The turning and lifting clutch is reliable and safe.

Similar documents
HALFEN MBT REINFORCING COUPLERS MBT 10-E CONCRETE

PRODUCT MANUAL 46ST (V.5.0) 46ST FS (V.5.0.F) 50ST (V.2.0) 50ST FS (V.2.0.F) RON-WPM ST/46STFS/50ST/50STFS-Rev.3

270PK SERVICE GUIDELINES

Adjustable Speaker Mount GRAVIS 12

PRODUCT MANUAL 52ST (V.4.0) 52ST FS (V.4.0.F) RON-WPM ST/52STFS-Rev.3

Adjustable Speaker Mount GRAVIS 8

Product Information Overspeed governor GB 260

PRODUCT MANUAL 34ST (V.2.0) 34ST FS (V.2.0.F) RON-WPM ST/34STFS-Rev.3

PRODUCT MANUAL 12ST (V.4.0) 12ST FS (V.2.0.F) RON-WPM ST/12STFS-Rev.3

MBT REINFORCEMENT COUPLER MBT 16-E. Existing Structures: DIBt-Approval Z also valid for connections of B500 with old reinforcement BSt 420 S

PIN TYPE FORK POSITIONER WITH SHIFTING SF-F MODEL

Air Trap TATSU2. Copyright 2013 by TLV CO., LTD. All rights reserved ISO 9001/ ISO M-02 (TATSU2) 7 August 2013.

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

PRESSURE RELIEF VALVE: DISASSEMBLY, INSPECTION, and ASSEMBLY CONTENTS

REEDSTER 125cc. versions: F1 - F2 - F3 - F4 OVERHAULING MANUAL

Free Float Air Trap G8

Installation and Maintenance Manual MRW-01. Radial Winch 40.2 ST

Performa Winch 50.2 STP

Hydraulic Rotary Hammer Drill

Performa Winch 80.3 STP

OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP

Performa Winch 70.2 STP

Performa Winch 40.2 STP

Facts and figures INTEGRALPICKER V.

Competence from the Original Equipment Supplier

Layher Ladders Instructions for Assembly and Use. Quality management certified according to DIN EN ISO 9001:2000 by TÜV-CERT.

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

Blohm+Voss Pipe Handling Equipment Special Link Connector Technical Documentation Original instructions

Installation and Maintenance Manual MRW-01. Radial Winch 40.2 PT

INSTRUCTION MANUAL. Pacific Self-locking Beam Trolleys Pacific Adjustable Angle Clamps Pacific Top Girder Clamps

IV STANDS. Assembly, Usage and Maintenance INSTRUCTION MANUAL

Technical Description Edition 2007 Mounting, maintenance and repair of propshafts with flanged universal joints

Operating Instructions Hoist Chains EN 818-7

APT14 Automatic Pump Trap Installation and Maintenance Instructions

Performa Winch 35.2 PTP

3 Ton Trolley Jack. Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference.

Accessories. Accessories and Fittings for Air Tools & Connecting Air Tools to an Air Distribution Grid

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

Mechanical and adapters

Metallic Nozzle Convertion Kit - PG 1 to PG 1-M

Installation and Maintenance Manual MRW-02. Radial Winch 80.3 ST

Serie 2003/2013. Three-way Control Valve, mixing/diverting. Wörth am Main. Service. Control Valve Division

Provided by: Operating, Maintenance & Parts Manual

USER MANUAL. TSK and TSK V.

Cast-in Channels Curved Solution

Facts and figures MULTILIFT SELECT 6

OPERATING INSTRUCTIONS (Translation) Hoisting crane

Instructions for INSTALLATION -- OPERATION -- MAINTENANCE of the SELAS AIR/GAS BLENDER VALVE. (for PROPANE/AIR, BUTANE/AIR AND OTHER BLENDS)

Installation and Maintenance Manual MRW-01. Radial Winch 20 ST

Heavy Duty Hoist WARNING. General Safety Precautions. Thank you for purchasing a

MiTek Machinery Division. Service Bulletin

CHASSIS CONTENTS EXTERIOR PARTS 6-1 FRONT WHEEL 6-2 FRONT BRAKE 6-6 HANDLEBARS 6-12 REAR WHEEL 6-30 REAR BRAKE 6-34 REAR SHOCK ABSORBER 6-36

REA electrical connectors

Installation and Maintenance Manual MRW-04. Radial Winch 70.3 ST

Installation and Maintenance Manual MRW-02. Radial Winch 20 ST

CENTAFLEX-H Assembly and operating instructions 008H /3000 M EN Rev

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA

Facts and figures MULTILIFT V 6

After Sales & Service. IST METZ GmbH

ATV WINCH. Thank you for purchasing a

BOTTOM END SERVICE TOOLS SERVICE PRODUCTS ENGINE, CVT AND GEARBOX Subsection 10 (BOTTOM END)

PRG 350 Series Stainless Steel Regulators

I. Safety Requirement WARNING. ATV/UTV Winch

SERVICE GUIDE For WARN PULLZALL 120Vac P/N &

INSTALLATION INSTRUCTIONS

Oxford /Hoyer. Professional Series. Adaptive Power Cradle SERVICE MANUAL Rev A

Maintenance and Lubrication

Owner s Manual Electric Swivel

Hydraulics. Part B, Section 1. This section covers the following unit configurations. 3700V 3800V 3900V

Spear & Jackson 37 cc Petrol Chainsaw Original Operating Instructions

Shut-off valves SVA-DH, SVA-DL

Performa Winch 80.2 STP

Exchange of rollers from the XTS-Mover

PNEUMATIC SLIDING VALVE

ABS Dry Installed Waste Water Pumps Series FR

Hygienic Installation Systems

MANUFACTURING CO. THE FIRST NAME IN QUALITY COUPLINGS. Installation, Inspection, Operation & Maintenance Guide. Model 880 Coupling IMPORTANT

6.0 SPECIFICATIONS CONTENTS. Calibration. According to factory procedureeeeeeeeeeeeeee Accuracy*

SERVICE GUIDE For WARN PULLZALL 24Vdc P/N &

TECHNICAL SERVICE MANUAL

Operating manual for

USE AND MAINTENANCE MANUAL

Product card User manual. KP Strong Safe

CHASSIS CONTENTS EXTERIOR PARTS 6-1 FRAME COVER 6-2 REAR FRAME COVER 6-4 FRONT WHEEL 6-6 FRONT BRAKE 6-10 HANDLEBARS 6-17 FRONT FORK 6-19

LIFTING ANCHOR SYSTEM CIVIL ENGINEERING TT 17-E

SPECIFICATIONS CONTENTS: Warning Information. Operating Instructions Preventative Maintenance and Troubleshooting

SLM - Sealing Liquid Monitor INSTRUCTIONS FOR USE

Operating Instructions. Globoidal cam gear

Service Handbook HD /97

STAND MODEL FOR MACH M2

Performance-Gewindefahrwerke Performance Coilover Kits

Lubrigun lubrication unit

Northern Sales & Distribution Centre

CHASSIS CONTENTS EXTERIOR PARTS 7-1 FRONT WHEEL 7-2 FRONT BRAKE 7-6 HANDLEBARS 7-13 FRONT FORK 7-15 STEERING 7-23 REAR WHEEL 7-26 REAR BRAKE 7-30

INSTRUCTION MANUAL WARNING

2.- HANDLING OF VALVES BEFORE ASSEMBLY 3.- FITTING THE VALVE TO THE REST OF THE ASSEMBLY 5.- PERIODICAL INSPECTION OF THE VALVE AND MAINTENANCE

Stainless Steel Kick Bucket and Stand

DESCRIPTION, TECHNICAL SPECIFICATION, OPERATION, AND MAINTENANCE MANUAL FOR THE ISU-SYSTEM INNOVATIVER SATTELANHÄNGER UMSCHLAG

Ö S T L I N G Markiersysteme GmbH. Broßhauser Str Solingen - Deutschland

Audi-Larm TM Audible Alarm: AirHawk II Air Mask

Transcription:

Assembly, inspection and maintenance of the lifting and turning clutch Application of the turning and lifting clutch to manufacture pipes of all sizes. The turning and lifting clutch is reliable and safe. The turning and lifting clutch is also used in the production of rectangular shafts. Regular inspection of the turning and lifting clutch The contractor has to ensure that the turning and lifting clutch is inspected regularly for damage and wear by a qualified expert. An inspection report must be kept. In addition to the checks described in point 1 to 5 (see page 4) the clutch should be disassembled intermittently and the parts checked for signs of damage and wear. Usually this happens when unusual damage has been noticed during a routine visual inspection of the turning and lifting clutch or when the cable needs to be replaced due to damage. The disassembly procedure and inspection of the turning and lifting clutch is described on page 4 and 5. 1

Maintenance and Inspection Maintenance and inspection of the turning and lifting link Closed Open 2-part anchor link Pressure plate with bearing Mandrel Monitor hole Hand wheel Cable guide Grease-nipple 1 The turning and lifting link must be stored in a clean and dry environment. Do not store in the open without sufficient protection. 1. Checking the cables Observe the regulations in DIN 3088 to determine discard periods for lifting cables. The cables must be discarded if the following number of broken wires are visible: 4 broken wires in a cable length of 3 times the rope diameter or 6 broken wires in a cable length of 6 times the rope diameter or 16 broken wires in a cable length of 30 times the rope diameter Cables must not be used with the following defects: breakage in a loop compressive deformation kinking bird-caging damage to the cable end connections especially heavy wear signs of corrosion or other obvious serious damage Use brushes and penetrating oil to clean and check the loop. This check should also include the cable end clamped in the ferrule. Avoid contact with aggressive substances that can cause corrosion; acids, alkalis and similar. A written detailed record must be kept that these inspections have been regularly carried out. See page 6 for order numbers for new cables. 2. Visual checking 3. Checking the mandrel movement 4. Grease nippel Check the condition of the turning and lifting link. The hand wheel and the cable guide may be slightly deformed, but must be correctly installed in order to use the lifting link. It is only permitted to open and close the turning and lifting link by hand (no tools are to be used). Ensure the cable moves freely and is not trapped or hindered by the cable cover. The mandrel must open and close smoothly without using tools. The mandrel is not to be forced beyond its designed stopping points. The turning and lifting link must be regularly greased to ensure the clutch moves freely. Use a suitable cupgrease applied via the grease-nipple. A damaged or missing grease-nipple must be replaced. The grease-nipple is a standard available item. Finally, always ensure the Allen- bolts in the cap have all been sufficiently tightened. 2

Maintenance and Inspection Maintenance and inspection of the turning and lifting link 5. Anchor clutch Closed Open The anchor clutch must be checked for wear. Refer to table 1 for wear limits. Table 1 Clutch wear-limits p [mm] max. q [mm] min. r [mm] min. 11.5 17.5 4.5 r 2.5 16.5 24.0 7.2 5.0 23.0 34.5 9.0 p q 10.0 31.0 44.4 11.8 20.0 43.0 67.0 18.5 32.0 54.0 85.5 23.8 6. Replacing damaged components Damaged components must be replaced if there is considerate damage visible when inspecting the turning and lifting clutch. The following replacement parts for the turning and lifting clutch can be ordered from HALFEN (see illustration below). To facilitate replacement, the sets listed on page 6 can be ordered. A maintenance report documenting any set replacement must be kept. Please note! Only use original HALFEN replacement parts. Only original replacement parts are manufactured in safety and wear resistant especially hardened steel. Parts of the turning and lifting link Grease-nipple SET 1 Mandrel with twopart anchor clutch SET 2 Pressure plate with bearing ring SET 3 Cable guide SET 4 Cable cover SET 5 Cap including bolts ( does not include a grease nipple; standard available part) SET 6 Handwheel SET 7 Ring-bolt with washer 3

Disassembly and Inspection Disassembly and inspection of the turning and lifting link The turning and lifting clutch is disassembled if considerable damage to the cable makes this necessary or if there are visible signs of significant damage. The following tools and materials are needed to disassemble and reassemble the clutch: - Allen key - Circlip pliers - Grease, grease-gun - Cleaning cloths Remove all grease and other dirt from all parts of the clutch. Avoid contact with aggressive substances that can cause corrosion; acids, alkalis and similar. Step 1 Unscrew the ringbolt and remove the washer. Check the condition and the function of the thread; the bolt should turn smoothly. Set 7 Step 2 The spindel is removed by hand; do not use any tools. Check the condition and the function of the thread; the bolt should turn smoothly. Check the tolerances according to table 1. Set 1 The entire set 1 must be replaced if the thread does not run smooth or the bolt is damaged or deformed. Step 3 Unscrew the bolts, 3 or 4 bolts depending on the load class of the link, (see table) using a hex-key (Allen key ). Step 4 Remove the circlip; Detach the handwheel from the cap. Step 5.1 Step 5.2 Visual inspection of the cap; including the bolts. Visual inspection of the handwheel and the circlip. Set 5 Set 6 4

Disassembly and Inspection Step 5.3 Each individual part of the clutch must be checked as follows: Visual inspection; the cable cover needs to be replaced if there are signs of deformation or other damage. Set 4 Step 5.4 The surface in the cable guide must be checked. There should be no visible scoring or striations in the cable-guide. Any scoring in all other surfaces should be less than 0.5 mm. Set 2 Step 5.5 Visual inspection of the pressure plate. The wear on the plate has to be checked. a Area II b Area I Maximum width of striations in Area I 0.5 mm Area II 1.5 mm Control values according to table 2 Set 3 Area II Area I Table 2 Minimum values min. a min. b 58.5 11.5 2.5 72.5 14 5 92.5 17 10 116 19 20 157 31 32 210.5 40.5 See tables on page 6 if damage is found that require components to be replaced. Reassembly of the the turning and lifting link Observe the following points when reassembling: 1. If any damage is found, the relevant components must be replaced. 2. Check all parts of the clutch are clean before reassembling. 3. To reassemble the clutch, follow the instructions for disassembly in the reverse order. 4. The safety-checked steel cable is placed between set 3 and set 4 and must move freely after assembly. Make sure the steel cable is not trapped. 5. Tighten all bolts by hand using a hex-key (Allen key ). 6. After being successfully reassembled, the turning and lifting link needs to be lubricated with fresh grease applied with a grease-gun to the grease nipple. 7. All maintenance and repairs must be documented. 5

Replacement Parts Replacement parts Turning and lifting clutch Set 1 Mandrel 0738.140-00001 5.0 5.0 00003 6116-Mandrel- Set 1 Set 2 Set 5 Cap including bolts 0738.190-00001* * 5.0 6116-Cap- 5.0 00003** ** ** ** *incl. 3 bolts ** incl. 4 bolts Set 2 Pressure plate 0738.160-00001 5.0 6116-Pressure plate- 5.0 00003 Set 3 Cable guide 0738.170-00001 5.0 6116-Cable guide- 5.0 00003 Set 4 Cable cover 0738.180-00001 5.0 6116-Cable cover- 5.0 00003 Set 3 Set 4 Set 5 Set 6 Set 7 Set 6 Handwheel 2.5 5.0 10.0 20.0 32.0 Article name 0738.150-6116-Handwheel- Set 7 Ring-bolt with washer 2.5 5.0 10.0 20.0 32.0 Article name 0738.200-6116-Bolt- Ordering example: for set 7 ring-bolt with washer, load class 10.0 6116-Bolt-10,0-0738.200-00002 2.5 00001 10.0 00002 32.0 00003 2.5 00001 10.0 00002 32.0 00003 Article name Order number 2015 HALFEN GmbH, Germany applies also to copying in extracts. Cable order numbers Cable Ø 10 0568.129-2.5 14 Cable length 5.0 18 according to 00004 10.0 26 customer s specifications 20.0 34 32.0 42 Please state orientation of the thimble and ferrule Steel cable A grease nipple is not available as a replacement part. A standard available grease nipple can be used. U - 161 - E - 06/15 PDF 06/15 HALFEN GmbH Liebigstr. 14 40764 Langenfeld GERMANY Tel.: +49 - (0)2173 / 970-9025 Fax: +49 - (0)2173 / 970-427 E-Mail: es.tpa@halfen.com www.halfen.com The Quality Management System of Halfen GmbH is certified for the locations in Germany, France, the Netherlands, Austria, Poland, Switzerland and the Czech Republic according to DIN EN ISO 9001:2008, Certificate No. QS-281 HH. 6