PROCUREMENT PLAN 50/70 SCHOOLS New, Modernizations and Replacements - Direct Delivered and Grant Funded. Project Type Grades

Similar documents
PROCUREMENT PLAN 50/70 SCHOOLS New, Modernizations and Replacements - Direct Delivered and Grant Funded. Project Type Grades

Schools Program Since 2011 October 8, 2014

Facilities List Alberta Facilities that Accept Hydrovac Waste

Energy Opportunities Anaerobic Digestion: Methane Production for Alberta

Electoral Division of Olds-Didsbury-Three Hills Statement of Official Results - March 12, 2001

Electoral Division of Grande Prairie-Smoky Statement of Official Results - March 12, 2001

List of Circuits (R6.1 PRC-023-AB-2)

Custom Rates Survey. Field Operations Fall Report 2007

Electric system improvements near you

GRAIN COMBINING AND HAULING TO BIN 2004

2013 Core Need Income Thresholds (CNIT) (Listed by Municipality) 2 BDRM $ 1 BDRM $

2017 Income Thresholds

Insolvency Statistics in Canada. Second Quarter of 2014

FORTISALBERTA INC. RATES, OPTIONS, AND RIDERS SCHEDULES January 1, 2018 Rates Residential Rate 11 Residential Service... 2

Taxi Cab Safety Bylaw

Dealer Contest Group A 3 Winners Standings thru AUGUST 2015

2012 Performance-Based Regulation Compliance Filings

AER APPROVED THIRD PARTY OILFIELD WASTE MANAGEMENT FACILITIES Updated: May 25, 2017

2018 Municipal Census RESULTS CENSUS2018

Dealer Contest Group A 4 Winners Standings thru OCTOBER 2016

Foothill College Participation Rates of High School Graduates in Fall Quarter

Dealer Contest Group A 4 Winners Standings thru NOVEMBER 2016

ATCO GAS AND PIPELINES LTD. ATCO GAS SOUTH RATE SCHEDULES. May 1, 2017

Insolvency Statistics in Canada. Second Quarter of 2012

FORTISALBERTA INC. DECISION D RATES, OPTIONS, AND RIDERS SCHEDULES October 2, 2018 Rates Residential Rate 11 Residential Service...

Total Three Months 8. Breastfed Two Weeks 5. Total Twelve Months 12. Breastfed Twelve Months 13. Total Two Weeks 4. Initiated Breastfeeding 3

March 29, 2018 Enrolment Report

WECC Annual Progress Report Alberta Electric System Operator

Population of Southern Health-Santé Sud June 1, 2014

LCPS Cluster Enrollment Month: September / SchoolYear: 2017

ACCEPTED OFFERS PUBLIC OFFERING

Electoral Division of Stony Plain Statement of Official Results - March 12, 2001

Some of the shows are close to capacity and existing Exhibitors will be given first choice on their space until Jan 31, Please book early!

Nonprofit Insurance Trust (NIT) Preferred Shop Network

Alberta s Third Party Auditor Certification Program. Testing Your Knowledge at the Third Party Auditor Interview Stage

WECC Annual Progress Report Alberta Electric System Operator (AESO)

Edmonton Region Commodity Flow Study

Lori Edwards Supervisor of Elections Polk County, FL. April Qualified Voters by Precinct

July Active Voters by District/Precinct

April Active Voters by District/Precinct

August Active Voters by District/Precinct

MOST OHSAA STATE TOURNAMENT CHAMPIONSHIPS

Saskatchewan Health Populations

Population of Southern Health-Santé Sud June 1, 2016

ACCEPTED OFFERS PUBLIC OFFERING

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2018 WV HSCA BOYS SOCCER RANKINGS

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

September Active Voters by District/Precinct

Lori Edwards Supervisor of Elections Polk County, FL. October Qualified Voters by Precinct

Lori Edwards Supervisor of Elections Polk County, FL. September Qualified Voters by Precinct

Class 1A - Region 1. Gehlen Catholic. B6 - Mon 10/22 7:00PM LeMars, Gehlen. Bracket Winner B5 MMCRU. B1 - Tue 10/16 7:00PM Marcus.

March Active Voters by District/Precinct

market Quarterly Highlights Single-family detached home sales increased 1.7% from 4th Quarter 2017 to 2,716. Closed Sales

ABC. Adults Confirmed/Baptized. Communed at least once. Communion Registration. Vacation Bible School. Average Attendance Children baptized

3 rd QTR Jon Schnoor 2016 GAAR President QUARTERLY MARKET REPORT CONTACT QUARTERLY HIGHLIGHTS. New Listings Closed Sales Average Sale Price

V-vDD ^l^lll Marietta, OA 30060

NOVA Gas Transmission Ltd. Appendix 2: 2013 Facility Status Update (December)

Population of Prairie Mountain Health June 1, 2018

Durham District School Board. October 31, Enrolment Summary

Title 1 Current Page 1

Title 1 Current Page 1

Existing and Proposed Canadian Commercial Oil Sands Projects. February 2009

VR Statistics by County Commissioner

DISTRICTWIDE OFFICIAL ENROLLMENT REPORT

VR Statistics by Ward

Social Studies Achievement. Mathematics Achievement. Gains of the Lowest 25% Mathematics Learning. Mathematics Learning. English Language Arts

Gillette Lost the Most Residents in 2017

THE WAY WE MOVE LRT FOR EVERYONE

CLEAR WATER PLUMBING CENTURY SERVICE MOBILE HOME AC APPLICATION TYPE A3 TOTAL: # OF PERMITS 9 1,662,743 8, ,497.00

2nd QTR % +1.24% +0.36% Danny Wm. Vigil 2018 GAAR President QUARTERLY MARKET REPORT CONTACT QUARTERLY HIGHLIGHTS

PHONE # FAX # BOX ELDER COUNTY P F P F P F CACHE COUNTY

DISTRICTWIDE OFFICIAL ENROLLMENT REPORT

Edmonton CMA. Edmonton s Housing Starts Decrease in October

Welcome. Metro Line Northwest LRT Expansion Project

TOTALS

CITY OF GRANDE PRAIRIE OFFICE CONSOLIDATION BYLAW C A Bylaw to Establish a Transportation System For the City of Grande Prairie

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

Tel: (0191) ext

2017 Total 2017 Calendar Year Unduplicated Minnesota WIC Participation Count by City of Residence Minnesota WIC Information System

Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources

DIRECTIONS TO SCHOOLS Updated 10/2015

Transportation Infrastructure Investment Program moving

Attached Conditions for the Operation of Long Combination Vehicles

Port Moody-Coquitlam (POM) MAP A - Port Moody-Coquitlam Electoral District

CS NAME K Total. 00A NC Connections Academy

Mid-Year Population Estimates for H-GAC Region Cities 1 Source: U.S. Census Bureau Released: May 2018

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

Philadelphia Catholic League Cross Country Record Book: Season Championship School Head Coach

Sulphur Recovery and Sulphur Emissions at Alberta Sour Gas Plants

Finally, Police and Fire Authority records may contain reports on incidents of vandalism, fires etc.

PRECINCT BY PRECINCT RESULTS SPECIAL AND GENERAL ELECTION, NOVEMBER 6, 2001 BREVARD COUNTY, FLORIDA

Utilization, Capacity, and 2010 Enrollment

Hillsdale Academy Directions to Sporting Events

FY2011 Algebra I EOC Test Results by School All Students Tested. School Type: HS

Maryland State Department of Education Division of Accountability, Assessment, and Data Systems 200 West Baltimore Street Baltimore, MD

FLAMAN RENTALS RENTAL CATALOGUE

Del Webb Corporation Sun City Summerlin Customer Care Department Thermal Galvanic Corrosion HOMES REPAIRED OVERHEAD

Transcription:

Method New, Modernizations and s - Direct Delivered and Airdrie Rocky View No. 41 - West Airdrie New K-4 600 600 DB Summer/ Fall Airdrie Rocky View No. 41 - East Airdrie New K-5 750 900 DB Summer/ Fall Ardrossan Elk Island Public s Regional Division No. 14 Écolé Élémentaire Ardrossan Mod K-6 501 759 DBB TBD Athabasca Aspen View Public Edwin Parr Composite Community Mod / 7-12 1000 1000 DB Spring 2015 Banff Canadian Rockies No. 12 Banff Mod K-6 615 615 DBB Fall Barnwell Horizon Division No. 67 Barnwell Mod K-9 293 293 DBB Bashaw Battle River No. 31 Bashaw Mod / 1-12 300 300 DBB TBD Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and Beaverlodge Roman Catholic Separate District No. 28 St. Mary New / Catholic - K-9 200 300 DB-2 Summer Blackfalds Wolf Creek Division No. 72 New K-6 400 500 P3-1 Bonnyville Lakeland Roman District No. 150 Écolé Notre Dame High Mod 9-12 370 370 DBB Brooks Christ the Redeemer Regional Div. No. 3 Holy Family Academy Mod K-6 944 944 DBB Fall - New Brighton New K-4 600 600 P3-1 Roman District No. 1 - Aspen Woods New K-6 750 750 TBD Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and ern Francophone Education Region No. 4 New Francophone in - West New K-6 400 400 DB Summer/ Fall Middle - McKenzie Towne New 5-9 900 900 DB Summer/ Fall Middle - Evergreen New 5-9 900 900 DB Summer/ Fall - Panorama Hills New K-4 600 600 DB Summer/ Fall - Auburn Bay New K-4 600 600 DB Summer/ Fall Roman District No. 1 High New 10-12 1,500 1,500 TBD 2016 Roman District No. 1 - New Brighton - Copperfield New K-6 600 600 TBD Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and Roman District No. 1 - Cranston New K-6 600 600 TBD Arts Academy Charter Arts Academy Mod K-9 300 300 CM - Tuscany New K-4 600 600 DB Summer/ Fall Middle - New Brighton - Copperfield New 5-9 900 900 DB Summer/ Fall Roman District No. 1 - Evanston New K-9 900 900 P3-1 - Evanston New K-4 600 600 P3-1 Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and High - east New 10-12 1,500 1,500 DB-6 Awarded Middle - Saddle Ridge New 5-9 900 900 P3-1 ern Francophone Education Region No. 4 Écolé La Mosaique - NE New K-6 300 350 P3-1 Middle - Rocky Ridge New 5-9 900 900 P3-1 Roman District No. 1 /Junior High - Auburn Bay New K-9 900 900 P3-1 - Copperfield New K-4 600 600 P3-1 Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and ern Francophone Education Region No. 4 Ste. Marguerite Bourgeoys Mod K-12 293 293 DBB Fall Foundations for the Future leased space from Montgomery - CBE Mod 9-12 523 523 DBB Bowness High Mod 10-12 1525 1525 DBB Aboriginal Family Community - Harold W. Riley Mod K-12 150 200 DBB Jack James High Mod 10-12 885 885 DBB Roman District No. 1 St. Cyril Mod K-9 464 464 DB Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and Christine Meikle 7-12 125 125 DBB Summer/ Fall Roman District No. 1 St. Vincent de Paul /Juni or High Mod K-9 610 610 DB Westmount Charter Leased space - Sir William Van Horne High -CBE Mod 5-12 779 779 DBB Calmar Black Gold No. 18 Calmar Secondary Mod 7-12 508 508 DBB TBD Camrose Elk Island Catholic Separate Regional Division No. 41 Our Lady of Mount Pleasant Mod 7-12 358 358 DBB TBD Cochrane Rocky View No. 41 /Juni or High - Cochrane New K-8 800 900 P3-1 Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and * Cold Lake ern Lights No. 69 Cold Lake Mod / K-4 500 500 DB-10 Spring 2015 Dapp Pembina Hills No. 7 Dapp Consolidation Mod K-9 N/A 250 TBD TBD Davisburg Christ the Redeemer No 3. / Junior High - Heritage Heights New K-9 400 600 P3 District No. 7 New /Jr High - Windermere New K-9 750 900 DB-9 Fall District No. 7 / Junior High - Summerside New K-9 750 900 DB-9 Fall District No. 7 Junior High - Lewis Farms New 7-9 600 900 DB-9 Fall Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and District No. 7 New /Jr High - Windermere New K-9 600 900 DB-9 Fall District No. 7 Lillian Osborne Solution Addition 10-12 600 600 DB TBD District No. 7 / Junior High - Lewis Farms New K-9 750 900 P3-1 District No. 7 - Heritage Valley New K-6 600 600 P3-1 District No. 7 Junior High - Terwillegar Heights New K-9 900 900 P3-1 District No. 7 Archbishop O Leary High Mod 10-12 684 684 CM Fall District No. 7 Ross Sheppard High Mod 10-12 2461 2461 DBB TBD Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and District No. 7 St. Brendan/ St. Kevin/St. James/St. Gabriel Mod / K-9 750 750 DB District No. 7 Vimy Ridge Mod 7-12 N/A N/A DBB TBD Government of Alberta & District No. 7 Alberta for Deaf Solution Mod K-12 700 700 CM Fall District No. 7 Belgravia Mod K-6 135 135 DBB TBD District No. 7 Louis St. Laurent Junior/Senior High Mod 7-12 1475 1475 CM District No. 7 J.H. Picard Mod K-12 1085 1085 DBB Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and District No. 7 K- 6 in Mature Neighborhood Mod / K-6 450 450 TBD TBD Fort McLeod Livingstone Range No. 68 Fort McLeod Solution Mod K-12 750 750 CM Summer Fort McMurray Fort McMurray Public District No. 2833 - Timberlea New K-6 600 600 DB-3 Summer * Fort McMurray Fort McMurray Public District No. 2833 K-8 - Parsons Creek New K-8 600 600 DB-7 Fall * Fort McMurray Fort McMurray Roman Catholic Separate District No.32 - Parsons Creek New K-6 600 600 DB-7 Fall Fort McMurray Fort McMurray Public District No. 2833 Fort McMurray High Mod 10-12 1068 1068 DBB TBD Fort Saskatchewan Elk Island Public s Regional Division No. 14 / Junior High - Fort Saskatchewan New K-9 500 800 DB-12 Spring 2015 Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and Fultonvale Elk Island Public s Regional Division No. 14 Fultonvale Mod K-9 600 700 DBB Summer Grande Cache Grande Yellowhead Public No. 77 Grande Cache Community High Mod K-12 535 535 DBB TBD District No. 2357 / Junior High - Riverstone New K-8 900 900 DB-8 Fall * Roman Catholic Separate District No. 28 Junior High - Grande Prairie New K-9 700 700 DB-11 Spring 2015 District No. 2357 - Pinnacle Ridge New K-8 750 750 DB-8 Fall west Francophone Education Region Écolé Nouvelle Frontiere Mod K-12 N/A N/A DBB District No. 2357 Montrose Jr High Mod K-8 649 649 DBB Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and District No. 2357 Alexander Forbes/ Parkside Modular Solution Mod K-6 783 783 DBB Fall * Grimshaw Holy Family Catholic Regional Division No. 37 Holy Family - New / K-9 325 350 DB-4 Spring 2015 * Grimshaw Peace River No. 10 Consolidation of Grimshaw Jr./Sr. High with Kennedy - Kennedy Mod / K-12 550 550 DB-4 Spring 2015 Hanna Prairie Land #25 Hanna Solution - JC Charyk and Hanna Mod K-12 934 934 DBB High Level Fort Vermilion No. 52 High Level Public Skills Center Mod 7-12 350 350 DBB TBD Innisfail Chinook's Edge No. 73 John Wilson Phase 2 Mod K-4 582 582 DB Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and Joussard High Prairie No. 48 Joussard - New / K-6 300 300 DB-1 Summer Leduc Black Gold No. 18 / Junior High - W. Leduc New K-9 500 700 P3-1 Leduc St. Thomas Aquinas Roman Regional Div. No. 38 New K-9 in East Leduc New K-9 600 600 DB-12 Spring 2015 Legal Greater Central Francophone Education Region No. 2 Écolé Citadelle - Interim Solution Mod K-9 227 227 TBD TBD Lethbridge Holy Spirit Roman No. 4 - Lethbridge New K-6 450 450 DB Lethbridge Lethbridge District No. 51 - West Lethbridge New K-5 500 600 P3-1 Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and Lethbridge Lethbridge District No. 51 Wilson Middle Mod 6-8 934 934 CM Summer/ Fall Magrath Westwind Division Magrath Junior/Senior High Mod K-12 1132 1132 CM Summer/ Fall Medicine Hat Medicine Hat No. 20 McCoy High Mod 10-12 840 840 DBB Medicine Hat CAPE CAPE Mod 10-12 N/A N/A TBD Medicine Hat Medicine Hat District No. 76 Medicine Hat High Mod 10-12 2015 2015 TBD Namao Sturgeon Division No. 24 Sturgeon Composite High Mod 10-12 1170 1170 DBB Fall Neerlandia Pembina Hills No. 7 Neerlandia - New / K-9 275 300 DB-1 Summer Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and Nobleford Palliser Regional Division No. 26 Noble Central Mod K-12 105 328 DBB Okotoks Foothills Division No. 38 Foothills Composite High Mod 10-12 1225 1225 CM Summer/ Fall Onoway ern Gateway No. 10 Onoway Junior Senior High Mod / 7-12 750 850 DBB TBD Paradise Valley Buffalo Trail Public s Regional Division No. 28 E H Walter Mod / K-12 300 334 DBB TBD Pincher Creek Holy Spirit Roman No. 4 St Michael's Mod K-12 626 626 DBB Red Deer Red Deer Catholic No. 39 High New 10-12 900 1,200 DBB 2016 Red Deer Red Deer Public District No. 104 - east New K-5 500 600 TBD Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and Red Deer Red Deer Public District No. 104 Annie L. Gaetz Mod K-5 300 300 DBB Schuler Prairie Rose No. 8 Schuler 1-9 125 125 DBB Sexsmith Peace Wapiti No. 76 Robert Zahara - New / K-6 550 550 DB-2 Summer Spruce Grove Parkland Division No. 70 Junior High - Spruce Grove New K-9 800 900 P3-1 St. Albert St. Albert Public District No. 5565 - Erin Ridge New K-6 600 600 P3-1 St. Albert Greater Central Francophone Education Region No. 2 Alexandre Tache New 7-12 400 450 P3-1 St. Albert St. Albert Public District No. 5565 William D. Cuts Mod 7-9 452 452 DBB TBD Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and St. Albert Greater St. Albert Roman Catholic Separate District No. 734 St. Albert Catholic High Mod 10-12 1015 1015 DBB Fall Stony Plain Evergreen No. 2 John Paul II Middle Mod 5-8 613 613 DBB TBD Sylvan Lake Chinook's Edge No. 73 /Juni or High New K-8 500 500 DBB Teepee Creek Peace Wapiti No. 76 Teepee Creek Mod K-9 108 108 TBD TBD Three Hills Golden Hills No. 75 Three Hills Prairie Christian Academy replacement one bldg. with addition to second bldg. Mod 7-12 300 300 DBB Fall Vegreville Elk Island Catholic St. Mary's High Separate Regional Division No. 41 Mod 7-12 368 368 DBB TBD Note: All tender and construction dates are approximate Revised June 6,

Method New, Modernizations and s - Direct Delivered and Vermilion East Central Alberta Catholic Separate s No. 16 St. Jerome's and Central Mod K-12 466 466 DBB Fall Warner Horizon Division No. 67 Warner Mod K-12 355 355 DBB Wetaskiwin Wetaskiwin No. 11 Wetaskiwin High Mod 10-12 N/A N/A TBD TBD Wheatland Golden Hills No. 75 East Wheatland Solution New K-12 450 450 DB-5 Fall Whitecourt Living Waters Catholic Regional Division No. 42 St. Joseph Mod / K-12 650 650 TBD TBD Note: All tender and construction dates are approximate Revised June 6,

New, Modernizations and s- Direct Delivered and Procurement Plan 50/70 Bundles (please note that this list only refers to design build bundles and does not include stand alone projects. 1. Davisburg, Heritage Heights Catholic Junior High (K-9) 2. Cochrane, Public Junior High (K-8) 3., Saddle Ridge Public Middle (5-9) 4., Auburn Bay Catholic Junior High (K-9) 5. St. Albert, Erin Ridge Public (K-6) 6., Lewis Farms Catholic Junior High (K-9) 7. St. Albert, Alexandre Tache Catholic Francophone (7012) 8., New Brighton-Copperfield Public Junior High (5-9) 9. Spruce Grove, Public Junior High (K-9) BASCP-P3-1 (19 10., Terwillegar Heights Public Junior High (K-9) s) 11. Lethbridge, West Lethbridge Public (K-5) 12., Public Francophone in NW (K-6) 13., Copperfield Public (K-4) 14., Rocky Ridge Public Middle (5-9) 15., Evanston Public Junior High (K-9) 16., Evanston Catholic Junior High (K-9) 17. Leduc, Public Junior High (K-9) 18. Blackfalds, Public (K-6) 19., Heritage Valley Public (K-9) 1. Joussard, Public (K-6) DB-1 2. Neerlandia, Public Junior High (K-9) 1. Beaverlodge, St. Mary Catholic Junior High (K-9) DB-2 2. Sexsmith, Robert Zahara Public (K-6) DB-3 1. Fort McMurray, Timberlea Public (K-6) 1. Grimshaw, Holy Family Catholic Junior High (K-9) DB-4 2. Grimshaw, Kennedy Junior High consolidation (K-12) DB-5 N/A (formerly Wheatland - now ) DB-6 1., East Public High (10-12) 1. Fort McMurray, Parsons Creek Public Junior High (K-8) DB-7 2. Fort McMurray, Parsons Creek Catholic (K-6) 1., Riverstone Public Junior High (K-8) DB-8 2., Pinnacle Ridge Campbell (K-8)

New: refers to the construction of a new school on a green site. New, Modernizations and s- Direct Delivered and 1., Windermere Public Junior High (K-9) 2., Lewis Farms Public Junior High (7-9) DB-9 3., Summerside Catholic (K-9) 4., Windermere Catholic Junior High (K-9) DB-10 1. Cold Lake, Public (K-5) DB-11 1., Catholic, Junior High (K-9) 1. Fort Saskatchewan, Public Junior High (K-9) DB-12 2. Leduc (East), Catholic Junior High (K-9) 1. East Airdrie, Public (K-4) DB ern Bundles 2. West Airdrie, Public (K-5) : Alberta Infrastructure manages the project. Project Management Service Providers (highlighted in green) : Board manages the project. * Potential Industrialization Projects DB: Design Build : refers to the construction of a DBB: Design Bid-Build (single procurement) replacement school which could be located on a green site or on CM: Construction the same site as an existing decommissioned school. MOD: A modernization project is to right size, modernize and revise instructional areas to suit new programming initiatives. please note that capacity at build out includes future modular or future additions.