ASVC2 OWNER S MANUAL. Vane Cutter PART # MACHINERY DIVISION

Similar documents
Spot Welder OWNER S MANUAL SPOT WELDER MODELS TSP-1/TSP-2/TBW

Spot Welder. Owner s Manual for TSP1: SN# and below TSP2: SN# and below TBW: SN# and below Approx: July 13 and earlier

PLSU2 OWNER S MANUAL. Liner Sizer PART # MACHINERY DIVISION

FG MACH I / MACH IIA OWNER S MANUAL AUTOMATIC BULK FEED PINSPOTTER MACHINERY DIVISION

Marsh Shipping Supply Co. LLC. Marsh TD2100 Electric Taper Technical Manual

INSTALLATION and OPERATION BALL WASHER MODEL NO: BW-001N

Installation and Service Manual

IDEAL Stripmaster Model 950 Wire Stripper #45-950

CHEMINSTRUMENTS HOT ROLL LAMINATOR MODEL HL-100, HL-101 OPERATING INSTRUCTIONS

ELECTRICAL SYSTEM RP-7

CRD610 Automatic Fitting Inserter

PBF OWNER S MANUAL PBF-510 PINSPOTTER MACHINERY DIVISION

NOTE: The orientation of the mounting brackets are critical. (See Figure 4)

Multihead OWNER S MANUAL MULTIHEAD PINSPOTTER MACHINERY DIVISION. Part #:

RolsplicerTM. Maintenance Manual And Illustrated Parts List

CRD600 Automatic Fitting Inserter

Loctite Spray Valve Controller Part Number EQUIPMENT Operation Manual

50 Green Street, Wrentham, MA Phone: Operation & Connections for Nitrous Control Section

Junior Sandblaster. Model #51 WARNING! FOR YOUR SAFETY PLEASE READ INSTRUCTIONS BEFORE OPERATING TOOL & WEAR EYE PROTECTION

XPS-ProFeed Shuttle SERVICE MANUAL. Revised:

Spreader and Vehicle Battery Kits

JBI Docupunch P33 Automatic Punch

STYLE 9300 FLOW/PRESSURE METER INSTALLATION & OPERATING INSTRUCTIONS

POWER PINNER RAPID FIRE 7005 RF OPERATOR S MANUAL

AGRI-COVERTM SWITCH CONTROL INSTRUCTIONS

Installation and Maintenance Manual

Thank you for purchasing a 911EP GALAXY Light Bar! Every light bar is carefully inspected for defects prior to shipment.

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH

TM-1620 OPERATING INSTRUCTIONS AND OWNERS MANUAL

Revision A

AUTO-PUMP 120 VAC AIR COMPRESSOR SYSTEM INSTRUCTION MANUAL. 170 Cherry Avenue West Sayville, NY

TIN KNOCKER FOURPLEX CLEAT FORMER INSTRUCTIONS & PARTS DIAGRAM

XPS-ProFeed Shuttle SERVICE MANUAL. Revised:

MF-12A MF-12A OWNER S MANUAL MF-12A PINSPOTTER MACHINERY DIVISION

General Installation Instructions for Valves and Gates

MC2500. Installation and Operation Manual

OVER THE RANGE MICROWAVE OVEN INSTALLATION INSTRUCTIONS

ARCHITECTURAL CONTROL SYSTEMS, INCORPORATED ST. LOUIS, MISSOURI

READ AND FOLLOW ALL SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS

MODEL 7100 PORTABLE PIN WELDER OPERATOR S MANUAL

INSTRUCTIONS. Owner's Manual. Ionizing Air Nozzles Models AN-2 and AN-6

MODEL 660 AUTOMATIC FASTENING CENTER OPERATOR S MANUAL

2300 OPERATING/APPLICATION/INSTALLATION INSTRUCTIONS

INSTRUCTION BOOKLET FOR PNEUMATIC STOCK CUTTER MODELS SCP-6 & SCP-12

IOM Manual. IOM Manual. Series 20/21.

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

MODEL NUMBER: MEDIUM DUTY ONBOARD AIR SYSTEM

200 Shadylane Drive Philipsburg, PA Phone: (814) Fax: (814) Service Manual. Model 642E Centrifuge

MODEL JH JACKSHAFT INDUSTRIAL DOOR OPERATOR INSTALLATION MANUAL. OPERATOR SPECIALTY COMPANY, INC. P.O. Box 128 Casnovia, MI 49318

Model 8144NC Fresh Air Ventilator

OVER THE RANGE MICROWAVE OVEN/HOOD SYSTEM INSTALLATION INSTRUCTIONS

ROSBACK PRINTERS AND BOOKBINDER S MACHINERY Quality Bindery Equipment Since 1881

Techcon Systems TS500R-PC Controller For Positive Displacement PC Pump

MF-12 MF-12 OWNER S MANUAL MF-12 MACHINERY DIVISION

APOLLO Gate Operators, Inc.

HIGHLANDER Residential Platform Lift

Principals of Operation... 1 Rotary Vane Priming Pump VPE and VPES... 2 Rotary Vane Priming Pump VPO and VPOS Priming Valve...

Kits 25490, Automatic Self-Leveling System

RAPID-AIR OPERATING INSTRUCTIONS FOR RD317S, RD417M RIM DRIVE

Instruction Manual AVTM for. Strip Chart Recorder Catalog Nos and

Instruction Bulletin. Jockey Pump Controller

Instruction Sheet. 1/2 HP Portable Electric Pumps SAFETY FIRST. L2062 Rev. F 02/ IMPORTANT RECEIVING INSTRUCTIONS 2.

MODEL HD-BTC. Installation, Operation & Repair Parts Information REV041416

Filtered PWM Speed Control for Permanent Magnet DC Motors

HERCULES. PROCESS CONTROL VISCOMETER Model M2. User Guide

Operating Instructions - Electric Pow'r-Riser Models

Security Door Controls

EXT DUCTLESS FUME HOOD

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

Adjustable Purge Valve

PERMA ROLL 75. installation instructions Automatic Roll-up Door. note:

Instruction Manual. Fudge Puppy Display Case

MICRO WELD MODEL AUF-8 HEAVY DUTY FERROUS BUTT WELDERS MICRO PRODUCTS COMPANY SERVICE MANUAL

Instruction Manual. Double Acting Hydraulic, Hollow Piston Cylinders RHD Series. Maximum Operating Pressure 700 bar

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG CEG

Installation Instructions Sport Shifter

SD Bendix E-10PR Retarder Control Brake Valve DESCRIPTION. OPERATION - Refer to Figure 2

Installation Instructions

( Versions Available)

ASSA ABLOY Series Power Operator Installation and Instruction ASSA Manual ABLOY ASSA ABLOY

Flow Line Controls. Installation & Operations Manual SERIES 20/21 Pneumatic Actuators

ASTA Handling System Installation & Operating Instructions

RT404-FLEX II ROTARY TABLE OPERATING MANUAL

Model Model (230V) High Speed Letter Opener

Part # Mopar LX Level 1 Air Suspension System

EXT HEPA/CARBON FUME HOOD

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT DRIVE XBL FANS

SALDET SALES & SERVICE, INC. CLINTON TOWNSHIP, MICHIGAN

Connector Systems Inc. SS-20 MACHINE MANUAL

ASSA ABLOY Series Power Operator Installation and Instruction ASSA Manual ABLOY ASSA ABLOY

SlimRack Bed Lift System OEM INSTALLATION MANUAL

1 2 3a 3b THREADING CARD 9 10 ABC Office

Handy Lift LT Owners Manual

Roller Door Operator

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

Innovatech User Manual. Predator 2400 T H E S U R F A C E P R E P A R A T I O N S P E C I A L I S T S

Helios. 24 Light 240 Volt Controller. PRODUCT # Instruction Manual.

DP K9 Door Popper Installation Manual. Patented

XENON POWER SUPPLY 4000 Watt Gladiator IV

OPERATION AND MAINTENANCE MANUAL. PennEngineering 5190 OLD EASTON ROAD DANBORO, PENNSYLVANIA

Transcription:

A S ASVC2 Vane Cutter PART # 43013 MACHINERY DIVISION OWNER S MANUAL -1-

INTRODUCTION The ASVC2 Hollow Vane Cutting Machine was designed utilizing the best current technology to provide greater reliability. The inherent minimal material handling, combined with the utilization of pneumatic power, will ensure your shop of a cost efficient, quality product. Trouble free service is the foundation on which all Duro Dyne machines are built. Duro Dyne continues this concept and brings the ASVC2 to a new level of reliability, serviceability and efficiency. This guide is designed to help you set up and operate your ASVC2 at peak performance for years to come. IMPORTANT Always follow manufacturer s recommendations for proper safety and handling procedures for all materials used in conjunction with this machine as outlined in manufacturer s Safety Data Sheet (SDS) for each product. LIMITED WARRANTY Duro Dyne Machinery is manufactured by skilled mechanics, utilizing the latest produc tion techniques. Each unit has been rigorously tested prior to packaging and shipment in order to ensure trouble-free operation. Your Duro Dyne machine has a one year warranty against defects in material. Any com ponent found to be defective will be repaired or replaced (at manufacturer s discretion) at no cost if faulty component is returned freight prepaid to the nearest Duro Dyne Service Department. Warranty does not apply to ex pendable parts (cutting blades, etc.) or repairs or service due to improper maintenance or operation procedures. Duro Dyne products have been engineered to maximize operator safety. Unauthorized modification of this product will void the warranty. All warranty claims must be accompanied by a serial number, date of purchase and the name and address of the distributor it was purchased from. INSTALLATION INSTRUCTIONS 1) Set up/install the ASVC2 machine as per the following several pages. Caution: The blade is very sharp. Please keep hands clear of the blade. 2) Connect the line cord to a 110-125 VAC outlet. 3) Connect the air line to the Regulator: Adjust the regulator pressure to 70 PSI if needed. AIR REQUIREMENTS: Input pressure 70 PSI TABLE OF CONTENTS TECHNICAL SPECIFICATIONS ASVC2 IMPORTANT 2 INSTALLATION INSTRUCTIONS 2 INSTRUCTIONS 5-9 INTRODUCTION 2 LIMITED WARRANTY 2 MAINTENANCE 12 MEASURING VANE 11 OPERATION 12 PARTS LOCATOR 11 SERVICING 12 SPARE PARTS LIST 11 THEORY OF OPERATION 3 WIRING DIAGRAM 4 ELECTRICAL: Input voltage: 110-125 VAC - 2 -

THEORY OF OPERATION During operation of the ASVC-2 the hollow turning vane is placed on the material feed track by the operator. The operator slides the hollow turning vane along the material feed track through an opening in the front panel of the machine. As the hollow turning vane continues to slide along the material feed track the hollow turning vane is supported by the blade saddle and pushes open the safety gate as it banks against the vane stop gauge located on the exit track. The hollow turning vane is supported by the entry and exit feed tracks. The internal track brackets prevent the hollow turning vane from escaping the material feed track during the cutting process. The safety gate is gravity biased into a closed position, hanging from a hinge such that access to the blade saddle and vane cutter blade is blocked or inhibited. When the hollow turning vane is inserted along the material feed track and positioned on the saddle abutting the vane stop gauge the safety gate is partially open or rotated about the hinge due to contact with the hollow turning vane. Once the hollow turning vane has been cut and removed from the exit track the safety gate automatically falls back into the blocking position due to gravity. A mesh screen on the safety gate allows the operator to see through the safety gate to view the blade saddle and vane cutter blade during and after cutting. The vane stop gauge is adjusted by the operator to set a desired length of cut on the hollow turning vane using the tape measure secured to the exit track as a reference. The vane stop gauge is locked in place using the ¼-20 thumb screw located on the stop gauge. Once the operator has positioned the hollow turning vane against the stop gauge, the operator may actuate the on/off switch from the off position to the on position suppling power to the ASVC-2 machine. The on/off switch may be actuated between the off and on positions at any time regardless of whether a hollow turning vane has been positioned against the stop gauge. Power is supplied to the ASVC-2 via a line chord. The power is supplied at 110volts and is stepped down through a 24 volt transformer. Once the operator has powered on the ASVC-2 using the on/off switch a green power indicator light will illuminate to indicate the ASVC-2 is receiving power. During setup or operation, the operator is required to connect an air supply line to the air regulator assembly through the air intake port. The air supply line will be regulated through the air regulator adjusted and set to 70 psi. Air from the intake port travels to the solenoid which controls the flow of air to the cylinder. During activation the solenoid associated with the output port will open air to the air cylinder assembly causing the cylinder assembly to pneumatically actuate the vane cutting blade to extend downward from the air cylinder and cut the hollow turning vane positioned on the blade saddle. Once cutting is complete, the solenoid associated with the output port may open the airflow to the air cylinder assembly causing the air cylinder assembly to pneumatically actuate the vane cutter blade to return upward toward the air cylinder assembly. The actuating mechanism is electrically activated by the momentary switches. Actuation of both momentary switches at the same time sends a signal to the sub-component chassis to open a flow path for the air from the air regulator assembly to travel to the air cylinder assembly. When the air reaches the air cylinder assembly the air pneumatically actuates the cylinder to perform a cutting stroke extending the blade in a downward stroke cutting the hollow turning vane before returning upward toward the air cylinder assembly in a return stroke. Each simultaneous actuation of the momentary switches may cause air cylinder assembly to perform only the cut motion while the return motion is performed in response to one or both of the momentary switches becoming unactuated. (The operator has removed a hand from one or both momentary switches) The potentiometer controls a 24 V Delay on make timer between actuation of momentary switches and the opening and closing of the solenoids. The potentiometer controls a timing between the cutting portion of the stroke using the output port and the return portion of the stroke. The vane cutter blade is attached to the blade holder and the blade holder is mounted to the pneumatic piston arm extending from the air cylinder assembly through an opening in the upper cylinder mounting plate. The cylinder mounting shaft is threaded to the blade holder which secures the blade in place. The cutting blade can be re sharpened and may be reversed to prolong life to the cutting blade. - 3 -

WIRING DIAGRAM AIR REGULATOR 50 100 150 0 PSI SMC RED CYLINDER AIR IN POT BLU YEL BLU BLU 1 5 4 24V DELAY ON MAKE TIMER 3 SOLENOID INITIATE SW #1 INITIATE SW #2 BLK EXH IN A B RED YEL GRN POWER LAMP BLK BLK ON/OFF SW RED BC YEL BC BLU BLU BLK BC BLK YEL 24V TRANSFORMER ASVC-2 WIRING/PNEUMATICS DIAGRAM ORG RED WHT GRN BLK NEUTRAL GROUND HOT LINE CORD (110Vac) BC (ALL WIRING 18Ga) =BUTT CONNECTOR - 4 -

REMOVING THE MACHINE FROM THE CRATE SAFELY Isometric illustration shown for illustrative purposes. NOTE: This machine MUST be secured to the Bench Top for operator safety. Use the Crate as a template to mount the Machine. To remove the Machine from the Crate safely, use the Lifting Eyebolts provided on each side of the Machine as noted below. With straps and a lifting device, lift the Machine onto the Bench Top and secure as per the following page. CAUTION: CAUTION: This machine This Machine is VERY is heavy, VERY please heavy, please use care use when care removing when removing from the Crate from the. Crate. Lifting Eyebolt on either side of Machine Machine - 5 -

INSTALLATION OF THE MACHINE TO THE BENCH TOP Isometric illustration shown with the Feed Track already assembled to the machine for illustrative purposes. NOTE: This machine MUST be secured to the Bench Top for operator safety. Using the Crate as a template, spot the holes with a sharpie, drill holes and mount the machine with 1/2-13 hardware (the hardware used in shipping may be used if the Bench Top is not too thick). Machine Feed Track 53" (minimum) - 6 -

INSTALLATION OF THE FEED TRACK Isometric illustration shown without Plexiglass Guard: The Plexiglass Guard must be removed to gain access to the inside of the Machine. CAUTION: The Blade is VERY SHARP, please keep hands clear of the Blade. 1) Remove but DO NOT discard the hardware & the Plexiglass Guard. 2) To assemble the Feed Track to the Machine- Thread the Short Shaft into the Feed Track & lock with a Hex Nut. Thread a Hex Nut on close to the end (if not already there), then secure it to the Base Plate using another Hex Nut supplied as shown. NOTE: Adjust the Feed Track height by adjusting the two Hex Nuts. The Feed Track must be even with or slightly higher than the Blade Saddle to ensure proper Hollow Vane feed. 3) Secure the Plexiglass Guard back in place using the hardware that was previously removed. 4) Secure two of the Support Feet to the Feed Track as shown, locking them in place with the Hex Nuts. NOTE: If desired, secure the Support Feet to the Bench Top using the mounting holes in the Support Feet, They are clearance for 5/16-18 bolts. Blade Saddle Blade Base Plate Feed Track Hex Nut Short Shaft Hex Nut Hex Nuts Support Feet - 7 -

INSTALLATION OF THE EXIT SUPPORT SYSTEM TO THE BENCH TOP Isometric illustration shown without Plexiglass Guard: The Plexiglass Guard must be removed to gain access to the inside of the Machine. CAUTION: The Blade is VERY SHARP, please keep hands clear of the Blade. 1) Remove but DO NOT discard the hardware and the Plexiglass Guard. 2) To assemble the Exit Track to the Machine: Thread the Short Shaft into the Exit Track and secure it with a Hex Nut. Thread a Hex Nut on close to the end (if not already there), then secure it to the Base Plate using another Hex Nut supplied as shown. NOTE: Adjust the Exit Track height by adjusting the Hex Nuts. The Exit Track must be even with or slightly lower than the Blade Saddle to ensure proper Hollow Vane feed. 3) Secure the Plexiglass Guard back onto the Machine using the hardware as before. 4) Thread the Support Foot into the middle of the Exit Track and secure it with the Hex Nuts. NOTE: If desired, secure the Support Foot to the Bench Top using the mounting holes in the Support Foot. The holes are clearance for 5/16-18 bolts. 5) Slide the Scrap Bin underneath the Frame to catch any debris. Safety Gate Exit Track Blade Hex Nuts Support Foot Hex Nut Short Shaft Hex Nut Scrap Bin - 8 -

INSTALLATION OF THE EXIT SUPPORT SYSTEM TO THE FLOOR Isometric illustration shown without Plexiglass Guard for orientation purposes only. The Plexiglass Guard should be secured to the machine at all times once the Exit Track has been secured to the machine. CAUTION: The Blade is VERY SHARP, please keep hands clear of the Blade. 1) Thread the Long Shaft into the end of the Exit track and secure it with the Hex Nut. Thread a Hex Nut on close to the end (if not already there), then secure the Support Foot to the end of the Long Shaft. Secure it with the Hex Nut. 2) NOTE: If desired, secure the Support foot to the floor using the mounting holes in the Support Foot, they are clearance for 5/16-18 bolts. Safety Gate Exit Track Blade Support Foot Plate Mounted to the Bench Long Shaft Hex Nuts Support Foot Plate for Mounting to Floor - 9 -

MEASURING THE HOLLOW VANE TO THE LENGTH DESIRED Illustration shown without Machine: CAUTION: The Blade is VERY SHARP, please keep hands clear of the Blade. 1) Slide the Stop Gauge with the Thumb Screw along the edge of the Exit Track to the desired location on the Tape Measure and secure it in place. 2) Slide the Hollow Vane through the Machine and bank it against the Stop Gauge at the Measuring Edge to cut the Hollow Vane to the desired length. Tape Measure Measuring Edge 4 13 14 15 16 17 18 19 20 21 22 23 53 54 55 56 57 58 59 60 Exit Track Stop Gauge with Thumb Screw - 10 -

ASVC2 BASIC PARTS LOCATION 39060 Delay Timer 43015 Main Cylinder Enclosure 44091 24V Transformer 17320 Dwell Potentiometer Exit Track Line-Cord 43016 Solenoid Assembly Stop Gauge with Thumb Screw 17377 Air Regulator 43014 2" Cutting Blade 43017 2" Blade Saddle Lifting Eyebolts Feed Track 43018 Initiate Switch Control Box 27315 Power Light 17334 On/Off Switch 43018 Initiate Switch Support Feet ASVC2 SPARE PARTS LIST NOTE: When ordering spare parts include serial number of machine. Part # Description 17320 Dwell Potentiometer 17334 On/Off Switch 17377 Air Regulator 27315 Power Light 39060 PLS/ASVC2 Delay Timer 43014 ASVC2 2in Cutting Blade 43015 ASVC2 Main Cylinder 43016 ASVC2 Solenoid Assembly 43017 ASVC2 2 Blade Saddle 43018 ASVC2 Initiate Switch 44091 24V Multi-Tap Transformer - 11 -

OPERATION ASVC2 Initial Adjustments 1) Turn the Power Switch to ON 2) Feed the Hollow Turning Vane into the Feed Track. 3) If needed, adjust the height of the Feed Track slightly higher than the Blade Saddle for proper feed of the Hollow Turning Vane. 4) Ensure the Safety Gate opens properly and fully, allowing the Hollow Turning Vane to exit onto the Exit Track. 5) Both initiate switches must be depressed to activate the cutting blade. 6) The speed in which the blade lowers to cut is pre-set from the Duro Dyne factory and should not be changed without contacting the Duro Dyne Service Department. MAINTENANCE To prolong the blade life and improve the cut quality, it is important that the cutting area always be kept clean. For best results, use a fine emory cloth to clean and smooth the blade and blade saddles. SERVICING A SIMPLIFIED STEP-BY-STEP PROCEDURE Duro Dyne has called upon its many years of manufacturing experience in designing the ASVC2. Your unit has been rigorously factory tested and inspected to provide many years of dependable service. WHAT TO DO BEFORE TROUBLESHOOTING: CONSULT THE MANUAL Most of the functional problems that occur are due to an oversight in the set-up, operational or normal maintenance procedures. Therefore, you should re-check all Set-Up, Initial Adjustment, Operation, and Maintenance procedures. INSPECT THE UNIT If the problem still persists, the next step is careful visual inspection. Turn off the electricity - that is, disconnect your ASVC2 from its power supply and carefully check the control box for loose, broken or disconnected wires. Also, check the air circuit for leaky air connections or cut hoses. HOW TO IDENTIFY CUTTING QUALITY PROBLEMS 1) The cut edge is burred 2) The cut edge is deformed 3) The cut is not completely through the vane 4) The vane gets jammed on entering 5) The vane gets jammed on exiting If any of the above problems occur, please call the Duro Dyne Technical Services Department at 1-800-899-3876 between the hours of 7am - 6pm EST. MACHINERY DIVISION 2018 Duro Dyne Corporation Printed in USA 2/26/2018 BI060011-12 -