TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Similar documents
SunZia Southwest Transmission Project

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

SunZia Southwest Transmission Project

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

Merger of the generator interconnection processes of Valley Electric and the ISO;

WestConnect Regional Planning Update

U.S. System Summary: ARIZONA/SOUTHWEST

Decision on Merced Irrigation District Transition Agreement

MCE SPECIAL MEETING Friday, September 28, :00 A.M. Agenda Page 1 of 2

California and the Western Grid: Transmission Challenges

City of Palo Alto (ID # 6416) City Council Staff Report

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST

Arizona Transmission Challenges

best to you all Gail Carbiener Page 1 of 5

Western NY Public Policy Transmission Planning Report

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

Supplement to ISO Transmission Plan. Harry Allen-Eldorado Project Description and Functional Specifications

WESTERN EIM BENEFITS REPORT Second Quarter 2018

SPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations

Michigan Renewable Energy Case Study

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

California s Energy Storage Summit California Energy Storage Association and Association of California Water Agencies

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

TransWest Express AC and DC Project Comprehensive Progress Report (CPR) 3,000 MW DC and 1,500 MW AC WECC Phase 1 Analysis

Arizona Energy Consortium Conference

Request for Qualifications. for

EIPC HIGH LEVEL TRANSMISSION COST ESTIMATION TASK #5: DOE PROJECT NO. DE-OE

LS Power Southwest Renewable Energy Conference: Financing Transmission Joseph Esteves Chief Financial Officer September 2009 Bringing Energy Forward

AES Corporation A CLEAN Program Brief

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

The Green Line Project

March 7, Subject: Southern California Edison 2011 Annual Progress Report

Contents. Solar Select TM Frequently Asked Questions

Michigan Thumb Loop Transmission Line Project

Southern California Edison Clean Energy Future

welcome to the BC Hydro community open house

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

Department of Market Quality and Renewable Integration November 2016

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Interdepartmental Memorandum

Presentation to the Senate Committee on Transportation. April 7, Carson City, NV

Representing Nevada s Rural Electric Cooperatives, Power Districts, and Municipal Utilities.

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

Black Hills Project Summary

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30)

ACTION: ESTABLISH LIFE-OF-PROJECT BUDGET FOR UP TO 100 NEW COMPO BUSES

Appendix D Black Hills Project Summary

PSE Attachment K Puget Sound Area Transmission Meeting

NYISO Market Initiatives

MILLIGAN SOLAR PROJECT

Feed-In Tariffs Presentation to the Nevada Production and Use of Energy Committee

Operating Committee Meeting. Transmission Policy Training

MILESTONE SUMMARY REPORT Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009

Transmission Planning using Production Cost Simulation & Power Flow Analysis

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

Operational Opportunities to Minimize Renewables Curtailments

Wyoming Energy Projects

Kansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross

California s Emission Reduction Plan for Ports and International Goods Movement

Update on State Solar Net Metering Activities Lori Bird, NREL RPS Collaborative Summit Washington, DC September 23, 2014

Meeting Policy Objectives Transmission: A Path to Compliance

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

U.S. SOLAR ENERGY INDUSTRY: NATIONAL DYNAMICS & STATE-LEVEL IMPACTS

APPENDIX F: Project Need and Description

Consulting Agreement Study. Completed for Transmission Customer

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

Electrical District No. 3 SOLAR Q & A

Purple Line Light Rail P3 Project

Donna Painter, Executive Consultant February 27, 2013

Rocky Mountain. Corridor Input Team. Alternatives Overview. TEMS, Inc. / Quandel Consultants, LLC TEMS, Inc. / Quandel Consultants, LLC

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION

RON ROBERTS SUPERVISOR, FOURTH DISTRICT SAN DIEGO COUNTY BOARD OF SUPERVISORS

Household Renewable Energy

RENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017

Solar in Utah: Policies, Markets, and Technology Billy Smallen, Utah Clean Energy

Transmission Planning Attachment K Public Input Meeting

Solar-Wind Specific Request for Proposals

THE TRES AMIGAS SUPERSTATION PROJECT

TransWest Express Project

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

Overview. Program Details

Salt Lake County Electrical Plan Task Force October Douglas N. Bennion, P.E. Vice President Rocky Mountain Power

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

California Energy Commission. December 7, 2015

Solar in Utah: Policies, Markets, and Technology Billy Smallen, Utah Clean Energy

WESTERN BLUE CHIP ECONOMIC FORECAST FOR JANUARY, 2017

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Distributed Solar Policy Case Study: NEVADA

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Transcription:

TransWest Express Transmission AC and DC Project 2018 2019 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission Group March 31, 2018

TransWest Express AC and DC Project: 2018 2019 Cycle Interregional Transmission Project Submittal at a Glance Regional Entities California Independent System Operator WestConnect Northern Tier Transmission Group Physical Connection Yes Yes Yes Cost Allocation Requested Yes Yes No, not at this time 1 Identified Primary Need Load and Resource Data Proposed Capacity CA SB350 needs including 50% RPS, AZ and NV RPS Compliance Load served by high quality and diverse Wyoming wind resources Economic opportunities though expanded grid. Accommodate planned resources. The Chokecherry and Sierra Madre Wind Energy Project, and natural gas plants at Northern Terminal DC Portion: Phased 1,500/3,000 MW between WestConnect system in UT and NTTG system in WY AC portion: 1,500 MW CAISO and WestConnect system in NV and to TWE DC portion in UT Proposed Technology Two Terminal, 500 kv, Bipole HVDC and 500 kv AC Circuit length DC potion: 406 miles, AC Portion: 324 miles or less as needed. In service Date 2022 Permitting Status Federal Records of Decision and Right of Way Grants issued in 2016 and 2017, Wyoming Industrial Siting Permit and County Permits underway System Study Status Initiated Phase 1 of WECC Path Rating in April 2018 Other Transmission Project Dependency Project Alternatives Project website Project Sponsor 1 TransWest Express LCC may request Cost Allocation from NTTG. None. Proposed HVDC project will complement 500 kv AC build out among Regional Entities similar to DC and AC buildout along the West Coast Initial DC segment capacity can be greater. AC segment can terminate at Crystal/Harry Allen. [Alternative TWE DC Project configuration submitted as separate 2018 2019 ITP proposal.] www.transwestexpress.net TransWest Express LLC David Smith (303) 299 1545 david.smith@tac denver.com 2

TransWest Express AC and DC Project: An Interregional Transmission Solution Proposed Project designed to provide needed transmission capacity from Desert Southwest Region to Wyoming wind resources and maximize use of existing STS capacity 1,500 MW initial/3,000 MW final, 500 kv HVDC Utah connections: WestConnect Wyoming connections: NTTG 1,500 MW, 500 kv AC Nevada connections: CAISO, WestConnect Bi directional operation 3

Project Need: Proposed TWE AC and DC Project Meets Interregional Needs TWE DC Project is an Interregional Transmission Project that provides needed capacity between California and Rocky Mountain regions Several studies found the benefits from additional capacity between these regions more than offset the transmission investment costs in meeting California s RPS and other more stringent green energy goals and targets being examined by utilities and other entities (Policy Need). The CAISO 2017 2018 Plan identified a severe lack of available transmission capacity to access Wyoming wind resources. The TWE AC and DC Project maximizes the use of existing transmission capacity between California and Utah. Other potential needs: (Economic) increased transmission capacity between CAISO and PacifiCorp BAAs could provide benefits due to the EIM, DAM and potential regional ISO. 4

TransWest Express Project Development Status Development initiated in 2008 with primary focus on permitting. TransWest and Western Area Power Administration jointly working on development since 2010. Bureau of Land Management and Western issued Records of Decision in December 2016 and January 2017, respectively. Right of way grants for federal land (67% of line route) issued in 2017 and 2018. Private land ROW acquisition and local permitting underway and planned to be completed in 2019. WECC Path Rating Phase 1 initiated, planned to complete Phase 2 and SIS analysis in 2019. Three year construction schedule planned. TWE Project can be placed in service as early as 2022 or as needed. TransWest Express affiliates are developing the 3,000 MW Chokecherry and Sierra Madre Wind Energy Project 2 and potential natural gas generating plant located near the TWE Project s Northern Terminal. 2 www.powercompanyofwyoming.com 5

TransWest Express Transmission Project Route

Technical Data Submitted DC Alternatives The proposed TWE Project is to build a 3,000 MW HVDC line and only 1,500 MW of terminal capacity and add in parallel a 1,500 MW of terminal equipment later. The initial HVDC capacity can be between 1,500 to 2,500 MW and there are alternative phasing approaches that would lower costs if the period between initial and final build out is shortened. AC Alternatives The 500 kv AC portion could installed along with the DC portion or on a separate schedule depending on system needs. In addition the 500 kv AC project could be interconnected to the Crystal and/or Harry Allen 500 kv stations north of Las Vegas. Overall Alternatives TransWest submitted a separate 2018 2019 ITP submittal for the TWE DC Project, which is an alternative configuration allowed for in the TWE Project Records of Decision. TransWest submitted the power flow models being used in WECC Path rating process to the planning entities. Capital Cost estimate The initial 1,500 MW phase DC segment, $1.62B. To increase the capacity to 3,000 MW, $0.87B. The 324 mile, 500 kv AC segment, $600M. 7

Development, Construction and Operation Plans TransWest plans to continue development activities including state and county permits, private ROW acquisition, Interconnection Agreements, Technical Specifications and project financing. TransWest project delivery plans are to use an Engineer, Procure, Construct (EPC) approach. The HVDC equipment will be procured separately and provided to the EPC contractor for installation. Alternative project delivery approaches may be used depending on the make up the TWE Project owners and access to balance sheet financing at the time of financial close for construction. The TWE Project will require full time operators at both terminals along with maintenance staff. AC substation and transmission line operations and maintenance will be contracted out. Western, PacifiCorp and other utilities that operate in the region are likely candidates to perform these services. 8

TransWest Express LLC TransWest Express LLC is a wholly owned affiliate of The Anschutz Corporation. The Anschutz Corporation is a privately held, multibillion dollar diversified company with worldwide investments in natural resources including oil and gas, pipelines, ranching and in other diverse industries. Anschutz has extensive experience in developing, constructing, financing and operating many large projects in the natural resources, real estate, sports and entertainment industries. The Anschutz Corporation has sufficient financial resources to provide the equity investment, although future equity partners will be obtained in the market. The Anschutz Corporation has on many occasions secured equity investments in other projects and continues to possess the appropriate reputation and relationships to attract such investments. 9

Interregional Project Review Considerations Policy and Economic Assessments Proposed Project designed to meet CPUC/CAISO and WestConnect Policy and Economic needs. Proposed Project not designed to meet NTTG regional needs expected in the 2018 2019 Study Plan. However, examination of broader economic opportunities including EIM, DAM and access to solar resources during over generation periods may be warranted. Reliability Assessments Multiple reliability assessments have been completed for Path Rating and are underway for SIS work with multiple entities from three regional planning groups plus Columbia Grid are already directly participating. Cost Allocation Consideration Seeking Cost Allocation consideration from CAISO and West Connect. Not currently seeking Cost Allocation consideration from NTTG. Cost Allocation of DC Project avoids common transmission cost allocation pitfalls of AC projects. DC controllability allows for subscription capacity process and limits free rider benefits. 10