CPUC Net Metering Decision Is Good News For Clean Energy

Similar documents
Overview of Net Energy Metering (NEM) Successor Tariff (NEM 2.0)

What, Why, and Where? Brian Lips Senior Project Manager for Policy NC Clean Energy Technology Center

Update on State Solar Net Metering Activities Lori Bird, NREL RPS Collaborative Summit Washington, DC September 23, 2014

Alternatives to Utility-scale Renewable Energy in the Desert. Basin & Range Watch

Solar Power, NEM and Challenges to the Traditional Utility Model. Carrie Cullen Hitt SVP, State Affairs

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Calif. Energy Storage Juiced By New Federal Guidelines

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

JEA Distributed Generation Policy Effective April 1, 2018

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Rate Impact of Net Metering. Jason Keyes & Joseph Wiedman Interstate Renewable Energy Council April 6, 2010

24. SOLAR INCENTIVE PROGRAM II

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

July 16, Dear Mr. Randolph:

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

States of SOLAR. Q Quarterly Report. Executive Summary NC CLEAN ENERGY TECHNOLOGY CENTER. July 2017

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

Frequently Asked Questions Trico Proposed Net Metering Tariff Modifications

Distributed Solar Policy Case Study: NEVADA

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 3rd Revised CPUC Sheet No. 137 Canceling 2nd Revised CPUC Sheet No.

The retail price a household pays for the last unit of grid-supplied electricity consumed is an

Illinois Solar Energy Association. Residential Rate Design Webinar August 25, 2016

2019 NYC Solar Installer Workshop: Solar and Storage. March 18, 2019

Next Generation Solar Incentive Program

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Decision on Merced Irrigation District Transition Agreement

The Gambia National Forum on

THE PUBLIC SERVICE COMMISSION OF MARYLAND

Community Solar Policy

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016

Glossary of Community Choice Energy and Related Terms

MCE Napa County Cleaner energy and lower rates. Honig Winery, Rutherford

California s Experience with Solar Housing Complexes. Simon Baker California Public Utilities Commission November 13, 2014 Mexico City

Net Metering in Illinois. Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014

Net Metering Policy Framework. July 2015

Microgrids A Regulatory Perspective

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Topic Small Projects (< 100 kw) Large Projects (>100 kw)

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

Schedule D DOMESTIC SERVICE

LANCASTER CHOICE ENERGY S BIENNIAL ENERGY STORAGE PROCUREMENT COMPLIANCE REPORT

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

TERRITORY: This rate schedule applies everywhere PG&E provides electric service. I

California s Energy Storage Summit California Energy Storage Association and Association of California Water Agencies

October 30, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

PUBLIC UTILITY COMMISSION OF OREGON AHD REPORT PUBLIC MEETING DATE: April 10, 2018 EFFECTIVE DATE N/A

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

SOLAR DISTRIBUTED GENERATION PROGRAM UPDATE

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

ELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE

The Commonwealth of Massachusetts

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) NOTICE OF EX PARTE COMMUNICATION

Distributed Resource Integration in the US: A Markets Perspective

ELECTRIC SCHEDULE EV Sheet 1 RESIDENTIAL TIME-OF-USE SERVICE FOR PLUG-IN ELECTRIC VEHICLE CUSTOMERS

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

Solar Electric Systems for Multi-Tenant Units. Presenters

States of SOLAR. Q Quarterly Report. Executive Summary NC CLEAN ENERGY TECHNOLOGY CENTER. October 2018

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

CPUC Transportation Electrification Activities

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Transmission Access Charges (TAC) Structure Use Transmission Energy Downflow (TED) as the TAC Billing Determinant

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING

Kansas Legislator Briefing Book 2009

Zero Emission Bus Impact on Infrastructure

Utility Solar Business Models

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

SHORE POWER RATE BC HYDRO 333 DUNSMUIR STREET VANCOUVER, BC

November 8, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

PG&E California Solar Initiative (CSI) & Net Energy Metering (NEM) Interconnection Webinar. March 26, 2009

Overview of S.L Competitive Energy Solutions for North Carolina

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON AR 515

Interconnection and Net Metering Service in Ohio

Modernization or Fossilization?

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

National Grid s Solar Initiatives and Net-Metering

Ratemaking Trends in the Utility Industry. Jeff Wernert The Prime Group, LLC

Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any

Renewable Energy System Tariffs and Pricing

Superseding Revised Sheet No. 63 REVISED SHEET NO. 63 Effective March 1, 2011 Effective September 1, 2012 ENERGY COST ADJUSTMENT CLAUSE

PREPARED DIRECT TESTIMONY OF CYNTHIA FANG CHAPTER 3 ON BEHALF OF SAN DIEGO GAS & ELECTRIC COMPANY

Interdepartmental Memorandum

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

Merger of the generator interconnection processes of Valley Electric and the ISO;

Statewide Joint IOU Study of Permanent Load Shifting Workshop #2: Expanding the Availability of Permanent Load Shifting in California

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

The Commonwealth of Massachusetts

Los Angeles. June 17, The Honorable City Council c/o Office of the City Clerk Room 395, City Hall Mail Stop 160

Solar Policy Landscape West. Andy Newbold, Public Affairs Manager January 2018

Transcription:

Portfolio Media. Inc. 860 Broadway, 6th Floor New York, NY 10003 www.law360.com Phone: +1 646 783 7100 Fax: +1 646 783 7161 customerservice@law360.com CPUC Net Metering Decision Is Good News For Clean Energy Law360, New York (February 3, 2016, 12:13 PM ET) -- Sheridan J. Pauker Peter D. Mostow Grace Hsu On Jan. 28, 2016, the California Public Utilities Commission adopted a decision by a vote of 3-2 approving a new tariff structure for future net energy metering customers. The decision preserves the existing retail rate of compensation for exports of electricity by the customer on a monthly basis in the service territories of the state's three large investor-owned utilities (IOUs). While the NEM successor tariff will impose on net metering customers certain interconnection fees, increase monthly charges that apply to all ratepayers, and require customers to take service on any time-of-use (TOU) rates available to them, it has been strongly praised by the clean energy industry as largely preserving the economics of a customer's decision whether to install distributed energy resources. Background Net metering has been a significant factor driving the growth of distributed solar photovoltaics in California and many other states across the country. California's current NEM tariffs allow customers with distributed generation systems to receive a credit on their utility bills for electricity exported to the utility grid at retail rates, allowing the customer's meter to "spin backwards" when the distributed generation device produces more electricity than the customer is using, and thereby offsetting electricity bills.[1] In 2013, California's Legislature passed Assembly Bill 327 (Perea)[2] (AB 327) which required the CPUC to develop a successor NEM tariff to apply on the earlier date of July 1, 2017, or the date the utility reaches a NEM program capacity limit of 5 percent of aggregate customer peak demand (the transition trigger date).[3] AB 327 also required the CPUC to ensure that the total benefits of the NEM successor tariff to all customers and the electrical system are approximately equal to the total costs.[4]

In an earlier decision, D.14-03-041, the commission decided that customers who took service prior to the transition trigger date could remain on the current NEM tariff for a period of 20 years after the original year that their each existing NEM facility interconnected. The caps for "NEM 1.0" are close to being met, and are predicted to be reached in the San Diego Gas & Electric Company's (SDG&E) territory as early as April 2016, and in the Pacific Gas and Electric Company's (PG&E) territory as early as August 2016.[5] In recent years, several states across the U.S. have made changes negatively impacting the economics of net metering, including imposing high fixed monthly charges on customers and significantly reducing the rate of compensation for exports. In October of 2015, for example, Hawaii regulators ended that state's net metering program and created new "self supply" and "grid supply" options for new solar systems seeking interconnection.[6] As recently as December 2015, Nevada regulators severely altered that state's NEM program by adding fixed charges and significantly decreasing export compensation to the avoided cost rate (in some areas, $0.02649 by 2020).[7] This had the effect of causing prominent solar installers to immediately withdraw operations in Nevada and lay off large numbers of employees in that state. In this context, the California decision was the subject of intense debate, regulatory advocacy and speculation. As part of the stakeholder process that resulted in the decision, the IOUs had argued for the imposition of high demand charges, standby charges, and a variety of substantial fees, as well as compensation for exports well below retail rates. The solar industry reasoned that the existing rate structure fairly took into account the value and benefits of distributed clean energy exports to the grid. NEM Successor Tariff Decision Retail Rates: The decision passed last week rejected most of the calls for extremely high fees and charges on net metering customers that were broadly predicted to be detrimental to the economics of rooftop solar and, most significantly, preserved full retail compensation for exports on a 1:1 basis.[8] Nonbypassable Charges: The decision changes the way certain generally applicable utility bill charges apply to net metering customers. Previously, certain "nonbypassable charges," including those funding public purposes like energy efficiency incentives and low-income programs, nuclear decommissioning, competition transition, and water resources bonds that apply to ratepayers generally only applied to the net kilowatt-hour consumed by NEM customers after taking the renewable energy exports into account. Now, these charges will apply to each kilowatt-hour a customer consumes from the grid. Industry experts expect these nonbypassable charges to add approximately 2 to 3 cents per kilowatt-hour or $6 to $8 per month for an average residential solar customer.[9] The decision maintains the existing minimum monthly customer bill of $10 for non-california alternate rates for energy (CARE) customers as established in D.15-07-001.10 Interconnection Fees: Under the decision, NEM customers will be charged a "reasonable" interconnection fee. The amount of such fee will be proposed by California's IOUs via upcoming advice letter filings, and calculated based on previously documented interconnection costs. The interconnection fees are likely to range between $75 to $100 for systems under 30 kilowatts.[11] Time-of-Use Rates: Another important change imposed by the decision requires net metering customers to take service under any available time of use rate.[12] Currently, residential customers are subject to tiered rates that depend on their monthly electricity usage. In D.15-07-001, the commission

determined that by 2019, customers will be moved to a default TOU rate, such that the cost of service is greater when demand for electricity is high in the late afternoon and the cost of service is lower when demand is low in the late evening. The NEM successor tariff accelerates the shift to TOU rates for net metering customers. Virtual Net Metering: AB 327 required the NEM successor tariff to include "specific alternatives" to ensure growth among residential customers in disadvantaged communities.[13] Instead, the decision maintains the current virtual net metering and net metering aggregation programs, which apply in the multimeter tenant and adjacent property contexts. Under the NEM successor tariff, these programs will also be subject to the changed application of nonbypassable charges and new interconnection fees. Virtual Net Metering will now allow multiple service delivery points at a single site. The final version of the decision approved by the CPUC removed prior language that would have expanded virtual net metering for disadvantaged communities, possibly including a community solar-like program that would have allowed customers in such communities to virtually participate in and benefit from offsite renewable projects. Citing the need to integrate legislation passed in October of 2015, the decision delays implementation of this program and instead determines to further examine how to expand renewables in disadvantaged communities in a second phase of the proceeding. Consumer Protection: With respect to consumer protection, the decision requires the IOUs to require that an applicant for the NEM successor tariff provide verification that all major solar system components are on the verified equipment list maintained by the California Energy Commission and that a minimum warranty of 10 years has been provided on all equipment and the installation. The decision indicated that other consumer protection issues, including the development of a customer information packet and measurement and evaluation of the NEM successor tariff, would be undertaken in the next phase of the proceeding. Grandfathering: Finally, like current NEM customers, customers interconnecting under the NEM successor tariff would be grandfathered onto such tariff for a period of 20 years. Next Steps The decision requires Southern California Edison, PG&E and SDG&E each to submit an advice letter with its NEM successor tariff by Feb. 29, 2016. It also indicates that the battles regarding net metering in California are not over, authorizing commission staff to undertake steps (e.g., collecting data, holding workshops, and developing reports and tools) to prepare for the commission's review of the NEM successor tariff, anticipated to happen in 2019. Such ongoing discussions were foreshadowed by several of the commissioners in their statements at the CPUC meeting approving the decision, and this process should be closely followed by the industry and investors. For the distributed energy industry, one of the most important next steps will be to evaluate proposed time of use rates and their potential impact on customer project economics. In December of 2015, the commission opened a new rulemaking docket (R. 15-12-012) to examine data on load, net load after renewable generation is taken into account, the predicted "shape" of solar and other electric generation, and other factors, in order to identify time periods that are relevant for encouraging customers to reduce demand or supply electricity under TOU rates.[14] There will be upcoming opportunities for interested stakeholders to get involved in this proceeding, including comments on California Independent System Operator data, workshops and additional public comments. The interplay between intermittent renewable generation and energy storage will be key factors in this and other

distributed generation analyses underway, with impacts on the incentive structures for such technologies. By Sheridan J. Pauker, Peter D. Mostow and Grace Hsu, Wilson Sonsini Goodrich & Rosati Sheridan Pauker is regulatory counsel in Wilson Sonsini's San Francisco office. Her practice focuses on renewable energy, energy storage and energy efficiency regulation, incentives, and financing, with particular emphasis on state energy regulatory programs. Peter Mostow is a partner in Wilson Sonsini's Seattle office. His practice focuses on the representation of emerging and mature companies in the fields of energy and clean technology. Grace Hsu is an associate in Wilson Sonsini's San Francisco office. She is a member of the firm's energy and clean technology practice. The opinions expressed are those of the author(s) and do not necessarily reflect the views of the firm, its clients, or Portfolio Media Inc., or any of its or their respective affiliates. This article is for general information purposes and is not intended to be and should not be taken as legal advice. [1] The current California NEM tariffs allow for cash compensation for electricity generated in excess of onsite load beyond a 12-month period at a lower, "net surplus compensation rate" (currently approximately $0.03 to $0.05/ kwh), or for the customer to roll credits forward to future months at such rate. This remains unchanged under the decision. See Decision at 96; Decision 11-06-016. [2] Stats. 2013, ch. 611; Cal. Pub. Util. Code 2827.1. [3] Under Public Utilities Code 2827(c)(4)(B), "aggregate customer peak demand" means "the highest sum of noncoincident peak demands of all the [IOU's] customers that occurs in any calendar year." [4] Cal. Pub. Util. Code 2827.1(b)(4). [5] See CalSEIA, "California regulators approve net metering 2.0" (Jan. 29, 2016), available at: http://calseia.org/industry-news/2016/1/29/california-regulators-approve-net-metering-20. As of Jan. 29, 2016, SDG&E customers have installed or submitted applications for 541.3 MWs out of a cap of 617 MWs. SDG&E, Net Energy Metering Dashboard, available at: http://www.sdge.com/clean-energy/netenergy-metering/overview-nem-cap. As of December, 2015, PG&E customers have installed or submitted applications for 1827.6 out of 2409 MW and Southern California Edison (SCE) customers have installed or submitted applications for 1387.7 MWs out of a cap of 2240 MWs. See PG&E, Net Energy Metering Program Tracking, available at: http://www.pge.com/en/mybusiness/save/solar/nemtracking/index.page; SCE, Get a Read On Net Energy Metering, available at: https://www.sce.com/wps/portal/home/residential/generating-yourown-power/net-energy-metering. [6] Public Utilities Commission of Hawaii, Docket No: 2014-0192, Order No. 33258 (Oct.12, 2015). [7] Public Utilities Commission of Nevada, Docket Nos: 15-07041/15-07042, Order dated (Dec. 23, 2015); see also NV Energy, Net Metering Overview, available at https://www.nvenergy.com/renewablesenvironment/renewablegenerations/netmetering.cfm.

[8] As with the existing NEM tariff, exports will net against usage on a monthly basis. Any net export credits can be rolled forward on a monthly basis. At the end of a 12-month period, surplus generation credits may be payable at the net surplus compensation rate, or the dollar value of such surplus can be rolled forward and credited against future bills. See Decision at 96; Decision 11-06-016. [9] Susannah Churchill, Vote Solar, "CPUC Net Metering Decision Keeps Leading on Rooftop Solar and Customer Choice" (Jan. 28, 2016), available at: http://votesolar.org/2016/01/28/cpuc-net-meteringdecision-keeps-leading-on-rooftop-solar-and-customer-choice/. [10] We note that an earlier draft of the decision also included a transmission charge. The exclusion of this charge was the stated reason CPUC Commissioners Sandoval and Florio did not vote for the decision. [11] See CPUC Press Release, "CPUC Ensures Customers Continue To Benefit From Going Solar By Approving New Net Metering Guidelines" (Jan. 28, 2016), available at: http://docs.cpuc.ca.gov/publisheddocs/published/g000/m158/k181/158181664.pdf; see also Decision at 67, 71. [12] SDG&E customers who complete their interconnection applications for the NEM successor tariff prior to the time the TOU rates for SDG&E residential customers are in effect will be allowed to maintain their current tiered rates for a period of up to five years. [13] Cal. Pub. Util. Code 2827.1(b)(1). [14] California Public Utilities Commission, Order Instituting Rulemaking to Assess Peak Electricity Usage Patterns and Consider Appropriate Time Periods for Future Time-of-Use Rates and Energy Resource Contract Payments (Dec. 17, 2015), available at: http://docs.cpuc.ca.gov/publisheddocs/published/g000/m157/k412/157412121.pdf. All Content 2003-2016, Portfolio Media, Inc.