Dominion Energy Instructional Guide for Completing Virginia Form NMIN

Similar documents
TERMS AND CONDITIONS

Municipality Generator Interconnection Application Single Meter Application Part I

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

Umatilla Electric Cooperative Net Metering Rules

TERMS AND CONDITIONS XXV. NET METERING CUSTOMERS AND SMALL AGRICULTURAL GENERATORS

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

Renewable Net Metering Program Appendix ESD APX 001 1

Net Metering Program

HydroGenerations PROGRAM HANDBOOK

APPLICATION Net Energy Metering (NEM2) Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Net Metering in Ontario POWER YOUR ELECTRICITY NEEDS AND MANAGE YOUR ENERGY COSTS.

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

Net Metering Service. Customer Information Package

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below:

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

To complete the process for a net metering interconnection, please follow the steps below:

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

White River Electric Association, Inc. Net Metering Information & Service Requirements

TILLAMOOK PEOPLE S UTILITY DISTRICT

Louisville Gas and Electric Company

ELECTRICAL DISTRICT # 2

JACKSON ELECTRIC COOPERATIVE POLICY NO. 305

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Purpose. Background. Exclusions

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 25 kw)

To complete the process for a net metering interconnection, please follow the steps below:

MISSOURI SERVICE AREA

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

Consumer Guidelines for Electric Power Generator Installation and Interconnection

24. SOLAR INCENTIVE PROGRAM II

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Form C Renewable Energy Micro-Generation Connection Application Distribution System

Duke Energy Carolinas North Carolina Interconnection Request Checklist

To complete the process for a net metering interconnection, please follow the steps below:

NET METERING APPLICATION

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

PSNH INTERCONNECTION REQUEST

06/05/2018. COMMUNITY SOLAR OVERVIEW For Generation Owners and Subscribers

London Hydro Connection Checklist

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

JEA Distributed Generation Policy Effective April 1, 2018

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

SCHEDULE 84 CUSTOMER ENERGY PRODUCTION NET METERING SERVICE

GENERATOR INTERCONNECTION APPLICATION

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota

Interconnection Process for Generation Systems

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Your Friendly and Caring Member Cooperative. Consumer Guidelines for Electric Power Generator Installation and Interconnection

Electric Utility Contact Information Indiana Michigan Power

HONOLULU AUTHORITY FOR RAPID TRANSPORTATION CITY AND COUNTY OF HONOLULU ADDENDUM NO. 1 TO THE REQUEST FOR INFORMATION FOR THE

Net +Plus Connection Code

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

The Commonwealth of Massachusetts

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

Schedule Z Additional Information Required for Net Metering Service. Is the Host Customer a: Municipality Other Governmental Entity

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

Please Refer to Attached Sample Form

CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

NET METER REQUEST FORM

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

Producing your own energy? Great Decision. ComEd.com/Interconnection. Let s connect you to our smart grid.

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Louisiana Net Metering Service. Customer Information Package

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

MISSOURI SERVICE AREA

ADOPT INTERCONNECTION AGREEMENT FORMS FOR CUSTOMERS INSTALLING GENERATION EQUIPMENT PURSUANT TO REGULATION 23.

INTERCONNECTION REQUIREMENTS POLICY

CITY OF SASKATOON ADMINISTRATIVE POLICY

Lassen MUD PV BUYDOWN PROGRAM Photovoltaic Systems Guidelines

WEB ENABLE ONLINE DATA LOGGER AND REMOTE MONITORING FOR 66 KW ON GRID SOLAR PV SYSTEM

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

Distributed Generation Interconnection Policy

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Transcription:

Complete Sections 1 through 4, sign the form at the bottom, and submit to Dominion Energy either by scanning and e-mailing to net.metering@dominionenergy.com, or send by US Mail to Dominion Energy, Net Metering, One James River Plaza, 9th Floor, P.O. Box 26666, Richmond, VA 23261-6666 1 2 3 1 For a traditional net metering arrangement leave both boxes un-checked. Use Ag Net Metering check box only if requesting that multiple existing meters be aggregated and net metered under one single account. Use Power Purchase Agreement only if requesting to execute a separate Power Purchase Agreement (PPA). 2 The Applicant will typically be the same person or entity that the electric account is billed to, and the Applicant name should match that of the electric account holder. 3 The Account Number should be the billing account number associated with the meter that the generation system will be physically interconnected with. 4 Proposed Interconnection Date -target date for when the system will be completed and ready to energize. 4

5 6 7 5 For solar voltaic systems please provide the panel manufacturer, panel model number, and number of panels. Example: QCells Q.Pro-G4 260W ( X 87) 6 The Rated Capacity in kilowatts AC should reflect the actual expected maximum AC system output after all system de-rates have been applied. The Rated Capacity in kilowatts DC should reflect the total installed system nameplate capacity. Example: AC 19.8 kw DC 22.6 kw 7 For solar voltaic systems please provide the inverter manufacturer, complete inverter model number, and number of inverters. Example: Solar Edge SE10000A-US ( X 2).

For Single Phase Inverter Based Systems Under 25 kw Section 3 may be skipped The Vendor is the entity who is providing the generation system equipment. Typically this will be the firm that is installing the solar system. For systems that are procured and/or installed by the Applicant simply state By Applicant Applicant please sign and date the notification at the bottom of the form

After completing Sections 1 through 4, and signing the form at the bottom, submit to Dominion Energy either by scanning and e-mailing to net.metering@dominionenergy.com, or send by US Mail to Dominion Energy, Net Metering, One James River Plaza, 9th Floor, P.O. Box 26666, Richmond, VA 23261-6666 Dominion Energy will send return confirmation that the Notification was received. Dominion Energy will review specifications for the proposed generating system and determine if the system is compatible with the electric distribution grid and the existing electric distribution facilities serving the interconnection point. When the review is completed, Dominion Energy will return a signed copy of the Notification along with any additional system protection requirements and/or required upgrades to the existing electric distribution facilities serving the interconnection point to enable completion of the interconnection. Please Note: A Net Metering Applicant is solely responsible for compliance with all applicable local zoning requirements, building codes, electrical codes, or any other codes or restrictions governing installation and operation of a generation system. Dominion Energy does not review or approve the system equipment selection, installation method, or installation location. Dominion only reviews the proposed interconnection for compatibility with the electric distribution system, based on UL1741/IEEE1547 standards.

Complete Section 5 after the system is installed and ready for interconnection resubmit the entire Notification form to Dominion Energy. Dominion Energy will complete the required metering work and return a separate written authorization to energize and operate the system In cases where the applicant or a licensed Virginia Class A or B General Contractor has installed the generation system, a copy of the final electrical inspection signed by the inspection authority may be provided as an alternative to the completion of this section of the Notification form.