.S. Disadvantaged Business Enterprise (DBE) Businesses owned and operated by members of one or more socially and economically disadvantaged minority groups, such as African Americans, Hispanic Americans, Native Americans, Asian Pacific Americans and Asian Indian Americans. Efficient Transportation Decision Making (ETDM) A FDOT initiative to improve and streamline the environmental review and permitting process of transportation projects by providing resource protection agencies and concerned citizens opportunities to comment on them during the initial planning phase. This is intended to improve the coordination of transportation decisions with social, land use and ecosystem preservation concerns. Federal Highway Administration (FHWA) The federal agency that develops regulations, policies and guidelines to achieve safety, economic development, and other goals of FHWA programs through the construction and improvement of the nation's transportation vii

infrastructure and highway system. Federal Highway Administration (FHWA) Metropolitan Planning (PL) Funds Primary source of planning funds allocated to the MPO and budgeted in the Unified Planning Work Program (UPWP) in accordance with 23 U.S.C., Section 134. Federal Transit Administration (FTA) The agency that develops policy on public transit issues and allocates capital and operating funds for public transit projects. Federal Transit Administration (FTA) Section 5303 Source of transit planning funds. Fiscal Year (FY) Defines budget year; runs from July 1 through June 30 for the state of Florida and from October 1 through September 30 for federal and local governments. Florida Administrative Code (FAC) A compilation of the rules and regulations of state agencies that have been filed with the Department of State pursuant to the provisions of Chapter 120, F.S. Florida Department of Transportation (FDOT) FDOT is a decentralized agency responsible for the development, maintenance, and regulation of public transportation systems and facilities in the state. Florida Intrastate Highway System (FIHS) A statewide network of limited and controlled access highways primarily intended for high speed and high volume traffic movements constructed and maintained by FDOT. Florida Standard Urban Transportation Modeling Structure (FSUTMS) Computer model used in Florida for transportation planning to simulate existing and future travel patterns developed by FDOT for long-range urban area transportation modeling. Functional Classification The process by which streets and highways are grouped into classes, or systems, according to the character of service they are intended to provide. Local governments are required to identify the functional classification of roadways within their jurisdiction in their comprehensive plans. Institute of Transportation Engineers (ITE) An international society of professionals in transportation and traffic engineering. The organization publishes the Trip Generation Manual, which provides trip generation data. Intelligent Transportation Systems (ITS) An umbrella term for a range of advanced technologies that monitor and manage traffic flow, reduce congestion, provide alternate routes to travelers, enhance productivity, respond to incidents, adverse weather or other road capacity constricting events. viii

Intermodal Facilities Transportation facilities that different travel modes, such as rail or bus stations at airports. Joint Participation Agreement (JPA) Legal instrument describing intergovernmental tasks to be accomplished and/or funds to be paid between government agencies. Level of Service (LOS) A qualitative assessment of operating conditions for transportation facilities using the letter grades A through F (best to worst), to describe their performance. Livable Communities A planning concept that applies to initiatives and programs directed at improving and/or maintaining an urban environment that promotes walking, bicycling and transit use and that provides a sense of place and opportunities for employment, education, recreation, entertainment and shopping. Local Coordinating Board (LCB) A board comprised of representatives of the MPO Board, social service agencies, private transportation providers, FDOT and citizens. The LCB is responsible for governing the Transportation Disadvantaged Program. Moving Ahead for Progress in the 21st Century Act (MAP-21) The 2012 federal surface transportation legislation (Public Law 112-141) that authorizes federal-aid highway and transit programs. MAP-21 sets forth funding and associated requirements for the MPOs and transportation improvement projects. MPO Long Range Transportation Plan (LRTP) Federally required plan that assesses existing and future transportation needs in the MPO planning area and identifies strategies, capital improvements and associated funding needed to address them. The LRTP addresses all principal modes of travel including the automobile, bicycle, airplane, transit and walking. MPO Public Participation Plan Sets forth strategies for generating meaningful public involvement in the course of preparing, developing and implementing MPO plans, programs and projects. National Highway System (NHS) Includes the interstate system and other routes identified as having strategic defense characteristics as well as routes providing access to major ports, airports, public transportation, intermodal transportation facilities and routes of particular importance to local governments. Pavement Management System (PMS) A systematic process utilized by state agencies and MPOs to analyze and summarize pavement information for use in selecting and implementing cost effective pavement construction, rehabilitation and maintenance programs. It is required for roads in the National Highway System. SRTS Safe Routes to School Program - The SRTS Program helps communities address school transportation needs while encouraging more students to walk or bicycle to school. The SRTS ix

Program funds projects such as the construction and installation of sidewalks, shared-use paths, etc. State Transportation Improvement Plan (STIP) A staged, multi-year, statewide, intermodal program that is consistent with the state and MPO transportation plans and TIPsIt must be approved by the Federal Highway Administration and the Federal Transit Administration at least every two years. Strategic Intermodal System (SIS) The SIS is a statewide network of high-priority transportation facilities, including the state's largest and most significant commercial service airports, spaceport, deepwater seaports, freight rail terminals, passenger rail and intercity bus terminals, rail corridors, waterways and highways. These facilities are recognized as having the top priority for state and federal funding. Surface Transportation Program (STP) A funding program under SAFETEA-LU that provides monies for federal-aid road improvements. SAFETEA-LU will expire on October 1, 2012, and Moving Ahead for Progress in the 21st Century Act (MAP-21) that will take effect on October 1, 2012. Transportation Alternatives Program (TAP) Allows for up to two percent of Surface Transportation Program funds to be allocated for non-roadway improvements/expenditures, including pedestrian/bicycle facilities, Recreational Trails and Safe Routes to Schools programs. Transit Development Plan (TDP) PSTA s ten-year planning, development and operational guidance document required for Florida Public Transit Block Grant funding. The TDP is used in creating the mass transit elements of the MPO Long Range Transportation Plan, TIP and FDOT Work Program. Transportation Demand Management (TDM) Employs techniques, such as vanpooling, increasing transit use and telecommuting, to reduce the demand for single occupant vehicle travel and vehicle-miles traveled. Transportation Disadvantaged (TD) Those persons who, because of physical or mental disability, income status or age are unable to transport themselves or to purchase transportation and are, therefore, dependent on others to obtain access to health care, employment, education, shopping, social activities or other life-sustaining activities. These persons also include children who are handicapped or high-risk or at risk as defined in Ch. 411, F.S. Transportation Disadvantaged Service Plan (TDSP) A three year implementation plan, with annual updates developed by the designated official planning agency (DOPA) in coordination with the community transportation coordinator. The TDSP contains the provisions of service delivery for the County s Transportation Disadvantaged Program and is reviewed and approved by the Local Coordinating Board. x

Transportation Impact Fee (TIF) Exaction assessed by local governments on new development projects that attempt to recover the cost incurred to provide transportation facilities required to serve the new development. Transportation Improvement Program (TIP) A five-year program of transportation improvements adopted annually by the MPO that incorporates State and federal work programs along with the capital improvement programs/elements of local governments and the transit agency within the MPO s jurisdiction. Transportation Regional Incentive Program (TRIP) A Florida program that provides state funds to improve regionally significant transportation facilities. Transportation System Management (TSM) A program involving the implementation of traffic control measures, such as high-occupancy vehicle (HOV) lanes, signal timing adjustments, median closings and access management strategies to increase the operating efficiency of the traffic circulation system. Unified Planning Work Program (UPWP) Identifies all transportation planning activities under the auspices of the MPO that are to receive federal and state grant funds. United States Code (USC) Also referred to as the Code of Federal Requirements, this is the codification of the general and permanent rules published in the Federal Register by the executive departments and agencies of the Federal Government. Work Program (WP) The five-year listing of all transportation projects scheduled by the Florida Department of Transportation. ABBREVIATIONS BRDG Bridge CTC Community Transportation Coordinator CTD Commission for the Transportation Disadvantaged CIP Capital Improvements Program FAA Federal Aviation Administration FAST Act Fixing America s Surface Transportation Act of 2015 FDOT Florida Department of Transportation FHWA Federal Highway Administration FM Financial Management FTA Federal Transit Administration IJR Interchange Justification Report IRC Indian River County LAR Local Agency Reimbursement xi

LCB LRTP MPO PST DES PTO RELOC ROW SRA TD TIP Local Coordinating Board Long Range Transportation Plan Metropolitan Planning Organization Post Design Public Transportation Office Right of Way Relocation Right of Way Senior Resource Association, Inc. Transportation Disadvantaged Transportation Improvement Program PHASES ADM CAP CEI CST DSB ENV MNT OPS PD&E PE PLN RRU Administration Capital Purchase Construction, Engineering, & Inspection Construction Design Build Environmental Maintenance Operations Project Development and Environmental Preliminary Engineering Planning Railroad/Utilities Construction FUND CODES ACBR ACER ACFP ACNP ACSA ACSL ACSN ACTL CIGP CM D DDR DFC DIH Advance Construction Bridge Replacement Advance Construction Emergency Repair Advance Construction Freight Program Advance Construction Bridge Replacement (MAP-21) Advance Construction Surface Transportation Program Any Area (Federal) Advance Construction Surface Transp. Program Areas Less Than 200K Pop. Advance Construction Surface Transportation Program Areas Less Than 5K Pop. Advance Construction Transportation Alternatives Areas Less Than 200K Pop. County Incentive Grant Program Congestion Mitigation Unrestricted State Primary District Dedicated Revenue (State) Developer Funded Contribution District In-House Product Support (State) xii

DITS Statewide Intelligent Transportation System DPTO State Public Transportation Office DS State Primary Highways and Public Transit DU State Primary Funds/Federal Reimbursement FAA Federal Aviation Administration FTA Federal Transit Administration GRSC Growth Management for SCOP LF Local Funds PKYI Turnpike Improvement PKYR Turnpike Renewal & Replacement PL Metropolitan Planning SA Surface Transportation Program Any Area (Federal) SCED Small County Outreach Program (2012 Senate Bill 1998) SCOP Small County Outreach Program SCWR Small County Outreach Program (2015 Senate Bill 2514A) SL Surface Transportation Program Areas Less Than 200K Pop. SN Surface Transportation Program Areas Less Than 5K Pop. TALL Transportation Alternatives Areas Less Than 200K Pop. TALN Transportation Alternatives Areas Less Than 5K Pop. TALT Transportation Alternatives Any Area TRIP Transportation Regional Incentive Program TRWR Transportation Regional Incentive Program (2015 Senate Bill 2514A) xiii

Indian River County MPO TIP FY 2018/19 2022/23 INTRODUCTION The FY 2018/19-2022/23 Transportation Improvement Program (TIP) identifies transportation projects programmed for Indian River County over the next five fiscal years. Consistent with Florida Department of Transportation (FDOT) requirements, this TIP lists all the federal and state funded transportation projects within the Metropolitan Planning Area for fiscal years 2018/19 through 2022/23. The TIP was developed in cooperation with FDOT and public transit operators in the county, who provide estimates of funds to develop financial plans. Purpose The TIP is a 5-year financially feasible program of multi-modal transportation improvement projects, as adopted by state and local government jurisdictions and transportation agencies. The Indian River TIP is updated annually by the Metropolitan Planning Organization (MPO) as one of several prerequisites for continued receipt of federal assistance for transportation improvements. The projects listed in the TIP are capital and noncapital surface transportation projects proposed for funding under Title 23 U.S.C. and Title 49 U.S.C. Chapter 53 (including bicycle facilities, sidewalks, and transportation alternatives projects). Also included are all regionally significant projects requiring an action by the Federal Highway Administration (FHWA) or Federal Transit Administration (FTA) regardless of funding source. In addition, the TIP identifies major improvement projects funded with local sources. At times, the TIP may require changes that are necessitated by the addition of a new project to the Work Program that is not yet in the TIP, or changes due to monetary revisions to the State s Budget. Such changes are reflected in the TIP through amendments. Those amendments are attached at the end of the original TIP, and submitted to the State for inclusion in the STIP. Financial Plan As structured, the TIP is financially constrained for each of the five years in the FY 2018/19-2022/23 period. All federal and state funded projects identified in the TIP are reflected in FDOT's Work Program for FY 2018/19-2022/23, and those projects can be funded using current and proposed revenue sources. The TIP is also financially constrained for all locally funded projects. For all projects in the TIP, costs and revenues are shown in Year of Expenditure dollars. Innovative financing techniques are used extensively in the development of projects in Indian River County, primarily as a source of local matching funds for FDOT grant dollars. Examples include transit advertising revenue, impact fees, and the Local Option Sales Tax that was renewed for a 20-year period on November 7, 2016. If reasonable additional funding sources are identified beyond those included in the financial plan, that additional funding would be used to advance the construction of MPO priority projects discussed below. 1

Indian River County MPO TIP FY 2018/19 2022/23 Project Selection The selection process for choosing projects incorporated within this TIP was carried out in accordance with the requirements of 23 USC 134(h)(2) and (i)(4). With reference to the projects included within this TIP, selection was made by FDOT in cooperation with the MPO in accordance with the requirements of 23 CFR 450.332(a). For the Indian River County MPO's FY 2018/19-2022/23 TIP, the project selection process started in June 2017. At that time, MPO staff, in conjunction with FDOT and local government officials, met to discuss MPO priorities. In September 2017, the MPO submitted its priority lists of highway, transportation alternatives, transit, airport, and congestion management process (CMP) projects to FDOT. Those lists were developed using interim year rankings of roadway improvements contained in the MPO s Long Range Transportation Plan, a CMP analysis based on the MPO s CMP plan, and local government input. Using the MPO's 2015 highway and CMP priority projects lists, FDOT developed its FY 2018/19-2022/23 Tentative Work Program. That five-year work program constitutes the principal part of this TIP. With FDOT s FY 2018/19-2022/23 Tentative Work Program as a base, MPO staff prepared the draft TIP. The draft TIP was then reviewed by the MPO Technical Advisory Committee (TAC) and the MPO Citizen's Advisory Committee (CAC). The TAC and CAC each recommended that the MPO adopt the TIP. At its meeting of June 13, 2018, the MPO adopted the TIP. Transportation Disadvantaged Transportation Disadvantaged (TD) services are provided pursuant to Florida Statute 427.015. In Indian River County, the MPO is the Designated Official Planning Agency (DOPA) and the Senior Resource Association is the Community Transportation Coordinator. For FY 2018/19, the Commission for the Transportation Disadvantaged has programmed the following funds for the Indian River County TD program: FY 2018/19 Transportation Disadvantaged (TD) Funding Allocations TD Trust Fund Trip & Equipment Grant Voluntary Dollars Planning Grant Local Match Total Trust Fund Local Match Total $475,417 $16 $52,826 $528,259 $22,553 $2,506 $25,059 Consistency with Other Plans As structured, the FY 2018/19-2022/23 TIP is consistent with all transportation plans applicable to the MPO area. Those include the following: MPO 2040 Long Range Transportation Plan. MPO Transit Development Plan. 2

Indian River County MPO TIP FY 2018/19 2022/23 MPO Congestion Management Process Plan. MPO Bicycle/Pedestrian Plan. Indian River County 2030 Comprehensive Plan. City of Vero Beach Comprehensive Plan. City of Sebastian Comprehensive Plan. City of Fellsmere Comprehensive Plan. Town of Indian River Shores Comprehensive Plan. Town of Orchid Comprehensive Plan. Regional Long Range Transportation Plan Components. Applicable Aviation Master Plans. The MPO's 2040 Long Range Transportation Plan was adopted in December 2015. That plan includes interim year sets of Long Range Transportation Plan improvements to be used as the basis for TIP development. In developing this TIP, MPO staff ensured that the TIP was consistent with projects listed in the MPO's financially feasible transportation plan. The local governments comprising the Indian River County MPO have all adopted transportation elements as part of their comprehensive plans. Each of those transportation elements identifies existing conditions, future needs, and programmed improvements. As an administrating jurisdiction for a countywide traffic impact fee program, Indian River County maintains a twenty-year capital improvements program applicable to roadways throughout the County. MPO staff reviewed those local plans and other transportation plans to form the list of project priorities and the TIP itself. Consequently, the TIP is consistent with all applicable plans covering the MPO area. Project Priorities This TIP implements those needed improvements identified in the MPO's adopted long-range transportation plan. The projects selected and incorporated within the FY 2018/19-2022/23 TIP are consistent with the FAST (Fixing America s Surface Transportation) Act and with FDOT s FY 2018/19-2022/23 Work Program. Those projects are financially feasible for the appropriate funding category, and the projects represent MPO project priorities. MPO project priorities were established in June 2017. At that time, the MPO established priority lists for highway, transportation alternatives, transit, aviation, and congestion management process (CMP) projects. Both the project prioritization criteria and the selection methodology are described in detail in the MPO's 2017 Priority Projects Report. The following roadway improvement projects are identified in the 2017 Priority Projects Report and have been incorporated into the TIP: 1. New interchange at I-95 and Oslo Road. An Interchange Justification Report (IJR) has been approved by FHWA for the new I-95/Oslo Road interchange, and the project s 3

Indian River County MPO TIP FY 2018/19 2022/23 design is underway. Right-of-Way acquisition is programmed for FY 2018/19 through 2019/20, with construction to occur later. [#1 Priority for Highway Projects - SIS] 2. Widening of CR 510 from CR 512 to 58th Avenue. This segment of CR 510 is to be widened to four lanes. The project s PD&E (project development and environmental) phase is currently underway. For the eastern segment (82nd Avenue to 58th Avenue), preliminary engineering is scheduled for FY 2017/18 and right-of-way acquisition is programmed for FY 2020/21 through 2022/23. For the western segment (CR 512 to 82nd Avenue), preliminary engineering is scheduled for FY 2018/19 and right-of-way acquisition is programmed for FY 2020/21 through 2022/23. FDOT will begin reserving funds for construction in FY 2022/23. [#1 Priority for Highway Projects - Other] 3. Widening of CR 510 from 58th Avenue to US 1. This segment of CR 510 is to be widened to four lanes. The project s PD&E (project development and environmental) phase is programmed for FY 2021/22 through 2022/23. Preliminary engineering, right-of-way acquisition and construction to be programmed for future years. [#2 Priority for Highway Projects - Other] 4. Widening of Oslo Road from 58th Avenue to I-95. This segment of Oslo Road is to be widened to four lanes. Right-of-Way acquisition is programmed for FY 2018/19 through 2020/21, with construction to occur later. [#3 Priority for Highway Projects - Other] 5. Widening of US 1 from 53rd Street to CR 510. This segment of US 1 is to be widened to six lanes. The project s design is underway, with right-of-way acquisition programmed to begin in FY 2021/22. [#4 Priority for Highway Projects - Other] 6. Construction of 82nd Avenue from 69th Street to CR 510. 82nd Avenue is to be constructed as a two-lane paved road from 69th St. to CR 510. Right-of-Way acquisition is programmed for FY 2019/20 through 2021/22, with construction to occur later. [#5 Priority for Highway Projects - Other] 7. Paving of 82nd Avenue from 26th Street to 69th Street. 82nd Avenue is to be constructed as a two-lane paved road from 26th St. to 69th St. Currently, this segment of 82nd Avenue is surfaced with asphalt millings. The project s preliminary engineering is currently underway, with right-of-way acquisition and construction to occur later. [#6 Priority for Highway Projects - Other] 8. Intersection Improvements at US 1 and Aviation Blvd. The project s PD&E (project development and environmental) phase is programmed for FY 2021/22 through 2022/23. Preliminary engineering, right-of-way acquisition and construction to be programmed for future years. [#7 Priority for Highway Projects - Other] 4

Indian River County MPO TIP FY 2018/19 2022/23 9. Widening of 66th Avenue from 49th Street to 81st Street. This segment of 66th Avenue is to be widened to four lanes. This project is being managed by the County with funding assistance from FDOT. FDOT funding assistance is programmed through the Transportation Regional Incentive Program (TRIP) for FY 2018/19 and 2019/20. TRIP is funded by documentary stamp revenues. [#1 Priority for Highway Projects - Regional] Implemented Projects In October of each year, FDOT produces an annual listing of project that were obligated in the prior fiscal year. This report is published by the MPO on its website and can be obtained at the following address: http://www.irmpo.com/documents/annual-obligations.pdf. Previous Conforming Projects As mandated by state and federal law, all MPOs are required to meet certain air quality conformity standards as contained in the FAST Act and the Clean Air Act Amendments of 1990 (CAAA). Since its formation, the Indian River County MPO has been an attainment area for all air quality standards required by the FAST Act and the CAAA. For that reason, this TIP need not include a list of previous conforming projects. Public Involvement This TIP was developed with the involvement and input of citizens, businesses, and officials from local, state, and federal entities. Last year, the MPO reviewed its 2017 priority lists for highway, transportation alternatives, transit, aviation, and congestion management process (CMP) projects at public meetings. Those included meetings of the MPO Board and its advisory committees, the TAC and CAC. Additional public meetings were held to review FDOT s FY 2018/19-2022/23 Tentative Five Year Work Program and the MPO s draft TIP for 2018/19-2022/23. Public notice for each of those meetings was given through a published advertisement in the local newspaper. In addition, agendas and staff reports were made available through the Indian River County website and through other means. As a result, members of the general public attended those meetings and participated in the process. The public involvement utilized in preparation of this TIP was consistent with the MPO s current Public Involvement Plan, which was adopted in 2018. Efficient Transportation Decision Making (ETDM) The MPO makes extensive use of ETDM throughout the planning process. All appropriate projects in the TIP were subject to ETDM planning and programming screening. 5

Indian River County MPO TIP FY 2018/19 2022/23 Management Systems In accordance with state and federal regulations, FDOT has developed and implemented six management and monitoring systems for which it has jurisdiction. Those are: pavement management system. bridge management system. highway safety management system. public transportation management system. intermodal management system. traffic monitoring system for highways. In addition, Florida statutes require that all MPOs develop and implement a Congestion Management Process (CMP). To obtain CMP priorities in the 2017 Project Priorities Report, the MPO performed a CMP analysis in May 2017. The MPO utilizes its CMP and the other management systems as appropriate to prepare its annual lists of priority projects and the TIP. Amendments Amendments to the TIP may be made from time to time, as necessary, to remain in compliance with state and federal regulations. Amendments are generally presented to the public as part of the MPO s regularly advertised meetings. Copies of the proposed amendments are made part of the agenda package which is available for public review on the MPO s website. State Certification The Indian River County MPO planning process is certified annually by FDOT to ensure that the MPO planning process conforms to state and federal guidelines. The last certification review statement was submitted by the MPO in January 2018. Strategic Intermodal System (SIS) The Strategic Intermodal System is a network of high priority transportation facilities composed of the state s largest and most significant commercial service airports, spaceport, deepwater seaports, freight rail terminals, passenger rail and intercity bus terminals, rail corridors, waterways and highways. Within Indian River County, SIS facilities include I-95, Florida s Turnpike, SR 60 (west of I-95), the Florida East Coast Railroad, and the Atlantic Intracoastal Waterway. Within the TIP, each project is indicated as being SIS or Non-SIS (See example TIP page below). 6

Indian River County MPO TIP FY 2018/19 2022/23 SIS or Non-SIS Identifier LRTP Reference Safety Performance Measures Performance Management is a strategic approach to connect investment and policy decisions to help achieve performance goals. Performance measures are quantitative criteria used to evaluate progress against adopted performance targets. The Moving Ahead for Progress in the 21st Century Act (MAP-21) requires State DOTs and MPOs to conduct performance-based planning by tracking performance measures and setting datadriven targets to improve those measures. The Fixing America s Surface Transportation (FAST) Act supplements the MAP-21 legislation by establishing timelines for State DOTs and MPOs to comply with the requirements of MAP-21. State DOTs are required to establish statewide targets and MPOs have the option to support the statewide targets or adopt their own. Safety is the first national goal identified in the FAST Act. In March of 2016, the Highway Safety Improvement Program (HSIP) and Safety Performance Management Measures Rule (Safety PM Rule) was finalized and published in the Federal Register. The rule requires MPOs to set targets for the following safety-related performance measures and report progress to the State DOT for each of the following performance measures: Fatalities; Serious Injuries; 7

Indian River County MPO TIP FY 2018/19 2022/23 Nonmotorized Fatalities and Serious Injuries; Rate of Fatalities per 100M Vehicle Miles Traveled (VMT); and Rate of Serious Injuries per 100M VMT. The FDOT Florida Highway Safety Improvement Program (HSIP) identified FDOT s 2018 safety targets, which set the target at 0 for each performance measure to reflect the Department s goal of zero deaths. This action is consistent with both the 2016 Florida Strategic Highway Safety Plan and the Florida Transportation Plan (FTP), which identify a commitment to a vision of zero deaths. On February 14, 2018 the Indian River County MPO adopted a resolution supporting the FDOT safety targets by also identifying 0 as the target for each of the five measures. Contained in the TIP are strategic projects aimed at implementing the directives and achieving the goals and objectives of the MPO s 2040 Long-Range Transportation Plan (LRTP). A Safe Transportation System for Residents and Visitors is one of 5 Major Goals of the LRTP (2040 LRTP, Appendix A), and implementing safety projects and safety upgrades into capacity projects are among the policies contained in the plan. Safety Funding is allocated by FDOT and is specifically identified in the LRTP, and the discussion of safety on page 52 of the LRTP notes that safety will be enhanced in a number of direct and indirect ways. These include implementing stand-alone safety projects; providing congestion relief which leads to fewer crashes; prioritizing projects with an identified safety benefits; and incorporating the latest design standards into the plan s capacity and maintenance projects. Collectively, the projects in the TIP serve the Goals of the LRTP and enhance safety in the transportation system, helping the MPO meet its performance measures. Some of the more notable individual safety projects included: SR A1A Resurfacing and Hurricane Restoration (FM#s 438042 & 4405542), which will improve travel lane pavement conditions and includes significant bicycle and pedestrian upgrades; CR 510 Widening (FM# 4056062), which includes buffered bike lanes and incorporation of a Roundabout at the major intersection; Fellsmere sidewalks (FM# 441768 & 441562), funded through the Safe Routes to Schools program; and SR 60 @ 43 rd Avenue Intersection (FM# 431769), which improves a dangerous intersection by adding storage to turn lanes, new pavement, traffic signal mast arms, and new bike and pedestrian infrastructure. How to Obtain Project Cost Information from the TIP In most cases, a project will include the following phases: Project Development and Environment (PD&E) phase, Preliminary Engineering (PE) phase, Right-of-Way (ROW) phase, and Construction (CST) phase. For projects that do not require the acquisition of additional land, the ROW phase may be omitted. 8

Indian River County MPO TIP FY 2018/19 2022/23 For each project within the TIP, project cost information is provided for the five years of the current TIP (FY 2017/18 through FY 2021/22) as well as historical costs from previous years and the projected costs for the five years following the TIP (FY 2021/22 through FY 2025/26). Where a project s total cost is listed in the TIP, it will be for costs through FY 2026/27. For project costs beyond FY 2025/26, please refer to the page or table indicated in the MPO s 2040 Long Range Transportation Plan (LRTP), which can be accessed at the following link: http://www.irmpo.com/lrtp/. Projects Located Outside the MPO Planning Area Information on projects located outside the MPO Planning Area may be obtained as follows. Projects on the Strategic Intermodal System (SIS): The SIS is a network of high priority transportation facilities which includes the state s largest and most significant commercial service airports, spaceport, deepwater seaports, freight rail terminals, passenger rail and intercity bus terminals, rail corridors, waterways and highways. Total project costs and other project details will be accessible through the Statewide Transportation Improvement Program (STIP) for highways on the SIS. The STIP is accessible at: http://www.dot.state.fl.us/programdevelopmentoffice/federal/stip.shtm. The normal project production sequence is to have a Project Development and Environment (PD&E) phase, a Design (PE) phase, a Right of Way (ROW) phase and a Construction (CST) phase. Some projects may not have a ROW phase, if land is not needed to complete the project. Costs on the STIP pages for projects on the SIS will have historical costs and ten years worth of project costs, which may or may not be the total project cost. If there is no CST phase, then the entry will probably not be reflective of the total project cost. The total project cost will be reflected in the SIS Strategic Intermodal System Plan available at: http://www.dot.state.fl.us/planning/systems/mspi/plans/. Non-SIS projects: Project costs and other information on Non-SIS may be obtained by contacting Florida Department of Transportation (FDOT) District 4 Office at 1-866-336-8435. 9

LACONIA ST 4317591 4317592 4056064 BREVARD COUNTY OP A1A Sebastian U S HIGHWAY 1 Indian River County MPO Transportation Improvement Program FY 2018/19 - FY 2022/23 TIP Projects 18/19 to 22/23 INDIAN RIVER DR ADD TURN LANES INTERCHANGE (NEW) NEW ROAD CONSTRUCTION COUNTY ROAD 507 ROSELAND RD MAIN ST EASY ST HIGHWAY A1A REPLACE BRIDGE RESURFACING SIDEWALK/GREENWAY WIDENING 4417621 4415681 4330681 95 COUNTY ROAD 512 BARBER ST COUNTY ROAD 510 4382781 2308792 4056063 1 77TH ST 4416921 4364161 Orchid STATE ROAD 510 4380421 Atlantic Ocean Fellsmere 69TH ST 4380731 65TH ST OP A1A 2308793 4363791 57TH ST Indian River Shores INDIAN RIVER COUNTY 82ND AV 66TH AV 58TH AV 4368501 49TH ST 53RD ST 45TH ST 4368481 41ST ST 4408201 26TH ST 37TH ST 33RD ST 26TH ST 4400191 AVIATION BLVD 37TH ST 4416931 4419191 OP 60 OCEAN DR 4408221 STATE ROAD 60 98TH AV 8TH ST OP 60 4377171 16TH ST 16TH ST 12TH ST 8TH ST Vero Beach 6TH AV 4380741 17TH ST 4408221 4TH ST 0 1 2 Miles 95 4130482 OSLO RD 4382791 I-95 4315211 1ST ST SW 5TH ST SW 43RD AV 27TH AV 20TH AV 17TH LN SW 1 OP A1A ST LUCIE COUNTY Map Created 5/4/2018

Indian River County MPO TIP FY 2018/19 2022/23 ROADWAY PROJECTS INDEX The following index contains project listings for major roadways within Indian River County. Listed projects include roadway, transportation alternatives, and maintenance projects. Project listings include segment limits, work description, funding amount, FM number, 2040 LRTP page number, and TIP page number. Roadway From Project Limits To Work Description Phase(s) FY Funding Amt. (5 Year Total) FM # LRTP Page/Table # 6th Ave US 1 18th St Resurface CST 20/21 21/22 $877,296 4380741 2-1 B-3 8th St @ 74th Ave (Lateral C Canal) Replace Bridge CST 20/21 $2,932,783 4377171 2-1 B-3 43rd Ave @ SR 60 intersection (18th St - 26th St) Widen/Resurface ROW CST 18/19-21/22 18/19 $4,995,916 $2,935,130 4317591 4317592 Airport Dr W 41st St Sidewalk CST 19/20 $714,936 4400191 50 D-2 45th St 58th Ave US 1 Resurface CST 19/20 20/21 $3,952,526 4368481 7-6 B-2 49th St 58th Ave 31st Ave Resurface CST 19/20 $739,721 4368501 2-1 B-2 58th Ave 57th St CR 510 Resurface CST 18/19 $1,785,885 4364161 2-1 B-2 66th Ave 49th St 81st St Widen to 4 Lanes CST 18/19 $32,480,427 4363791 7-1 A-2 69th St 66th Ave US 1 Resurface CST 20/21 21/22 $1,637,530 4380731 2-1 B-3 82nd Ave CR 510 26th St 69th St Pave 2-Lane Road ENV 20/21 $20,000 2308793 7-1 A-3 69th St CR 510 Construct 2-Lane Road ROW 19/20 21/22 $2,972,362 2308792 7-1 A-4 58th Ave US 1 Widen to 4 lanes PDE 22/23 $2,005,000 4416921 7-1 A-5 82nd Ave 58th Ave Widen to 4 Lanes ROW 20/21 22/23 $11,556,171 4056063 7-1 A-6 CR 512 82nd Ave Widen to 4 Lanes CR 512 58th Ave Widen to 4 Lanes PE ROW ENV CST (Rsv.) 18/19 20/21 22/23 19/20 22/23 7-1 TIP Page # A-15 A-14 $7,554,850 4056064 7-1 A-9 $200,000 $1,000,000 4056062 4382781 CR 512 Myrtle St. 125th Ave. Resurface CST 18/19 $462,347 4330681 2-1 B-4 I-95 @ Oslo Rd (9th Street SW) New Interchange ROW 18/19-19/20 Indian River Blvd Merrill Barber Br $10,949,799 $405,000 4130482 4130485 53rd St Resurface CST 21/22 22/23 $4,092,618 4419191 2-1 B-5 Oslo Rd 58th Ave I-95 Widen to 4 Lanes ROW CST (Rsv.) 18/19-20/21 20/21 $5,861,702 $1,000,000 4315211 4382791 7-1 7-1 7-1 A-7 A-8 A-10 A-11 A-11 A-12 11

Indian River County MPO TIP FY 2018/19 2022/23 Roadway South Broadway St CR 512 South Cypress St CR 512 SR A1A US 1 From Project Limits To Massachusetts Ave Massachusetts Ave Work Description Phase(s) FY Funding Amt. (5 Year Total) FM # LRTP Page/Table # TIP Page # Sidewalk CST 20/21 $427,877 4415681 50 D-2 Sidewalk CST 21/22 $357,908 4417621 50 D-2 SR 510 Sebastian Inlet Repairs CST 18/19 $5,597,584 4405542 2-1 B-6 SR 60 SR 510 Resurface CST 18/19 $8,309,720 4380421 2-1 B-7 @ SR 60 & SR 656 (17th St.) Add Turn Lanes PE 19/20 $510,000 4408221 2-1 B-7 @ Aviation Blvd. Intersection improvements PDE 21/22 22/23 $2,505,000 4416931 7-1 A-17 53rd St CR 510 Widen to 6 Lanes ROW (Rsv.) 21/22 22/23 $22,176,651 4408201 7-1 A-16 12

Indian River County MPO TIP FY 2018/19 2022/23 FISCAL SUMMARY OF TIP PROJECTS FOR FY 2018/19-2022/23 A. ROADWAY CAPACITY PROJECTS Fund Code Federal Funding 2018/19 2019/20 2020/21 2021/22 2022/23 5 Yr Total ACFP Y 4,992,496 5,757,303 - - - 10,749,799 ACNP Y - - - - 200,000 200,000 CIGP N 1,954,065 330,500 840,479 840,479-3,965,523 CM Y - - - 2,517,960 2,262,649 4,780,609 DDR N - - - 18,116,648 6,560,003 24,676,651 DIH N - - - 10,000-10,000 DS N - - - 400,000-400,000 LF N 30,387,474 330,500 840,479 840,479-32,398,932 SA Y 3,085,147 2,785,067 1,338,080 35,253 6,335,634 13,579,181 SL Y 2,045,196 270,000 2,139,645 2,139,645 2,139,645 8,734,131 SN Y 983,283 390,953 1,233,976 1,233,976 1,233,976 5,076,164 TRIP N 284,169 724,548 - - - 1,008,717 TRWR N 2,962,295 76,006 - - - 3,038,301 Total 46,694,125 10,664,877 6,392,659 26,134,440 18,731,907 108,618,008 Total Federal Funds 11,106,122 9,203,323 4,711,701 5,926,834 12,171,904 43,119,884 B. TRAFFIC OPERATIONS, MAINTENANCE, AND SAFETY PROJECTS Fund Code Federal Funding 2018/19 2019/20 2020/21 2021/22 2022/23 5 Yr Total ACBR Y 470,000-2,462,783 - - 2,932,783 ACER Y 285,474 - - - - 285,474 CM Y - - - 207,230-207,230 D N 2,177,000 2,177,000 2,177,000 2,177,000 2,177,000 10,885,000 DDR N 8,359,196 153,845 158,460 163,214 392,621 9,227,336 DIH N 196,331 10,000 - - - 206,331 13

Indian River County MPO TIP FY 2018/19 2022/23 Fund Code Federal Funding 2018/19 2019/20 2020/21 2021/22 2022/23 5 Yr Total DITS N 186,587 191,251 196,033 200,934 209,440 984,245 DS N 5,214,761 500,000-1,592,072-7,306,833 GRSC N 762,177 370,354 872,503 755,799 932,190 3,693,023 LF N 184,930 2,477,967 628,706 1,023,154-4,314,757 SA Y - - - 324,964-324,964 SCED N 512,821 458,767 8,988 35,525 512,821 1,528,922 SCOP N 485,129 284,831 198,732 307,132-1,275,824 SCWR N 550,347 588,257 398,749 591,377 606,667 2,735,397 Total 19,384,753 7,212,272 7,101,954 7,378,401 4,830,739 45,908,119 Total Federal Funds 755,474-2,462,783 532,194-3,750,451 C. TRANSIT AND TRANSPORTATION DISADVANTAGED PROJECTS Fund Code Federal Funding 2018/19 2019/20 2020/21 2021/22 2022/23 5 Yr Total DDR N - - - - 642,180 642,180 DPTO N 531,885 554,739 582,476 611,600-2,280,700 DU N 69,714 73,228 76,889 80,734 84,770 385,335 FTA Y 2,350,000 2,350,000 2,350,000 2,350,000 2,350,000 11,750,000 LF N 1,153,047 1,156,561 1,160,222 1,164,067 1,168,103 5,802,000 Total 4,104,646 4,134,528 4,169,587 4,206,401 4,245,053 20,860,215 Total Federal Funds 2,350,000 2,350,000 2,350,000 2,350,000 2,350,000 11,750,000 D. BICYCLE, PEDESTRIAN, TRAILS, AND ENHANCEMENT PROJECTS Fund Code Federal Funding 2018/19 2019/20 2020/21 2021/22 2022/23 5 Yr Total LF N - 256,473 67,948 - - 324,421 SL y - 117,688 - - - 117,688 SR2T y - 5,000-352,908-357,908 14

Indian River County MPO TIP FY 2018/19 2022/23 Fund Code Federal Funding 2018/19 2019/20 2020/21 2021/22 2022/23 5 Yr Total TALL Y 5,000 172,294 172,873 - - 350,167 TALT Y - 168,481 182,056 - - 350,537 Total 5,000 719,936 422,877 352,908-1,500,721 Total Federal Funds 5,000 463,463 354,929 352,908-1,176,300 E. AVIATION PROJECTS Fund Code Federal Funding 2018/19 2019/20 2020/21 2021/22 2022/23 5 Yr Total DDR N 2,105,023 1,964,000 960,000 - - 5,029,023 DPTO N 5,659,546 525,000 640,000 - - 6,824,546 FAA Y 2,872,242 4,050,000 - - - 6,922,242 LF N 2,060,819 791,000 400,000 - - 3,251,819 Total 12,697,630 7,330,000 2,000,000 - - 22,027,630 Total Federal Funds 2,872,242 4,050,000 - - - 6,922,242 F. TRANSPORTATION PLANNING/STUDIES Fund Code Federal Funding 2018/19 2019/20 2020/21 2021/22 2022/23 5 Yr Total DPTO N 8,902 8,902 7,159 7,374 7,160 39,497 DU N 41,213 57,306 57,278 58,997 57,278 272,072 LF N 8,902 8,902 7,159 7,374 7,160 39,497 PL Y 439,140 442,983 442,983 442,983 442,983 2,211,072 Total 498,157 518,093 514,579 516,728 514,581 2,562,138 Total Federal Funds 439,140 442,983 442,983 442,983 442,983 2,211,072 Total Funds 83,384,311 30,579,706 20,601,656 38,588,878 28,322,280 201,476,831 Total Federal Funds 17,527,978 16,509,769 10,322,396 9,604,919 14,964,887 68,929,949 15

Section A - Roadway Capacity Projects A-1

Roadway Capacity Projects 66th Ave. Widening 4363791 Non-SIS Work Summary: ADD LANES & RECONSTRUCT From: 49th Street To: 81st Street Lead Agency: Indian River Co. Length: 4.037 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total CST TRIP 284,169 724,548 0 0 0 1,008,717 CST LF 28,433,409 0 0 0 0 28,433,409 CST TRWR 2,962,295 76,006 0 0 0 3,038,301 Total 31,679,873 800,554 0 0 0 32,480,427 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 0 0 32,480,427 Widen 66th Avenue from 2 lanes to 4 lanes between 49th Street and 81st Street. County project with funding assistance from FDOT through the Transportation Regional Incentive Program (TRIP). A-2

Roadway Capacity Projects 82nd Ave. Paving 2308793 Non-SIS Work Summary: NEW ROAD CONSTRUCTION From: 26th Street To: 69th Street Lead Agency: FDOT Length: 5.000 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total ENV SA 0 0 20,000 0 0 20,000 Total 0 0 20,000 0 0 20,000 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 1,300,124 0 1,320,124 Construct 2-lane paved road between 26th Street and 69th Street. Project length is 5.0 miles. Preliminary engineering is currently underway. Construction to be programmed for future years. A-3

Roadway Capacity Projects 82nd Avenue (New Road Construction) 2308792 Non-SIS Work Summary: NEW ROAD CONSTRUCTION From: 69th Street To: CR 510 Lead Agency: FDOT Length: 1.546 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total ROW SN 0 390,953 121,159 965,386 0 1,477,498 ROW CM 0 0 0 1,494,864 0 1,494,864 Total 0 390,953 121,159 2,460,250 0 2,972,362 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 151,880 12,918,559 16,042,801 Construct 2-lane paved road between 69th Street and CR 510. Project length is 1.546 miles. ROW acquisition programmed for FY 2017/18 through 2019/20. Construction to be programmed for future years. A-4

Roadway Capacity Projects CR 510 Widening 4416921 Non-SIS Work Summary: PD&E/EMO STUDY From: 58th Avenue To: US 1 Lead Agency: FDOT Length: 0.6 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total PDE CM 0 0 0 469,747 1,109,416 1,579,163 PDE SA 0 0 0 35,253 260,734 295,987 PDE SN 0 0 0 0 129,850 129,850 Total 0 0 0 505,000 1,500,000 2,005,000 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 0 0 2,005,000 Project Development & Environmental (PDE) study programmed for FY 2021/22 and 2022/23. Construction to be programmed for future years. A-5

Roadway Capacity Projects CR 510 Widening 4056063 Non-SIS Work Summary: ADD LANES & RECONSTRUCT From: 82nd Avenue To: 58th Avenue Lead Agency: FDOT Length: 3.070 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total ENV SL 0 25,000 0 0 0 25,000 ROW SN 0 0 1,112,817 268,590 1,104,126 2,485,533 ROW SL 0 0 1,453,274 503,165 1,748,085 3,704,524 ROW SA 0 0 112,981 0 4,074,900 4,187,881 ROW CM 0 0 0 0 1,153,233 1,153,233 Total 0 25,000 2,679,072 771,755 8,080,344 11,556,171 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 4,052,644 0 15,608,815 Widen CR 510 from 2 lanes to 4 lanes between 82nd Avenue and 58th Avenue. Preliminary engineering funded during FY 2017/18 and ROW acquisition programmed for FY 2020/21 through 2022/23. Project length is 3.07 miles. See FM# 4382781 for partial reservation of construction funds. A-6

Roadway Capacity Projects CR 510 Widening 4056062 Non-SIS Work Summary: PD&E/EMO STUDY From: CR 512 To: 58th Avenue Lead Agency: FDOT Length: 5.27 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total ENV SL 0 200,000 0 0 0 200,000 Total 0 200,000 0 0 0 200,000 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 2,606,012 0 2,806,012 See also FM# 4056063, 4056064, and 4382781. A-7

Roadway Capacity Projects CR 510 Widening 4382781 Non-SIS Work Summary: ADD LANES & RECONSTRUCT From: CR 512 To: 58th Avenue Lead Agency: FDOT Length: 5.27 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total CST SA 0 0 0 0 1,000,000 1,000,000 Total 0 0 0 0 1,000,000 1,000,000 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 0 0 1,000,000 Reservation of construction funds for widening of CR 510. See also FM# 4056063 and 4056064. A-8

Roadway Capacity Projects CR 510 Widening 4056064 Non-SIS Work Summary: ADD LANES & RECONSTRUCT From: CR 512 To: 82nd Avenue Lead Agency: FDOT Length: 2.200 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total PE SN 983,283 0 0 0 0 983,283 PE SA 1,213,611 0 0 0 0 1,213,611 PE SL 2,045,196 0 0 0 0 2,045,196 ENV SL 0 45,000 0 0 0 45,000 ROW SL 0 0 686,371 1,636,480 391,560 2,714,411 ROW CM 0 0 0 553,349 0 553,349 Total 4,242,090 45,000 686,371 2,189,829 391,560 7,554,850 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 0 0 7,554,850 Widen CR 510 from 2 lanes to 4 lanes between CR 512 and 82nd Avenue. Preliminary engineering programmed for FY 2018/19 and ROW acquisition programmed for FY 2020/21 through 2022/23. Project length is 2.2 miles. See FM# 4382781 for partial reservation of construction funds. A-9

Roadway Capacity Projects I-95/Oslo Rd. (9th Street SW) Interchange 4130482 SIS Work Summary: INTERCHANGE (NEW) From: To: Lead Agency: FDOT County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total ROW ACFP 4,992,496 5,757,303 0 0 0 10,749,799 RRU ACNP 0 0 0 0 200,000 200,000 Total 4,992,496 5,757,303 0 0 200,000 10,949,799 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 5,524,472 42,956,983 59,431,254 Proposed interchange at I-95/Oslo Road (9th Street SW). Right-of-way programmed for FY 2018/19 and 2019/20. Construction programmed for after FY 2022/23. See also FM # 4315211 and 4382791 for widening of Oslo Road. A-10

Roadway Capacity Projects I-95/Oslo Rd. (9th Street SW) Interchange 4130485 SIS Work Summary: INTERCHANGE (NEW) From: To: Lead Agency: FDOT Length: 1.010 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total PE DIH 0 0 0 5,000 0 5,000 PE DS 0 0 0 400,000 0 400,000 Total 0 0 0 405,000 0 405,000 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 0 0 405,000 Landscape project at new interchange. See FM # 4130482 for new I-95/Oslo Road interchange. A-11

Roadway Capacity Projects Oslo Road Widening 4315211 Non-SIS Work Summary: ADD LANES & RECONSTRUCT From: 58th Avenue To: I-95 Lead Agency: FDOT Length: 3.2 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total ROW SA 1,871,536 2,785,067 1,205,099 0 0 5,861,702 Total 1,871,536 2,785,067 1,205,099 0 0 5,861,702 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 5,508,471 0 11,370,173 Widen Oslo Rd. (9th Street SW) from 2 lanes to 4 lanes between 58th Ave. and I-95. Right-of-way acquisition programmed for FY 2018/19 through 2020/21. See FM # 4382791 for a partial reservation of construction funds. Project length is 3.2 miles. Project is in conjunction with proposed I-95/Oslo Rd. interchange (see FM # 4130482). A-12

Roadway Capacity Projects Oslo Road Widening 4382791 Non-SIS Work Summary: FUNDING ACTION From: 82nd Avenue To: 58th Avenue Lead Agency: FDOT Length: 3.0 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total CST SA 0 0 0 0 1,000,000 1,000,000 Total 0 0 0 0 1,000,000 1,000,000 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 0 0 1,000,000 Reservation of construction funds for widening of Oslo Road. See also FM# 4315211. A-13

Roadway Capacity Projects SR 60/43rd Avenue Intersection (Construction) 4317592 Non-SIS Work Summary: From: To: Lead Agency: Indian River Co. County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total CST LF 1,467,565 0 0 0 0 1,467,565 CST CIGP 1,467,565 0 0 0 0 1,467,565 Total 2,935,130 0 0 0 0 2,935,130 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 7,291,146 0 10,226,276 Improvements at SR 60/43rd Avenue intersection and widening of 43rd Avenue from 2 lanes to 4 lanes between 18th Street and 26th Street. Construction programmed for FY 2017/18 and 2018/19. See FM# 4317591 for right-of-way acquisition. A-14

Roadway Capacity Projects SR 60/43rd Avenue Intersection (Right-of-Way) 4317591 Non-SIS Work Summary: From: To: Lead Agency: Indian River Co. County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total ROW LF 486,500 330,500 840,479 840,479 0 2,497,958 ROW CIGP 486,500 330,500 840,479 840,479 0 2,497,958 Total 973,000 661,000 1,680,958 1,680,958 0 4,995,916 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 12,345,978 0 17,341,894 Improvements at SR 60/43rd Avenue intersection and widening of 43rd Avenue from 2 lanes to 4 lanes between 18th Street and 26th Street. Right-of-way acquisition programmed for FY 2017/18 through 2021/22. See FM# 4317592 for construction of intersection improvements. A-15

Roadway Capacity Projects US 1 Widening 4408201 Non-SIS Work Summary: FUNDING ACTION From: 53rd Street To: CR 510 Lead Agency: FDOT Length: 4.3 miles County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total ROW DDR 0 0 0 17,616,648 4,560,003 22,176,651 Total 0 0 0 17,616,648 4,560,003 22,176,651 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 0 0 22,176,651 Partial reservation of right-of-way funds for widening of US 1 to six lanes. A-16

Roadway Capacity Projects US 1/Aviation Blvd. Intersection 4416931 Non-SIS Work Summary: PD&E/EMO STUDY From: To: Lead Agency: FDOT County: Indian River LRTP #: Table 7-1 Phase Fund Source 2018/19 2019/20 2020/21 2021/22 2022/23 Total PDE DDR 0 0 0 500,000 2,000,000 2,500,000 PDE DIH 0 0 0 5,000 0 5,000 Total 0 0 0 505,000 2,000,000 2,505,000 Prior Cost < 2018/19: Future Cost > 2022/23: Total Project Cost: Project Description: 0 0 2,505,000 Intersection improvements at US 1 and Aviation Blvd. Project Development & Environmental (PD&E) study programmed for FY 2021/22 and 2022/23. Design and construction to be programmed for future years. A-17