Your Friendly and Caring Member Cooperative. Consumer Guidelines for Electric Power Generator Installation and Interconnection

Similar documents
Consumer Guidelines for Electric Power Generator Installation and Interconnection

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

REVISION NO.: 7 EFFECTIVE: 07/07/16

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Electrical District No. 3 SOLAR Q & A

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

MEMBER RELATIONS POLICY NO SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

TERMS AND CONDITIONS

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

JEA Distributed Generation Policy Effective April 1, 2018

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

London Hydro Connection Checklist

2018 Solar Home & Solar Share Home Program Manual

Connecting your home or small business generation

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

To complete the process for a net metering interconnection, please follow the steps below:

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Interconnection Process for Generation Systems

Duke Energy Carolinas North Carolina Interconnection Request Checklist

Municipality Generator Interconnection Application Single Meter Application Part I

PVI 60KW, PVI 82KW, PVI 95KW

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

White River Electric Association, Inc. Net Metering Information & Service Requirements

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Umatilla Electric Cooperative Net Metering Rules

ELECTRICAL DISTRICT # 2

Net +Plus Connection Code

To complete the process for a net metering interconnection, please follow the steps below:

Louisville Gas and Electric Company

ALZ Electrical Solar Consumer Guide

COMMUNITY SOLAR PROGRAM

AGRALITE ELECTRIC COOPERATIVE 320 EAST HIGHWAY 12 P.O. BOX 228 BENSON, MN PHONE: (320) FAX: (320)

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

New Hampshire Electric Cooperative s (NHEC) Above the Cap Interconnection (Net Metering) Application Instructions

APPLICATION Net Energy Metering (NEM2) Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

Renewable Net Metering Program Appendix ESD APX 001 1

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

NET METERING APPLICATION

Contents. Solar Select TM Frequently Asked Questions

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

Interconnection Process for Customer-Owned Generation (QFs)

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

Noble County Rural Electric Membership Corporation

WARRANTY POLICY. Grid-Tied Photovoltaic Inverters. Revision D. 2014, Solectria Renewables, LLC DOCIN

Senate Substitute for HOUSE BILL No. 2101

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION

Louisiana Net Metering Service. Customer Information Package

HydroGenerations PROGRAM HANDBOOK

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

Application for Net Export Rebate

PVI 1800/PVI Residential/Commercial Grid-Tied Photovoltaic Inverter WARRANTY MANUAL. Subject to Change REV , Solectria Renewables

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES

MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488

A guide to rate information & requirements for the interconnection of a solar distributed generating system

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

ADOPT INTERCONNECTION AGREEMENT FORMS FOR CUSTOMERS INSTALLING GENERATION EQUIPMENT PURSUANT TO REGULATION 23.

Net Metering Program

Frequently Asked Questions Trico Proposed Net Metering Tariff Modifications

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

TILLAMOOK PEOPLE S UTILITY DISTRICT

Dominion Energy Instructional Guide for Completing Virginia Form NMIN

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

MISSOURI SERVICE AREA

All of Texas Has Excellent Solar Resources. United States Solar Installed (as of mid 2013): 10 GW Germany Solar Installed (end of 2013): 35.

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1

Overview of State Distributed Generation Interconnection Rules

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

RENEWABLE FUEL INFRASTRUCTURE PROGRAM APPLICATION FORM

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

Enhanced Road Assessment Policy

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

To complete the process for a net metering interconnection, please follow the steps below:

Page 1 of 10. Motor Pool Policies & Procedures

Presentation to the PJM NEMSTF Interconnection Issues. Interconnecting Solar Projects on the PSE&G Distribution System

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

REQUEST FOR PRICE QUOTATION FOR Laser Toner Cartridges. DATE BIDS REQUESTED: June 24, 2009 WEDNESDAY 10:30 A.M BID # RETURN TO:

TECHNICAL REQUIREMENTS FOR PARALLEL OPERATION OF MEMBER-OWNED GENERATION

Transcription:

Your Friendly and Caring Member Cooperative Consumer Guidelines for Electric Power Generator Installation and Interconnection Your electric cooperative seeks to provide its members and patrons with the best electric service possible, and at the lowest cost consistent with sound economy and good management. In some cases, cooperative members and patrons may become interested in installing their own electric power generation equipment. In these cases, we stand ready to work with you to ensure that your generation equipment is installed in a proper and safe manner, and in accordance with all applicable codes, standards, regulations, laws, and insurance requirements. In most of these cases, you will also need to coordinate the installation and approval of your electric power generator with the local code inspection authority. Your cooperative engineers and customer service representatives can also help you identify the appropriate contact for this purpose. Table 1 summarizes the documents required from a customer who is installing distributed generation. Table 1. Documents Required When Installing Distributed Generation Distributed Generation Information Information Required from Consumer Size Less than 10 kw 10 30 kw More than 30 kw Interconnected with Cooperative? 1 Inverter Based? Power Export? 10kW Inverter Based Process Application Part 1 Application Part 2 Contract Agreement Short Contract Agreement Long No No No x x Yes No Yes x x Yes Yes x No No x Yes No x x Yes x x x No No x x Yes No x x x Yes x x x 1 Interconnected with the Cooperative means that the generation will be electrically connected to the Cooperative system. Backup generation that uses an automatic transfer switch is not interconnected with the Cooperative. In lieu of Table 1, a customer can use the following flow charts to determine the required information. 1

Figure 1. Information Required When Installing Less than 10 kw 2

Figure 2. Information Required When Installing 10 30 kw 3

Figure 3. Information Required When Installing More than 30 kw MORE THAN 30 KW Interconnected with NO Application Documents: the Co-op? Application Parts 1 & 2 YES Application Documents: Application Parts 1 & 2 Contract Documents: Long Form Contract 4

The remainder of these guidelines detail specific information required for different sizes and applications of customer-owned distributed generation. Special Accelerated Application Process for Small Generators If you are planning to install photovoltaic (PV) or other generation of less than 10 kilowatts (kw) in a home residence or farm, we have established a special streamlined process to make it easy for you to complete the installation. Inverter-Based If your generator utilizes an inverter, the 10 kw Inverter Process packet includes everything required, from the initial application to the final contract. No other documents or information are required. Not to Be Interconnected If your small generator is not to be interconnected with the electric power system, all you need to do is give us a call and provide us with the electrical capacity, manufacturer, and name of your electrical installer. We may ask you to send us a copy of your manufacturer information. No formal application or fee is required. To Be Interconnected If you are planning to interconnect your generator with the cooperative s electric power distribution system, you need to complete Part 1 of the attached application and submit it to us. A minimal application fee also is required (see Fee Schedule attached). You also need to sign our streamlined contract form (copy of Short-Form Contract Agreement attached). 5

Generators Not Interconnected with the Cooperative Distribution System You may be planning to install a generator for isolated operation, with no connection to the cooperative distribution system. Find your specific situation below. Generator Installation (10 30 kw and not interconnected with the cooperative distribution system) If you are considering installation of an emergency generator from 10 30 kw, typically running on gasoline or diesel fuel oil, you probably are not planning to interconnect your generator with the cooperative s electric power distribution system. It is important that your installation is safe for you, our other customers, and our utility workers. It also should not interfere with the co-op s reliable supply of electric power to your residence or other facility. To accomplish this, care must be taken to install your generator so that it will either (1) start up only to serve your entire load when you have disconnected from the electric power grid, or (2) you are serving only isolated loads when there is a choice of power supply (the cooperative system or your emergency generator). You are required to complete Part 1 of the attached application to notify us of your plans. A small application fee is required. You should also let us know once your generator is up and running. Generator Installation (greater than 30 kw and not interconnected with the cooperative distribution system) Installation of larger generators within a customer facility has the potential to impact distribution system operations. If you are planning to install a large generator, you must complete Parts 1 and 2 of the attached application and submit it to us so we are aware of your plans. There is a fee associated with this application (see Fee Schedule attached). We will review your plans to ensure that your installation is not interconnected and make certain to the greatest extent possible that your installation will not endanger safety or reliability on the cooperative s electrical distribution system. We want to make sure that your installation will not place our utility workers in any danger of electric shock. We will report back to you with our findings within 12 business days of your application. 6

Generators Interconnected with the Cooperative Distribution System When installing a generator and planning to interconnect with the distribution system, we must review your plans to ensure that personnel safety and system reliability will not be compromised. [TO BE CUSTOMIZED BY COOPERATIVE, AS APPROPRIATE] If you are interested in selling some or all of the power that you generate, (1) we have/do not have one or more programs in place for the purchase of power from consumers, and/or (2) we are/are not willing to wheel excess power for you. Generator Installation and Interconnection with the Cooperative Distribution System (all generators) Customers may wish to install a new generator and interconnect it with the cooperative electric distribution system. In such cases, you need to complete the attached application form and pay the application fee. If your proposed generator installation is 30,000 watts or less and no power will be exported, you only need to complete Part 1 of the application. 1 If your generator installation is more than 30,000 watts, you must complete Parts 1 and 2. If you are interconnected with the cooperative, you also need to complete the Long-Form Contract Agreement. A check made out to the cooperative in the amount of the proper fee must accompany the application. An application fee schedule is attached. Submit your application to your electric cooperative representative as indicated below. Once we receive your application, we will review your proposed generator installation. If we approve your application, we will let you know if there are special steps you need to take during the generator installation process. We may request additional information regarding your planned installation. We will also ask you to sign a contract in which you agree to operate your generator safely, maintain the unit properly, and maintain insurance as needed. We will furnish you with an advance copy of the contract upon request. You can give us a call at any time during this review process to find out the status of your application. If your application is not approved, we will explain the reason and be available to discuss your plans. As part of our application review process, we will examine the ability of the cooperative s electric distribution system to accept your new power generation unit. On certain parts of our system, we may need to replace existing equipment or add some new equipment to accommodate customer generation. Your cooperative then will incur costs beyond what are normally required to operate and maintain the system to benefit all of our members. To be fair to all members, you will need to pay for any necessary system upgrades. If this is the case for your planned generator installation, we will advise you of the additional cost and seek your agreement before approving your application. You also 1 If you are planning power export, you must complete Parts 1 and 2 of the application. 7

will be asked to sign a system upgrade contract that obligates you to reimburse us for the additional expense incurred on your behalf. * * * * * Submit your application to your electric cooperative representative as follows: Cooperative contact: Title: Address: Phone: Fax: e-mail: 8