H2020 Coordination and Support Action

Similar documents
United States Antarctic Program

Argo Germany National Report 2013

Transport Challenges & Opportunities in the North. Dr. Barry E. Prentice, Professor Dept. Supply Chain Management University of Manitoba

2013/2014 Strategic Priorities Fund Application Overview

Low-Speed Autonomous Shuttle Project Summary

Evaluation. Evaluation. Evaluation. Evaluation. Evaluation. Evaluation. CIVL 1101 Problem Solving - Chapters /5

Okitsugu WATANABE* Okitsugu WATANABE, Masayuki INOUE and Shun'ichi KOBAYASHI

PORT TYRE CRANE. SANY Industrial Park, Gaolan Port Economic and Development Zone, Zhuhai, Guangdong, China

Development of an Unmanned Aircraft Mounted Software Defined Ground Penetrating Radar

National report of Japan (Submitted by Nobuyuki Shikama)

Linear Induction Motor (LIMO) Modular Test Bed for Various Applications

Newsletter 2: Boarding Assistance System Evaluation & Recommendations

Power and Deployment Workshop

Canadian Environmental Sustainability Indicators. Marine pollution spills

Solar Powered Golf Cart

Curiosity lands on Mars

Campaigns planned in for the Validation of SMOS

Mars Surface Mobility Proposal

Argo National Data Management Report Italy (2018) - MedArgo

Contract No: OASRTRS-14-H-MST (Missouri University of Science and Technology)

High, Wide, and Heavy

Over-Snow Rovers for Polar Science Campaigns

Transport by road overweight and overdimension loads that do not require a pilot or overdimension permit

Alaska Deep-draft Arctic Ports Planning Charrette

Interim report Q3 2014

METRO CNG Program Phase I Update. Customer Service Committee April 2014

EXERCISE PENGUIN ISLAND

Research Update Briefing for 18 November HSRMC

LUNAR INDUSTRIAL RESEARCH BASE. Yuzhnoye SDO proprietary

AUTOPILOT Webinar Series (II): Developing Automated Driving Pilots for IoT: Brainport

Considerations in Improving the International Connectivity in Asia-Pacific Region. China Academy of Information and Communication Technology Chen Hui

Attachment D Environmental Justice and Outreach

Bus Stop Optimization Study

TEMPERATURE CHANGE OF A TYPE IV CYLINDER DURING HYDROGEN FUELING PROCESS

Photovoltaic Installation in Ecuador and The Amazon

Energy Demand-Aware Open Services for Smart Grid Intelligent Automation. SmartHG. EU FP7 Project #317761

Economic and Social Council

Omineca Region Stocked Lake Assessment Report

Autonomous / Unmanned Surface Vehicles And The Increased Efficiencies They Offer. James Hailstones, ASV, Ltd.

The electro-mechanical power steering with dual pinion

BOXER for the Danish Armed Forces short briefing

Vripack 2000 Listing ID:

LAKE SEDIMENT, IMPACT AND PERMAFROST DRILLING

Planetary Surface Transportation and Site Development

2019 SpaceX Hyperloop Pod Competition

Deploying Smart Wires at the Georgia Power Company (GPC)

Casspir Mine Protected Vehicle with Steel Wheels and VAMIDS

STU in Lapland. Table 1

Mississauga Transit 2009 Budget

EASA Update. ARSA Symposium, Washington DC. 20 March Karl SPECHT

FIRE CONTAINMENT GUIDE

H. Motoyama et al. Japanese Antarctic Research Expedition (JARE) members have measured surface snow accumulation during traverse surveys between coast

Improving co-operation between regional programs and the FCH Joint Undertaking: Hamburg. Heinrich Klingenberg

Asia Pacific Research Initiative for Sustainable Energy Systems 2012 (APRISES12)

Cue Energy Resources Limited A.B.N

Development of a Moving Automatic Flagger Assistance Device (AFAD) for Moving Work Zone Operations

Survey Report. Precise Differential Levelling Samoa

MINE CLEARANCE, REMOTE CONTROL AND AREA DENIAL SYSTEMS SPECIAL PROJECTS

MI-26T Super Heavy Lift Helicopter Demonstration: Whitecourt Alberta. Highlights and Photos

Marine Current Turbines

STAGING AND STORAGE OF GROUND SERVICING EQUIPMENT (GSE) AND UNIT LOAD DEVICES (ULDs) OPERATIONAL SAFETY POLICY

Decommissioning & Re-use in NL: A Joint Effort

Modernising the Great Western railway

2015 Carbon footprint JTP. Date of issue: 14 th March 2016

APPROVED AROUND THE WORLD BENTEC RIGS

HYLIFT-DEMO DELIVERABLE 8.4

Variable Speed Limit Pilot Project in BC

Proposal for New Task X PV for Transport

ODENSE MARITIME TECHNOLOGY

Planning and Green Port Marine Debris Mitigation

Challenges and Opportunities in the Canada Newfoundland and Labrador Offshore Oil Industry

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

Fuel Cells and Hydrogen 2 Joint Undertaking (FCH 2 JU) Frequently Asked Questions

EUROPEAN NEW CAR ASSESSMENT PROGRAMME (Euro NCAP) TEST PROTOCOL SPEED ASSIST SYSTEMS

HERCULES-2 Project. Deliverable: D8.8

BEHAVIORS OF AN AGGRESSIVE DRIVER. Running stop signs and red lights. Passing on the right of a vehicle

Commuter Rail Performance. October

1 of 5 4/19/11 2:15 PM

APPENDIX TO INSTRUCTIONS MANUAL LEON

Coast Guard s Fleet Renewal Plan 2017 November, 2017

PAVIA FERRARA TORINO PARMA ANCONA FIRENZE ROMA

Dr. Charles Kim. EcoCar Team 2 (R.E.V)

Local Climatological Data Summary Aurora, Illinois

Inventing a new type of platform gate

Pangolin Associates case study

neuron An efficient European cooperation scheme

Crane Services. For all brands of cranes and carriers.

Avalanche Tower LS12-5

BY HOEYCOMB AEROSPACE TECHNOLOGIES. HC-330 HYBRID-POWERED ALL- ELECTRICITY DRIVEN four-rotor UAV

Northern Sovereignty and Security

Effectiveness of Plug-in Hybrid Electric Vehicle Validated by Analysis of Real World Driving Data

W-3A Sokół DURABLE AND DEPENDABLE

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-12

Komatsu News Komatsu Europe supports Polar science

RIMRES: A project summary

The Engineering Department recommends Council receive this report for information.

Alaska Clean Seas. North Slope Oil Spill Response

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council:

Baltic Marine Environment Protection Commission

Kilowatt-Range Turbine Implementation at the South Pole. Kenneth L. Ratzlaff Rob Young Instrumentation Design Laboratory The University of Kansas

Transcription:

H2020 Coordination and Support Action BE-OI BEYOND EPICA OLDEST ICE Grant Agreement No : 730258 Deliverable No 1.3 Update 22 nd March 2017 Mini-traverse to Little Dome C

Submission of Deliverable Work Package WP1 Logistic support and coordination Deliverable No D1.3 Deliverable title Mini-traverse to Little Dome C Version 2 Update on 22 nd March 2017 Status Final Dissemination level PU - Public Lead Beneficiary 3 - ENEA Contributors 1 AWI 2 IPEV 3 - ENEA 4 CNRS 5 NERC-BAS 6 UU-IMAU 7 NPI 8 SU 9 - UBERN 10 UNIBO 11 UCAM 12 - UCPH 13 ULB 14 ULUND Due Date 31 January 2017 Delivery Date 22 March 2017 Page 2 of 14

Table of Contents EXECUTIVE SUMMARY... 4 1. Introduction... 4 2. Execution... 4 3. Other significant information... 12 Page 3 of 14

EXECUTIVE SUMMARY This report describes the logistic efforts to transfer material within Antarctica to the Little Dome C survey site during the Antarctic season 2016/17. It provides a schedule of performed actions on site and lists required resources. 1. Introduction The work described further below was carried out in the frame of: Subtask 1.1.1 Mini-traverse to "Little Dome C" 2016-2017 (IPEV/ENEA, M2-M4) To enable fieldwork at Little Dome C, in 2016-2017 a Talos Dome to Dome C traverse is planned (M2-M3, D1.3). Once at Concordia Station, the vehicles will allow about 20 days of fieldwork (M3-M4). After providing the infrastructure for a test of geophysical and rapid access equipment at DC, a mini-traverse to Little Dome C will allow the ground-based survey (see Task (T) 2.1.2 and T3.1) in the area we will have chosen on the base of the analysis of the airborne radar surveys from T2.1.1 (D2.1). The traverse is an important Milestone MS2. The retrograde traverse to Concordia Station will take place in M5. 2. Execution As a part of CSA BE-OI project, between October 28 and December 12, 2016, ENEA/PNRA personnel in strait collaboration with Institut Polaire Francais Paul Emile Victor (IPEV) and British Antarctic Survey (BAS) realized a traverse through northern Victoria Lands, George V and Adelie lands to transfer the ITASE traverse equipment (vehicles, modules, tanks and sledges) from Mario Zucchelli Station/Talos Dome to Concordia Station. After tests of geophysical and rapid access drill equipment at Dome C, ITASE traverse equipment was transferred to Little Dome C allowing our research team to conduct 26 days of fieldwork consisting in the ground-based survey (WP2, Subtask 2.1.2) and rapid access drill RAID (WP3, Subtask 3.1.1). At completion of 2016-2017 fieldwork the ITASE traverse equipment returned to Concordia Station, underwent maintenance and was prepared for wintering in 20 days. Page 4 of 14

Transfer of ITASE traverse equipment from Mario Zucchelli Station/Talos Dome to Little DC The ITASE traverse system is composed by vehicles, modules and tanks mounted on sledges (fig.1): Fig. 1 ITASE traverse vehicles and modules during the traverse between Talos Dome and Concordia Station. In particular the following vehicles and equipment were deployed: four vehicles: two Kassbohrer Pisten Bully 330D and two Caterpillar Challenger 65C one module for living accommodation, kitchen, dining room and two sleeping rooms (8 beds). one module with toilet and shower, diesel-electric generator, workshop, and snowmelter. one storage module (spare parts and food) 3 fuel sledges (16,000 litres each). one scientific module for the drilling activity equipped with a second diesel-electric generator for emergency. Page 5 of 14

An enclosed passage way connects the first two groups during the stop. Various electric and service connections link the three groups of module (living, toilet/generator and drill). The ITASE traverse equipment is at Talos Dome since 2002. To allow activities ENEA/PNRA decided to substitute one of Pisten Bully 330D with a new Kassbohrer Pisten Bully 300 polar equipped with crane, transported by ship at Mario Zucchelli Station (MZS) during January 2016. This was necessary considering the time lapse that is required for transportation of heavy equipment in Antarctica. This new vehicle had to be transported from MZS to Talos Dome to join the ITASE traverse. The required material and fuel for the supply of the ITASE traverse was transported to Antarctica from New Zealand by sea (ITALICA cargo vessel, 10-12 days travel time) or by airplane (Lockheed Hercules L-100/30, 8-9 h travel time) then unloaded at MZS, then transported by airplane (1.5 h travel time). The distance from Mario Zucchelli Station to Talos Dome by air is 275 km, whereas the distance to cover by land is about 410 km. The first 150 km from MZS to the plateau are a very dangerous area due the heavy presence of crevasses. Therefore this operation is performed rarely and only if unavoidable by other means, like it was in this case because of the need to bring to Talos Dome an heavy vehicle. For safety reasons, all transportation of personnel and materials to Talos Dome is performed by air (Twin Otter DHC-6, Basler BT-67, Helicopter Squirrel AS350) from the MZS at Terra Nova Bay. Page 6 of 14

Fig. 2 British Antarctic Survey FFB Twin Otter DHC-6, landing at Talos Dome The traverse route from MZS to Concordia Station can be divided in three sections. These differentiate mainly by the trip difficulties caused by snow surface conditions and crevasses occurrence (Fig.3): Page 7 of 14

Fig. 3 Map of the traverse from MZS to Concordia Station/Little Dome C, with the distance and the time. First part: the traverse from MZS to Talos Dome, 410 km long, the most dangerous part because of the presence of a heavy crevasses area in the first 150 km; Second part: from Talos Dome to D85 about 1000 km long, the most difficult part from a logistic point of view, because of the presence of a high roughness surface, sastrugi and dunes respectively higher than a meter and a half and 3 metres. Third part: from D85 to Concordia Station about 650 km following the Concordia logistic traverse route from the coastal station of Cape Prud homme to Concordia Station. As this logistic traverse is performed three times per year for the necessities of supply of Concordia Station, this part of route is made of compressed snow and permits a faster and safer travel of vehicles and modules. Page 8 of 14

The traverse team was composed of 8 persons that arrived on October 28, 2016 at Mario Zucchelli Station by Hercules L-110/30 from Christchurch (NZ). From October 29 and November 7, the team prepared the material, food, scientific instruments and the new vehicle PB300 polar to the transfer to Talos Dome. During this period the team with the support of MZS staff also performed surveys over the crevassed area by helicopter and land, to identify the safer route to reach the plateau. The most dangerous area, the conjunction of Widowmaker Glacier with Larsen Glacier, was examined using radio-echo sounding to detect the wide of the crevasse and their depth of snow bridge, to establish the less dangerous point to cross with the PistenBully 300. On November 7, the Basler BT-67 transferred part of the team to Talos Dome, while the other part reached Talos Dome from MZS by land with the new PB300 polar, 3 days were necessary for this trip for a total of 42 h of transfer. To avoid problems caused by the low temperatures, the PB300 was never stopped during the last 32 h of travel. A shift of the crew was done after 20 h with the support of the NERC-British Antarctic Survey TwinOtter FFB. The vehicles velocities were about 10 km/h with a fuel JetA1 consumption of 1250 l (about 3 l per km). From November 7 to 17, the team at Talos Dome performed pre departure operations: cleaning of the vehicles and modules from the snow, and accurate maintenance of the vehicles for the traverse. During this period the traverse received a resupply of food and fuel by Basler and BAS TwinOtter, with a total received mass of approx. 20t. The traverse moved from Talos Dome on November 18 and arrived at D85 on December 5, covering about 1000 km. The first 350 km from Talos Dome were very hard for the vehicles and team due the roughness of surface and climatic conditions in a pristine environment never reached by man. The traverse stopped 3 days (November 24-26) at Sitry site. The traverse successfully arrived at Concordia Station on December 12. Globally 10 days of preparation at MZS, 35 days of travel were needed from MZS and 23 from Talos Dome. The traverse succeeded in arriving at Concordia Station according to the original plans (Fig. 3). Page 9 of 14

Between December 13 and 18 the team was partially swapped with researchers of WP2 and WP3 and the vehicles were serviced. In parallel, during this period, radar surveys with DELORES unit and GPS strain net measurements were performed in the so called Patch North area and a radar survey was also performed between Concordia Station and Little Dome C (Fig. 4). The traverse was then moved to Little Dome C. Fig. 4 Map (contour line every 0.5 m) of the Dome C area and activities conducted during the field season, DELORES and pres profiles. Fieldwork at Little DC closure of the 2016-2017 field season The deployment of ITASE traverse equipment to Little DC allowed over 25 days of fieldwork. The fieldwork team was composed of five people and worked there from December 19, 2016 to January 12, 2017. WP2 and WP3 related activities were performed at Little Dome C and at Patch North as originally planned for more than 20 days (Fig. 4 and 5). Page 10 of 14

Fig. 5 The Little Dome C camp. During this period five pres stations were installed as planned. The very precise GPS positioning was successfully executed both at Little Dome C and Patch North with 26 stations including one permanent station and two firn compaction/vertical strain stations. A considerable ground based radar profiling was achieved with the DELORES radar, resulting in more than 1000 line km of new high-resolution profiles of internal echoes and of the bedrock. In addition at Little Dome C, a second search patch located slightly North from Concordia Station was documented with the DELORES radar. Intermediate ice core were drilled at a depth of 105.25 m with RAID system (WP3) for borehole temperature profile and coffee-can firn compaction/vertical strain cable was anchored to the bottom of the borehole. At the end of the fieldwork the ITASE traverse equipment was returned to Concordia Station and between 15/1/2017 and 8/2/2017. The vehicles and modules were maintenanced and prepared for the winter-over at Concordia Station where the temperature can fall below - 80 C. Page 11 of 14

3. Other significant information Both the deliverables (D1.1 and D1.3) and the Milestone (MS2) have been achieved with 100% of success and as originally planned. litres: The total fuel consumption of the traverse from MZS to Concordia Station was 41,650 MZS Talos Dome: 410 km, 1250 litres, about 3 l/km (only PB300 polar); Talos Dome D85: 1000 km, 25,000 litres, about 24.5 l/km (entire traverse plus power generator); D85-Concordia: 650 km, 15,400 litres 23.5 l/km ((entire traverse plus power generator). The total consumption of the traverse (PB300, PB330 and Caterpillar 65C) and for GPS and radar survey (1400 km) at Little Dome C was about 6000 litres. At D85 and at 250 km from Concordia the RAID logistic traverse provided 15,400 litres (Fig. 6) of diesel fuel (SAAB). Additional 5700 litres were provided at Concordia Station for the activity at Patch North and at Little Dome C. Page 12 of 14

Fig. 6 Refuelling of the ITASE traverse from RAID logistic traverse at 250 km from Concordia Station Moreover, the traverse ITASE transported 14,000 litres of JetA1 at Concordia Station. This fuel will be used at the beginning of next season (2017-18) when the temperature will be lower than -50 C. The total air support for the traverse was: HDB and HNR helicopters Squirrel AS350: 12.15 h FFB NERC-BAS, Twin Otter DHC-6: 45.4 h KBO Twin Otter DHC-6: 5.4 h VKB Basler BT-67: 14.6 The maintenance of vehicles at Talos Dome and during the transfer from Talos Dome to D85 were marked by breakdown and following necessity of reparation of: PB330: high pressure tube two times; PB300: coupling high-pressure tube two times, wipers motor, the oil pressure system of the tracks, fan control of hydraulic oil, various electronic fault; Page 13 of 14

Caterpillar 65C: elastic coupling between the engine and transmission, voltage regulator; sledge of drill module. Due to these inconveniences, the convoy was stopped for a total of 3 days. The spare parts were provided by MZS and Cape Prud Homme stations. The traverse and Little Dome C activity was performed with climatic conditions very severe due to katabatic winds that has reached over 70 nodes in coastal area (MZS-Talos) and with temperatures dropped below 45 C with wind-chill frequently below -50 C. The team that prepared and conducted the traverse from MZS to Concordia Station was composed from 7 person ( ) plus the contribution for the survey and maintenance of vehicles mainly by others 5 person (^), whereas the team of Little Dome C were composed by 5 person (*) for a total of 643 man/day: Bianchi Fasani Gianluca (28/10/2016-13/12/2016) ^Brunetti Simone (7-11/11/2016) ^Bussani Massimo (9-10/11/2016) ^Calligaro Luigi (29/11-13/12/2016) ^De Leonardis Antonio (10-17/11/2016) De Podestà Davide (30/10/2016-13/12/2016) *Frascati Fabrizio (28/10/2016-21/1/2017) *Frezzotti Massimo (28/10/2016-21/1/2017) Panichi Saverio (28/10/2016-15/12/2016) *Mulvaney Robert (20/11/2016-21/1/2017) *Quintavalla Mario (28/10/2016-8/2/2017) Scalet Michele (8/11/2016-13/12/2016) ^Urbini Stefano (28/10/2016-21/11/2016) *Vittuari Luca (20/11/2016-21/1/2017) The crew of NERC-BAS FFB Twin Otter DHC-6 have supported the traverse from November 1 and 25, 2016: Steven King - Aircraft Captain David Benner - Aircraft Engineer Page 14 of 14