Applicable Requirements - NSPS Subpart JJJJ

Similar documents
A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines

New Federal Regulations for Internal Combustion Engines. Doug Parce

Permit Holder. Permitted Equipment

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

RICE NESHAP Frequently Asked Questions (FAQ)

Federal Engine Regulations NSPS JJJJ/NESHAP ZZZZ

New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines

AUTHORITY TO CONSTRUCT

Internal Combustion Engines Air Updates 2010

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES

State of New Jersey. Department of Environmental Protection Division of Air Quality

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

Permit Holder. Permitted Equipment

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

Example Notification of Compliance Status Report a

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1

Area Source NESHAPS and Air Permits

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

South District. Reciprocating Internal Combustion Engines EPA S RICE NESHAP and NSPS. Carter B. Endsley, P.E. Air Resource Permitting

Regulatory Impacts of Biogas-fired Internal Combustion Engines

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

RICE NESHAP Implementation. Ray Lukkarinen, P.E. Stanley Consultants, Inc.

August CFR Part 63 Subpart ZZZZ review

RICE NESHAP RECORD KEEPING Stationary Engines

RICE NESHAP Finalized Rule Summary Spark Ignited Engines

Regulation No. 3 Changes For Internal Combustion Engines. Christine Hoefler November 14, 2012

Appendix K. Final DOC Conditions

Appendix K. DOC Conditions

RICE MACT / NSPS Update: How to Make Sense of this Difficult Issue

AUTHORITY TO CONSTRUCT

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

Air Permitting: Municipal Facilities with Emergency Generators

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

RICE MACT 40 CFR 63, Subpart ZZZZ. SI Source Requirements 7/18/2013

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Draft Air Individual Permit Major Amendment

Streamlining Multiple Applicable Requirements

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

Electrical Power Generator Use and Procurement Guidance

U.S. EPA and State Perspectives on Clean Air Act Rules for Stationary/Emergency Engines

EPA s Air Quality Regulations. Melanie King U.S. Environmental Protection Agency

Air Individual Permit Permit Limits to Avoid NSR

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

MAJOR SOURCE OPERATING PERMIT THIRD TITLE V RENEWAL DRAFT

April 4, Wayne Marshall Principal White Street Renewables, LLC P.O. Box 659 Huntersville, NC 28070

State of New Jersey. Department of Environmental Protection Air Quality Permitting

Part 70 Operating Permit Amendment

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

PERMIT TO INSTALL. Table of Contents

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

TITLE DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Appendix B: Rule Consistency Analysis August 20, 2009 APPENDIX B. Rule Consistency Analysis

Example Petition for Exemption

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

Intricacies of VOC Measurement

PERMIT TO INSTALL. Table of Contents

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

TIER 3 MOTOR VEHICLE FUEL STANDARDS FOR DENATURED FUEL ETHANOL

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015

The purpose of this rule is to limit VOC emissions from the transfer of organic liquids.

STATEMENT OF BASIS Boise Cascade Wood Products, LLC Thorsby Engineered Wood Products Thorsby, Chilton County, Alabama Facility/Permit No.

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

RULE 4702 INTERNAL COMBUSTION ENGINES PHASE 2 (Adopted August 21, 2003; Amended June 16, 2005; Amended April 20, 2006; Amended January 18, 2007)

Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411

Draft Air Individual Permit Major Amendment

Air Quality Compliance Issues in the Oil & Natural Gas Industry OIPA Air Emission Workshops

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

AUTHORITY TO CONSTRUCT

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

OPERATING PERMIT. Bill Barrett Corporation Bailey Compressor Station

This rule applies to any internal combustion engine rated at 25 brake horsepower or greater.

Safe Operating Procedure

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)

State of New Jersey. General Permit (GP-009A)

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 10, 2014 REVISED July 7, 2017 PERMIT TO INSTALL 97-14

TRANSFER OF ORGANIC COMPOUNDS INTO MOBILE TRANSPORT TANKS (Effect: 5/6/77: Rev. Effect. 7/26/00)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

Permit No. NN OP

Transcription:

Facility Name: CO Station 3 Combustion Type: 4SRB Facility HAP Status: Area Fuel Type: Natural gas RICE Owner: RICE Operator: S2C Gathering Co Acme Operating Inc. Use Type: Max. Runtime: Non-emergency Over 100 hrs per calendar year Control Type: NSCR Date Manufactured: 09/09/2009 Control Make: Altronic Date Ordered: 08/08/2009 Control Model: EPC-999 Date Orig. Constructed: 12/01/2009 Monitoring System: None Date Reconstructed: N/A Black Start?: No Date Modified: N/A Rule Name: Fed Register Date: Comply by: 40 CFR Part 60 NSPS Subpart JJJJ for Stationary SI Internal Combustion Engines 01.30.2013 Upon startup Emission Standards g/hp-hr ppmvd (@15% O2) NOx 2.0 160 NOx + HC CO 4.0 540 VOC (excl. CH2O) 1.0 86

Emission Standard Conditions: Owners and operators of stationary non-certified SI engines may choose to comply with the emission standards in units of either g/hp-hr or ppmvd @ 15% O2. VOC emissions standard: exclude formaldehyde when calculating VOC emissions. Emission Standards Rule Reference: Table 1 Monitoring Requirements No monitoring requirements apply to non-emergency engines. Fuel Requirements Fuel requirements apply only to GASOLINE engines (40 CFR 60.4235). For engines fueled with gasoline, gasoline that meets the per gallon sulfur limit in 40 CFR 80.195 must be used.

Compliance Requirements / O&M 1. Operate and maintain certified engine and control device according to manufacturer's emission-related written instructions and keep records; OR 2. Keep a maintenance plan and records of conducted maintenance; 3. Maintain and operate the engine in a manner consistent with good air pollution control practice for minimizing emissions. Performance testing requirements (>500 hp): Conduct an initial performance test [within 60 days after achieving the maximum production rate at which the affected facility will be operated, but not later than 180 days after initial startup (60.8)], and Conduct subsequent performance testing every 8,760 hours or 3 years, whichever comes first, thereafter to demonstrate compliance. Performance testing requirements shown assume that the engine is not certified. An owner/operator may optionally choose to purchase an engine certified under NSPS Subpart JJJJ. Performance testing is NOT required for certified engines as long as the engine is operated and maintained according to the manufacturer emission-related written instructions.

Testing Requirements Conduct each performance test within 10% of 100% peak (or highest achievable) load and according to the requirements in 60.8 and under specific conditions that are specified by Table 2 to this NSPS subpart. You may not conduct performance tests during periods of startup, shutdown, or malfunction, as specified in 60.8( c). If your stationary SI IC engine is non-operational, you do not need to startup the engine solely to conduct a performance test; however, you must conduct the performance test immediately upon startup of the engine. You must conduct three separate test runs for each performance test required in this section, as specified in 60.8(f). Each test run must be conducted within 10% of 100% peak (or the highest achievable) load and last at least 1 hour. Refer to 60.4244 for method to determine compliance with mass per unit output emission limitations. FOOTNOTES (referenced by NOx/CO/VOC testing requirements below): (a) ASTM D6522-00 is incorporated by reference; see 40 CFR 60.17. Also, you may petition the Administrator for approval to use alternative methods for portable analyzer. (b) You may use ASME PTC 19.10-1981, Flue and Exhaust Gas Analyses, for measuring the O2 content of the exhaust gas as an alternative to EPA Method 3B. (c ) You may use EPA Method 18 of 40 CFR part 60, Appendix A, provided that you conduct an adequate presurvey test prior to the emissions test, such as the one described in OTM 11 on EPA's website (http:// www.epa.gov/ttn/emc/prelim/otm11.pdf). (d) You may use ASTM D6420-99 (2004), Test Method for Determination of Gaseous Organic Compounds by Direct Interface Gas Chromatography/Mass Spectrometry as an alternative to EPA Method 18 for measuring total nonmethane organic. Limit the concentration of NOx in the stationary SI IC engine exhaust: use Method 1 or 1A of 40 CFR 60, Appdx A or ASTM Method D6522-00 (2005) (a). Select the sampling port location and the number of transverse points using one of these methods. If using a control device, the sampling site must be located at the outlet of the control device. Determine the O2 concentration of the IC engine exhaust at the sampling port location: use Method 3, 3A, or 3B (b) of 40 CFR 60 Appdx A or ASTM Method D6522-00 (2005) (a). Measurement to determine O2 concentration must be made at the same time as the measurements for NOx concentration. If necessary, determine the exhaust flow rate of the IC engine exhaust: use Method 2 or Method 19 of 40 CFR 60. If necessary, measure moisture content of the IC engine exhaust at the sampling port location: use Method 4 of 40 CFR 60 Appdx A, Method 320 of 40 CFR 63 Appdx A, or ASTM D6348-03 (60.17). Measurements to determine moisture must be made at the same time as the measurement for NOx concentration. Measure NOx at the exhaust of the IC engine: use Method 7E of 40 CFR 60 Appdx A, ASTM Method D6522-00 (2005 ) (a), Method 320 of 40 CFR 63 Appdx A, or ASTM D6348-03 (60.17). Results of this test consist of the

average of the three 1-hour or longer runs. Limit the concentration of CO in the stationary SI IC engine exhaust: use Method 1 or 1A of 40 CFR 60, Appdx A or ASTM Method D6522-00(2005) a. Select the sampling port location and the number of transverse points using one of these methods. If using a control device, the sampling site must be located at the outlet of the control device. Determine the O2 concentration of the IC engine exhaust at the sampling port location: use Method 3, 3A, or 3B (b) of 40 CFR 60 Appdx A or ASTM Method D6522-00 (2005) (a). Measurement to determine O2 concentration must be made at the same time as the measurements for CO concentration. If necessary, determine the exhaust flow rate of the IC engine exhaust: use Method 2 or Method 19 of 40 CFR 60. If necessary, measure moisture content of the IC engine exhaust at the sampling port location: use Method 4 of 40 CFR 60 Appdx A, Method 320 of 40 CFR 63 Appdx A, or ASTM D6348-03 (60.17). Measurements to determine moisture must be made at the same time as the measurement for CO concentration. Measure CO at the exhaust of the IC engine: use Method 10 of 40 CFR 60 Appdx A, ASTM Method D6522-00 (2005) (a), Method 320 of 40 CFR 63 Appdx A, or ASTM D6348-03 (60.17). Results of this test consist of the average of the three 1-hour or longer runs. Limit the concentration of VOC in the stationary SI IC engine exhaust: use Method 1 or 1A of 40 CFR 60, Appdx A. Select the sampling port location and the number of transverse points using one of these methods. If using a control device, the sampling site must be located at the outlet of the control device. Determine the O2 concentration of the IC engine exhaust at the sampling port location: use Method 3, 3A, or 3B (b) of 40 CFR 60 Appdx A or ASTM Method D6522-00 (2005) (a). Measurement to determine O2 concentration must be made at the same time as the measurements for VOC concentration. If necessary, determine the exhaust flow rate of the IC engine exhaust: use Method 2 or Method 19 of 40 CFR 60. If necessary, measure moisture content of the IC engine exhaust at the sampling port location: use Method 4 of 40 CFR 60 Appdx A, Method 320 of 40 CFR 63 Appdx A, or ASTM D6348-03 (60.17). Measurements to determine moisture must be made at the same time as the measurement for VOC concentration. Measure VOC at the exhaust of the IC engine: use Methods 25A and 18 of 40 CFR 60 Appdx A, Method 25A with the use of a methane cutter as described in 40 CFR 1065.265, Method 18 of 40 CFR 60 Appdx A (c, d), Method 320 of 40 CFR 63 Appdx A, or ASTM D6348-03 (60.17). Results of this test consist of the average of the three 1-hour or longer runs.

Recordkeeping / Notifications / Reporting 60.4245 RECORDKEEPING: (a) Owners/operators must keep records of all NSPS JJJJ notifications submitted, all supporting documentation for those notifications, maintenance conducted, and for non-certified engines, documentation that the engine meets the emission standards. (b) For all stationary SI emergency ICE greater than or equal to 500 HP manufactured on or after July 1, 2010, that do not meet the standards applicable to non-emergency engines, the owner or operator of must keep records of the hours of operation of the engine that is recorded through the non-resettable hour meter. For all stationary SI emergency ICE greater than or equal to 130 HP and less than 500 HP manufactured on or after July 1, 2011 that do not meet the standards applicable to non-emergency engines, the owner or operator of must keep records of the hours of operation of the engine that is recorded through the non-resettable hour meter. For all stationary SI emergency ICE greater than 25 HP and less than 130 HP manufactured on or after July 1, 2008, that do not meet the standards applicable to non-emergency engines, the owner or operator of must keep records of the hours of operation of the engine that is recorded through the non-resettable hour meter. The owner or operator must document how many hours are spent for emergency operation, including what classified the operation as emergency and how many hours are spent for non-emergency operation. NOTIFICATIONS: (c ) Owners and operators of stationary SI ICE greater than or equal to 500 HP that have not been certified by an engine manufacturer to meet the emission standards in 60.4231 must submit an initial notification as required in 60.7 (a)(1). The notification must include the information in paragraphs (c )(1) through (5) of this section. Note: The only other notification requirement that applies is the following from NSPS Subpart A that addresses testing: 60.8 (d) The owner or operator of an affected facility shall provide the Administrator at least 30 days prior notice of any performance test, except as specified under other subparts, to afford the Administrator the opportunity to have an observer present. If after 30 days notice for an initially scheduled performance test, there is a delay (due to operational problems, etc.) in conducting the scheduled performance test, the owner or operator of an affected facility shall notify the Administrator (or delegated State or local agency) as soon as possible of any delay in the original test date, either by providing at least 7 days prior notice of the rescheduled date of the performance test, or by arranging a rescheduled date with the Administrator (or delegated State or local agency) by mutual agreement. REPORTS: (d) Owners and operators of stationary SI ICE that are subject to performance testing must submit a copy of each performance test as conducted in 60.4244 within 60 days after the test has been completed. Refer to 40 CFR 60.7, 60.8, and 60.19 NSPS Subpart A General Provisions for other requirements pertaining to recordkeeping, notifications, and reporting.

Other Requirements No other requirements apply. IMPORTANT NOTE: NSPS requirements to be met by the engine manufacturer (as opposed to the owner/operator) are excluded from the scope of this evaluation and the conclusions presented herein.