Land Systems Division

Similar documents
PHASE 4 OVERLANDER PROTECTED MOBILITY VEHICLE LIGHT

LAND DOMAIN. Defence Led UNCLASSIFIED 2

LAND 400 Phase 2. Defending Australia and its National Interests

UNCLASSIFIED: Distribution Statement A. Approved for public release.

DMO REPORT Bushmaster Vehicles

BUSHMASTER FAMILY OF VEHICLES.

Effective Systems Engineering and Project Management Integration. Angela Tuffley, RedBay Consulting

Cooperative Research Centre for Advanced Automotive Technology

DMO REPORT Bushranger Vehicles

The Puma. Protection I Survivability I Effectiveness

Air Force Operational Energy

Establishment of Light Tactical Vehicles Program Office

Thales in Australia and New Zealand

Thales in Australia and New Zealand

neuron An efficient European cooperation scheme

advanced technologies seminar

Focus Areas Power and Energy Operational Environments

DEFENSE LOGISTICS AGENCY AMERICA S COMBAT SUPPORT LOGISTICS AGENCY

The Military Perspective on Power & Energy

Technology for the Future of Vertical Lift

REQUEST FOR INFORMATION FROM VENDORS FOR DESIGNS FOR A FUTURE READY COMBAT VEHICLE FOR INDIAN ARMY

The HIPPO All Terrain Support Vehicle (ATSV)

Thank you for the opportunity to

Energy & Power Community of Interest March 21, 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2011 Total Estimate. FY 2011 OCO Estimate

Future C4ISR Technologies on Ground Platforms

EW Engagement Modelling for Light Armoured Vehicles

Fuel Cells and Hydrogen 2 Joint Undertaking (FCH 2 JU) Frequently Asked Questions

Evonik Corporate Venturing. Dr. Jürgen Finke Ecosummit 2012, Neuss November 14, 2012

VEDECOM. Institute for Energy Transition. Presentation

Advancing the TWV Fleet 10 May 2016

GSGF workshop on Energy Storage,

KONGSBERG DEFENCE & AEROSPACE

NATIONAL WORKSHOP FOR PROMOTION OF LOW SULPHUR FUELS IN BOTSWANA, MARCH 2016.

Kathrine Wilson-Ellis Strategic Safety Team. Phil Proctor Future Technologies

Thales on the Land Defence market

LIST OF OPEN TRAINING TRAINING PLANNER 2016/2017 Course location: Lagos, Abuja, Port Harcourt.

-Mobility Solutions. Electric Taxis

TARDEC OVERVIEW. Tank Automotive Research, Development and Engineering Center. APTAC Spring Conference Detroit 27 March, 2007

July 24, Rhode Island Transportation Innovation Partnership AUTONOMOUS VEHICLE MOBILITY CHALLENGE

Electro Optic Systems Holdings Limited

Statement of Jim Schoppenhorst, Director, DD(X) BAE Systems / Armament Systems Division. Before the

Program Manager Light Armored Vehicles Expeditionary Warfare Conference 12 October 2016

The cost-effective delivery of an armoured vehicle capability

Respect for customers, partners and staff. Service: another name for the respect that a company owes its customers, partners and staff.

Thales in Victoria Alistair Beaton Industry Engagement Director

Share with the GHSEA. Smart Energy Initiatives. Collaboration and a partner eco-system to achieve results

Advance Your Company s Success in Technology Development & Commercialization PARTNER WITH ARGONNE NATIONAL LABORATORY

NDIA Tactical Wheeled Vehicles (TWV) Conference 8 February 2010 COL Mark Barbosa, G-8

ODIN FIRE SUPPORT SYSTEM

Unilever Sustainable Palm Oil Sourcing Policy

How a smarter grid enables smart mobility and how smart mobility enables smarter cities!

Future of Defence. Shipbuilding In India. P75 Make in India

Connected and Automated Mobility in London Viajeo PLUS City Showcase November 2015, Singapore

Analysts/Fund Managers Visit 19 April Autonomous Systems and Future Capability Mark Kane

AT A GLANCE GRID /2014

EXPERIENCES IN ASIA FOR INTEGRATION OF SMART GRIDS AND RENEWABLES: THE SINGAPORE STORY

The Hinkley Point C Project

VOP-026 Šternberk, s.p.

Jointly towards a long term sustainable energy supply

USMC Hybrid Power Efforts Jennifer Gibson

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Project Spartan. An Innovative Light Frigate Design for General Purpose Frigate (GPFF)

Please visit the stations to provide your input: EV Charging Location Map EV Adoption ZEV Drivers Other Ideas

Army Ground Vehicle Use of CFD and Challenges

FREQUENTLY ASKED QUESTIONS

Advancing the SDGs: Understanding and Improving the Role of Corporate Transparency. Petrobras' experience on Integrated Reporting.

Shaping the future of the TWV Fleet

Low Carbon Green Growth Roadmap for Asia and the Pacific FACT SHEET

The BOXER. Addressing the UK Mechanised Infantry Vehicle (MIV) Requirement. January 26, 2018

UfM Ministerial Declaration on Energy

Automotive R&D: Energy, Transport & ICT

PRESS KIT IDEB 2018 May 16th May 18th 2018

THE PERFECT MOBILE VSHORAD SOLUTION

rmy uide monthly #3 (150) March 2017

SAPIA corporate profile

EBRD Transport & Energy in Serbia

Intelligent Mobility for Smart Cities

The SHIFT2RAIL Joint Technology Initiative Presentation to the Rail Forum Europe 15 November 2011

Overview of FAA Alternative Jet Fuel Efforts. Aaron Wilkins Senior Representative, UAE Federal Aviation Administration

Connected Vehicles for Safety

Integrating R&D, innovation and technology management GPCA R&I Summit

Precise Indirect Fires. Mr. Bart Barcellos. Raytheon

Making the UK the Best Place to Invest in Low Carbon Vehicles (Reflection and Delivering on the Potential)

Defense Green Technology of KOREA

Air Platforms Community of Interest Update

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

THE MULTI-STATE ZEV ACTION PLAN

Colgate-Palmolive Company

Warring Neilsen Corporate Affairs Manager Elgas

PUBLIC TRANSPORTATION AS THE

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

AUDI SUSTAINABILITY PROGRAM

Gaining Ground. Michael Fabey/AW&ST

Co-Optimization of Fuels and Engines

MA THOR SolarLight UAS

actsheet Car-Sharing

Solano County Transit

WHY TWO SPOOLS ARE BETTER THAN ONE: EQUIPPING OUR MILITARY WITH THE BEST TECHNOLOGY FOR EXISTING AND EMERGING THREATS

Transcription:

Land Systems Division Capability Acquisition and Sustainment Group Head Land Systems Presentation Major General David Coghlan Head Land Systems Land Systems Division

Land Systems Division - Structure Land Systems Division (LSD) acquires and sustains land materiel for the Australian Defence Force. Land Systems Division 2

Land Systems Division Location: A total of ~1100 APS and ADF based in Melbourne (Victoria Barracks, Defence Plaza, Laverton North and Monegeetta) FY2016/17 Acquisition Budget: 22 Acquisition Projects with a total FY16/17 budget of $1.390 billion Unapproved Projects Estimated Total Acquisition Value: 12 Unapproved Projects with a total value exceeding $20 billion FY2016/17 Sustainment Budget: 28 Sustainment Products with a total FY16/17 budget of $719 million (including Operations funding of $41 million) Land Systems Division 3

Land Systems Division - Structure Land Systems Division 4

Land Systems Division - Goals 1. Acquire and sustain land materiel for the Army, Navy and Air Force 2. Implement First Principles Review recommendations 3. Enhance our relationships with Government and key stakeholders 4. Focus our partnerships with Industry to maximise delivery of land capability 5. Be accountable and transparent. LSD provides complete advice to fully inform our key stakeholders 6. Develop a Culture where a professional, diverse and highly capable workforce thrives 7. Deliver a safe and healthy work environment Land Systems Division 5

CASG Reform CASG Reforms Underway Restructure of CASG into a Balanced Matrix Delivery teams focus on meeting Capability Manager s expectations Functions ensure that the right people with the right skills are provided at the right time Delivery team (what/when) within Systems Divisions Function (who/how) members of Centres of Expertise Referred to as balanced matrix because both have an equal role Land Systems Division 6

CASG Reform The Smart Buyer reform includes a decision-making framework that provides more flexibility in how Defence acquires equipment and services and improves the relationship between Defence and Industry. - it supports project managers in developing tailored approvals, project management, acquisition and sustainment strategies based on a thorough analysis of a project s risks. - will have the agility to refine strategies as new information becomes available and use industry best practice to strike the optimum balance between performance, time and cost. Land Systems Division 7

Land Systems Division 9

Integrated Soldier Systems Integrated Soldier Systems Branch (ISSB) comprises five SPOs responsible for: Armaments Small Arms and Direct Fire Support Weapons ADF clothing Combat and Non-Combat Soldier Modernisation Body Armour, Load Carriage, Field Equipment, Chemical Biological Radiological and Nuclear Defence, Aerial Delivery Equipment Health Systems Pharmaceuticals, Medical and Dental Equipment, Combat Rations Diggerworks Future Soldier Systems Development, Configuration and Integration Key Projects Land 40 Phase 2 Direct Fire Support Weapons ($150-200m) Land 53 Phase 1BR NINOX Night Fighting Equipment - Technology Refresh ($300-500m) Land 125 Phase 3C Soldier Systems Integration Lethality ($400-500m) Land 125 Phase 3B Soldier Enhancement Survivability ($150-200m) Land 125 Phase 4 Soldier Systems Integration version 3 ($500-1000m) Land 2110 Phase 1B Chemical, Biological, Radiological and Nuclear Defence ($200-300m) Land 3025 Phase 1 Deployable Incident Response Regiment Capability ($25-50m) Land 3025 Phase 2 Deployable Incident Response Regiment Capability JP 2060 Phase 3 Deployable Health ($250-400m) Land Systems Division 10

ISSB Industry Engagement Initiatives Defence Industry Forums Prime Vendors Non Combat Clothing Health Pharmaceuticals Health Medical / Dental Consumables Ration Packs Armaments Future Soldier Combat Ensemble / CBRN / Deployable Health Adaptive Acquisition Key Messages Early Engagement of Industry Transparency in the way we work Educate and then work with Industry Performance Based Contracting Guarantee Cash flow Enduring contracts extension Significant Media / Ministerial Scrutiny Challenges Large Number of Small to Medium Enterprises Industry Capacity and Capability Number of Industry Supply Agents representing Overseas OEM Land Systems Division 11

Land Systems Division 12

Land Vehicle Systems Land Vehicle Systems Branch is responsible for sustaining Defence s general service vehicles (green fleet) and commercial vehicles (white fleet) and acquiring and delivering the next generation of field vehicles, modules and trailers to the ADF under the multi-phased program LAND 121 (Overlander). Key Projects LAND 121 Phase 3A Lightweight and Light Vehicles and Trailers ($1.0bn) LAND 121 Phase 3B Medium and Heavy Vehicles and Trailers ($3.4bn) LAND 121 Phase 4 Protected Mobility Vehicles Light ($2.0bn) LAND 121 Phase 5B Medium and Heavy Vehicles and Trailers ($1.0bn - $2.0bn) JP157 Phase 1 National Support Base Aviation Refuelling Vehicles ($67m) Land Systems Division 13

LVSB Industry Engagement Initiatives Increased use of OEMs for key equipment support through strategic agreements Vehicle/Inventory Rationalisation Use of Whole of Australian Government (WoAG) agreements for Smart Buying of commercial vehicles. Challenges Ageing fleets need to be sustained until new capability arrives Various integrated logistics support models need to be standardised Smart Sustainment initiatives continue to be implemented Key Messages WoAG procurement saves time and money but tolerance for risk required. Industry best-practice innovations are to be thoroughly explored eg: Business to Business synergy Industry should be involved early in project and contract management Land Systems Division 14

Land Systems Division 15

Land Manoeuvre Systems Land Manoeuvre Systems Branch (LMSB) comprises four SPOs responsible for: Mounted Combat (tank, M113, ASLAV and Bushmaster) Combat Support Vehicles (Plant eqpt, bulk fuel, fire fighting, special ops vehicles) Combat Support (artillery, air defence systems, radars, simulation) General Support (tents, generators, shelter, general commodities) Key Projects LAND 19 Phase 7A C-RAM ($150 300m) LAND 116 Phase 3 Bushranger ($1000 1500m) LAND 17 Phase 1C1 Additional Lightweight Towed Howitzers ($150 300m) LAND 136 Phase 1 Land Force Mortar Replacement ($50 100m) LAND 907 Phase 1 Main Battle Tank Replacement ($750m-$1b) LAND 998 Phase 1 Replacement Aviation Fire Trucks ($50-100m) LAND 155 Phase 1 Enhanced Gap Crossing Capability ($150-300m) JP 2097 Phase 1B Enhancements to Special Operations ($300-500m) Land Systems Division 16

Land Manoeuvre Systems Emerging Projects LAND 19 Phase 7B Short Range Ground Based Air and Missile Defence Enhancements or Replacement ($1.5n-$2b) LAND 907 Phase 2 Maine Battle Tank Upgrade ($750m-$1b) LAND 8120 Phase 1 Engineer Support Platforms ($200-$300m) LAND 8140 Phase1-3 Deployable Force Infrastructure ($300-$400m) LAND 17 Phase 2 Digital Terminal Control System CAP ($100-$300m) LAND 8160 Phase 1 Enhanced Gap Crossing Capability Program (Assault Crossing and Breaching) ($1b-$2b) Land Systems Division 17

LMSB Industry Engagement Initiatives PMV Modernisation/Baseline: Vehicle kits Armour APU RWS Commodity Reform Program Managing Contractor LAND 155 Performance Based Contract PMV Life of Type Management Planning for A Vehicles Key Messages Close collaboration with key industry partners Listen to Industry and incorporate their feedback. Performance Based Contracting: Guarantee cash flow Value enduring contracts extension Challenges Breadth of materiel: Platforms/systems/commodities Ageing Fleets First Principles Review Transformation Digitisation for Indirect Fires and Platform integration Land Systems Division 18

COMBINED A R M S F I G H T I N G S Y S T E M Land Systems Division 19

Combined Arms Fighting System Combined Arms Fighting System (CAFS) manages LAND 400 LAND 400 will acquire the armoured fighting vehicles systems to deliver the mounted close combat capability to the Land Force. LAND 400 Land Combat Vehicle System Phase 1: Project Scoping Study (complete) Phase 2: Mounted Combat Reconnaissance Capability (ASLAV replacement) ($4b-5b Acquisition) Phase 3: Mounted Close Combat Capability (M113 replacement) ($10b-15b Acquisition) Phase 4: Integrated Training System ($400m-500m) Land Systems Division 20

CAFS Future Outlook and Opportunities Phase 2: BAES AMV and Rheinmetall Boxer have been selected for evaluation in the Phase 2 Risk Mitigation Activity. Risk Mitigation Activities (2016-2017) comprising: Test and Evaluation Activities Improvement of AIC opportunities Cost/Capability tradeoff analysis Government Second Pass Consideration (2018) Contract Signature (2018) - The 2016 Integrated Investment Program (IIP) identifies the acquisition cost as $4b-5b Land Systems Division 21

CAFS Future Outlook and Opportunities Phase 3: RFI evaluation complete (debrief opportunities during Land Forces 2016) Program Timeframe of 2019-2032 The 2016 IIP identifies the acquisition cost as $10b-15b Phase 4. The 2016 IIP identifies: Program Timeframe of 2023-2032 Acquisition cost as $400m-500m Architecture / framework being established in 2016 Land Systems Division 22

CAFS Industry Engagement Initiatives LAND 400 Industry Portal, regular Industry briefings through a wide range of forums (ASPI, Land Environment Working Group etc). Dedicated website for direct communication. Engagement with Industry bodies (AIDN, ICN) and State Government Industry bodies. Independent review of Phase 2 RMA AII activities. Deloitte Strong and clear alignment RMA enhancements AIC Roadmap has been delivered by BAES and Rheinmetall. Challenges Optimising Australian Industry involvement. Managing expectations in a fluid/changing environment. Balancing Industry and Government / Defence expectations. Key Messages L400-2 RFT progressing Stage 2 Risk Mitigation Activities (RMA) concludes 18 Aug 17. Listening to Industry and incorporating their feedback. Fairness and openness with Industry. Early engagement - tell Industry what is going on in a timely manner. Deloitte Review of RMA AII activities publicly released by MDIND on 28 Jul 16. In 2016, Defence facilitated highly successful, industry showcase workshops, and 377 Australian and New Zealand companies attended. Land Systems Division 23

Land Systems Division 24

Land Engineering Agency LEA s primary role is to provide engineering resources and capability to support project and sustainment activities within the System Program Offices (SPOs) of Land Systems Division. LEA does this by providing systems, processes and physical capability to ensure compliance with the Army Technical Regulatory Framework to ensure that equipment is: Fit for service Safe to operate Environmentally compliant Land Systems Division

Land Engineering Agency At a glance: Outposted model Direct support to Projects & Sustainment in LSD Branches 7 Directorates (~153 core staff & ~340 outposted) - Includes 248 engineers and 245 technical staff Providing engineering capabilities Design Testing Prototyping Configuration Management Drafting Specialist Engineering Land Systems Division 26

Directorate Systems Engineering and Integration (DSEI) DSEI provides wide Directorate ranging Systems engineering Engineering support and to Integration LSD System (DSEI) Program Offices in niche technologies and capabilities that are more efficiently delivered from a centralised model. DSEI provides services across LSD in Configuration Management, Drafting and Specialist Engineering including Safety, Integration, Reliability and Maintainability, Survivability, Electronic Warfare and Communications. Land Systems Division 27

Directorate Systems Engineering and Integration (DSEI) Optics Electrical Power Software Survivability Mobility Electronics/ Communications/ EW Weapons/Lethality Engineering Analysis/Simulation Configuration Management Human Factors RAM 3D Modelling Land Systems Division 28

Directorate of Prototype and Test Services (DPTS) Land Engineering Agency Test Capability - LEA Proving Ground Monegeetta The test capability includes vehicle performance and endurance testing, Electromagnetic Interference and Compatibility, Electro-Optics and Thermal Imaging Testing, Climatic Testing, Mechanical testing, Weapons testing, Field Data Acquisition and High Speed Video in support of blast testing. Land Systems Division 29

Land Systems Division 30

LSD Points of Contact Land System Division contacts: MAJGEN Coghlan david.coghlan@defence.gov.au DGCAFS BRIG McGlone - gregory.mcglone1@defence.gov.au DGISS BRIG Smith - david.smith5@defence.gov.au ASLVS Ms Myers - sarah.myers@defence.gov.au DGLMS BRIG Kohl - haydn.kohl@defence.gov.au ASLE Mr Aitken - shane.aitken@defence.gov.au DGCRP BRIG Welsh - simon.welsh@defence.gov.au Office of HLS CASG.HLSOffice@defence.gov.au Land Systems Division 31