Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

Similar documents
D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

AMENDMENT ELECTRIC SERVICE MANUAL 2014

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Approved Contractor Construction e-guide Residential Commercial

Table of Contents. Electrical Service Requirements. 1. General Requirements

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

For Conduit Inspections

UNDERGROUND SERVICES - SECONDARY

7 Single Family Service

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

COMMERCIAL QUICK REFERENCE

PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS

320A Single Phase URD Meter Loop Installations

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

SECTION 300 OVERHEAD SERVICE

SINGLE PHASE WIRING SPECIFICATIONS

THREE PHASE WIRING SPECIFICATIONS

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

7. Residential Single-Family and Duplex Buildings (Dwellings)

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT

CHAPTER 1 INTRODUCTION

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

CHAPTER V RESIDENTIAL WIRING

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION

OVERHEAD SERVICE. Items to consider

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

OREGON TRAIL ELECTRIC CO-OP ELECTRIC SERVICE REQUIREMENTS & GUIDELINES

10 Commercial, Industrial, Agricultural Services


Indianapolis Power & Light Company

ELECTRIC SERVICE MANUAL

Generator Fire Safety: Generator assemblies should be located outside the building.

Commercial & Industrial

ELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL

Customer Requirements Meter Socket Configurations

Section 6 Electric Metering: Residential

SPRINGVILLE CITY ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

Electric Service Requirements & Guidelines

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

SPRINGVILLE CITY ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

Service Requirements

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

5. Underground Requirements

SALEM CITY POWER ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

GENERAL INFORMATION 1.01 PURPOSE

JACKSON ENERGY AUTHORITY ELECTRIC SERVICE POLICY EFFECTIVE SEPTEMBER 26 th, 2005 *REVISED JULY 12 th, 2017

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions

U-18. Company furnishes and installs: 10. Service lateral and connectors. 11. Conduit package, Amperes.

Service Requirements

NEW SERVICE HANDBOOK

Spring Test 10 due 05/11/2013

SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp

New Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI

JACKSON ELECTRIC COOP METER LOOP CONSTRUCTION SPECIFICATIONS JUNE 2018

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

2016 METER SERVICES SPECIFICATION GUIDE

10. METERING General Requirements

Installing or Rebuilding Your Electric Service

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

Electric underground service installation requirements

Customer Guide to Electric Service Requirements

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

Associated equipment As related to metering equipment: such as the current transformers, CT wiring and test switches.

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES

Commercial Electric Service Handbook

INSTALL SERVICE- ENTRANCE SYSTEMS

NEC 2011 Code Changes

Metering and Service Installation:

Commercial Electric Policy

Electric Service Policy Kerrville Public Utility Board

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

Spring Test 7 due 05/03/2013

TEMPORARY ELECTRICAL SERVICE

Sentinel Field Satellite Controller

METERING REQUIREMENTS

SECTION 500 METERING AND ASSOCIATED EQUIPMENT

ELECTRIC SERVICE HANDBOOK INFORMATION & REQUIREMENTS

Have You Been Grounded Lately

Marshfield Utilities Rules for Electric Service Installations. Table of Contents

TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION CHAPTER TWO - TEMPORARY OVERHEAD SERVICE

SECTION VII METERING INSTALLATIONS

Customer Requirements Downtown Secondary Network Service

Electric Service Guidelines TSN

ELECTRICAL METERING RESIDENTIAL

WPS SERVICE MANUAL. Section Amp and Smaller - Common

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Pretest Module 24 Three-phase Service Entrance

Transmission & Distribution Glossary of Electrical Terms

Parkland Light & Water Co. ELECTRIC SERVICE REQUEST AND METER STANDARDS

KIUC Service Installation Manual

Electric Service Requirements

Transcription:

PULL BOX F SECONDARY SYSTEM Typical grade Pentahead bolts See note 2 Conduit run as specified Plastic or fiberglass for grass areas or Polymer concrete for light duty areas (see notes 2, 3, & 4) Company facility. Refer to drawing SS8.6-2 or STANDARD SERVICE INSTALLATION Exact Meter locations to be determined by Company. See section.5 9 address shall be a minimum 3" lettering marked on structure, or meter enclosure and should be visible from street. Conduit run as specified Pull Box (see pull box detail and notes 2, 3, & 4) Company facility. Refer to drawing SS8.6-2 or Exact Meter locations to be determined by Company. See section.5 STANDARD SERVICE INSTALLATION WITH PULL BOX 3 2. Customer facilities shall comply with Company Standards. the NEC, and authorities having jurisdiction. 2. Customer shall consult with company for location and type of pull box for any length over 200'. 3. If more than three 90 bends (including riser bends and regardless of length) are required in any run, consult the company. 4. Pull box shall be installed at a 90 bend or the center of run and be of sufficient strength to support probable local traffic (consult Company for box in areas with traffic or trucks driving over boxes). Recommended size: 7" W X 30" L X 8" D. 5. The Customer shall bear the cost of conduit and its installation. 6. See table for conduit diamater. 7. The customer shall install 80lb non-metallic (manila or grass) pull line or bull tape in the conduit. Conductor normally supplied by Company. 8. Underground service conduit shall be separated from telephone, cable, or water facilities by not less than 3" of concrete, 4" of brick masonry, or 2" of well tamped earth and 8" of well tamped earth for gas facilities (NESC 320.B.2 and NESC 354.A.2). 9. Conduit shall bear the U.L. label, either rigid nonmetallic (schedule 80 PVC above ground, schedule 40 below grade, gray only) or rigid /intermediate metal conduit (aluminum not permitted below grade). If metal conduit is used below grade, corrosion protection shall be provided. 0. Conduit required in restricted areas.. Additional details are found in other drawings SS8.6-2,, SS8.6-4 and SS8.6-5. 4 2/05 UPED: CUSTOMER INSTALLATION STANDARDS TEAM 4/02 5/99 6/98 UPED: CUSTOMER INSTALLATION STANDARDS TEAM UPED PER SERVICE STANDARDS TEAM UPED PER SOLUTIONS GROUP RECOMMENIONS TKV MCC 5-888-258-0808 In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. It shall be the responsibility of the Customer to stay clear of all underground facilities. CONDUIT REQUIRED TRIPLEX CONDUCT (AWG) JDS LKE CONDUIT DIAMETER /0 4/0 2.5" /0 4/0* 2" Arkansas only 350 kcm 3" * ARKANSAS ONLY TYPICAL CONDUIT SYSTEM REQUIREMENTS F SINGLE PHASE CUSTOMER UNDER SERVICE April 998 NONE SS8.6- =

See note 2 CONDUIT PLACEMENT Meter socket shall be designed for underground service installed and maintained by customer (Meter enclosure minimum required size is 4 /8" D x " W x 5 /2" H). Main breaker should be within 2'-0" of the meter. Outside wall recommended. Company may provide weather sealing as necessary Conduit stand-off bracket (supplied by Company) Upper portion of conduit will be furnished by Customer and installed by Company. See EXCEPTION in note 3. Threaded coupling, adapter, or sleeve as appropriate. Rigid/intermediate metal (steel), rigid aluminum, EMT, or schedule 80 PVC gray conduit with U.V. protection, sized per table. Metal conduit grounding shall be connected to Company's ground at pole with grounding clamp. NEC250.04B 36" radius factory bend (If PVC, schedule 80 required). 2'-6' 6" 2 Pole Ground 7" Customer shall extend the conduit to 7" from the pole. Consult the Company for details. (See drawing SS8.6- for additional details on conduit system.). Customer facilities shall comply with Company Standards, the National Electrical Code, and authorities having jurisdiction. 2. See sec. 8.6.4 & 0.2. for information on multiple conduit installations on Company poles. 3. The Company will install the Customer supplied riser material up the pole. The Customer shall supply enough conduit to extend up the pole to a point 50" above the Telephone Co.'s and/or Cable TV Co.'s cable. When these minimum conditions cannot be satisfied, the Customer shall consult the Company. The Customer shall secure the riser material at the meter entrance for installation by the Company. (EXCEPTION: In Arkansas the conduit for the riser is supplied by the Company ) 4. The Customer shall install 80lb. non-metallic (manilla or grass) pull line or bull tape in the conduit. Conductors normally supplied by Company. 5. Consult a Company Representative for required system in your area. 6/98 5/99 UPED PER SERVICE STANDARDS TEAM UPED PER SOLUTIONS GROUP RECOMMENIONS IN CONDUIT SYSTEM (see note 5) Minimum Customer Wiring Size - Family Residence Single Phase METER 00 Amp 200 Amp 320 Amp CONDUIT 2.5" *** 4/0 2/0 #4 ** 3" ALUMINUM 2" #2 Current carrying & neutral wire size (per NEC) COPPER See NEC 30.5(B) (6) - phase conductors: NEC 220.6 - Neutral, and NEC 250.66 - Ground Wire * Wire smaller than #6 must be protected from physical damage (see NEC 250.20C) ** For sole connection to rod, plate or pipe type electrode #6 AWG Cu is allowed (see NEC250.66A) *** Arkansas locations only allows 2" 4 2/05 UPED: CUSTOMER INSTALLATION STANDARDS TEAM 3 4/02 UPED: CUSTOMER INSTALLATION STANDARDS TEAM #4 Consult NEC WIRE 5 3/08 UPED: CUSTOMER INSTALLATION STANDARDS TEAM #6 * TKV MCC 53 DIRECT BURIED SYSTEM (see note 5) See drawing SS8.6-4 for working clearances -888-258-0808 In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. It shall be the responsibility of the Customer to stay clear of all underground facilities. TYPICAL SINGLE PHASE RESIDENTIAL UNDER SERVICE FROM OVERHEAD JDS April 998 LKE NONE =

CONDUIT PLACEMENT Meter socket shall be designed for underground service installed and maintained by customer (Meter enclosure minimum required size is 4 /8" D x " W x 5 /2" H). Main breaker should be within 2'-0" of the meter. Outside wall recommended. -888-258-0808 In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. It shall be the responsibility of the Customer to stay clear of all underground facilities. Threaded coupling, adapter, or sleeve as appropriate. 6'-6" working clearance 3' working clearance 5'-0" -6'-0" max. (required) Ground wire to be sized per table below. 6" max. When installing conduit system, Customer shall extend conduit to pole or underground system. Consult the Company for details. (See drawings SS8.6-2 and ) 2'-6" See note 5 See note 4 5/8" X 2" steel dowels required when concrete encased.. Customer facilities shall comply with Company Standards. the NEC, and authorities having jurisdiction. 2. Concrete encasing on elbow is required where soil subsidence is possible, consult with Company. 3. Conduit shall bear the U.L. label, either rigid nonmetallic (schedule 80 PVC above ground and schedule 40 PVC below ground, grey only) or rigid/intermediate metal conduit (aluminum not permitted below ground line). If metal conduit is used, corrosion protection shall be provided. 4. Conduit shall be flush with wall. The foundation may be required to have blocked out area for conduit in order for conduit to be flush with wall when installed. Conduit is not allowed behind the wall. 5. Upper end of ground rod to be flush with or below grade. 6. Conduit required in restricted access or paved areas. (See section 8.6.) 7. Main breaker should be within 2'-0" of the meter. Outside wall recommended. 8. Consult a Company Representative for required system in your area. IN CONDUIT SYSTEM (see note 8) DIRECT BURIED SYSTEM (see note 8) See note 2 5/8" X 8'-0" copper clad ground rod and clamp 36" radius factory bend (If PVC, schedule 80 required.) Minimum Customer Wiring Size - Family Residence Single Phase METER 00 Amp 200 Amp 320 Amp CONDUIT 2" 2.5" *** 3" Current carrying & neutral wire size (per NEC) ALUMINUM COPPER 4/0 2/0 #4 ** Consult NEC WIRE #2 #4 #6 * See NEC 30.5(B) (6) - phase conductors: NEC 220.6 - Neutral, and NEC 250.66 - Ground Wire * Wire smaller than #6 must be protected from physical damage (see NEC 250.20C) ** For sole connection to rod, plate or pipe type electrode #6 AWG Cu is allowed (see NEC250.66A) *** Arkansas locations only allows 2" 4 3/08 UPED: CUSTOMER INSTALLATION STANDARDS TEAM 4 2/05 UPED: CUSTOMER INSTALLATION STANDARDS TEAM 3 4/02 UPED: CUSTOMER INSTALLATION STANDARDS TEAM 2 5/99 UPED PER SERVICE STANDARDS TEAM TKV 6/98 UPED PER SOLUTION GROUP RECOMMENIONS MCC 54 DETAILS F TYPICAL SINGLE PHASE RESIDENTIAL UNDER SERVICE AT HOUSE JDS April 998 LKE NONE SS8.6-4 =

UNDER CLEARANCE F SWIMMING POOL UNDER REQUIREMENTS F PAVED AREAS POOL Connection point 5' Existing Company pole Electrical facilities and lines can never be within 5' of a pool (see NEC 680.0) Connection point Existing Company pole Electrical lines under paved areas shall be in conduit UNDER FACILITIES CLEARANCES From shrubs, trees, buildings, fences, decks etc. DO NOT BLOCK ACCESS TO ELECTRICAL FACILITIES 3' Proposed Driveway 3' URD box (See note 2) 2' (lock side) 3' Do not plant, pave, or build around electrical URD boxes, transformers, or cables not in conduit CAUTION: No gas meters within a 3' radius of meter enclosure METER CLEARANCES 5" HOUSE Meter Socket 3' 5" No fences, clear shrubs, etc. For residential service, the meter is to be located on the outside of the building on the side of the residence within three feet of the front wall and outside of the fences on the side most economical to reach the company's facilities. Place temporary underground service wire here (underground 30" deep) Transformer Door Lock 2" Street 2" Pedestal -888-258-0808 In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. It shall be the responsibility of the Customer to stay clear of all underground facilities.. The customer is responsible for clearing and maintaining all right of way. 2. Transformers must meet requirements of drawing SS0.- 2 3/08 UPED: CUSTOMER INSTALLATION STANDARDS TEAM 2/05 UPED: CUSTOMER INSTALLATION STANDARDS TEAM 56 Underground Service Installation Details & Clearances JRH LKE = April 2002 None SS8.6-6

20V 20V 240V STUD TYPE S DETACHABLE 3 WIRE SINGLE PHASE 20/240 VOLTS A teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals. STUD TYPE S DETACHABLE 3 WIRE SINGLE PHASE 20/208 WYE VOLTS LINE LINE Ungrounded Conductor with the Higher Voltage to Ground (Phase marked C) must be marked orange (NEC 0.5 & 230.56) Caution: For 277/480 volt service a disconnect shall be installed on the source side of the meter can. THREE PHASE 4 WIRE DELTA 20 / 240 VOLTS THREE PHASE 4 WIRE WYE 20 / 208 or 277/480 VOLTS. All diagrams on this drawing show connections when the switch is installed on the right side (see Right Side below) of the meter socket. If the switch is installed on the left side of the meter socket you will need to mirror this diagram (see Left Side below). 2. All sockets, except residential single phase less than 320 Amps, shall have a manual mechanical gang operated bypass switch. 3. Load and supply wires shall not cross in the meter socket (..2.7) Note: Install conduit under meter socket on opposite side of switch CONDUIT PLACEMENT Meter socket shall be designed for underground service (installed and maintained by customer) Left Side Right Side Note: Install conduit under meter socket on opposite side of switch 3/08 UPED: CUSTOMER INSTALLATION STANDARDS TEAM 83 WIRING DIAGRAM CONNECTIONS F UNDER SELF CONTAINED METERS JRH JED SS.8-2 = APRIL 2005 NONE 2 2