Transportation Improvement Program

Similar documents
Transportation Improvement Program (TIP) Candidate Project List for Public Review

5. OPPORTUNITIES AND NEXT STEPS

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Basic Project Information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Dixie Transportation Planning Office

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Overview of Transit Funding and Planning in the PACTS Region

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Develop ground transportation improvements to make the Airport a multi-modal regional

A Presentation to: Project Advisory Group Meeting #10

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

Recommended Transportation. Capital Improvement Program

Waco Rapid Transit Corridor (RTC) Feasibility Study

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

Arizona-Sonora Border Master Plan. Plan Maestro para la Frontera Arizona-Sonora

MPO Staff Report Technical Advisory Committee: July 12, 2017

Parking Management Element

Public Information Workshop

METRO Orange Line BRT American Boulevard Station Options

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Leadership NC. November 8, 2018

Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan

City of Grand Forks Staff Report

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

APPENDIX H. Transportation Impact Study

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

Chapter 7: Corridor Visions

Committee Report. Transportation Committee. Business Item No

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

TRAFFIC REGULATION APPROVAL PROCESS

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

4 COSTS AND OPERATIONS

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

LACEY CITY COUNCIL MEETING July 09, 2015

ALTERNATIVES ANALYSIS/ ENVIRONMENTAL IMPACT STATEMENT SCOPING BROCHURE

Chapter 7. Transportation Capital Improvement Projects. Chapter 7

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

STH 60 Northern Reliever Route Feasibility Study Report

METRO Light Rail Update

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM

2030 Multimodal Transportation Study

VAN NESS AVENUE BUS RAPID TRANSIT

Characterization of Combined Use of County Road Segment

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

December 12, Dear Secretary Foxx:

Colorado Association of Ski Towns August 26, 2016

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

Major Widening/New Roadway

City of Lake Oswego Transportation System Plan Update PLAN AND POLICY REVIEW, PART 1

Call for Projects Congestion Mitigation and Air Quality (CMAQ) Emissions Formulas Technical Advisory Committee

The range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives:

Improving Accessibility of Regional Bus Stops and Pathways

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting

Business Advisory Committee. July 7, 2015

Alternatives Analysis Findings Report

ALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002

Community Advisory Committee. October 5, 2015

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Table 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period

4.0 TIER 2 ALTERNATIVES

Update on Bus Stop Enhancements

The Eastern Connector Study November, 2007 planning for the future

Wentzville Parkway South Phase 2 & 2A

North Shore Alternatives Analysis. May 2012

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

The Georgia CMAQ Program. Practice Makes Perfect

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study

Operating & Maintenance Cost Results Report

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Balancing the Transportation Needs of a Growing City

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Report by Planning, Development & Real Estate Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6

Reston Transportation Strategy July 9, 2018

Redefining Mobility. Randy Iwasaki. Executive Director Contra Costa Transportation Authority January 18, 2018

Draft Results and Open House

PARTIAL PROGRAM OF PROJECTS FFY

Key Project Elements Status Report

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only

ITEM 13 - NOTICE May 20, 2009

Transcription:

FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION CITY OF FLAGSTAFF COCONINO COUNTY ARIZONA DOT Office: 100 West Birch Avenue Flagstaff, Arizona 86001 Mail: 211 West Aspen Avenue Flagstaff, Arizona 86001 Phone: (928) 226-4849 Fax: (928) 213-4825 www.flagstaffmpo.org 2010 2014 Transportation Improvement Program Executive Board Approval June 24, 2009 Partners in Transportation Enhancing Our Community

This report produced with financial assistance from the Arizona Department of Transportation, Federal Transit Administration and the Federal Highway Administration.

Resolution Number 09-01 of the Flagstaff Metropolitan Planning Organization Executive Board Approving the 2010 2014 Transportation Improvement Program WHEREAS, The Flagstaff Metropolitan Planning Organization (FMPO) has the responsibility for conducting the area-wide continuing, comprehensive, and cooperative transportation system planning program and must maintain the regional transportation system plan and short range transportation improvement program on a current basis pursuant to Section 124 of Title 23, USC as Amended by the Intermodal Surface Transportation Act of 1991, the Transportation Efficiency Act for the 21 st Century of 1998, and the Safe, Accountable, Flexible, Efficient Transportation Equity Act - a Legacy for Users Act of August 10, 2005; and WHEREAS, The FMPO s Transportation Improvement Program is a central program management tool for structuring metropolitan transportation programs and reflects the integrated nature of the regional transportation system; and WHEREAS, The FMPO reviews the arterial, transit, and bicycle improvement programs prepared by the member agencies for correlation as one regional Transportation Improvement Program, and advises the member jurisdictions of any conflicts, and prepares, as a coordinated composite of local programs, a regional Transportation Improvement Program for the FMPO area; and WHEREAS, The FMPO Technical Advisory Committee and Executive Board, consisting of local and state officials, are involved in a process to annually coordinate the preparation of a regional Transportation Improvement program and have reviewed and approved this Fiscal Year 2009 2013 Transportation Improvement Program; and WHEREAS, The projects in this 2010 2014 Transportation Improvement Program, including its 2009 Annual Element, are consistent with the Flagstaff Metropolitan Planning Organization Regional Transportation Plan, adopted June 13, 2002; and WHEREAS, The FMPO HEREBY CERTIFIES that the metropolitan transportation planning process is being carried on in conformance with all applicable requirements of 23 U.S.C. 134, and as amended by the Intermodal Surface Transportation Efficiency Act of 1991, the Transportation Efficiency Act for the 21 st Century of 1998, the 1990 American with Disabilities Act; and the 1990 Clean Air Act Amendments; and WHEREAS, The FMPO FURTHER CERTIFIES that the metropolitan planning program is being performed to satisfy the following federal regulations:

Table of Contents Resolution 09-01: Adopting the FY 2010-14 Transportation Improvement Program i Table of Contents iii Chapter I: Introduction General 3 Geographic Area 4 Statutory Requirements 5 Criteria for Inclusion of a Project in the TIP 5 Chapter II: ADOT Projects 8 Chapter III: Local projects: Federal Aid Funds 11 Chapter IV: Local projects: Non-Federal Aid Funds 14 Chapter V: Local Projects: Federal Transit Funds 16 Chapter VI: Local Projects: Safety and Enhancement Funds 19 Chapter VII: All Agencies: Pavement Preservation Projects 22 List of Figures FMPO Area Boundaries 4 FMPO Planning process 7 List of Tables Table 1. ADOT: Tentative 5-Year Highway Construction Program: FY 2010-2014 9 Table 2. ADOT: FMPO proposed projects: FY 2010-2014 9 Table 3. FMPO Surface Transportation Program (STP) projects FY 2010-2014 12 Table 4. Non-Federal Aid Projects within the FMPO-area FY 2010-2014 15 Table 5. FMPO Transit System Projects: FY 2010-2014 17 Table 6. Safety projects within the FMPO-area: FY 2010-2014 20 Table 7. Approved Enhancement Projects within the FMPO-area: FY 2010-2014 20 Table 8. FMPO Area Pavement Preservations Projects All Agencies: FY 2010-2014 23 List of Maps Map 1. ADOT: 5-Year Highway Construction Program Projects & FMPO Proposed Project 10 Map 2. FMPO Surface Transportation Projects 13 Map 3. Transit System Route Map and Capital Projects 18 Map 4. FMPO Area Enhancement Projects 21 Map 5. FMPO Area Pavement Preservation Projects (all agencies) 24

FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION 2010-2014 Transportation Improvement Program Chapter I Introduction

Chapter I. INTRODUCTION GENERAL FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION 2010-2014 TRANSPORTATION IMPROVEMENT PROGRAM This Transportation Improvement Program (TIP) represents the project selection document for Federally-funded project. Project priorities are indicated by the year the project is programmed. For Federally-funded projects, the year programmed as indicated in the TIP refers to the state fiscal year ending June 30 th. This TIP is a multi-year, multi-agency listing of transportation improvements for the Flagstaff Metropolitan Planning Organization s (FMPO) area covering a period of five years, 2010 through 2014. Included are projects on state routes which have recommended funding by the Arizona Department of Transportation for consideration by the Arizona State Transportation Board (Table 1) these projects are extracted from the state s draft 5-year plan; projects proposed for funding under the Federal Surface Transportation Program, Bridge, or Hazard Elimination System (Safety) programs; and other needed projects for which state funding is sought and/or local sources of revenue are identified. Last year s improvements are the Annual Listing of Projects. Table 2 in Chapter II presents projects proposed by FMPO members for potential inclusion in the Arizona State Highway System within the FMPO area. Chapter III lists other proposed local projects both federally and non-federally funded. Each of the projects proposed for implementation in this TIP are consistent with the FMPO Regional Transportation Plan, adopted June 13, 2002.

GEOGRAPHIC AREA Figure 1 illustrates boundaries for the Flagstaff Metropolitan Planning Organization. The area stretches from the unincorporated areas of Kachina Village and Mountainaire in the south to the San Francisco Peaks in the north and the unincorporated areas of Winona to the east and Bellemont to the west. Figure 1. FMPO Boundaries

STATUTORY REQUIREMENTS Under federal guidelines, the TIP is a staged, multi-year (4-5) program of transportation projects which is consistent with and implements the FMPO Regional Transportation Plan. The TIP must be prepared in such detail as to identify projects (or groupings of projects of similar types), to assign these projects to appropriate staging periods, and to identify costs and funding sources. Further, it must be revised as least biannually and be endorsed by the FMPO. The purpose of the TIP is to synthesize the short-range plans and programs of all local agencies to insure coordination, to schedule projects of area-wide significance which are recommended in the Regional Transportation Plan, and to provide system s level overview of the proposed improvements for the entire area. Further, the TIP is a central program management tool for structuring metropolitan transportation programs and reflects the integrated nature of the regional transportation system. The TIP must be approved by the FMPO Executive Board and the Governor of Arizona or his/her designee. Following such approvals, the TIP shall be included in the Statewide Transportation Improvement Program (STIP) prepared by the Arizona Department of Transportation. FMPO S TIP is a product of the regional transportation planning process that is carried on cooperatively by FMPO with the City of Flagstaff, Coconino County and ADOT. Working together, these agencies plan and sponsor projects that carry out the policies and recommendations of the regional plan. This process is detailed in Figure 2. CRITERIA FOR INCLUSION OF A PROJECT IN THE TIP The FMPO has created an application form and process the scoring for which is summarized below: Roadway Projects: Criteria: REGIONAL PLAN SUPPORT Possible Points: 20 Criteria: ROADWAY SYSTEM ENHANCEMENT Possible Points: 25 Criteria: COST EFFECTIVENESS Possible Points: 15 Criteria: BONUS POINTS Possible Points: 10 Transit Projects: Criteria: COMPLIANCE WITH SHORT RANGE TRANSIT PLAN Possible Points: 20 Criteria: EXISTING AND/OR FUTURE RIDERSHIP ON ROUTE Possible Points: 20 Criteria: SAFETY AND SECURITY Possible Points: 20 Criteria: INTERMODALISM/MULTIMODALISM Possible Points: 10 Criteria: REGIONAL PLAN SUPPORT Possible Points: 10 Criteria: BONUS POINTS Possible Points: 10

Pedestrian/Bicycle Projects: Criteria: SAFETY Possible Points: 25 Criteria: REGIONAL PLAN SUPPORT Possible Points: 20 Criteria: PEDESTRIAN/BIKEWAY SYSTEM ENHANCEMENT Possible Points: 25 Criteria: EFFECTIVENESS/COST EFFECTIVENESS Possible Points: 20 Criteria: BONUS POINTS Possible Points: 10 This process is employed when the number of projects proposed for the use of federal funds exceeds the ability to work through a consensus process.

Figure 2. FMPO TRANSPORTATION PLANNING PROCESS FMPO TRANSPORTATION POLICY FRAMEWORK Goals, Objectives, Policies State Policy FMPO TRANSPORTATION PLANNING State Transportation Planning System Performance Pavement, Bridges, Transit, Safety, Congestion, Freight Movement, Traffic Monitoring System Performance Public Input Public Input Transportation Plan Long Range Forecasting Analyses, and Identification of Travel Needs Short Range Analyses of Operational Needs FMPO Transportation Plan State Transportation Plan Annual Transportation Improvement Program (TIP) State Transportation Improvement Program (STIP) Update and Refine Update and Refine

FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION 2010 2014 Transportation Improvement Program Chapter II ADOT projects in the FMPO area

Table 1. Arizona Department of Transportation: Tentative 5-Year Highway Construction Program Fiscal Years 2010-2014 as of 6/4/09 mpo_cog tip_fy project_sponsor project_name project_location work_type_equipment_etc Length federal_functional_class lanes_before lanes_after funding_type fmpo 2010 ADOT US 66 Steve's Blvd Turn Lanes Add right turn lane @ Steve's 0.1 Principal Arterial 2 2 HURF 75,000 fmpo 2013 ADOT 89A Airport TI Construct intersection improvement 0.1 Urban Minor Arterial 2 2 STP 6,250,000 fmpo 2009 ADOT I-40 Walnut Canyon, WB Reprofile Vertical Curves 3.8 Rural Interstate 2 2 ARRA 12,000,000 18,427,000 federal_funds Table 2. Arizona Department of Transportation: FMPO proposed projects Fiscal Years 2010-2014 Updated 6/4/09 PROJECTS IN THIS TABLE ARE LISTED FOR ILLUSTRATIVE REASONS ONLY - THEY ARE NOT PROGRAMMED mpo_cog tip_fy project_sponsor project_name project_location work_type_equipment_etc Length lanes_before federal_functional_class lanes_after federal_aid_type fmpo 2014 ADOT I-40 Lone Tree TI, mile post construct new traffic interchange 1.5 Interstate 2 2 STP 25,000,000 25,000,000 Note: This project has been submitted to Congress for consideration in the next highway bill federal_funds

FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION 2010-2014 Transportation Improvement Program Chapter III Local Projects: Federal Aid Funds

Table 3. FY 2010-2014 FMPO Surface Transportation Program (STP) projects Update: 6/24/09 mpo_cog tip_fy project_sponsor project_name project_location work_type_equipment_etc Length federal_functional_class lanes_before lanes_after federal_aid_type federal_funds fmpo 2009 Flagstaff Lake Mary AZ FH 3 (Lake Mary Rd) (1) Widening - shoulders Urban Minor 4.4 Arterial 2 2 STP $ 226,678 1,600,000 13,900,000 fmpo 2010 ADOT Turn lane E. Route 66/Steves (WB) Bus pull-outs, const. Other Principal 0.1 Arterial STP $ 260,680 75,000 335,680 Milton Rd Design - Congestion Relief - Riordan to Other Principal fmpo 2010 Flagstaff Milton I Phase I (3) 180 0.86 Arterial STP $ 340,017 18,859 12% of $15M fmpo 2010 NAIPTA Mt. Links - BRT Downtown & NAU Design 4.7 System STP-flex $ 260,680 430,000 Milton Rd Design - Congestion Relief - Riordan to Other Principal fmpo 2011 Flagstaff Milton II Phase II 180 0.86 Arterial STP $ 436,129 24,190 Rio de Flag Bridges fmpo 2012 Flagstaff Rio bridges (4) bridge improvements Urban Collector 2 2 HPP $ 3,000,000 W. Route 66 @ Rio Bridge Construction (share) Other Principal fmpo 2012 Flagstaff 66 bridge de Flag (2) (3) 0.2 Arterial STP $ 183,881 10,199 fmpo 2012 Flagstaff Milton III Milton Rd Design - Phase III Congestion Relief - Riordan to 180 Other Principal 0.86 Arterial STP $ 459,704 175,497 fmpo 2013 Flagstaff Milton IV Milton Rd Design - Phase IV Congestion Relief - Riordan to 180 Other Principal 0.86 Arterial STP $ 835,067 146,317 local_match Total Project Cost fmpo 2014 Flagstaff Beulah Beulah Blvd extension Road Design - Complete Urban Collector 0.4 (prop.) STP $ 662,954 36,771 520,000 fmpo 2014 Flagstaff Lone Tree T.I. T.I. Design Support Road Design - Share Urban 0.4 Interstate STP $ 508,265 25,372 20,000,000 (1) Total project cost estimated at $13,900,000, additional funding programmed through City of Flagstaff, Coconino County, and federal forest highways program (2) Total project cost estimated at $2,000,000, additional funding aniticpated from ADOT bridge program (3) Total project cost estimated at $15,000,000 - capital funding not programmed at this time (4) Total project cost estimated at $54,000,000 for the complete flood control project (5) Assumed 4% per year cost of inflation from FY 2009.

FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION 2010-2014 Transportation Improvement Program Chapter IV Local Projects: Non-federal Aid Funds

Table 4. FY2010-2014: Non-Federal Aid Projects within the FMPO-area on Federal Aid Eligible roads Update 6/4/09 mpo_cog tip_fy project_sponsor project_name project_location work_type_equipment_etc Length federal_functional_class lanes_before lanes_after local fund source fmpo 2009 Flagstaff Huntington Drive Improvements Enterprise to Bronco reconstruction Urban 0.75 Collector 2 2 Transpo 4,500,000 Urban fmpo 2009-2011 Flagstaff Beulah Blvd. Extension Forest Meadows to Yale right-of-way purchase 0.35 Collector 2 2 Transpo 1,995,480 fmpo 2008-2009 Flagstaff Downtown Rail Crossing Modifications Beaver and San Francisco Streets quiet zone installations Urban 0.1 Collector 2 2 Transpo 860,000 fmpo 2009 Flagstaff Lake Mary Rd/FH 3 JWP to City Limits utility relocate and shoulder widening Urban Minor 4.3 Arterial 2 2 Transpo 1,445,000 Urban Industrial Drive/Fanning Eagle Mountain to reconstruction and Collector fmpo 2009-2013 Flagstaff Wash Huntington drainage 0.25 (prop) 2 2 Transpo 2,785,000 Urban fmpo 2009 Flagstaff West/Sixth Intersection West/Sixth roundabout construction 0.2 Collector 2 2 Transpo 740,000 Industrial Drive-Fanning Fanning to Eagle Urban Collector fmpo 2009 Flagstaff to Eagle Mtn Drive Mountain construction 0.3 (prop) 2 2 Transpo 1,750,000 fmpo 2011 Flagstaff Country Club/Oakmont intersection safety improvements Urban 0.2 Collector 2 2 Transpo 775,000 fmpo 2011-2014 Flagstaff West Arrowhead Improvements Route 66 to West, Arrowhead to Dortha reconstruction, edge improvements Urban 1.15 Collector 2 2 Transpo 7,400,000 local funds fmpo 2009 Coconino Lake Mary Rd Guardrail replacement south of City limits Guardrail replacement Urban Minor na Arterial 2 2 HURF 300,000 fmpo 2010 Coconino Cosnino Road full limits grade change and reconstruction Rural 2.1 Collector 2 2 Roads 1,800,000 fmpo 2011 Coconino Stardust Trail Yancy to Rio Rancho new construction Rural 0.8 Collector 0 2 Roads 1,750,000 26,100,480

FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION 2010-2014 Transportation Improvement Program Chapter V Local Projects: Federal Transit Funds

Table 5. FY2010-2014: Transit Projects within the FMPO-area Update 6/4/09 Fiscal Agency Year ALI Code Location Project Description Fund Type Local Cost Federal Cost Total Cost In Progress Projects NAIPTA 2009 11.7A.00 Region Vehicle Rehab and Maintenance 5307 $ 24,400 $ 97,600 $ 122,000 NAIPTA 2009 11.32.10 Flagstaff Passenger Shelters, Signs, and Poles 5309 $ 4,540 $ 18,157 $ 22,697 NAIPTA 2009 11.32.10 Flagstaff Passenger Shelters, Signs, and Poles 5307 ARRA $ 67,303 $ 67,303 NAIPTA 2009 11.71.01 Flagstaff Design & Engineering Mountain Links - Bus Rapid Transit (BRT) 5307 ARRA $ - $ 170,000 $ 170,000 NAIPTA 2009 11.31.10 Flagstaff Passenger Shelter - Downtown Transfer Center 5307 $ 33,000 $ 120,000 $ 153,000 NAIPTA 2009 11.76.91 Flagstaff Building Construction - Maintenance and Admin Bldg, Kaspar Dr 5307 $ 298,963 $ 1,195,851 $ 1,494,814 NAIPTA 2009 11.76.91 Flagstaff Building Construction - Maintenance and Admin Bldg 5309 $ 381,037 $ 1,524,149 $ 1,905,186 TOTAL ALL CATEGORIES-2009 $ 336,503 $ 1,571,311 $ 1,907,814 Future Projects NAIPTA 2010 30.09.00 Region Operating Assistance, including Project Management 5307 $ 3,475,402 $ 904,974 $ 4,380,376 NAIPTA 2010 11.13.02 Flagstaff 1 Hybrid Electric Bus (expansion of fleet, increase frequency) 5307 ARRA $ 540,000 $ 540,000 NAIPTA 2010 11.7A.00 Region Vehicle Rehab and Maintenance 5307 ARRA $ 25,200 $ 319,084 $ 344,284 NAIPTA 2010 11.33.02 Flagstaff Passenger Shelter - Mall Transfer Center 5307 ARRA $ - $ 200,000 $ 200,000 NAIPTA 2010 11.32.10 Flagstaff Passenger Shelters, Signs, and Poles 5307 ARRA $ 44,569 $ 178,274 $ 222,843 NAIPTA 2010 11.71.01 Flagstaff Design & Engineerng Mountain Links - BRT 5307 STP $ 17,312 $ 230,000 $ 247,312 TOTAL ALL CATEGORIES-2010 $ 3,562,483 $ 2,372,332 $ 5,934,815 NAIPTA 2011 30.09.00 Region Operating Assistance, including Project Management 5307 $ 4,751,127 $ 904,974 $ 5,656,101 NAIPTA 2011 11.7A.00 Region Vehicle Rehab and Maintenance 5307 $ 25,960 $ 103,840 $ 129,800 NAIPTA 2011 11.12.15 Region 1 Para-Transit Van (Replacement) 5307 $ 13,049 $ 52,195 $ 65,244 NAIPTA 2011 11.32.10 Flagstaff Passenger Shelters, Signs, and Poles 5309 $ 7,750 $ 31,000 $ 38,750 TOTAL ALL CATEGORIES-2011 $ 4,797,886 $ 1,092,009 $ 5,889,895 NAIPTA 2012 30.09.00 Region Operating Assistance, including Project Management 5307 $ 4,941,471 $ 904,974 $ 5,846,445 NAIPTA 2012 11.12.15 Region 1 Para-Transit Van (Replacement) 5307 $ 13,375 $ 53,500 $ 66,875 NAIPTA 2012 11.32.10 Flagstaff Passenger Shelters, Signs, and Poles 5307 $ 5,000 $ 20,000 $ 25,000 TOTAL ALL CATEGORIES-2012 $ 4,959,846 $ 978,474 $ 5,938,320 NAIPTA 2013 30.09.00 Region Operating Assistance, including Project Management 5307 $ 5,139,475 $ 904,974 $ 6,044,449 NAIPTA 2013 11.7A.00 Region Vehicle Rehab and Maintenance 5307 $ 27,600 $ 110,400 $ 138,000 NAIPTA 2013 11.12.15 Region 1 Para-Transit Van (Replacement) 5307 $ 13,709 $ 54,838 $ 68,547 NAIPTA 2013 11.32.10 Flagstaff Passenger Shelters, Signs, and Poles 5307 $ 5,000 $ 20,000 $ 25,000 TOTAL ALL CATEGORIES-2013 $ 5,185,784 $ 1,090,212 $ 6,275,996 NAIPTA 2014 30.09.00 Region Operating Assistance, including Project Management 5307 $ 5,139,475 $ 904,974 $ 6,044,449 NAIPTA 2014 11.12.15 Region 2 Para-Transit Van (Replacement) 5307 $ 28,104 $ 112,417 $ 140,521 NAIPTA 2014 11.32.10 Region Passenger Shelters, Signs, and Poles 5307 $ 60,000 $ 240,000 $ 300,000 NAIPTA 2014 11.33.02 Flagstaff Design and Construction of BRT Route/Corridor 5309 $ 943,000 $ 3,772,000 $ 4,715,000 NAIPTA 2014 11.13.02 Flagstaff 4 Hybrid Electric Bus (expansion of fleet, implementation of BRT) 5309 $ 432,000 $ 1,728,000 $ 2,160,000 NAIPTA 2014 11.13.02 Flagstaff 6 Hybrid Electric Bus (replacement of expired fleet)) 5307 ARRA TIGGER $ - $ 3,240,540 $ 3,240,540 NAIPTA 2014 11.13.02 Flagstaff 4 Hybrid Electric Buses (replacement of expired fleet) 5309 $ 472,984 $ 1,891,936 $ 2,364,920 NAIPTA 2014 11.76.91 Flagstaff Building Construction - Phase 2 of Admin Facility 5309 $ 1,200,000 $ 4,800,000 $ 6,000,000 TOTAL ALL CATEGORIES-2014 $ 8,275,563 $ 16,689,867 $ 24,965,430

Map 3.Mountain Line Projects Mall Transfer Center NAIPTA Administrative Center Downtown Transfer Center Mountain Links Transit Way/BRT

FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION 2010-2014 Transportation Improvement Program Chapter VI Local Projects: Safety & Enhancement Projects

Table 6. Safety Projects with the FMPO -area: FY 2010-2014 Updated 6/4/09 Project Sponsor none Project Location Project Description Federal no projects at this time Fund Source Required Local Other 10 11 12 13 14 TOTAL Table 7. Approved Enhancement Projects within the FMPO-area: FY 2010-2014 Update: 6/04/09 fmpo fmpo mpo_cog tip_fy 2009 Flagstaff 2010 Flagstaff project_sponsor project_name project_location work_type_equipment_etc Length federal_aid_type federal_funds Multi-use trail on west side, Railhead to Snowflake US 89 trail construction 1.27 Enhance $ 500,000 $ 481,720 Multi-use trail on north side from Country Club to Mall Way old Route 66 trail construction 0.5 Enhance $ 466,570 $ 100,000 local_match fmpo 2013 Flagstaff Walnut Street Railroad Underpass BNSF RR trail construction 0.5 Enhance $ 500,000 $ 760,408 Trail work from Rio de Flag to San fmpo 2010 Flagstaff Francisco Street B40 trail construction 0.25 ARRA-TE $ 500,000 $ 250,000 fmpo 2010 Flagstaff S. Beaver & S. San Francisco Southside streetscape/landscaping 0.5 Enhance $ 500,000 $ 2,028,000 fmpo 2011 Flagstaff Woodlands Village Landscaping Woodlands Village Bvd streetscape/landscaping 0.25 Enhance $ 500,000 $ 200,000

FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION 2010-2014 Transportation Improvement Program Chapter VII All Agencies: Pavement Preservation Projects

Table 8. Pavement Preservation Projects within the FMPO Area: 2010-2014 Fiscal Years 2010-2014 as of 6/4/09 mpo_cog tip_fy project_sponsor project_name project_location work_type_equipment_etc Length federal_functional_class lanes_before lanes_after federal_aid_type federal_funds local_match fmpo 2009 ADOT US-89 Townsend- Fernwod Pavement preservation Rural Principal 6 Other 4 4 ARRA-STP 8,000,000 fmpo 2009 Coconino W. Rte 66 Pavement preservation Minor Arterial 2 2 ARRA-STP 916,000 125,000 fmpo 2010-2014 Flagstaff system Pavement preservation Local to Minor varies Arterial 12,000,000 fmpo 2012 Coconino Lake Mary Rd -Phase I Pavement recycle Major Collector 1,462,323 fmpo 2013 Coconino Lake Mary Rd -Phase II Pavement recycle Major Collector 1,200,000 fmpo 2014 Coconino Townsend- Winona Pavement recycle Minor Arterial 1,200,000 0 15,987,323