Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw

Similar documents
Enquiry Form for Micro and Small Generators 5MW and Less

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

Micro Embedded generation

Renewable Energy System - Electricity System Connection Application Form

Large Embedded Generation User Guide A

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

Connecting your business diesel generation

APPLICATION ELECTRICITY SERVICES. APPLICATION FOR THE CONNECTION OF SMALL SCALE EMBEDDED GENERATION Page 1

Connecting to the network information pack Version 5

Connecting your home or small business generation

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

Assisted School Travel Program. Eligible Service Provider Request for Increased Run Capacity

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Guidelines for connection of generators:

NS194B Guidelines for Rotating Machines Connected to the Ausgrid Network. October 2014

Basic Connection Services Application and Price Guide

JEA Distributed Generation Policy Effective April 1, 2018

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

SSEFITAPP 2012_08_07 v2.1. FeeD-In TArIFF APPlICATIon ForM

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Appendix Item Addendum

REQUEST FOR PROPOSAL

REVISION NO.: 7 EFFECTIVE: 07/07/16

Marina Bay Sands Guidelines for Electrical and Wiring Service

Export limits for Embedded Generators up to 200 kva connected at Low Voltage

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Construction and Connection of Street Light Assets

Distributed Energy Resources Grid Connection Guidelines

Connection Application

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Model Standing Offer for Micro Embedded Generator Basic Connection Services

Technical Standard - TS 129. Small Inverter Energy Systems (IES) - Capacity not exceeding 30kW. SA Power Networks. Published: November 2017

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Note: it is a criminal offence to give false information in this application.

Application for Net Export Rebate

PHILIPPINE DISTRIBUTION CODE 2017 EDITION

ibusiness Banking Application Form Welcome to ibusiness Banking Need help completing this form? Adding an Additional Company to an existing Group

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

Palabora Copper REQUEST FOR PROPOSAL SUPPLY AND DELIVERY OF BEARINGS AND ACCESSORIES RFP.PC.2017/18 PART 1 PROPOSAL INFORMATION AND CONDITIONS

Clean Energy Council submission to the Energy Networks Australia. Technical Guidelines for Basic Micro and Low Voltage Embedded Generation Connections

National Distributed Energy Resources Grid Connection Guidelines. Technical Guidelines for Basic Micro EG Connections

London Hydro Connection Checklist

The relative site locations are detailed below with the main headquarters circled in blue and the new Fiji Airways Aviation Academy in green.

SA Power Networks Commissioning Witnessing Checklist

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Your Friendly and Caring Member Cooperative. Consumer Guidelines for Electric Power Generator Installation and Interconnection

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

WORKSAFE VICTORIA APPLICATION FOR A VEHICLE LICENCE TO TRANSPORT DANGEROUS GOODS - FTL

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Completing this form accurately will help us process your application as quickly as possible. Please complete all sections relevant to your project.

Application for a New / Augmented Connection

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

Net +Plus Connection Code

Queensland Electricity Connection and Metering Manual

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Umatilla Electric Cooperative Net Metering Rules

To complete the process for a net metering interconnection, please follow the steps below:

Requirement Definition/Terms of Reference Satellite Beach City Hall - Solar Array Installation

To complete the process for a net metering interconnection, please follow the steps below:

Duke Energy Carolinas North Carolina Interconnection Request Checklist

Distribution Code Part 4: Distributed Generation Requirements

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

REQUEST FOR PROPOSALS (RFP) FOR THE PURCHASE OF SOLAR ENERGY

Example 1MW Solar System for Fosters Yatala

Addressing ambiguity in how electricity industry legislation applies to secondary networks

APPLICATION Net Energy Metering (NEM2) Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Electrical District No. 3 SOLAR Q & A

ELECTRICAL DISTRICT # 2

Interconnection Process for Generation Systems

MICRO-GENERATOR APPLICATION GUIDELINE

Large General Service Time-of-Use Storage Program

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

MARLBOROUGH LINES DISTRIBUTED GENERATION INFORMATION PACK

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS

Solar*Rewards Frequently asked questions system size and customer usage

City Title. . Is System Owner interested in being contacted about energy efficiency opportunities at this site? Title. City. Site Contact.

Service & Installation Rules 2014

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

To complete the process for a net metering interconnection, please follow the steps below:

Standards, Procedures and Policies for Grid Connection

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

APPENDIX A 2018/ Where do you apply to obtain membership of the Scheme and the required vehicle stickers?

UK Power Networks Use of System Charging Methodology

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

SERVICE & INSTALLATION RULES Manual No. 32

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota

Dublin Airport Chauffeur Code of Conduct Dublin Airport Chauffeurs Code of Conduct. Dublin Airport Parking

Transcription:

Major Customer Connections Preliminary Enquiry Form Embedded Generation > 30 kw MARCH 2018 Privacy Notice Ergon Energy is collecting information (including personal information) on this form for the purposes of your enquiry. Your personal information will not be disclosed to any external third parties without your consent, unless authorised or required by law. If you wish to apply for access to this information, or make a privacy complaint, you may contact the Privacy Officer on 13 10 46 or privacy@ergon.com.au. Ergon Energy s privacy policy may be viewed at ergon.com.au. If you have provided personal information of another individual, please ensure that you advise that person about this privacy statement.

A Major Customer Embedded Generator Connection is where embedded generation above 30 kw will be connected to Ergon Energy s network. This form may be used for submitting a formal connection enquiry, or to request more information about establishing or modifying a Major Customer connection. When completed, please email this Enquiry Form to majorconnections@ergon.com.au SECTION 1 - Customer Information CUSTOMER (ENTITY) DETAILS NAME: ABN: ACN: EMAIL ADDRESS: (Ergon Energy will use this email as the preferred method of contact unless otherwise specified) WEBSITE: POSTAL ADDRESS: PHYSICAL ADDRESS: PHONE NUMBER: OTHER INFO: (e.g. joint venture, manager / agent arrangements/authority) The applicant listed above acknowledges and agrees that Ergon Energy may concurrently process competing enquiries, which may impact on the physical, technical or financial arrangements required to connect the applicant s project to Ergon Energy s network. To facilitate transparency and assist applicants, the applicant listed above agrees that Ergon Energy may disclose to third parties the applicant s: capacity requirements, general project location, and relevant submission dates in the connection process. If the applicant does not consent to this disclosure, please tick this box: The applicant listed above also acknowledges and agrees that information submitted as part of this Major Customer Enquiry Form may be released to contractors, sub-contractors or consultants of Ergon Energy (subject to confidentiality requirements) in order to manage the Enquiry on Ergon Energy's behalf, and submission of this Enquiry Form is deemed to be consent to such release. This Major Customer Connection Enquiry Form is hereby submitted to Ergon Energy by an authorised representative of the applicant listed above. Signed Position Date Major Customer Preliminary Enquiry Form Embedded Generation > 30 kw page 1

CUSTOMER (ENTITY) REPRESENTATIVE DETAILS (please note that you may also nominate an authorised agent on page 1) NAME: EMAIL ADDRESS: POSTAL ADDRESS: PHONE NUMBER: CONSULTANT DETAILS COMPANY OR BUSINESS (TRADING) NAME (as per ASIC registration, ABN registration, as relevant) ABN: ACN: CONTACT NAME: EMAIL ADDRESS: (Ergon Energy will use this email as the preferred method of contact unless otherwise specified) WEBSITE: POSTAL ADDRESS: PHYSICAL ADDRESS: PHONE NUMBER: MOBILE NUMBER: AUTHORISED AGENT (If you complete this section and nominate an authorised agent, we will only transact with this agent and not the (or any) business (entity) representative listed on page 1) As Ergon Energy will only transact with an agent that has been appropriately authorised, please arrange for the applicant to sign section 1 and this section to grant authority for your consultant to act on their behalf. I/We authorise to act on our behalf in relation to this proposed project. Any information or advice provided by my/our authorised agent may be relied upon by Ergon Energy as if it were information or advice provided by the entity listed in Section 1. Signed Position Date Major Customer Preliminary Enquiry Form Embedded Generation > 30 kw page 2

SECTION 2 - Details of your Preliminary Enquiry Please complete the relevant details below to enable us to process your request efficiently and in accordance with any relevant provisions of the National Electricity Rules (NER). Further detail on the relevant connection processes associated with EG systems can be found in Ergon Energy Network s Embedded Generator Information Pack. I / we request general information in relation to a negotiated Major Customer Embedded Generation connection. I/we wish to submit a request for sitespecific connection advice about a proposed Major Customer Embedded Generator connection I/we wish to submit a preliminary enquiry in respect of an embedded generator that is > 30 kw and < 5,000 kw I/we wish to make an enquiry in respect of an embedded generator > 5,000 kw to obtain a Preliminary Enquiry Response (PER). I/we wish to make an enquiry in respect of an embedded generator > 5,000 kw but bypass the PER and proceed directly to a Detailed Enquiry Response (DER). I/we have received a PER and now request to proceed to a DER By selecting this service, you are requesting general process information regarding the establishment or alteration of a Major Customer connection. A Major Customer Group representative will contact you to discuss your requirements within 5 business days of receiving this form. Please note there is no charge for this service. Please note that a fee will apply to this service. A preliminary enquiry under rule 5A.D.2 of the NER allows you to get certain information so that you can make an informed connection application. Please note there is no charge for this service. A preliminary response to enquiry under rule 5.3A.7 of the NER gives you certain preliminary information before moving to obtain a detailed response to enquiry. Note that a generator > 200 kw to 5 MW may apply for this service if they wish to be processed under PART B of Ergon Energy Network s Embedded Generator Information Pack. Please note there is no charge for this service. Within 5 business days of receiving this request, we must advise you if we agree to bypass the PER. If we agree to go straight to the DER, we will advise what further detail may be required to proceed. Please note that if your request is approved, a fee for the provision of a DER is applicable. A Major Customer Group representative will contact you to discuss your requirements and provide you with a quote within 5 business days of receiving this form. Please note that a fee will apply to this service. Major Customer Preliminary Enquiry Form Embedded Generation > 30 kw page 3

SECTION 3 Details of your proposed embedded generation project General information regarding your proposed Embedded Generation system PROJECT & SITE DETAILS PROJECT / GENERATOR DESCRIPTION (Please provide a qualitative description of the objectives/purpose of the proposed project and relevant estimated commission dates) NATIONAL METERING IDENTIFIER (NMI): LATITUDE: SITE ADDRESS INCL. GPS: (Please provide Google Earth Pin attachment; files or spatial data may also be sufficient) LONGITUDE: ANTICIPATED CONNECTION DATE: REGISTERED PLAN NUMBER AND/OR LEASE NUMBER: REGISTERED OWNER OF THE SITE: EXISTING GENERATION ON SITE IS THERE EXISTING GENERATION ON THE SITE? YES (Please complete details below) EXISTING EG CONFIGURATION: Non-export Capacity (kw) NO (Please continue to next section) EXISTING TECHNOLOGY ONSITE: Via IES (e.g. Solar PV) Partial-export Full export Capacity (kw) Capacity (kw) Via Rotating Machine (e.g. diesel generator) Battery Storage on site CURRENT EXISTING EG RATED CAPACITY: kw TOTAL AUTHORISED (CONTRACTED) SIZE OF EXISTING EG SYSTEM: kw TOTAL CONNECTION POINT CAPACITY REQUESTED (including all generation, both existing and proposed): kw Major Customer Preliminary Enquiry Form Embedded Generation > 30 kw page 4

DETAILS OF DISTURBING LOADS Additional information including nature of power electronic plant which may produce harmonic distortion e.g. harmonics, large motors, welders, thyristor drives, draglines). Load Type: Component Size: Duty Cycle: kva starts/hr or day Load Type: Component Size: Duty Cycle: kva starts/hr or day ADDITIONAL INFORMATION (As relevant to the proposed plant / generating system) ANTICIPATED POWER FACTOR POWER FACTOR CORRECTION TO BE INSTALLED? YES NO SECTION 3 Details of your proposed embedded generation project AUSTRALIAN ENERGY MARKET REGISTRATION CATEGORIES For more information on registration requirements, please refer to www.aemo.com.au Please advise your intentions / requirements (if known at this time) for AEMO Registration: Automatically exempt from registration (Typically all EG Systems less than 5 MW) Intending to apply for a specific exemption Please advise your intentions (if known at this time) for registration classifications: Market Non-Market Intending to register with AEMO (typically < 5 MW Have registered or applied for registration Non-Scheduled Semi-Scheduled Scheduled Major Customer Preliminary Enquiry Form Embedded Generation > 30 kw page 5

EMBEDDED GENERATION VIA AN INVERTER ENERGY SYSTEM (IES) If you are connecting an embedded generation unit via rotating machine (such as diesel), please disregard this section. IES GENERATOR PLANT DETAILS PROPOSED CONFIGURATION: TYPE OF CONNECTION REQUIRED: Non-export Low Voltage (LV) High Voltage (HV) Partial-export Full export INVERTER BRAND AND MODEL BATTERY STORAGE? YES NO Capacity (kw) COMBINED OUTPUT CAPACITY OF INVERTERS (kw) INVERTER COMPLIANT WITH IEC 62116:2014? YES NO Note that installations with inverters that are not compliant may require the installation of other equipment. (IEC 62116:2014 provides a test procedure to evaluate the performance of islanding prevention measures used with utility-interconnected PV systems. This standard describes a guideline for testing the performance of automatic islanding prevention measures installed in or with single or multi-phase utility interactive PV inverters connected to the distribution network.) DETAILS OF PROTECTION DEVICE(S) IF INVERTER NOT COMPLIANT WITH IEC 62116:2014 NOTE THAT THE PROTECTION DEVICE(S) MUST BE COMPLIANT WITH IEC 60255 PROPOSED ENERGY PRODUCTION kwh per annum PROPOSED MAXIMUM RATING OF ALL COMBINED IES GENERATING UNITS kw PROPOSED POWER LIMIT kw Major Customer Preliminary Enquiry Form Embedded Generation > 30 kw page 6

EMBEDDED GENERATION VIA A ROTATING MACHINE If you are connecting an embedded generation unit via IES (such Solar PV), please disregard this section. GENERATOR PLANT DETAILS GENERATING UNIT DESCRIPTION (i.e. technology type, make, model) (Please attach relevant product data sheets) DETAILS OF PROTECTION SYSTEM (i.e. model, compliance details of components of the protection system to complement the SLD provided. PROPOSED ENERGY PRODUCTION (estimated energy production kw per annum) kwh per annum PROPOSED OUTPUT CAPACITY OF RM GENERATING UNIT PROPOSED MAXIMUM RATING OF ALL COMBINED RM GENERATING UNITS kw OPERATING HOURS (i.e. 24hrs / 7 days per week operation) GENERATOR OPERATING TYPE (please see Ergon Energy s relevant Technical Connection Standard for descriptions of each operating type) Bumpless Standby Continuous TYPE OF CONNECTION REQUIRED High Voltage Low Voltage Major Customer Preliminary Enquiry Form Embedded Generation > 30 kw page 7

SECTION 4 Information to be submitted with this form Mandatory documents listed below must be submitted with this enquiry Embedded Generation > 30 kw via IES or Rotating Machine The documents listed in Items 1 to 5 below must be submitted with this Enquiry. 1. Product/Technical Specification Sheet for: Any existing or proposed inverters on site, clearly showing compliance with IEC 62116 and AS 4777.2.2015; and/or Any existing or proposed rotating device on site; 2. Product/Technical Specification Sheet for any existing or proposed protection devices on site, clearly displaying compliance with IEC60255 Series (where applicable); 3. Product/Technical Specification Sheet for any existing or proposed battery storage systems on site; 4. Detailed Electrical Single Line Diagram clearly displaying the appropriate Inverter and Grid Protection Device settings in accordance with our Standards; and 5. Site Plan showing the precise location of any current and proposed the embedded generation and any battery storage systems e.g. Google Earth snapshot. The above technical specification documents are also used to confirm that system elements are compliant with relevant industry codes and specifications. For further information about the technical requirements for connecting an embedded generator > 30 kw, please refer to the following technical standards: For EG > 30 kw to 1,500 kw (LV) Standard for Connection of Embedded Generation Systems (30 kw to 1500 kw) to a Distributors LV Network, STNW1174 For EG > 30 kw to 5 MW (HV) Standards for Connection of Embedded Generators, STNW1165 For EG > 5 MW Customer Standard for Embedded Generation (5 MW and above), STNW3365 Major Customer Preliminary Enquiry Form Embedded Generation > 30 kw page 8