Cutterhead Dredge 55ft Ladder 20 X 18 X 46 In Hull Mount Pump Noble Spirit 2 March 1, 2011 Conditions: Minimum Depth: Maximum Depth: 6ft 44ft Estimated General Information: Length: 115ft Width: 27-6 Estimated dry Weight 365,000 lbs Hull Depth 5 Estimated Mean Draft tbd Ladder Length 55 Hull: (Approximate Sizes) Center Section: 48 x11-6 x5 Side Pontoons (overall): 94 x 8 x5 Overall Size: 94 x 27-6 x5 Hull Skin Thickness: ¼ Watertight Bulkheads: Approximately every 10 ft Testing: Every section of floatation is pressure tested for leaks before paint Center hull enclosure: Center hull enclosed from back of the cab to the spud towers. Connections: Through hull and exterior Engine Room: Skin Material: 1/8, 3/16 & ¼ Ventilation Louvers and Exhaust fans estimated quantity 3 Interior lighting Engine room 12 volt Workshop area approximately 11 x12 Workshop area lighting 110v with 12 volt emergency lighting Access: Removable ceiling panels
Paint: (Fabricated Items) Hull Outside Sides and bottom paint Top Hull Inside Surface Commercial Blast Coal Tar Epoxy (Black) 12 Mil Mastic Epoxy with grit added (Grey) 4 mil Brush blast hull shell only, solvent wipe / machine clean on structure Mastic Epoxy grey 8 mil aprox Cab, enclosures and other Primer Paint Commercial Blast or Phosphate wash epoxy primer Polyurethane 4 Mil Dredge Pump: Pearce 20x18x46 20 suction 18 discharge 46 diameter Impeller Engine and transmission: Engine: ******* Customer Supplied***** Power Trans: Twindisc Marine Transmission MG6984SC rated at 1422hp Fuel Capacity: 2000 gal shared Auxiliary: Manufacturer: ******* Power Trans: Funk Hydraulic Drive Fuel Capacity: 2000 gal shared Customer supplied******** Generator: ******* Customer supplied******** Capacity 100kw Fuel capacity built in tank with auto refill from main dredge fuel tank Cutter Type and Specifications: Cutter Type: Cutterhead Vosta TSC04 with 70 Teeth Size: 57.28 ID Drive: SAI hydraulic Planetary Drive Bearings Oil bath Speed 0-25 rpm HP 200 ****** ONE SPARE SET OF TEETH INCLUDED*****
Fresh Water Service Pump: Electric motor driven Simflo vertical turbine Winches: Swing: Ladder: Spuds: Pullmaster H18-18,000lbs cap bare drum Pullmaster M-18 18,000lbs cap bare drum Pullmaster H-18 18,000lbs cap bare drum with birds nest preventers Spuds: Diameter: 20 Length: 55 Wall thickness: 5/8 Hydraulic Systems: Winch system Tank: Valves: Pumps: Motors: Contamination Protection: System relief: Cutterhead Tank: Valves: Pumps: Motors: Contamination Protection: System relief: 225 gallons shared (equipped with high temp/low level shutoffs) Electro-Proportional Geartek gear pump Pullmaster Motor Pre-strainers, and 10 Micron Filters All circuits set at 2500psi 225 gallons NOT SHARED (equipped with high temp/low level shutoffs) Electro-Proportional Hydrostatic Transmission SAI radial piston Pre-strainers, and 10 Micron Filters All circuits set at 3200psi Every effort is made to have all steel hydraulic lines to have welded fittings. Operator Cab Extra large operator cab 8 x12 air-conditioned Standard light package utilizes both 12 and 24 volt Tinted windows Mechanical Operators Seat Industrial grade operators seat with shock absorption and swivel. Upgraded Lighting Package: 4-400watt flood lights mounted on cab platform 2-400watt flood lights mounted in location specified by customer 8 Perko spotlight
Instruments and Controls: All hydraulic controls are electric joystick switch or pushbutton control. Gauges 4 discharge pressure gauge 0-160psi 1pc 4 hydraulic pressure gauge 0-5000psi 4pcs 4 packing pressure gauge 0-160psi 1pc 4 Vacuum gauge 2 temp gauges hydraulic oil 2pcs Miscellaneous Items: Manual 2-ton jib crane for pump service with manual chain hoist Ladder sheave blocks Swing winch snatch blocks (hinge style) Speed Rail Handrail including 2 gates Guarding (final guarding to meet government inspection responsibility of Dredge America Lift system for pump cleanout Suction Sleeve 2 air release hand operated ball valve on discharge Fire Extinguisher x2 2 access platforms 2 3700 gph Bilge Pumps 4 110v outlets in cab Tie downs every 20 ft Outlet from service water to wash deck All fitting ends to be welded on pipe All water/hydraulic hose ends JIC Assembly: The dredge will be assembled once at our facility then broke down and shipped for reassembly. If dredge is being assembled in the continental United States CDW will supply service technicians to help you with initial assembly. Estimate about two weeks to assemble on site. Customer is to provide assembly labor and equipment necessary. After assembly CDW will provide training (1-2days) for the operator on the workings of the dredge. Items to be supplied by the customer: Hydraulic oils, fuel, etc. Cable Crane service Assembly labor Any permitting Freight All site preparation for launch.
Price FOB Topeka, Ks (Price does not include any state sales tax or permitting fees they are the buyer s responsibility) Additional Options: Sound Proofing insulation applied to engine room: Sound proofing material applied to engine room compartment. Applied with weld on studs and bolted in. Pinch Valve: Hydraulically operated Pinch valve on discharge to assist in priming Price on Request Oak planking strips: 4 x 12 Solid Oak planks located along side floatation. Used a bumper protection against other vessels. Extends life of hull. Zinc Anodes: Anti- Fouling Bottom Coating: Apply two coats of anti-fouling coating to area of hull waterline and below See attached Terms and conditions Thank you for the opportunity to quote your upcoming project.