SEC Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

Similar documents
3SB Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

MS & MS XT/XC Connections

Blue Quick Seal Connection

22. TenarisHydril Blue Thermal Liner Connection

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

ER Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

Wedge TenarisHydril Running Manual.. Premium connection approved thread compounds TSH-MD

Wedge 533 / 503 / 553

2. The power tong snub line should be attached to a back up post, leveled and positioned at a 90 angle to the power tongs.

Blue Series and Legacy Series Make up Acceptance

1. Use slip type elevators for flush, near flush, integral, special clearance and special bevel coupled connections.

Handling / Lift Plugs

Initial Running Guidelines

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: May 1, 2013

JFETIGER RUNNING MANUAL. Downloaded From JFETC.COM Thu, 20 Sep :15: JFETIGER. * valid at time of download * JANUARY 2015

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: January 6, 2017

OCTG Mill RUNNING AND PULLING PROCEDURE FOR TPS-MULTISEAL (ALL TYPES & GRADES) QP 05-16E Revision No. 7 Page 1 of 11

SEAL-LOCK APEX ANCILLARY

JFEBEAR RUNNING MANUAL

Running Procedure. VAsuperior. Rev.:2.

Running Procedure. Rev.:2 VAGT.

Drill Pipe Connection Care and Handling

RECOMMENDED PRACTICE TKC FJ-150

TKC CONVERTIBLE: 8 RD / NUE / EUE / BUTTRESS 4040 / 4040 HO / 4040 HO-B FS-150 ANCILLARY SPECIFICATION

RECOMMENDED PRACTICE SEAL-LOCK FLUSH/SEMI FLUSH CONNECTIONS

RECOMMENDED PRACTICE SEAL-LOCK HT

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

Running Procedure. VAroughneck. voestalpine Tubulars GmbH & Co KG Rev.: 0

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.

SEAL-LOCK HT ANCILLARY SPECIFICATION

SEAL-LOCK HT-S (TIMED) ANCILLARY SPECIFICATION

Running Procedure. VAxplorer. Rev.:1.

Running Procedure for Casing with GB Drilling with Casing Connections

RECOMMENDED PRACTICE TKC-4040 V.I.T. and HO-I

Wedge /8" TO 13 5/8"

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

Blue 2 3/8" TO 13 5/8"

Fishing Bumper Sub. Manual D450

Blue 2 3/8" TO 13 5/8"

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

GB Connection Performance Properties Sheet Rev. 3 (10/07/2015) E N G I N E E R I N G T H E R I G H T C O N N E C T I O N S TM

TenarisXP Buttress 4 1/2" TO 16"

Product Instructions. Mixing Station. Features. Specifications. Materials

OIL COUNTRYTUBULAR GOODS

Contents. RE PS Revision 5

FIELD INSPECTION OF JFETIGER THREAD. Downloaded From JFETC.COM Fri, 16 Nov :49: * valid at time of download * JFETIGER.

Сontents. RE PS Revision 5

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

Agility. Introducing the First Class Finish...

Small Block Chevy. S-Drive Pulley Kit INSTALLATION INSTRUCTIONS

CHAPTER 9 : TYPE II TEST ON SI ENGINES (VERIFYING CARBON MONOXIDE EMISSION AT IDLING)

Statoil Multi Dope Yellow

Amsted Rail POCKET INSPECTION GUIDE. Freight Railcars

MODEL 5800 CONTENTS. Installation, Operation, and Maintenance Instructions 1.0 GENERAL

BAMBI BUCKET (ALL MODELS) QUICK REPAIR GUIDE 2014 VERSION B

JCM 101 Universal Clamp Couplings

G-SERIES PAPER ROLL CLAMP. Rugged. Reliable. Ready when you are.

PONTIAC Late Model (with 11 Bolt Water Pump)

Pressure Relief Valve Maintenance Manual

I-317. AWWA Check Valves WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS SERIES 317 WARNING

TPAK Series COOLANT PUMP

TESLA MODEL S REFRESH FRONT FASCIA INSTALLATION MANUAL FIGURE 1. Unplugged Performance 3523 Jack Northrop Ave, Hawthorne, CA 90250

TECHNICAL SPECIFICATIONS FOR BATTERY OPERATED HEAVY DUTY FORK LIFT TRUCK - 20 T

Stewart Warner Electric Sending Units

SHARKBITE INSTALLATION GUIDE

For further information please visit our website at TenarisHydril. Aberdeen. Esbjerg. Copenhagen Nisku Red Deer Prudential.

INSTALLATION INSTRUCTIONS

Belt Drive Preventive Maintenance Manual

S02. MAGNETIC PARTICLE TESTING

Explanatory Information (NOT PART OF ANSI STANDARD)

Product Engineering Bulletin

Stainless Steel Pipe System. System No. Submitted By Spec Sect Para Location Date Approved Date TEMPERATURE ( F/ C)

VAGT STill GoinG STronG. voestalpine Tubulars GmbH & Co KG

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

Number 9 January SECTION 1 Dimming of T12 Fluorescent lamps 2. SECTION 2 Dimming of T8 Fluorescent lamps 4. SECTION 3 Do's and Don'ts 6

QUALITY CONTROL PROCEDURES

OTR - GRADER - FORESTRY

Live and Dead Centres

FOR IMMEDIATE RELEASE

AEROSWEEP SPEED SWEEPING SYSTEMS OPERATORS MANUAL

Notification of a Proposal to issue a Certification Memorandum. Rotor Drive System Gearbox TBO Development

CLEARLINE PROFILER REPORT P.R. Anderson CleanFlow Systems Limited, Albany, Auckland, New Zealand

Analysis of Aquawrap for use in Repairing Pipelines with a Dent / Gouge Defect

JUL 17 Rev M

Application Tooling Specification Sheet

no adhesion effect on sliding surface, even after a long standstill superior performance over a wide range of temperatures and hydraulic fluids

SOUTHEAST REGIONAL MAINTENANCE CENTER LOCAL STANDARD ITEM

Application Tooling Specification Sheet

DA Series Diaphragm Valve

Dodge Torque-Arm II The Legacy Continues

Casing & Tubing Running Services

Lubrication. Extend the life of Circuit breakers and Switches. Presented by Phillip Serna

LS Chevy With Variable Valve Timing (VVT)

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

TOYOTA Runner (17 Beadlock ) ALLOY WHEEL Preparation

A system of lubricant dispensing devices (oil or grease) connected by piping to a central pumping unit that is operated automatically or manually.

The kit comes with a 100 psi sensor, solenoids and harness.

Installation Instructions

About Cobra Downhole Motors

Transcription:

IDM Code GDL23377/1 / March 2018 SEC Connection Scope These guidelines apply specifically to the use of SEC connections. This document should be used in conjunction with the TenarisHydril Running Manual, which is the main document applicable to the running of all TenarisHydril premium connections. References. TenarisHydril Running Manual.. Premium Connection Approved Thread Compounds TSH-MD-00.0002.. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG 13-005. Equipment, Material & Documents 1. Verify the appropriate thread compound is available. 2. Refer to document TSH-MD-00.0002 for a list of compounds approved by Tenaris. 3. Latest version of the specific Product Data Sheet can be obtained from the local Tenaris Technical Sales representative or contact-tenarishydril@tenaris.com. TenarisHydril RUNNING MANUAL 1

TenarisHydril RUNNING MANUAL Pre-Running 1. Never move or handle pipe without the correct thread protectors securely in place. 2. Ensure connections are clean and free of all debris and / or contaminants, cleaning methods employed should conform to the recommendations contained within the TenarisHydril Running Manual. 3. Verify all pipe and accessories have genuine TenarisHydril manufactured connections. 4. Visually inspect thread and seal areas prior to running, ensuring no damage is evident. 5. Verify the compatibility of the SEC connection with accessories such as cement heads, safety valves, cross overs, etc. 6. Verify material grade of all accessories ensuring compatibility with main string. 2

IDM Code GDL23377/1 / March 2018 Inspection 1. Inspection criteria for all TenarisHydril connections is as outlined in the Field Service Operative Guideline FSOG 13-005. 2. Pay particular attention to seal areas. 3. Ensure the pin nose has no tears, gouges or raised metal. 4. Ensure the pin and box torque shoulders have no dents, tears or raised material which could interfere with correct assembly. TenarisHydril RUNNING MANUAL 3

TenarisHydril RUNNING MANUAL SEC Configuration Tubing 2 3/8" 2 7/8" = 8 TPI Tubing 3 1/2" 4 1/2" = 6 TPI Casing 5" 13 3/8" = 5 TPI 4

TenarisHydril RUNNING MANUAL IDM Code GDL23377/1 / March 2018 Casing Seal Torque Shoulder Modified BTC Thread Tubing Seal 5

TenarisHydril RUNNING MANUAL Thread Compound Application 1. Apply a thin coating of thread compound on the pin and box connections, fully covering all threads, seals, pin nose and box torque shoulder, the thread form should be fully visible. 2. Use approximately 20% of the quantity applied to the pin when doping the box. 3. For Tenaris approved thread compounds, apply the friction factor indicated in TSH-MD-00.0002. For thread compounds other than those listed, apply the thread compound manufacturers indicated friction factor. 6

IDM Code GDL23377/1 / March 2018 Thread Lock Application Connections must be clean and dry when applying thread lock. 1. Apply a thin coating of thread lock on 50% of the pin threads furthest from the pipe body. 2. Do not apply thread lock on the seal or torque shoulder. TenarisHydril RUNNING MANUAL 3. Apply thread compound to the box seal and torque shoulder. 4. Apply the thread lock manufacturers indicated friction factor. 7

TenarisHydril RUNNING MANUAL Torque Application 1. The use of computer make up analysis equipment is strongly recommended when assembling SEC connections. 2. Shoulder points for SEC connections are determined as a percentage of final applied torque. Final Torque Shoulder Torque Final Torque Tubing Casing Shoulder Torques ST / FR GR ST / FR / GR x 100 = Delta Torque Minimum 30% 30% 40% Maximum 95% 100% 95% 3. The table above indicates the acceptable minimum and maximum delta torque percentages. 4. Reference torque should initially be set at 5% of optimum torque. 5. The dump valve should be set at optimum torque, verify correct operation on the pipe body prior to first make up. 6. Set the computer turns to 2 initially then adjust as necessary to attain good graph depiction. 7. Refer to the TenarisHydril running manual make up acceptance section for further explanation. 8. The computer make up profile for SEC connections should be similar to the ones below. 8

IDM Code GDL23377/1 / March 2018 9. SEC connections of the same same OD different weight are fully interchangeable. TORQUE * 1000 ft-lbs TORQUE * 1000 ft-lbs 6.7 5.0 3.4 1.7 0 6.7 5.0 3.4 1.7 0 0 0 OPT 9000 OPT 9000 0.23 0.45 0.68 0.91 0.23 0.45 0.68 0.91 MAX. 9680 MIN. 8330 TURNS MAX. 9680 MIN. 8330 TURNS RUNNING MANUAL TenarisHydril 10. SEC ST / FR / GR tubing connections with the same OD are interchangeable. 11. If different weight or grade of connections are to be mixed apply the lower of the indicated make up torques. 9

TenarisHydril RUNNING MANUAL Running 1. The use of a stabbing guide is strongly recommended. 2. The use of a weight compensator is strongly recommended for chrome, large OD or heavy pipe. 3. To avoid cross threading stab pipe in a smooth controlled fashion ensuring the pipe is vertical when doing so, continue to support and stabilise the pipe throughout the stabbing and make up operation. 4. Upon commencement of initial rotation use low RPM (5 RPM or below) in order to ensure the pipe has not cross threaded during stabbing. 5. If cross threading is evident, immediately reverse rotate the pipe, break out, clean and inspect both connections. 6 Maximum spin in speed should not exceed 15 RPM. 7. Apply power tong at low RPM (do not exceed 5 RPM) for final make up. 8. Walk chrome pipe all the way in to hand tight, then apply tong only for final make up. 10

IDM Code GDL23377/1 / March 2018 Pulling 1. Automatic stabbing system or stabber is highly recommended to maintain the pipe in a vertical position. 2. The use of a stabbing guide is recommended to assist in centralising the pin to prevent hang up. 3. A weight compensator is strongly recommended for chrome, large OD and heavy pipe. 4. Apply the back up tong jaw on the lower part, over the mill end, of the coupling. 5. Apply power tong in low RPM (3-5 RPM) to break the connection, ensuring the pipe is stabilised during the break and spin out process. 6. Do not exceed 15 RPM during spin out. 7. Walk chrome pipe all the way out after initial break out. 8. Visual inspection is recommended to classify the thread condition, any rejected connections should be clearly marked and segregated for further investigation. TenarisHydril RUNNING MANUAL 9. Apply clean, dry thread protectors after applying storage compound on clean, dry connections. 10. Storage / thread compound should always be applied to connections post job, even rejects. 11