TM Vacuum Sputter System SOP

Similar documents
Title: CHA Flash Source

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics

AccuSputter AW 4450-Series Sputtering Deposition Systems

Standard Operating Procedure: Mask Aligner

CHA-50 Evaporator Operation

Sputter System. SPS-R2R series. ULTECH Co., Ltd.

SPI Supplies Vacu Prep II TM Operation Manual

A Brief User s Manual of. The Scanning Tunneling Microscope

CFM 1050 Reactive Closed Field Magnetron Sputtering System

Operating Instructions EVG620 Aligner

DENTONVACUUM DESKV DESK V - SPUTTER/ETCH UNIT AND ACCESSORIES

R and R Meritor WABCO Enhanced Easy-Stop Trailer ABS Replacement Kits for Easy-Stop ECU/Modulator Valve Assembly Part Number

Newcastle Weighing Services Pty Ltd

Introduction. Figure 1: Labeled picture of the Instron 3367 load frame.

OPERATING MANUAL Digital Diesel Control Remote control panel for WhisperPower generator sets

MODEL 1010 ION MILL Standard Magnification Version INSTRUCTION MANUAL

4.1 Flow Rate Verification and Adjustment

PRODUCT SELECTION GUIDE 651, 1651, 153, 253, 653, and heated valves. Pressure Control Techniques. Dynamic Range

Service Bulletin Immobilizer System (Type 7) February 22, (Supersedes , dated March 6, 2009; see REVISION SUMMARY)

Automotive Application ET01 Software Revision A 12/06

BD FACSJazz Users Guide Satchmo Stanford Shared FACS Facility

Model 809 Diaphragm Gauge Controller

Service Bulletin Immobilizer System (Type 3) (Supersedes , dated June 27, 2007; see REVISION SUMMARY) February 22, 2013

Wireless Tire Pressure and Temperature Monitoring System Instruction Manual Model #: TM Cap Sensors

APSX WIDEBAND D2 AFR CONTROLLER GAUGE. Installation and User Manual. APSX WIDEBAND D2 Manual V1.0

Service Bulletin Immobilizer System (Type 6) (Supersedes , dated February 20, 2009; see REVISION SUMMARY) February 22, 2013

2004, 2008 Autosoft, Inc. All rights reserved.

Issue 2.0 December EPAS Midi User Manual EPAS35

Informational Distribution List:

EPAS Desktop Pro Software User Manual

(g)honda Service Bulletin

TOYOTA TUNDRA TVIP V5

Conflicts: Highlander without sunroof

! WARNING To avoid risk of electrical shock, personal injury or death; disconnect power to oven before servicing, unless testing requires power.

Electric wiring kit for towbars / 7-pin / 12N / 12 Volt / ISO 1724

Vehicle Security System

TELEDYNE HASTINGS INSTRUMENTS

DynoTune Wideband Gauge

Idle Timer Controller - A-ITC620-A Chevrolet Express/GMC Savana

Electric wiring kit for towbars / 13-pin / 12 Volt / ISO 11446

Conflicts: Vehicles with a sunroof

Series 347. Granville-Phillips Series 347 Stabil-Ion Vacuum Gauge Module. Instruction Manual

Electric wiring kit for towbars / 7-pin / 12N / 12 Volt / ISO 1724

CurveMaker HD v1.0 2Ki Programmable Ignition programming software

Thermal Evaporator System (Solar cell)

Digital Diesel Control Remote control panel for GENVERTER GV4 and GV7i

NJ RPM. Probe Usage Guide

How to bias: MTS3200, MTS3212 Rev A 8/1/2008 carvinservice.com

TOYOTA VENZA HANDS FREE BLU LOGIC Preparation

Installing the Throttle Commander Ford F250 F550 Super Duty

Electric wiring kit for towbars / 7-pin / 12N / 12 Volt / ISO 1724

Pendulum control & isolation valve with extended control range with Logic interface

Installation Guide. Enhanced Easy-Stop Trailer ABS 2S/2M Standard with PLC Installation Instructions TP Revised 1 Technical Bulletin

HEX KORVUS TECHNOLOGY VERSATILE COATING SYSTEM FOR THIN FILM DEVELOPMENT SPUTTERING ORGANICS DEPOSITION

REV F2.0. User's Manual. Hydraulic ABS (HABS) Hydraulic Power Brake (HPB) Page 1 of 28

Idle Timer Controller - ITC Freightliner MT45 Contact InterMotive for additional vehicle applications

TIP SHEET. STEP 1: Starting the installation

SUMMARY TOOL INFORMATION

INSTALLATION INSTRUCTIONS. Revision 3.1.1

CURTIS TOLEDO. AF Series Compressors VS models with VFD WARNING

Main Harness Quantity: 1

A U T O M A T I C T R A N S M I S S I O N M U L T I - C H A N N E L T W O - W A Y L C D R E M O T E S T A R T E R AS-2510 TW.

Service Bulletin Immobilizer System (Type 2) (Supersedes , dated July 3, 2007; see REVISION SUMMARY) February 22, 2013

Conflicts: Vehicles without a sunroof Vehicles with a single sunroof

Temescal FC-1800 Electron Beam Evaporator System Refurbished by TES

CLA-VAL e-drive-34. User Manual. Motorised Pilots. CLA-VAL Europe LIN072UE - 04/16

HGM-MZ Multi-Zone Monitor Annual Maintenance And Troubleshooting Guide

The first step is to configure the input lines to use the Pierce and Fault signals from the AVHC.

a. Remove the jack screw: c. Replace the jack screw. d. Reassemble and adjust the limit switch.

OEM TM-50 Quick Start Guide

ITCEMS950 Idle Timer Controller - Engine Monitor Shutdown Isuzu NPR 6.0L Gasoline Engine

Airaid Poweraid Throttle Body Spacer (11-13 V6):

Idle Timer Controller - A-ITC620-A Chevrolet Express/GMC Savana

Toyota 4RUNNER With/MR Overhead Video

Title: M.I.L. ON DTC P3191, P3190, AND/OR P0A0F Models:

2. Description of Standard NUV Lightsource (350nm-450nm) 3 3. Description of Deep UV (220nm-280nm) and Mid UV (280nm-310nm) Lightsource Systems 3

TurfDefender Electronic Leak Detector Kit Reelmaster 5000, 6000 and 5010 Series Traction Units

FORM: C 01/06

Installing the Throttle Commander

Installation Manual for VMAC Throttle Commander Throttle Control T500111

PRSalpha Air Drill (Double Valve)

Setup and Programming Manual

SPEEDKEY KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 9. GEM e2, e4, e6, el XD

TOYOTA TUNDRA TVIP V5

OP-COM IMMOBILISER-II Guide

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin LowNOx Commercial Gas Electronic Spark Ignition Sequence

Plastic Tube Flar ing Syste m

CHARGE TANK. Overview. Using The Charge Tank. User Guide

GENERAL MOTORS SERVICE PARTS OPERATION 6200 Grand Pointe Drive, Grand Blanc, MI 48439

Wired Real Time GPS Installation Instructions

Electricity. Teacher/Parent Notes.

4000 SYSTEM OPERATING MANUAL

CS-865RKE Series II REMOTE KEYLESS ENTRY SYSTEM

MODEL 2001 HERMETI-CHECK OPERATING INSTRUCTIONS

CHECK AND CALIBRATION PROCEDURES FOR FATIGUE TEST BENCHES OF WHEEL

MDX-300 Series. For 12-volt automotive starting batteries and starting/charging systems INSTRUCTION MANUAL

This page intentionally left blank.

High Power, RF Excited EUV Flow Light Source EUV X LHP500FL Operating Manual

CAUTION All safety information must be followed as provided in Service Manual

Installation Manual for VMAC Throttle Commander Throttle Control T500100

Transcription:

TM Vacuum Sputter System SOP Page 1 of 17 TM Vacuum Sputter System SOP 1 Scope 1.1 This document provides the procedures and requirements to operate the TM Vacuum Sputter system. 2 Table of Contents 1 Scope... 1 2 Table of Contents... 1 3 Reference Documents... 2 3.1 Referenced within this Document... 2 3.2 External Documents... 2 4 Equipment and/or Materials... 3 5 Safety... 3 6 Setup Procedures... 3 7 Load Samples... 3 8 Pump Down the Load-lock Chamber... 6

TM Vacuum Sputter System SOP Page 2 of 17 9 Transfer Carousel to the Main Chamber... 8 10 DC Sputter... 9 11 Transfer of Carousel back to Load-Lock... 14 12 Unload Samples from the Load-lock... 15 13 Troubleshooting... 16 13.1 Plasma does not Ignite... 16 14 Process Notes... 16 14.1 TMV Parameters... 16 14.2 TMV Target Positions... 17 15 Revision History... 17 Figure 1, TMV Chambers... 3 Figure 2, Ion Gauges... 4 Figure 3, Control Mode... 4 Figure 4, Load Lock Control Panel... 4 Figure 5, Sample Loading... 5 Figure 6, Chuck Positions... 5 Figure 7, Handle (Secured Position)... 6 Figure 8, Nitrogen Valve Location... 6 Figure 9, Roughing Pump... 7 Figure 10, Load Lock Vacuum Panel... 7 Figure 11, Timer... 7 Figure 12, Main Menu... 8 Figure 13, Gate Valve Buttons... 8 Figure 14, Automatic Control Panel... 9 Figure 15, Substrate Index Rotation Control Window... 10 Figure 16, MKS Pressure Controller... 10 Figure 17, MDC Stepper Motor Controller... 11 Figure 18, Power Supply/Cathode Selection Screen... 11 Figure 19, DCGs... 12 Figure 20, Plasma Supply Control... 13 Figure 21, Cathode Shutter Control... 14 Figure 22, TMV Target Positions... 17 Table 1, Power Setpoints... 12 Table 2, Cathode Materials... 13 Table 3, DC Sputter Parameters... 16 3 Reference Documents 3.1 Referenced within this Document 3.1.1 None 3.2 External Documents 3.2.1 None

TM Vacuum Sputter System SOP Page 3 of 17 4 Equipment and/or Materials 4.1 TMV Sputtering System 4.2 Wafer 4.3 Kapton Tape 4.4 Nylon Screws 5 Safety 5.1 Follow all Nanofab safety procedures. 5.2 Place carousel only on clean stainless steel surfaces. 5.3 Ask for assistance moving carousel if too heavy to remove/mount alone. 5.4 Do NOT use a chair/stool with wheels to stand on while attempting to remove/mount the carousel. 5.5 Use only kapton tape or plastic screws to secure samples to the rotating chuck. 6 Setup Procedures 6.1 Before using the system, reserve the equipment with on the online reservation system. 6.2 Write your name, date, and phone number on the TMV white board. 6.3 Record all information on log sheet. 7 Load Samples 7.1 Use flash light to check that the carousel is in the load-lock chamber. See Figure 1, TMV Chambers. 7.2 Check to see that the following buttons are lit on the control panel. [A] load-lock cryo-pump [B] load-lock high-vac valve [C] main chamber cryo-pump [D] main chamber high-vac valve 7.2.1 If not lit, DO NOT turn on the ion gauge for either the main chamber or the load-lock, and contact the fab staff. 7.3 If there is a reading on top left IG display, press Chamber Gauge button to turn it OFF. See Figure 2, Ion Gauges. 7.4 Check reading A on Main Chamber ion gauge; the reading should be 0.0. See Figure 2. Load Lock Main Chamber Figure 1, TMV Chambers

TM Vacuum Sputter System SOP Page 4 of 17 Reading A Chamber IG Load Lock IG Gauge Buttons 7.5 If load-lock Ion Gauge is on (top right IG display), press Gauge to turn it OFF. See Figure 2. 7.6 Turn CONTROL MODE key to AUTO position. See Figure 3, Control Mode. The AUTO light should be on. 7.7 If load lock AUTO PUMP is on, turn it OFF. See Figure 4, Load Lock Control Panel. 7.8 Press AUTO VENT on the Load-lock panel. See Figure 4. 7.8.1 If AUTO VENT does not work, (light does not come on, no gas sound), press TRANSFER GATE VALVE CLOSE, then try AUTO VENT again. 7.9 If AUTO VENT still does not work, put the key in MANUAL mode. 7.9.1 Close the load-lock high-vac valve (light off). 7.9.2 Open the load-lock vent valve (light on). 7.9.3 Close the load-lock vent valve after the door opens (light off). 7.9.4 Return the key to AUTO mode. 7.10 Once the load lock door pops open, press AUTO VENT again to stop the nitrogen flow. Pay attention to glove cleanliness when handling the carousel so as not to contaminate your sample. Load Lock AUTO PUMP Button Load Lock AUTO VENT Button Figure 3, Control Mode Figure 4, Load Lock Control Panel If you are only using 1 or 2 chucks, you may load the wafers onto the chuck(s) without removing the carousel. 7.11 If you are using more than 2 chucks, remove the carousel from the load-lock. 7.11.1 Lift the carousel off the pins. Figure 2, Ion Gauges

TM Vacuum Sputter System SOP Page 5 of 17 Carousel Chuck Nylon Screw Wafer 7.11.2 Rotate the carousel 1/16 of a turn. 7.11.3 Slide the carousel down off of it s mount. Figure 5, Sample Loading 7.12 Load samples on rotating chucks. See Figure 5. Only 2 of the chucks are able to rotate. If you need chuck rotation, load your samples on the chucks with small gears on the back. 7.12.1 Attach samples on the chuck with the nylon screws or kapton tape. Chuck Positions as Loaded into the Load Lock 7 8 6 1 Sample Holders 5 2 3 Front of TMV 4 Figure 6, Chuck Positions The nylon screws are located in the small black toolbox. 7.13 Note the position of your samples on the carousel. See Figure 6, Chuck Positions.

TM Vacuum Sputter System SOP Page 6 of 17 Figure 7, Handle (Secured Position) 7.14 Mount the carousel in the load lock (ask for help from others). 7.14.1 Slide the carousel up over the mounts. 7.14.2 Rotate the carousel 1/16 of a turn. 7.14.3 Bring the carousel down on the mount pins. 7.15 Close the load-lock door. See Figure 7, Handle (Secured Position). 7.15.1 Secure the bottom door handle. Do NOT overtighten. 7.15.2 Do NOT use the top locking handle. 8 Pump Down the Load-lock Chamber 8.1 Turn on the Nitrogen Gas. 8.1.1 Open the N2 valve. See Figure 8, Nitrogen Valve Location. The N2 valve is located on the wall behind the TMV. Open = handle vertical. Closed = handle horizontal. 8.2 Press Load lock AUTO PUMP. See Figure 4, Load Lock Control Panel. The light for the Roughing Pump will come on. Figure 8, Nitrogen Valve Location 8.3 Press START on the Roughing Pump control box. See Figure 9, Roughing Pump. Nitrogen Valve (closed)

TM Vacuum Sputter System SOP Page 7 of 17 Stop Start Figure 9, Roughing Pump Within 30 seconds the load lock handle will fall. This indicates that load-lock is pumping down. Load Lock Roughing Valve Light Load Lock High Vac Valve Light Roughing Pump Button Figure 10, Load Lock Vacuum Panel After about 8 minutes the LOAD LOCK ROUGHING VALVE light will be OFF (automatically) and LOAD LOCK HIGH VAC VALVE light will be ON. 8.4 Turn off the roughing pump by pressing ROUGHING PUMP on the front control panel. See Figure 10, Load Lock Vacuum Panel. 8.5 Set the timer for 10 minutes. See Figure 11, Timer. 8.6 Turn off Nitrogen. 8.6.1 Close the N2 valve. See Figure 8, Nitrogen Valve Location. 8.7 Start the timer. Figure 11, Timer

8.8 Fill out the log book while the load-lock is pumping down. TM Vacuum Sputter System SOP Page 8 of 17 8.9 When the 10 minutes are up, press GAUGE on the load-lock ion gauge to turn it on. See Figure 2, Ion Gauges. 9 Transfer Carousel to the Main Chamber CAUTION The Ion Gauges are extremely sensitive. They should only be turned on when the machine is under high vacuum and not sputtering. 9.1 Transfer to the main chamber may begin once the load lock IG pressure is less than 3 x 10-6 Torr. 9.2 Press GAUGE on the Main Chamber Ion Gauge to turn it ON. See Figure 2. 9.3 On the TMV computer (monitor) go to the MAIN MENU. 9.4 Click Substrate Transfer Control. See Figure 12, Main Menu. Figure 12, Main Menu You will see Load lock, chamber and gate valve animated photographs here. You can see if the gate valve is open or closed on this screen. Red = closed, Gray = open. Transfer Gate Valve Close Button Transfer Gate Valve Open Button Figure 13, Gate Valve Buttons 9.5 Press the TRANSFER GATE VALVE OPEN on the front panel (manually). See Figure 13, Gate Valve Buttons.

TM Vacuum Sputter System SOP Page 9 of 17 You will hear a loud noise of the valve opening. 9.5.1 Check on the monitor to see if the gate valve is open or closed. Auto Unload Button Auto Load Button Figure 14, Automatic Control Panel If gate valve is Open then proceed to next step otherwise contact nanofab staff. 9.6 Press AUTO LOAD button on the control panel. See Figure 14, Automatic Control Panel. On the Computer Screen you will see animated pictures of carousel transferring to the main chamber. The transfer process will take about 5 minutes. The software will say Transfer Arm is not at Home during the transfer. 9.6.1 Wait until the software says Transfer Arm Is At Home. 9.7 When the Transfer Arm has returned home, press TRANSFER GATE VALVE CLOSE on the front panel. See Figure 13, Gate Valve Buttons. You will hear loud noise of gate valve closing. 9.8 Wait till Chamber IG pressure is below 9 x 10-7 Torr. See Figure 2, Ion Gauges. This is called the base pressure. 9.9 Write this value in the log book. 10 DC Sputter 10.1 Turn OFF the Main Chamber ion gauge by pressing the gauge switch. See Figure 2. There should be no reading on the IG display. 10.2 Rotate the control mode key to the MANUAL position. See Figure 3, Control Mode. 10.3 Go to the Main Menu. 10.4 From the Main Menu on the computer click Substrate Index Rotation Control. See Figure 12, Main Menu. 10.5 Click INDEX POWER. See Figure 15, Substrate Index Rotation Control Window.

10.6 Wait for carousel to stop (on the picture). TM Vacuum Sputter System SOP Page 10 of 17 10.7 Check your sample position inside the main chamber using the flashlight. 10.8 Note the chuck number on the carousel. 10.9 Click NEXT INDEX to bring the samples in front of your desired metal target. See Figure 22, TMV Target Positions. 10.10 Click on MAIN MENU. 10.11 Click on PROCESS GAS CONTROL from the MAIN MENU. Index Power Next Index Figure 15, Substrate Index Rotation Control Window 10.11.1 Click on CHAMBER BARATRON VALVE. 10.11.2 Wait for 10 seconds until the indicator on the control panel lights up and stops blinking. 10.11.3 Click on REMOTE PRESSURE SET POINT OFF. Pressure Readout Figure 16, MKS Pressure Controller 10.11.4 Click on the SET PRESSURE VALUE. See Table 3, DC Sputter Parameters. 10.11.4.1 Type 10 to get 10 mtorr pressure. 10.11.5 Click CHAMBER PROCESS GAS. 10.11.6 Click INDIRECT. 10.11.7 Click GAS-3 (Ar gas). Flow rate of Argon is 150 sccm.

10.11.8 If reactive sputtering with O2, click GAS 2. TM Vacuum Sputter System SOP Page 11 of 17 10.11.8.1 See staff for assistance switching from O2 to N2. 10.12 Read the chamber pressure on MKS Pressure controller. See Figure 16, MKS Pressure Controller. The reading should match the pressure you entered in step 10.11.4.1. 10.13 Switch ON the MDC Stepper Motor control if using chuck rotation. See Figure 17. Figure 17, MDC Stepper Motor Controller The power switch is located on the back lower right side of the controller. 10.13.1 Using the flashlight, check inside the chamber (through the window) to see if your samples are at desired location and the chuck is rotating. 10.14 Click on MAIN MENU. 10.15 From the main menu, click on CATHODE/SUPPLY SWITCHING. 10.15.1 Ensure that the picture of the target you see on the monitor matches with the white board on TMV. Figure 18, Power Supply/Cathode Selection Screen Each target lists the power supply that connects to it. 10.15.2 Click on the desired metal target. 10.15.3 Make sure the connection is between DCG-1 / DCG-2 and the desired metal target and there is NO OTHER connection to any other metal target. 10.15.4 If the connection is in RPG-1 or RPG-2 then click on the generator picture.

The connection will switch to DCG. 10.16 Turn on the DCG (either DCG-1 or DGC-2). See Figure 19. TM Vacuum Sputter System SOP Page 12 of 17 MKS Pressure Controller DCG 1 DCG 2 DCG Power Switches Figure 19, DCGs 10.16.1 Wait a few moments till the generator is ready. The power supply display will indicate that is it stable. 10.17 Back on the computer monitor, click on the appropriate DCG tab. 10.18 Click on the number next to TYPE IN SETPOINT. Table 1, Power Setpoints Power (Watts) Set Point DCG Set Point RPG 50 (max power for liftoff) 0.94 0.42 100 1.92 0.92 150 2.88 1.4 200 3.86 1.9 250 4.85 2.38 300 (do not exceed 300 W) 5.84 2.87

TM Vacuum Sputter System SOP Page 13 of 17 10.18.1 Adjust the number till you get the desired power for your sputtering. See Table 1, Power Setpoints. 10.19 On the computer monitor, click on PLASMA to begin sputtering. See Figure 20. 10.20 Look through the chamber porthole to see if plasma is formed. CAUTION DO NOT exceed 300W (50 W max for liftoff, photoresist will hard bake at higher power) The plasma is a purple or blue glow. Also the Voltage should drop when the plasma ignites. 10.20.1 If yes proceed to next step, otherwise click on PLASMA again (to Stop) and go to section 13 Troubleshooting. Plasma Button Figure 20, Plasma Supply Control 10.21 Pre-sputter for desired time (usually 2 min). The Voltage should read between 200-700 Volts and the Current should read between 0.1-0.5 Amps. 10.22 Set timer to the desired sputter time. See Figure 11, Timer. 10.23 Press CATHODE SHUTTER button on the front panel. See Table 2, Cathode Materials. 10.24 Start the timer. Shutter should be opened manually from the front panel and not from the software. 10.25 Check inside the chamber from the window if shutter is open fully and if chuck is rotating. 10.25.1 Any abnormalities need to written on the log book (in comment section). Table 2, Cathode Materials Target Cathode Shutter # Cr 1 TiW 2 Ir 2 Ti 3 Au 4 Pt 4

TM Vacuum Sputter System SOP Page 14 of 17 10.26 When the desired time has elapsed, press CATHODE SHUTTER on the panel manually to close the shutter. See Figure 21. Cathode Shutter Buttons Figure 21, Cathode Shutter Control 10.27 If more samples on other chucks need to be sputtered with the same target then do the following: 10.27.1 Click MAIN MENU. 10.27.2 Click SUBSTRATE INDEX ROTATION CONTROL. 10.27.3 Click on NEXT INDEX until your samples are in front of desired metal target. 10.27.4 Repeat from Step 10.23. 10.28 When finished sputtering with the target, click on PLASMA (to stop). 10.29 Turn off the DCG power. See Figure 19. 10.30 If you need to sputter another layer of different metal then repeat the process from Step 10.14. 10.31 When Sputtering is completely finished, click on MAIN MENU. 10.32 Click on PROCESS GAS CONTROL. 10.32.1 Click on GAS 3 to stop gas flow. 10.32.2 Click on INDIRECT to stop. 10.32.3 Click on CHAMBER PROCESS GAS. 10.32.4 Click on REMOTE PRESSURE SET POINT ON. 10.32.5 Click on CHAMBER BARATRON VALVE. 10.33 Click on MAIN MENU. 10.34 Switch OFF MDC Stepper Motor control. See Figure 17. 11 Transfer of Carousel back to Load-Lock 11.1 Make sure the DCG power is off, the gas pressure is zero, and the stepper motor is off.

11.2 Press Gauge to turn ON the Main Chamber ion gauge. TM Vacuum Sputter System SOP Page 15 of 17 11.3 On the computer go to the MAIN MENU click Substrate Transfer Control. 11.3.1 The computer screen should show the transfer gate valve closed (red triangles). 11.4 Press TRANSFER GATE VALVE OPEN on the front panel (manually). You will hear loud noise of valve opening. 11.5 Check on the monitor to see if gate valve is open or closed (red triangles are gone). 11.5.1 If gate valve is OPEN then proceed to next step otherwise contact fab staff. 11.6 Turn the key to AUTO mode on the control panel. 11.7 Press AUTO UNLOAD on the control panel. You will see animated pictures of transfer of carousel from main chamber to load-lock. The transfer process will take about 5 minutes. 11.7.1 Wait until the software says Tranfer Arm is at Home. 11.7.2 Contact staff if transfer fails. 11.8 Press TRANSFER GATE VALVE CLOSE on the front panel. You will hear loud noise of gate valve closing. 12 Unload Samples from the Load-lock 12.1 Turn off the load lock ion gauge. 12.1.1 Make sure that there is NO reading on load lock ion gauge. 12.2 Press AUTO VENT on the load-lock panel. You will hear loud noise of air rushing to load lock. 12.3 Wait for 1-2 min and Load-lock door will OPEN automatically. 12.4 Press AUTO VENT on load-lock panel to stop gas flow. 12.5 Unload the carousel. Ask for assistance if needed. 12.5.1 Remove samples. 12.6 Mount the carousel in the load-lock chamber. Ask for assistance if needed. 12.7 Put the bottom load-lock locking handle in a horizontal position. 12.8 Turn on N2 on wall behind TMV. 12.9 Press Auto Pump on the load lock control panel. 12.9.1 When the roughing pump light comes on, start the roughing pump. 12.10 Once the load lock high-vac valve has opened as indicated on the control panel, turn off the roughing pump. 12.11 Turn off the N2 gas. 12.12 Turn off the load lock Auto Pump

12.13 Make sure your run has been entered in the log book. 13 Troubleshooting 13.1 Plasma does not Ignite 13.1.1 Go to the Process Gas Control page. 13.1.2 Click on the pressure set point. 13.1.3 Increase the set point. 13.1.4 Click Ok. 13.1.5 Go back to the DCG page. 13.1.6 Click Plasma to start sputtering. TM Vacuum Sputter System SOP Page 16 of 17 13.1.7 Check the Voltage, it should drop to within the 200-700V range when the plasma ignites. 13.1.8 If the plasma still does not ignite, try opening the shutter. 13.1.9 If the plasma does ignite, close the shutter, if open. 13.1.10 Go back to the Process Gas Control page to correct the gas pressure setpoint. 14 Process Notes 14.1 TMV Parameters Shutter # Metal Power 1 Cr 2 TiW Table 3, DC Sputter Parameters (Watts) Pressure (mtorr) Time (min) Thickness (nm) Dep Rate (nm/min) 2 Ir 90 8 8 100 12.5 3 Ti 45 10 5 50 10 4 Au 4 Pt 90 11 12 240 20

TM Vacuum Sputter System SOP Page 17 of 17 14.2 TMV Target Positions Source 3 Shutter Source 2 Shutter DCG1 Top TiW DCG1 Bottom Ir DCG1 Back Ti DCG2 DCG1 Cr Front Top Au DCG2 Bottom Pt DCG2 Source 4 Shutter DCG2 Source 1 Shutter TMV DOOR Figure 22, TMV Target Positions 15 Revision History Rev Date Orginator Description of Changes 1 10 May 2010 L. Williams Initial release. 2 20 May 2010 Sam Bell Added figures and tables.