APPENDIX A AERODROME DATABASE MIDDLE EAST REGION. Lighting VASI Power Main/Sec. 2 sources. All RWYs with PAPI. 3 generators satifactory condition

Similar documents
High Performance Power. For Middle Eastern And African Airports

Just drive we take care. Flexible and long-term protection with the Mercedes-Benz ServiceCare products for your Van.

Guidelines on Bus Tendering & Specifications. Mohamed Mezghani Head of Middle-East and North Africa Office

Prime goods deserve premium delivery. Mercedes-Benz Trucks and Vans Logistics Solutions.

Region Middle East - Terminal Handling Charges & Security Origin

PRODUCT CONFORMITY & REGULATORY REQUIREMENTS FOR AUTOMOTIVE PARTS FOR THE REGION-TYRES & BATTERIES

Statistical Appendix

GCC CATALYST MARKET. (Saudi Arabia, UAE, Kuwait, Qatar, Bahrain) Prepared for XXXX

Individual Certification Programs Status Update

Pressure Pipe System. Imperial & Metric Range

HEAVY VEHICLES & CONSTRUCTION EQUIPMENT SERVICE

A summary of AUE Activities. MEDELEC Meeting, Tunis 15/4/2014

Workshop on International Good Practices of Sustainable Energy Technologies. Beirut Energy Forum 9-11 Sep 2015

Oman / Sohar LEBANON Beirut

Approximately 13 years experience in H.V and L.V projects, 9 years in Egypt and two years in Emirates and two year in SAUDI ARABIA

GLOBAL ELECTRICITY PRICES

Electricity Subsidy in Oman

Zeina Nazer, MSc P.E. MBA Secretary General. ITS Arab

fischer Product Range Direct Fastening

SMV 316. SUPPORTING. measuring. VaN ENGLISH INNOVATIONS FOR POWERFUL PERFORMANCES

MRT 300/2 MARKING REMOVAL TRUCK ENGLISH INNOVATIONS FOR POWERFUL PERFORMANCES

Greenheck Quick Delivery Middle East Stock Catalog

Powering the railways in the Middle East Efficient and reliable solutions for sustainable mobility

Siemens BRI Summit 2018 Country Pavilion CC China

Qatar Integrated Railways QATARI DIAR Real Estate Investment Company Projects in Eritrea

Polymet Industries LLC P.O Box Ras Al Khaimah, United Arab Emirates SPHERICAL BEARING SYSTEMS -POLYSPHERE

CRE Presentation on Emerging Technology Guidance

Knowsley SK s turnkey solution for extinguishing fires which can occur on helipads and helidecks NESTOTM. Deck Integrated Fire Fighting System (DIFFS)

Blue Sea Industrial Equipment EST.

Curriculum Vitae. Date of Birth: 23/03/1951 mailing address: Khilda P.O. Box 1877

WHY INVEST IN FAIRMONT HOTELS & RESORTS. August 2017

Aircraft Hangar Doors

Tender Information. Overseas Information

NURZAT MYRSALIEVA. Distributed solar technologies: trends and scenarios in the Mediterranean Region

FALL 2017 ADVERTISING SCHEDULE

RETEXTURING & ROAD LINE REMOVAL TRUCK

Interconnection between Arab countries

KINGDOM OF CAMBODIA NATION RELIGION KING 3

Hermes Cover for Exports to the Middle East

KINGDOM OF CAMBODIA NATION RELIGION KING 3

KINGDOM OF CAMBODIA NATION RELIGION KING 3

Company Presentation

Guide Rail Safety Symposium

KINGDOM OF CAMBODIA NATION RELIGION KING 3

KINGDOM OF CAMBODIA NATION RELIGION KING 3

KINGDOM OF CAMBODIA NATION RELIGION KING 3

KINGDOM OF CAMBODIA NATION RELIGION KING 3

KINGDOM OF CAMBODIA NATION RELIGION KING 3

KINGDOM OF CAMBODIA NATION RELIGION KING 3

CPB Memo. Date: 26 June 2013 Subject: CPB World Trade Monitor April 2013, corrected

increase of over four per cent compared to the average of $409,058 reported in January 2010.

VEHICLE / PEDESTRIAN COLLISIONS

ELE-MPT-E-2009 Senior Maintenance & Protection Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Roadside Safety MASH

RESULTS OF PHYSICAL WORKSHOP 1 st Australian Runway and Roads Friction Testing Workshop

SAFA. Per-Erik Öberg SAFA National Coordinator

Toyota IMV Sales Reach Global 5 Million-unit Mark

(A WORKING PAPER) FOR THE FIRST MEETING OF THE DGCAA S IN THE MID REGION ABU DHABI / MARCH, 2011

Active Grid Management

MONTHLY NEW RESIDENTIAL SALES, SEPTEMBER 2018

Implementation Status & Results Report China GEF Large City Congestion and Carbon Reduction Project (P127036)

OPEC PRIMARY ENERGY CONSUMPTION IN 2005 (1)

3 Award of Contracts for the Supply of Vehicle Tires

World Air Conditioner Demand by Region

EU Dairy Exports to Third countries

KEEPING HOUSTON AIRPORTS OPENING DAY FRESH

Motorisation for garage doors Dexxo RTS. Motorisation for sliding gates Elixo V 3S RTS Elixo RTS

Price Category Breakdown - February 2010

System Status Update & Demand Response

Aviation Fuel Filtration Update. Phil Rugen, Chairman, API/EI Aviation Fuel Filtration Committee. IATA Aviation Fuel Forum Miami, USA - 22 nd May 2007

MEG Oil Market Outlook

List of Qualified Companies as per MEMAC endorsement for the ROPME Sea Area

NAPOLI WIRE PANELS. Epoxy-coated on galvanized core Ral 6005 green, Ral 9005 black or Ral 7016 anthracite Mesh 100 x 55 mm Wire Ø 3,8/4,0 mm. Art.

ICX-CMOS-S-2004 Senior I&C Technician PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Sharm El Sheikh SUPPLEMENT PER PERSON WITH EGYPT AIR: ECONOMY: $75 & BUSINESS: $175

How will District Cooling Evolve in the GCC? Presented by Fouad Younan CEO & MD of DC PRO Engineering

Bayt.com Middle East Job Index. August 2013

Customer Service. Enjoy 24/7 peace of mind with flexible service offerings from Schneider Electric.

Airport Information. Details for TURKMENBASHI. Terminal Chart Change Notices. TURKMENBASHI State/Province

Werra Steel Gates. - for ultimate adaptive security. Produced by elkosta.com

Improving Accessibility of Regional Bus Stops and Pathways

DRIVEWAY/SIDEWALK PERMIT APPLICATION

Performance-Based Communication Tools for Maintenance Budgets. 11th National Conference on Transportation Asset Management July 12th, 2016.

Habtoor Leighton Group Interiors

Solar Rooftop Perspective on Regulatory Frameworks and Emerging Business Models in the Middle East Abridged Version

STEEL EXPORTERS S ASSOCIATON UNITED ARAB EMIRATES PRESENTATION

Tender Information. China. Ethiopia (EEPC Ref. No. DB-121) Overseas Information

WE GUIDE AIR LOUVERS

UN-ECE / WP.29-AC3 HFCV - SGS. Federal Ministry of Transport, Building and Urban Affairs

OPERATING INSTRUCTIONS FOR USE WITH AIR OPERATED TOUGHLIFT JACKING SYSTEM

2014 DEMOLITION DERBY RULES

67 th edition. Renewable energy. Appendices. 44 Other renewables consumption 45 Biofuels production

Dräger Workstar Flexothane / PVC Splash Suit

November 2018 Customer Switching Report for the Electricity and Gas Retail Markets

Sydney Airport Operational Statistics May 2013

PARTIAL PROGRAM OF PROJECTS FFY

From 31/03 till 14/04 From 31/03 till 18/04 BEY -SSH / BEY -SSH / SSH-BEY / SSH-BEY /

Sixth Report on the Implementation of the Agreement on Movement and Access

JEPPESEN JeppView

NJ Solar Market Update

Transcription:

AERODROME DATABASE MIDDLE EAST REGION Reduction/ Egypt Alexandria (4C) 04/32-2201x45 18/36-1801x30 7.5 m shoulders B727 largest All s S-edge lighting and SA edge lighting All s with 2 sources. 3 generators satifactory Category 8 6 RFF vehicles 35 RFF personnelaep established. Full scale exercise every 2 years, last one in June 2000 2.2m high wire, satisfactory. Asphalt perimeter road Aswan 17/35-3400x45 7.5m shoulders A300-600 largest 17-35-PA2 23 to -edge, c/l and app. light as -edge lights 2 sources 5 generators, 1040 kva 8 RFF vehicles. Fairly good 39 RFF personnel AEP established, full scale exercise every 2 years, last one in April 2000 2.2m wire. No perimeter road Cairo Intl Luxor 02/20-3000x45 7.5 m shoulders B747 largest 02-20-PA1 23 to -edge, c/l and app. lights as - edge lights s on both ends 2 sources 6 generators 1670 kva 7 RFF vehicles 76 RFF personnel AEP established, full scale exrcise every 2 years, last one in May 2000 2.2m wire, good. Asphalt perimeter road Sharm El Sheikh 04L/22R- 3081x45 04R/22L- 3081x45 7.5m shoulders A310 largest 04L-PA2 others 24m wide Both s have edge, c/l lights. App. lights as. -edge lights s on all s One source-2 feeders 7 generators-1430 kva capacity 7 RFF vehicles. 21 RFF personnel AEP established, full scale exercise every 2 years, last one in Sep. 2000 2.2m wire, good New asphalt perimeter road Jordan Amman/ 24 PA! 38m with Rwy edge lighting Both s have Main supply from Category 8 No bird hazard 2m high, excellent

A-2 Marka Intl 06/24 3275x45 41/F/C/W/C Largest using -B747 Shoulders 5m shoulders App. Lighting 06 SA 24 PA1 C/L lighting provided. edge lighting provided. one source only 6 standby generators 7 RFF vehicles, 2 ambulances. All in good 60 RFF personnel exercise once a year. No friction testing equip. Rubber removal by machine. Reduction/ problem s. provided, in good. Note: Requirement of ICAO assistance on environmental issues indicated. Amman/ Queen Alia 08R/26L- 3660x61 08L/26R- 3660x61 Largest - B747 Shoulders 7m 08R-PA! 26L-PA2 08L-PA2 26R- PA1 31m Edge and C/L lighting on both s. App. Lights only on 08L, 26L edge and c/l lights provided All s Two independent sources for main power supply 2 standby generators-total capacity 5 MW Category 7 22 RFF vehicles. All in v. good 154 RFF personnel exercise every year Friction testing and rubber deposit removal equip. Loud speakers and eventually shooting birds are used Galvanized wire mesh fencing-good provided and good Aqaba Intl. 01/19-3000x45 AN 124 is the largest Shoulders 7.5m 01-PA1 Edge lightsand c/l lights provided Both S with SA edge lights provided Both ends of have One independent source for main power 2 stanby gen.- capacity 675 kva Category 7 7 vehicles and 2 ambulances RFF personnel-46 exercise once a year. Last exercise in Dec. 1999 Rare 2.3 m high wire meshexcellent provided good Kuwait Kuwait intl Largest 15L/33R 3400x45 All s - PA2 23 m All s and Twys edge and C/L lighting. All s Main supply from one source RFF Vehicles 16 All v. good Very rare. Gun men used to reduce bird hazard. No Bird Strike Double security fencing 2.5 m height in good

A-3 AOP SG-WP/12 using-b747 15R/33L 3500x45 shoulders 10m strip 300m All s provided with PA2 App. Lighting Comprehensive AEP established. Last full scale exercise in 1988. Needs assistance in updating the AEP and conducting full scale exercise Reduction/ Committee. Friction testing equip. Rubber deposit removal once a year Disabled removal by local arrangements. Lebanon Beirut Largest using- B747 3 runways 21/03 3800x45 18/36-3250x45 17/35-3395x45 Shoulders 7.5m strip 150m 03-PA1 21-PA1 18 -PA1 17-PA1 36,35- T.O. only 23 m All s provided with edge lighting C/l lighting on 18/36 and 03/21 App. Lighting on all s except 35 All s Main supply from 2 sources RFF Vehicles- 6. All reported excellent 80 fire fighters. Fire station facilities reported excellent, meeting intl. Standards AEP established. Assistance needed for updating. Full Scale exercise not yet conducted. Needs assistance some bird strike problems seagulls and pigeons. Preparing plans with internal ministry. No friction testing equip. Disabled removal arrangement 3 m fencing- good provided asphalt good Oman Muscat (9eeb intl) Pakistan 1 main runway 08/26 3589x45 60/F/A/X/T Shoulder 13.5m strip 300m Both s - PA! Edge, C?L and PA1 approach lighting provided edge lighting provided Both s with Main supply from one source only 5 standby generators-total capacity 3850 kva 10 RFF vehicles Except one all are in v. good. 142 RFF personal AEP established. Last full scale exercise in March 1999. Eagles, vultures present bird hazard. Phenix Wailer bird deterrent system in use. No friction testing equip. Disabled removal arrangement with IATA Chain link fencing 2.6m high. with grey sand fair to good Islamabad 12/30-3355x45 12-30-PA1 + with edge, c/l and app. lights as 30 with One source. ICAO recommendations ICAO standard. partially

A-4 Shoulders 7.5m not reported Largest B747-400 shoulders with edge lights 12 generators, total capacity 1220kVa Satisfactory 3 RFF vehicles, satisfactory 35 RFF personnel exercise once in 2 years-last one in 1998. Reduction/ followed Karachi 07L/25R- 3200x46 07R/25L- 3400x45 shoulders 7.6m B747-400 operates 25R- PA1 Others 23m to -edge lights C/L lights on 07R/25L App. lights-pai on 25R, 25L. SA on 07L, 07R All s with 2 independent sources 12 generators, total capacity 3000kVa 4 RFF vehicles, satisfactory 153 RFF personnel exercise once in 2 years, last one in June 2000. Light to moderate bird strike problems. Bird shooters employed. Fence as per ICAO standards. Jeepable perimeter road Lahore (4E0 18L/36R- 3360x46 18R/36L- 2743x46 shoulers 7.4m B747 largest 36R- PA2 others 23 to Edge and c/l lights on both s 36R with PA2 app. lights, others with SA with edge and c/l lights s on all s except 18R One source. 16 generators, total capacity 2175kVa 4 RFF vehicles, satisfactory exercise once in 2 years, last one in 1998 available Bird activity observed. Bird shooting adopted 2.4m chain link. Satisfactory. Track provided all around Peshawar United Arab Emirates 17/35-2743x46 3m shoulders A300 largest Both S- 23 m wide edge light 35-SA edge lights Both ends have 2 independent sources 1 generator, capacity 300kVa, satisfactory Category 8 2 RFF vehicles, good AEP established. Exercises regularly Bird activity observed. Shooting is adopted Brick wall Mud road on perimeters Abu Dhabi Intl 13/31-4100x45 13-PA1 31-PA3 22.5 m wide and edge, c/l and app. lighting provided as Main supply from one source. 11 RFF vehicles-all excellent Fence-2,5m concrete and 0.5m barbwire.

A-5 AOP SG-WP/12 Largest - B747 80/F/B/W/T strip 45m. 2 standby generators total capacity 2.4 MW to v. good 205 RFF personnel AEP established. No info on exercises Reduction/ provided and very good. Al Ain 01/19-4000x45 Largest - B747 Strip 300m 01-PA! 19-30m wide 01-PA 19-SA Edge and C/L lighting on & at both ends 2 sources with 3 feeders 4 standby-total capacity 4.2 MW 6 RFF vehicles, good Rubber deposits removed whenever. 112 RFF personnel None 3m wire mesh with barbed wire top. provided. V. good. exercise annually Dubai Intl. 12L/30R- 4000x60 12R/30L- 4000x46 Largest - B747-400 70 12L-PA3 30R- PA3 12R- PA2 30L-PA2 30m &23m wide s All s with PA3 edge, C/L and app. lighting. edge and c/l lighting All runways One municipal supply 6 standby total capacity.., v. good 6 Rosenbauer RFF vehicles, good. 131 RFF personnel. AEP established. Full scale exercise generally annuallylast one in 1997. Rubber deposit removed by water spray. Water bird activity Sept. to March. No specific steps taken 3m wire, v. good. provided, sealed, mostly fit. Fujairah 11/29-3750x45 shoulders 7.5m strip 150m 11-29-PA1 with 10.5 paved shoulders and edge, c/l and app. lighting provide as Both s with Two independent sources. 4 generators-total capacity 970 kva provided 8 RFF vehicles, good. 29 RFF personnel. AEP established. Annual full scale exercise-last in Nov 1999 Minimal to none 3m high wire. provided (unpaved). Largest AN 124 No friction testing equip. Rubber deposits removed. using water jets. Sharjah 12/30-4060x45 12-PA1 30-PA2 and edge, One source for main supply Details not available None 2.7m

A-6 Strenghth not reported in c/l and app. lighting as 5 generators, total capacity 1250 kva, good Reduction/ No proper perimeter road. 4 wheel drive vehicles only can operate. Ras Al Khaimah 16/34-3760x45 AN124 largest 70 Strip 300m 16-34-PA1 Rwy with edge, c/l and app. lighting as edge lights only Two independent souces. 11 generators-total capacity 1300 kva Category 8 3 RFF vehicles and 1 ambulance. All are not in good 47 RFF personnel exercises every 18 months, last one in May 1999 Minimal 2m chain link Good Graded natural surface for perimeter road - END -