TOPAZ 24 DIMMER RACK INSTALLATION & MAINTENANCE GUIDE (Part # LIT A)

Similar documents
TOPAZ 12 WALL PACK INSTALLATION & MAINTENANCE GUIDE (Part # LIT A)

TOPAZ 12 PORTABLE PACK AND ASSOCIATED CONTROL MODULES USER GUIDE (Part # LIT A)

User Manual JS-ICON. 624 ARCH Dimmer Rack. JOHNSON SYSTEMS INC. Spring

SAVE THESE INSTRUCTIONS

PD404-AN V analog control 4 Channel x 500 W Dimmer & Switch Packs ANALOG 0-10 V. Serial Number

WARNING: FAILURE TO FOLLOW THESE RULES MAY RESULT IN SERIOUS PERSONAL INJURY CAUTION: INSTALLATION LOCATION:

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

ACC Series Power Conditioner OPERATION & INSTALLATION MANUAL

Page 1 of 5 FL-4020 FLUORESCENT BALLAST CONTROLLER

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH

CTFRP Series Power Supplies

Models beginning with MO, MK, 7B, 6S, 6F or 5B. Product Description. Technical Specifications. Installation Instructions.

SAVE THESE INSTRUCTIONS

Industry Compliance The cabinet and modules are Listed to applicable UL Standards and requirements by Underwriters Laboratories Inc.

model ps600 Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

PSX-240 Enclosed Autotransformer Installation Manual

INSTALLATION MANUAL MODEL #100947, AMP MODEL #100949, AMP RELIANCE CONTROLS ARL SERIES AUTOMATIC TRANSFER SWITCH

Sensor3 Rack (SR3 and HSR3 Series) Installation Manual

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment.

INSTALLATION INSTRUCTIONS SINGLE HORIZONTAL ACCESS DOOR PANTRY INSERT MANUAL

GP Dimming Panels 230 Volt (CE)

SAVE THESE INSTRUCTIONS

Portable Pack USER MANUAL

Florham Park, NJ USA Call (ASCO) for sales or service

Matrix AP 400V 690V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 20 ❷ Startup/Troubleshooting Pages WARNING

CurrentGuard. CurrentGuard. CurrentGuard. Plus. Surge Protective Devices. Installation,Operation and Maintenance Manual PN

POWER PINNER HAND WELDER 7200 OPERATOR S MANUAL

READ THIS BEFORE INSTALLING SWITCHGEAR

Patient Care Facility

Drug Testing Labs. Style 2 W/ Ver 4.41 pcb & Pulse Relay pcb(s) Installation, Operations, Start-up and Maintenance Instructions

CIVACON GROUND VERIFICATION RACK MONITOR SYSTEM and ASSOCIATED EQUIPMENT

CBC-300 Series & CBC-300C Series Dual Channel Adjust Clutch/Brake Controls

FD Conveyor for FD 260 Tabber

SIGNAL WORDS QUALIFIED PERSON

C3000 SIGNAL TRANSMITTER. Introduction

SineWave Guardian TM 380V 600V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 17 ❷ Startup/Troubleshooting Pages WARNING

A2P Single Phase Automatic Industrial Battery Charger

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Safety, Installation and Service Manual Models 1952, 1953 & 1972

Model 8144NC Fresh Air Ventilator

Matrix APAX. 380V-415V 50Hz TECHNICAL REFERENCE MANUAL

M T E C o r p o r a t i o n MATRIX FILTER. SERIES B Volts, 50HZ USER MANUAL PART NO. INSTR REL MTE Corporation

miconverter 18-Module Rack-Mount Power Chassis User Manual 38 Tesla, Irvine, CA USA Phone: (949) ; Fax: (949) Page 12

Electrical Installation

PowerLogic High Density Metering System 4-Meter Enclosure Installation Guide

Operators Manual. Recirculating Chiller /06/08

WARRANTY INFORMATION...

LP Dimming Panels. GRAFIK Systems

Smart Battery Charger GPC-35-MAX GPC-45-MAX GPC-55-MAX GPC-75-MAX GPC-100-MAX. Owner s Manual

A.C.E.S. Series ACES 3 & 6 MODULE PANELS. System Manual. Touch-Plate Lighting Controls. ACES 3 & 6 Module System Manual

10 Commercial, Industrial, Agricultural Services

Environmental Series Air Curtains

Wired Maestro Local Controls

MaxLite LED UTILITY WRAP FIXTURES

Motorized Stainless 2-Way Valves

LX-80 COMMERCIAL POOL & SPA CONTROL INSTALLATION INSTRUCTIONS

! "! User Manual Myers Power Products CTEP/G Manual 6/2009

Patient Care Facility

Drug Testing Labs. Style 2 W/ Ver 4.41 pcb & Pulse Relay pcb(s) Installation, Operations, Start-up and Maintenance Instructions

C.fm Page 1 Thursday, February 21, :28 AM Raptor user manual

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

Florham Park, NJ USA Call (ASCO) for sales or service

180w Performance Series 2-CH Amplifier Kit For Harley Street Glide/Ultra/Ultra LTD. Fairing JMAA-1800HC14

ALL700/ALL700-CM INSTALLATION INSTRUCTIONS

Dual MaxDim Installation Instructions

2-Way Motorized Valves

Installation Instructions Please Read Before Installing. Overview. Important Notes. Designer-Style Maestro Remotes HD-RD, -RS 120/127 V ~, 50/60 Hz

ALL W INSTALLATION INSTRUCTIONS

FLO Home TM G5 Model. Installation guide

Sunburst SB2400 Dimmer Rack and Receiver. Version 1.02 P/N F371

Quick Start Guide TS 910 & TS 920

WARNINGS, CAUTIONS AND NOTES

Installation Instructions Electric Heaters 5 20 kw

Installation Instructions Electric Heaters 5 20 kw

M T E C o r p o r a t i o n MATRIX FILTER. SERIES B Volts, 50HZ USER MANUAL PART NO. INSTR REL MTE Corporation

JAMP-500HR06-RC. Installation and Operation Instructions. 500W 4-CH Amplifier Kit For Harley Road Glide Fairing with Lower Fairing Speakers

BZ Products Inc. U.S.A.

Manual Transfer Switch

Temperature Control Panel Wiring Diagram Model: ISPA-120-1P-15A

IV. PROOF OF PURCHASE: A warranty claim must be accompanied by proof of the date of purchase.

SAVE THESE INSTRUCTIONS

GP Dimming Panels 230 Volt (CE)

For additional information, please refer to the Installation/Operation Manual

Model LA 4100 Time Delay OFF Controller

Transformer Installation, Operation, and Maintenance Manual

Fiber Optic Illuminator. Model 21AC Model 21DC

Performance Series 400W 4-CH Amplifier Kit For Harley Road Glide Fairing with Rear Speakers JMAA-4000HR06-RCR

Section 6 Electric Metering: Residential

Asymmetrical Installation Instructions. Components: i2cove Asymmetrical LED Light Fixtures. 12 [305mm] [918mm] 48.

30A SMART ENERGY MANAGEMENT SYSTEM TM

Pump Installation and Service Manual HRS Hydromatic Retractable System

Design Standard. Purpose: Design Standard:

O & M Manual for the EATON Generator Ready Loadcenter

High Velocity Series Air Curtains

60 PSI Boost Gauge. For Product Numbers: MT-DV01_60, MT-WDV01_60

MaxDim Installation Instructions

REFERENCE MANUAL FORM: MX-TRM-E REL REV MTE

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

Quik-Spec Coordination Panelboard

Transcription:

TOPAZ 24 DIMMER RACK INSTALLATION & MAINTENANCE GUIDE (Part # LIT-29132-1A) Contractor: Please read these instructions before starting installation. After installation, please forward this guide to the user for operation and maintenance instruction. Copyright March 2002 Leviton Manufacturing Co., Inc.

Table of Contents Unpack rack(s).. 1 Mount rack(s) 1 Terminate conduits.. 3 Convert bussing to single-phase.. 3 Pull power, load and control conductors to the racks 3 Connect power feeders... 4 Label circuits. 4 Connect load conductors 5 Low-voltage application notes 5 Connect control conductors 6 Seal unused openings. 6 Install control module(s).. 7 Set thumbwheel switch(es). 8 Set non-dim switches.. 8 Apply power and check... 9 Install dimmers.. 9 Install filler modules.... 9 Test loads.. 9 Close door. 10 Maintenance and Specifications... 11 Warranty 12

TOPAZ 24 RACK INSTALLATION INSTRUCTIONS The TOPAZ 24 dimmer racks are easy-to-install front-wired electrical distribution panels and are connected similarly to a circuit breaker panel. These instructions will tell you how to mount, wire, assemble, test and maintain TOPAZ 24 racks. The instructions in this manual are provided in the order of installation. In the U.S.A., this equipment is intended to be installed in accordance with the National Electrical Code and local electrical regulations. In Canada, installation shall be in accordance with the Canadian Electrical Code. Step 1 - Unpack rack(s) In each rack box you will find one TOPAZ 24 rack, two keys, one set of circuit numbers, and one installation manual (this document). Dimmer and control modules are shipped separately. Leave control module and dimmer modules in their packing and store in clean, dry place until ready to perform Step 11. After unpacking, please inspect the rack for any possible shipping damage. Document any shipping damage and contact the freight company and Leviton. Step 2 - Mount rack(s) Racks must have 6" (152mm) minimum clearance above fan and 36" (914mm) minimum clearance in front for proper cooling and access. Racks should be located in a clean, dust free environment within proper operating temperature range. See Specifications - Table IV, pg 11. One rack per location: Note: If you have a multiple rack installation, skip ahead to the next section for instruction. Locate stud or a secure framing member in wall where rack is to be mounted. Using the dimensions shown in Figure 1 mark location of one row of 3 mounting holes on wall over stud. Fasten rack to wall with appropriate fasteners. Note: Fully loaded rack weighs 66 pounds (29.9 Kg.) not including wire weight. Two racks mounted together: Locate two studs or secure framing members on 16 (406mm) centers in wall where racks are to be mounted. Note: If appropriately spaced studs or framing members cannot be located, racks may have to be mounted on Unistrut or equivalent supporting channels. Skip ahead to the next section for instructions. Using the dimensions shown in Figure 1 mark location of one row of 3 mounting holes on wall over each stud. Fasten racks to wall with appropriate fasteners. Note: Two fully loaded bussed racks weigh 139 pounds (63 Kg.) not including wire weight. Racks mounted to Unistrut supports: Note: If more than two racks are mounted together, the mounting holes are no longer on 16 centers. Using the dimensions shown in Figure 1 mark the wall with the locations of two horizontal mounting channels. Fasten two mounting channels, Unistrut P3300T or equivalent (not supplied), to the wall at each vertical stud or framing member. Insert Unistrut nuts (not supplied) on 14 (356mm) centers in each channel for each rack section to be mounted. Mount the rack assembly to the mounting channels using bolts and lockwashers. Page 1

FIGURE 1 - MOUNTING DIMENSIONS Page 2

Step 3 - Terminate conduits See Figure 2. Terminate the feeder conduit at the top or bottom conduit knockouts of the rack containing the feeder lugs. This is usually the left-most rack, or if provided, the auxiliary feeder rack. See Table IV, page 11 for knockout size and location. Dimmer racks can also be field punched for one 3" T.S. conduit in the top, and if provided, the auxiliary feeder rack will accept two 4" T.S. conduits in the blower opening cover plates. Terminate load conduits at top and/or bottom conduit knockouts of the rack which the loads will be connected. In most cases this means the first 24 loads should connect to the first rack, the next 24 loads should connect to the second rack and so on. Terminate the control conduits at the top, bottom or side conduit knockouts of the first rack. Bottom or side access is preferable. Bottom Conduit Knockouts Step 4 - Convert Bussing To Single-Phase Racks are shipped ready to accept three-phase, 4 wire feeders. If feeder is single-phase, 3 wire, convert bussing as follows. Otherwise skip to the next Step (5). Single Rack: Locate the required 1Ø Bus Adapter Kit, Model No. LEC 2012 (shipped separately). Figure 2 Conduit Entry Area Remove the terminal lugs on the ØB bus and either the ØA or ØC bus. Refer to Figure 3. Keep the hardware, as it will be reused below. Install one end of the jumper bus bar from the kit to the feeder bus plate mounting hole on the ØB bus. Note that the bus is installed in front of the plate. Use the bolts kept from above noting that all bolted joints include a flat washer against all bus/lug surfaces, and a lock washer under the nut. Re-install one terminal along with the other end of the jumper bus bar to the feeder bus plate mounting hole on ØA or ØC bus using the long bolt supplied with the bus bar kit, and the balance of the hardware from above. Note that the lug is installed behind the plate, and that the joint includes a flat washer on top of the jumper bus as well as behind the lug. (If this kit is installed in more than one rack, connect to ØA in the first rack and ØC in the second rack to balance feeder). Two racks bussed together: Proceed with the first (left-most) rack as above jumpering ØA to ØB and re-installing the lug on ØA. Install a second 10 Bus Adapter Kit in the second rack as above jumpering ØB to ØC for balance. In this rack no lugs are re-installed and the jumpering bus must be installed on the back of the feeder bus plate in order to clear the lateral neutral bus. Note: Do not install lateral bus between the two ØB busses. Since one ØB bus is jumpered to ØA and one is jumpered to ØC, a short circuit will develop. Step 5 - Pull power, load and control conductors to the racks Pull all conductors into the racks. Feeder and load conductors must be rated for 90 C, and be copper. Control conductors must be rated for operation at 85 C and are all Class 2. All control conductors must be routed so that they are not likely to come in contact with feeder or load conductors. Page 3

Step 6 - Connect power feeders Connect the feeders at the phase, neutral and ground lugs and tighten according to Table I. See Figure 3 for lug locations. (If rack has been converted to single phase, only lugs A & C will be terminated.) PHASE LUGS NEUTRAL LUG GROUND LUG Figure 3 - Power Lug Locations Table I - Line Terminal Torque Ratings Line and Neutral Lugs 6 AWG - 250 kcmil 375 in. -lbs. (rated for copper wire only and for (16-127 mm2) 9O C ampacity wire) Ground Lug 14 AWG - 10 AWG 35 in.-lbs. (2-6 mm 2 ) 8 AWG 40 in.-lbs. (10 mm 2 ) 6 AWG - 4 AWG 45 in.-lbs. (16-20 mm 2 ) 2 AWG - 1/0 AWG 50 in.-lbs. (35-50 mm 2 ) Step 7 - Label Circuits A sheet of labels, P/N 29247, has been supplied to number the circuits in the circuit directory on the door of the rack. It is important to number these circuits as they also by association number the load terminals inside. Usually the left-most cabinet begins with circuits I thru 24, and on from left to right. If your racks have been factory assembled and custom numbered, skip to the next step (8). Page 4

Step 8 - Connect load conductors Follow the instructions here for each dimmer type you are installing. 15/20 AMP INCANDESCENT & LOW-VOLTAGE LOADS: Referring to Figure 4, connect the load conductor for the first (upper) dimmer to the upper load terminal, and the second load conductor to the lower load terminal. Terminate their respective neutral conductors to the adjacent neutral terminals located directly behind the load lug. Tighten all lugs according to Table II. Terminal 15/20A Incandescent and Low-Voltage Load 1A 1B 2A 1 2 3 NEUTRAL BUS LOAD 4B 8 Figure 4 Load Terminal Wiring Table II Load Terminal Torque Ratings LOAD TERMINALS (rated for copper wire only, and for 9O C ampacity wire) 14 AWG - 2 AWG 50 in.-lbs. (2-6 mm 2 ) Note: If 15 Amp and 20 Amp 120V dimmers are intermixed on the premises, they must both be wired as 20 Amp branch circuits as the modules are not separately keyed. LOW-VOLTAGE APPLICATION NOTES: When using TOPAZ dimmer modules with transformer loads, the kw rating becomes the kva rating. VA ratings are found by multiplying the input voltage (12OV) by the current flowing in the transformer primary (120V side) for all transformers connected to the dimmer module. When calculating VA load keep in mind that transformer losses add many VA to the published VA load rating of the transformer. When current cannot be measured, derate the kw rating of the dimmer module by 25% and add up the kw ratings of the lamps involved. Caution: Operation of a dimmed transformer loaded circuit with all lamps inoperative or removed may result in current flow or voltage in excess of normal levels. To avoid possible transformer overheating and possible premature transformer failure, Colortran strongly recommends the following: a. Do not operate dimmed transformer loaded circuits without operative lamps in place; and b. Replace burned out lamps as quickly as possible; and c. Use transformers which incorporate thermal protection or fuse transformer primary windings to prevent transformer failure due to over-current. For best results transformers employed in transformer loaded dimmed circuits should be high-quality units well varnished and with an extra margin of magnetic material. Page 5

Step 9 - Connect control conductors Follow the instructions below for the type of control you are installing. Note: All control terminals accept 24-14 AWG. (.02-2mm 2 ) wire and are all Class 2. All cable shielding and all drain wires (wires connected to cable shielding) must be insulated. DMX512 or CMX: A TOPAZ Remote or Universal Control Module is provided for each rack. Connect the control wires to the 5-position terminal strip in each rack as shown in Figure 5. From Control Console, DLR Interface or Previous Rack Figure 12 Figure 5 ANALOG 0-10V For analog 0-10V applications, a Universal Control Module must be used. Locate the terminal block in the rack labeled 0-10VDC Dimmer Control Inputs and connect the control wires to terminals 1-24. Make sure to connect at least one common per group of 12 inputs. Step 10 - Seal unused openings Seal any unused mounting and conduit access holes in the rack. This is necessary to maintain proper ventilation while the rack is operating. If conduits are large and relatively empty, or if they connect to a gutter nearby, they must be sealed also. Page 6

Step 11 - Install control module(s) Unpack the control module(s). Set the 3 DIP switches labeled S1 on the printed circuit board (See Figure 6) as follows: SW1 down SW2 down SW3 down If the control module is a Remote type, verify that jumper JP5 is in the REM position. Control Module Type 120V Module No. TOPAZ 12 Remote LEC2102 LEC2105 TOPAZ 12 Universal 600-902 600-904 240V(Foreign Electric Service Only) If the control module is a Universal type, verify that the AMX/DMX switch is in the DMX position and that the Status/Other switch is in the Other" position. See Figure 7. Install the appropriate control module in the bottom slot of each pack by sliding it in until it is fully seated. 3 GANG DIP SWITCH (S1) JUMPER (JP5) CONTROL FUSES RACK NO. THUMBWHEEL SWITCH TEST SWITCH POWER INDICATOR Figure 6 - Remote Control Module NON-DIM SWITCHES Figure 7 - Universal Control Module STATUS/OTHER SWITCH AMX/DMX SWITCH Page 7

Step 12 - Set thumbwheel switch(es) Set the thumbwheel switch(es) on all TOPAZ 24 control modules according to Table III on next page. See Figure 6 (Pack 1 is usually the left-most pack). Table III - Thumbwheel Switch Settings PACK NUMBER THUMBWHEEL SWITCH NUMBER 1 0 2 1 3 2 4 3 5 4 6 5 7 6 8 7 9 8 10 9 11 10 12 11 13 12 14 13 15 14 16 15 Step 13 - Set Non-Dim switches Note: if control module is not a Topaz Universal type, skip to the next step (Step 14). Switch Non-Dim switches to select which dimmers are to operate in the Non-Dim mode. The Non-Dim mode switches are located on the left-hand side of the top printed-circuit board on the Universal Control Module. See Figure 7, page 7. In the off (left) position, the channel will function as a dimmer. In the on (right) position, the dimmer will function as a non-dim (fully off or fully on). CAUTION: Do not operate these switches while the pack is energized. Page 8

Step 14 - Apply power and check Apply power to the rack. Power indicator LED should be lit on each control module. If the LED is not lit or is flashing, at least one control fuse is blown or one power leg has no voltage present. See Figure 6. CAUTION: High Voltage - all measurements with a meter and other operations within the rack must be with the rack deenergized or by a qualified electrical installer exercising extreme care. Check the control fuses on the rear of the control module. Check the feeder wiring with a meter, correct the problem and restore power to the rack. Model No. 166-361 166-362 166-364 Max Load 1.8kW 2.4kW 2.5kW Voltage 120 120 220/240* Circuit Breaker 15A 20A 15A *(foreign electrical services only) Step 15 - Install dimmers Unpack all dimmers. Slide a dimmer module into each slot in the rack, beginning with the bottom dimmer slots first and building upward. Push the dimmers in until they are seated firmly. Step 16 - Install filler modules If there are less than 12 dimmer modules for a rack, unpack and install filler modules (Part Number 166-360) in slots where there are no dimmers. This must be done to insure proper cooling while the rack is in operation. Filler modules look the same as dimmers but do not have circuit breakers and are installed the same way. NOTE: Rack should not be operated without all spaces filled. This insures proper cooling. Step 17 - Test loads Switch all dimmer circuit breakers OFF first (switched to the right). Switch the test switch on each control module to the TEST position. See Figure 6. This will turn on the fan. Switch on the circuit breaker of each dimmer, one at a time, by moving the breaker handle to the left. Verify that the load is on and the dimmer is operating. When testing is completed, switch the test switch on each control module to the NORMAL position. This will turn off the fan and all dimmers. Verify that all circuit breakers are in the ON position (switched to the left). Page 9

Step 18 - Close door If desired, label circuits for easy identification later. Close the front access door. This will aid proper cooling of the rack and restrict access to the dimmer circuit breakers. See Figure 8. ACCESS DOOR LOCK DIMMER AND FILLER MODULES ACCESS DOOR CONTROL MODULE Figure 8 - Assembled Rack Page 10

MAINTENANCE Caution: Do not perform maintenance with the rack energized. Every six months (or more often, if the environment is particularly dusty) clean any accumulation of dust from the fan grills, dimmer module air intake openings, control module front and any other place dust may have accumulated. This may be done with compressed air or a vacuum. Also check all electrical terminations for tightness, bus to bus, bus to lug, and lug or terminal to wire. Refer to Tables I & II for torque ratings on wire termination. Rack Capacity: Dimensions: Weight: Conduit Knockouts Top and Bottom Load/Line: Sides Control Signal: Bussing: Maximum Fan Noise Rating: Ambient Operating Temperature: Maximum Operating Humidity: Maximum Feeder Size: Nominal Input: 120 V Circuits: Table IV - Specifications (per single rack section) 24 Circuits, 20 Amp max. per circuit. 21-5/8" H x 14" W x 9' D (546mm H x 356mm W x 229mm D) Empty - 30 lbs. (1 3.6 Kg.) Full - 66 lbs. (29.9 Kg.) 4 concentric ½, ¾, l, 1 1¼ T.S. 1 concentric 1½, 2", 2½ T.S. 1 concentric ½, ¾ T.S. 5 rectangular 2¼ x 2¾ 33dba, 20 Amp max. per circuit. O C (32 F) to 40 C (104 F) 90% without condensation. 200 Amp. 120/208V, 3Ø, 4W, 60 Hz, or (with LEC 2012 Kit Installed) 120/240V, 1Ø, 3W, 60 Hz. 240 Circuits: (FOREIGN ELECTRICAL SERVICE ONLY) 240/415V, 3Ø, 4W, 50/6OHz, or (with LEC 2012 Kit Installed) 240/480V, 1Ø, 3W, 50/6OHz Phase-to-Neutral Operating Voltage: 120V± I 0% or 220/240V ± 1 0% Operating Frequency: 60 ±.5Hz or 50 ±.5Hzl Rack Enclosure: NEMA Type 1 for indoor use only (utilizer dans un endroit a I'abri) For further information on the operation of the TOPAZ 24 Rack refer to the user guides and operations manuals of the control console or architectural control stations that will be used in conjunction with this product. For additional assistance, please contact the NSI Technical Support Line, Monday through Friday, 8:00 am to 5:00 pm PST. 1-800-864-2502 Page 11

LEVITON-NSI DIVISION TWO-YEAR LIMITED WARRANTY Leviton-NSI warrants new Leviton-NSI electronic control and dimmer products to be free from defective materials and workmanship for a period of two years from the date of purchase to the original owner when purchased from an authorized Leviton-NSI dealer. Fixtures, lamps and gel material are not covered under this warranty. The purchaser is encouraged to complete and mail to Leviton-NSI the product registration card enclosed with each product. Leviton-NSI products that have been subjected to accident, alteration, abuse or defacing of the serial number are not covered by this warranty. The normal wear and tear of items such as knobs, jacks and switches are not covered under this warranty. If your Leviton-NSI product requires service during the warranty period, Leviton-NSI will repair, at its option, defective materials provided you have identified yourself as the original owner of the product to Leviton-NSI or any authorized Leviton-NSI dealer. Transportation charges to and from an authorized dealer or the Leviton-NSI factory for repair shall be the responsibility of the owner. All products returned to Leviton-NSI must have a factory return authorization number issued prior to shipping. Leviton-NSI is not liable for any incidental or consequential damages resulting from defect or failure other than repairs of the Leviton-NSI product subject to the terms of this warranty. This warranty gives you specific legal rights, and you may have other rights which vary from state to state. This warranty is expressly in lieu of all other agreements and warranties expressed or implied except as may be otherwise required by law. 20497 SW Teton Avenue Tualatin, OR 97062 503-404-5500 fax: 503-404-5600 Page 12