Installation Instructions for Model CityFix

Similar documents
T his chapter contains instructions for installing the RICON S-Series (ADA) Transit Use Wheelchair and Standee Lift

S-SERIES AND K-SERIES SERVICE MANUAL

S-SERIES AND K-SERIES EXPORT USE WHEELCHAIR AND STANDEE LIFT PRINT. Service Manual. 05/15/15 32DSKE02.C 2015 RICON CORPORATION All Rights Reserved

KlearVue K-Series Folding Platform DOT Private Use Lift

KlearVue K-Series Folding Platform DOT Private Use Lift

S-SERIES AND K-SERIES DOT PUBLIC USE LIFT

S-Series DOT - Private Use Lift

The RICON Eclipse F8000 (A) Series Export Use Wheelchair and Standee Lift is installed in a

FIGURE 2-1: LIFT (LEFT-SIDE) MOUNTING HOLES

K-SERIES PUBLIC USE LIFT OPERATING INSTRUCTIONS

INSTALLATION MANUAL. Thunderstone Manufacturing LLC 3400 West O Street Lincoln, NE (Fax)

S-SERIES PUBLIC USE OPERATING INSTRUCTIONS

650 Series Cargo Van Lift Mounting Instructions Ford Transit (Standard Roof) 2015-Present

650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present

S-SERIES ADA TRANSIT USE OPERATING INSTRUCTIONS

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS

CAUTION -TABLE OF CONTENTS- II. OPERATING INSTRUCTIONS

II. W-SERIES WHEELCHAIR LIFT OPERATING INSTRUCTIONS T

K-SERIES SERVICE MANUAL

This chapter contains safety precautions, daily safety check instructions, control and indicator

AL625 & AL625HD INSTALLATION & OWNER S MANUAL

SLIDE-AWAY EXPORT USE SPARE PARTS

Cantilever Series Mounting Instructions Fullsize Sprinter Van (US) All except WB (AA) present

CAUTION CAUTION MAINTENANCE AND REPAIR A. LUBRICATION

INSTALLATION INSTRUCTIONS FOR WHEELCHAIR LIFT MODEL NO. WL7-vers. C WL7-vers. C-1K

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate

INTERLIFT. ILF INSTALLATION MANUAL & CHECK-OFF SHEET Rev. 1.2, Date

WARNING! THIS PRODUCT MUST BE INSTALLED BY A TRAINED, AUTHORIZED RICON SERVICE TECHNICIAN.

and Original Series Pickup Lift Mounting Instructions Fullsize Nissan Titan Trucks present T-420 BOLT-ON GUSSET PART#5257

and Original Series Pickup Lift Mounting Instructions Fleetside Chevy & GMC Trucks Fleetside 4-door Chevy & GMC Trucks T-100

Regular maintenance of the RICON S-Series Transit Use Wheelchair Lift will help optimize its

INSTALLATION INSTRUCTIONS

OPERATING INSTRUCTIONS

Installation Instructions Rotation Control Kit

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

SUNROOF - SERVICE INFORMATION ADJUSTMENTS

SELF DRILL SCREWS FILLER STRIP

TRAILER WINCH MODELS ST315 AND ST712. General Safety (Continued) Description. Unpacking. General Safety Information.

MIRAGE F9TF DOT - PUBLIC USE LIFT

Patriot. Aluminum and Steel 5spring. Step #1 Tarp Spool with Gear Motor (Includes Instructions for Optional Wind Deflector)

K-Series DOT Private Use Lift

Installation Manual P / P / P A / P B / P C E N G I N E B R A K E S

Patriot Jack Systems OEM INSTALLATION MANUAL

Installation and Service Manual

MKVI Jetta Fog Light Kit

Click Here for Printable PDF File. CHAPTER 3 - BASIC INFORMATION for PERFORMING HYDRAULIC SYSTEM MAINTENANCE

Pulltarps Tower with Electric Drive

SL15/20-6 AND SL15/20-10 INSTALLATION INSTRUCTIONS

WARNING TABLE 3-1: DAILY SAFETY CHECK

Quick Install Lift AL065 Installation Guide & Owners Manual

INSTALLATION INSTRUCTIONS

Cantilever Series Mounting Instructions Chevy Express (AD) present

K-Series DOT Public Use Lift

Model 315. Always stand clear of the area behind and between the load or anchor point and the winch. Serious injury could occur, if the cable breaks.

Ricon Wheel Chair Lifts

Timer. TipTop Timers. Installation and Operation Manual

INSTALLER S MANUAL FOR THE AHT TAIL LIFT

PN R CHEVY CAMARO w/reverse Two panel Sequential LED Taillight kit installation guide. Kit Contents:

INSTALLATION MANUAL RA-35 & RA-45 M REV. D SEPTEMBER 2017

MiniFix INSTALLATION MANUAL & CHECK-OFF SHEET. ECN-M0262 Rev. 1.3, Date Part #

and Original Series Pickup Lift Mounting Instructions Fullsize Chevy & GMC Trucks: 1500 & 2500 LD HD & 3500HD BOLT-ON GUSSET

MIRAGE F9TF DOT - PUBLIC USE LIFT

and Original Series Pickup Lift Mounting Instructions T-150-T T-150 PART#5177 T-150-T

G-170. r ve Pickup Lift Mounting Instructions Fullsize Chevy & GMC Trucks- 1500, 2500 & 3500: 2007-present

INTRODUCTION Thank you for purchasing a Maurer Revolver. Proper care and use will result in many years of service. WARNING: TO AVOID PERSONAL INJURY O

HIGH RISE POWER ANGLE KIT

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

Cantilever Series Mounting Instructions Fullsize Sprinter Van (US) WB (AB) present

Customer Name: Installing Dealer: Date Installed: Serial Number:

DUMP BODY SPREADERS INSTALLATION INSTRUCTIONS

CHEVY CAMARO Four panel Sequential LED Taillight kit installation guide

29048, 29049, 29050, 29051, 29052, 29053, 29054,

(31 ) ZEON CONTROL PACK RELOCATION KIT

Operator Manual riconcorp.com

INSTALLATION INSTRUCTIONS AMBASSADOR DRUM OVERHEAD SERIES 100 DUMBWAITER

MIRAGE F9TF DOT - PUBLIC USE LIFT

Cantilever Series Mounting Instructions Ram Promaster Extended Body (AH) Present

ILU INSTALLATION MANUAL & CHECK-OFF SHEET. ECN-M0257 Rev. 1.5, Date Part #

(4) 1/4" Plastic Plugs 12-1/16" 1/4" Ø (4X) 2-5/8" (2X) 4-1/16" 7-1/8" 7-1/8"

WARNING WARNING CAUTION

Installation instructions, accessories - Fuel driven heater 912-D

1 Position Lift. Braun Corporation FMVSS No. 403 Quick Reference Installation Sheet Rev. C

INSTALLATION AND OPERATION MANUAL

KWIKEE #888 ELECTRIC STEP. Owner's Manual ( )

1200 Southeast Ave Tallmadge, Ohio to 2014 Mustang (V6 & V8) Summit Racing Roll Stop Install Instructions.

INSTRUCTIONS, (FORD) SUPER DUTY INSTALLATION KIT (C2 PICKUP LIFTGATES)

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

IV. S-SERIES PRIVATE USE SPARE PARTS T

S-Series Transit Use Wheelchair Lift

Kwikee # Series Step OWNER'S MANUAL ( )

920 Remote Control Switches

29048, 29049, 29050, 29051, 29052, 20953, 29054,

T-52. r ve Pickup Lift Mounting Instructions Chevy / GMC- Colorado/ Canyon: 2015-present. Preparing the Gate. Installing the Bolt-on Gussets

ILM16 ILM20 ILM30 ILM12AF ILM16AF ILM20AF ILM30AF

BAYLIFT SERVICE MANUAL

Stowe Cargo Management System

COOKSON OWNER'S MANUAL

S-Series Transit Use (ADA) Wheelchair and Standee Lift

MKVI Jetta Fog Light Kit

LGT-311L Bumper LED Light Kit EZ-Go RXV Installation Instructions

Transcription:

INTERLIFT Interlift, Inc. 15939 Piuma Ave. Cerritos, CA 90703 Tel: 888-774-5844 Fax: 562-924-8318 Installation Instructions for Model CityFix www.interlift.net 1. LIFT LOCATION The installation surface must be flat and level. It is recommended that lift be installed on a 12mm, minimum, high grade plywood sub-floor. However, this additional installation height may not be acceptable in cases where overhead clearance is limited. NOTE: Check for proper travel clearance through doorway. a. With doors fully open, place/position lift in vehicle doorway as close as possible to door, with lift's baseplate assembly parallel to side of vehicle. b. Allow a distance of 20mm, if possible, between door and the part of lift closest to it. Adjust lift left and right-side locations to accommodate subframe members. c. Verify proper clearance of door frame, passenger seats, and outer edge of vehicle floor and possible interference with wires, fluid lines, subframe members, etc. 2. LIFT INSTALLATION GUIDELINES The mounting of lift is a very important step. Lift performance can be adversely affected by improper mounting or fastening of lift. Although fastening details may vary from one vehicle to the next, some general principles apply: Be certain that all mounting bolts are properly installed and tightened. Bolts used to fasten baseplate assembly to vehicle floor must have a minimum strength rating of SAE Grade 5 and be torqued to 38 Nm, dry. Recognize that the most important bolts are those along the rear of lift, since these bolts retain majority of load. Refer to Diagram 1. Improper torquing sequence of bolts may result in a warped or bowed baseplate, which can cause lift to operate erratically. CORRECT BOWED UP BOWED DOWN 3. LIFT MECHANICAL INSTALLATION Refer to Diagrams no. 2 and 3. Clamping bars are used to help distribute floor loading and should only be shortened if necessary to clear a subframe member. A subframe member should be used to support forward end of clamping bar. WARNING! Lift weight is approximately 160-170 kgs. Take great care when positioning because the lift might tip. This procedure should not be attempted by one person. a. Refer to Diagram no. 2. With rear doors fully open, position lift in opening so that front and rear edges are supported by vehicle floor. Position folded lift in doorway with lift baseplate parallel to side of bus and lift clearing the doors by at least 6mm. b. Refer to Diagram no. 3 on next page. Mark and drill eight 10mm baseplate mounting holes (1 thru 8) through vehicle floor. NOTE: Before drilling holes, be sure that underlying wires, fuel and hydraulic lines, etc, are not in the way. CLAMPING BAR VEHICLE FLOOR SUBFRAME MEMBER TIGHTEN HERE LOOSEN HERE CLAMPING BAR Diagram No. 2 LOOSEN HERE Diagram No. 1 TIGHTEN HERE c. Insert eight 3/8-16 x 4 carriage bolts through baseplate and vehicle floor. d. Place four clamping bars below floor. The clamping bars are bolted across the baseplate width, i.e., from 1 to 5, 2 to 6, etc., and run towards front of van. Secure with 3/8" washers, lock washers and hex-nuts. 32DSSC03.A 1

CLAMPING BAR BASEPLATE 1 2 3 4 BATTERY 90 AMP MAIN BREAKER 4 AWG POWER CABLE: SHORT CABLE, NOT TO EXCEED 12", CONNECTED BETWEEN BATTERY (OR MAIN POWER SOURCE) AND MAIN CIRCUIT BREAKER 5 6 7 8 Diagram No. 3 e. Verify that lift baseplate is as level as possible. Tightening carriage bolts requires special care to prevent the baseplate warping when it is secured to vehicle floor. If baseplate warps, the vertical arms will not be parallel. Corrections can be made by shimming at appropriate locations. To help prevent warping, tighten the eight carriage bolts to 38 Nm in the following sequence: 2, 3, 6, 7, 1, 4, 5, 8 NOTE: Vertical arms must be parallel for proper operation. Adjust bolts as required. Best results are obtained when lift is mounted on a plywood, or similar material, subbase. Shims, although best avoided, may be used if required. 4. ELECTRICAL INSTALLATION Do not route a wire while it is connected to the battery. Route wires clear of moving parts, brake lines, and the exhaust system. Secure to the vehicle. When routing an electrical wire through vehicle floor or walls, use a grommet to protect wires from chafing. Check underside of vehicle before drilling to avoid damage to fuel lines, vent lines, brake lines, or wiring. Refer to Diagram no. 4 for an overall schematic of the electrical installation. BUS BAR Diagram No. 4 4 AWG POWER CABLE: LONG CABLE CONNECTED BETWEEN MAIN CIRCUIT BREAKER AND POSITIVE TERMINAL OF SOLENOID PUMP SOLENOID 8 AMP CIRCUIT BREAKER #4 RING TERMINAL A. INSTALL MAIN CIRCUIT BREAKER 1. Disconnect battery. 2. Mount main circuit breaker inside engine compartment near battery. Mount within 300mm to minimize amount of unprotected cable. Avoid installing near a heat source. B. ROUTE AND CONNECT MAIN POWER CABLE Check underside of vehicle before drilling to avoid damage to fuel lines, vent lines, brake lines, or wiring. 32DSSC03.A 2

NOTE: For applications where power cable is to pass through sheet metal, drill a 20mm hole and use a wire clamp. For applications where cable is to pass through plywood, drill a 25mm hole and use black plastic grommet provided. 1. Refer to Diagram no. 5. Drill a hole through vehicle floor near or under pump solenoids so power cable can reach positive stud of side solenoid (the stud on side solenoid that is not connected to top solenoid with a bus bar). The hole should be drilled where it is covered by the pump cover. 4 AWG POWER CABLE VERTICAL SUPPORT CABLE TIES "A" : 20mm DIA FOR FLOOR METAL 25mm DIA FOR OTHER MATERIAL A 48mm GROMMET OR CABLE CLAMP Diagram No. 6 "B" : 813mm PLATFORM WIDTH = 57mm 762mm PLATFORM WIDTH = 32mm Diagram No. 5 B PENDANT INTERFACE NOTE: An 8 amp circuit breaker is provided for lift as a circuit protection device. Whatever circuit interface is supplied by the OEM, it should be capable of carrying 8 amps of continuous current. 2. Install ring terminals to each end of short power cable (300mm long), and one ring terminal to one end, and one end only, of long power cable using an appropriate crimp tool (such as Ricon P/N 26553). 3. Connect end of long 4 AWG power cable (with ring terminal) to main circuit breaker, then route power cable underneath vehicle floor and up through hole in floor. 4. Verify that power cable is secure. Bind power cable to pump assembly harness and to pump motor using cable ties. Avoid pinch points, exhaust system, any moving parts, and brake lines. Be sure that there is no interference with any parts that could damage power cable or other wires in any way. 5. Refer to Diagram no. 6. Cut any excess wire from long cable, install remaining heavy ring terminal to unterminated end of long cable, and connect it to live side of solenoid. Verify that red wire from main circuit breaker (if applicable) is connected to positive solenoid pole. Be sure that harness does not interfere with any moving parts, or binds against any parts, or is pinched in any way. 6. Refer to Diagram no. 7. Connect RICON hand-held control pendant to lift and secure control cable to lift with cable clamp. 7. Install wall portion of pendant dovetail clip in an appropriate safe location. Diagram No. 7 CABLE CLAMP STRAIN RELIEF BRACKET C. GROUND CONNECTIONS 12VDC powered lifts are chassis grounded and do not require a separate ground cable connection to battery. However, if lift electrical system is connected to chassis with a cable, the cable must be attached in a manner that provides a reliable electrical connection. If ground cable is attached to an existing ground circuit, the circuit must be capable of conducting an additional 90 amps to the negative battery terminal. 32DSSC03.A 3

D. INTERLOCK INSTALLATION An interlock device can be installed to prevent unsafe operation of the lift. This interlock device consists of a switch mounted near the driver seat that interrupts power to the lift control circuitry. The installer must verify that none of the original equipment circuit breakers, fuses, or solenoids are bypassed, removed, or altered. Be sure that no wires are left frayed or hanging loose after installation of interlock device. If you have any questions about the proper installation of this interlock device, please contact our Product Support Department. WARNING! Do not operate lift unless you are certain that the integrity of lift electrical circuits has been maintained. Wiring attached directly to the positive battery terminal is not protected against short circuits and therefore must be a length of 300mm or less. This wiring must be routed in a manner that prevents pinching or abrasion by vehicle parts. If the power source for the interlock circuit comes from an existing fuse panel, the circuit must be capable of supplying an additional 8 amps of current. All connectors utilized on interlock circuit must be a fully insulated type. Refer to Diagram 8. This method interrupts power between the lift 8-amp circuit breaker and vehicle battery. The installer must provide an additional 8-amp circuit protector (or fuse). 1. Disconnect battery. 2. Connect a wire from battery to the additional 8 amp circuit protector that is 16 AWG or larger, and does not exceed 300mm in length. 3. Connect output side of additional 8 amp circuit protector to input side of interlock switch using 16 AWG or larger wire. 4. Disconnect wire connected to input side of the 8-amp breaker (located on pump assembly). Cover its exposed end with electrical tape or heat shrink tubing. 5. Connect output side of interlock switch to input side of 8 amp circuit breaker (on pump assembly) using 16 AWG or larger wire. 6. Dress and secure wires to prevent rubbing or chafing of insulation, and to relieve strain at wire connection points. 7. Re-connect battery. 4 AWG POWER WIRE TO PUMP SOLENOID BATTERY (OR FUSE PANEL) APPLICABLE 8 AMP CIRCUIT PROTECTOR 90 AMP MAIN BREAKER PROVIDED BY INSTALLER BATTERY + PROVIDED BY INSTALLER 8 AMP CIRCUIT PROTECTION INTERLOCK TO INPUT SIDE OF 8 AMP CIRCUIT BREAKER 8 AMP CIRCUIT BREAKER 16 AWG WIRE (MINIMUM SIZE) INTERLOCK 16 AWG WIRE (MINIMUM SIZE) Diagram No. 8 32DSSC03.A 4

E. LIMIT ADJUSTMENT For lift limit switch adjustment, refer to Diagram no. 9, and the following procedure. NOTE: To avoid operational dead-spots, always adjust DEPLOY CUTOFF before RAISE CUTOFF. NOTE: When loosening adjustment screws, apply enough pressure to screw to move block instead of screw. (The block might stick if insufficient pressure is applied to screw.) PARALLEL ARM KNUCKLE ACTUATOR SADDLE RAISE CUTOFF ADJUSTMENT SCREW RAISE CUTOFF CAM STOW CUTOFF DEPLOY CUTOFF ADJUSTMENT SCREW DEPLOY CUTOFF Diagram No. 9 STOW CUTOFF ACTUATOR LOWER CAM LOBE a. Fully DEPLOY platform. b. Adjust RAISE CUTOFF ADJUSTMENT SCREW and DEPLOY CUTOFF ADJUSTMENT SCREW 6-8 turns counter-clockwise and then push screws FORWARD. c. Cycle platform to STOW then DEPLOY. d. When in DEPLOY position, platform should stop at an angle and NOT even with vehicle floor. If not, turn DEPLOY CUTOFF ADJUSTMENT SCREW an additional 2-3 turns counter-clockwise, push screw forward, STOW then DEPLOY platform, then repeat this step. e. Cycle platform to RAISE position. f. When in RAISE position, platform should stop short of vehicle floor level. If not, turn g. RAISE CUTOFF ADJUSTMENT SCREW an additional 2-3 turns counterclockwise, push screw forward, cycle platform DOWN then UP, then repeat this step. h. Cycle platform to STOW then DEPLOY. i. Push and hold control pendant DEPLOY button. Slowly turn DEPLOY CUTOFF ADJUSTMENT SCREW clockwise until platform jogs down to vehicle floor level, then stop turning screw and release DEPLOY button. NOTE: Refer to Diagram no. 10. Make sure that clearance between knuckle actuator saddle and parallel arm is 3mm minimum (distance may be 12mm maximum and unequal for left and right arms). j. Position platform at ground level then RAISE until it stops. k. Push and hold control pendant RAISE button. Slowly turn RAISE CUTOFF ADJUSTMENT SCREW clockwise until platform jogs up to vehicle floor level, then stop turning screw and release RAISE button. NOTE: If lift does not operate after 1-2 full turns of adjustment screw, cycle platform UP and DOWN (the RAISE CUTOFF is less sensitive than DEPLOY CUTOFF.) l. Cycle platform through all functions (DEPLOY, LOWER, RAISE, and STOW) to verify correct adjustment. Refer to Diagram 11 if necessary. COMPONENT Fold cutoff actuator Up cutoff adjustment screw Out cutoff adjustment screw TABLE 2-1: LIMIT ADJUSTMENT CHART SYMPTOM Lift does not fold tightly. Pump runs continuously. Lift stops low. CORRECTIVE ACTION Rotate collar counter-clockwise. Rotate collar clockwise. clockwise. ADJUSTMENT PROCEDURE With lift fully folded (handrails should be folded tight against vertical arms), rotate actuator so that fold cutoff leg barely trips fold cutoff switch. Test lift. Pump should cutoff when lift is folded tight. Adjust up cutoff switch so that lift stops just before first knuckle actuator saddle or roller touches underside of lower parallel arm. (Saddle or roller should be about 3mm from lower parallel arm.) 32DSSC03.A 5 Lift stops high. Lift stops low. Lift stops high. BRIDGEPLATE counter-clockwise. counter-clockwise. clockwise. Diagram No. 10 END OF TABLE Diagram No. 11 3mm MIN 12mm MAX Adjust lower limit switch so that lift stops just below "Up" cutoff described in above step. This will give the necessary overlap to avoid "dead" spots.

5. VERIFY INSTALLATION Be certain that no vehicle components interfere with operation of CityFix. The CityFix is designed to handle 500kgs. The vehicle structure must be capable of supporting all loads produced during lift operation, as well as those forces caused by motion of vehicle when it is driven. CAUTION Do not operate lift when test weight is on platform. This load test is designed to test the lift mounting method, not the lift capacity. Remove test weight immediately after test. Vehicle suspension will compress and vehicle will lean when test weight is placed on platform. If weighted platform contacts ground, remove weight, raise platform, and retest. The lift must be test loaded to 125% of its rated 500kgs load capacity to verify integrity installation. Position lift platform 50mm 150mm above the ground, place 625kgs in center of platform, and inspect lift mounting points. REMOVE TEST WEIGHT. Run lift through several complete cycles while checking for proper operation. 32DSSC03.A 6