Improving Onboard DS-ATC Equipment Functions in Response to Shinkansen Service Expansion

Similar documents
Railway Systems. Class 385 for the International Market

Rolling Stock System Technologies Underpinning the Next Generation of Railways

Special feature article

Development of a Train Control System by Using the On-board Interlocking

Applicability for Green ITS of Heavy Vehicles by using automatic route selection system

Integrated Monorail Systems Extending Around the Globe

Development of Next-generation Switchgear Targeting High Reliability and Maintenance Savings

Featured Articles Utilization of AI in the Railway Sector Case Study of Energy Efficiency in Railway Operations

Special edition paper Development of an NE train

Autonomous Haulage System for Mining Rationalization

Power Interchange System for Reuse of Regenerative Electric Power

Development of Emergency Train Travel Function Provided by Stationary Energy Storage System

Special edition paper Radio Train Control System (ATACS)

JR EAST, a passenger railway company, is the largest railway company in JAPAN

MODURBAN MODURBAN. Dan Otteborn, Member of the MODURBAN Supervisory Board

Special edition paper Measurement and Analysis of the Driving Energy of Shinkansen Rolling Stock

Special edition paper

Study of composition draft on automatic changeover system in neutral section railway catenary system for highspeed train line

Examples of Electric Drive Solutions and Applied Technologies

Establishment of Japan Transport Engineering Company (J-TREC)

Next-generation SCADA and Control Technologies for Large-scale Use of Photovoltaic Generation on Electric Power Grid

Special edition paper

Manufacturing of Rolling Stock in Kawasaki Heavy Industries (KHI) Kobe, Japan 9 th of June 2009

Special edition paper

Enhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center

Parameter Design and Tuning Tool for Electric Power Steering System

Rescue operations on dedicated high speed railway lines

High-voltage Direct Inverter Applied to Induced Draft Fan Motor at Takehara Thermal Power Station No. 3 of Electric Power Development Co., Ltd.

Development of the Micro Combustor

The 1,400-MW Kii-Channel HVDC System

Special edition paper

Challenges of Rotary Aircraft Rotating Component Instrumentation

Core Components for Large-scale PV Generation Systems

Integrated Monitoring System Design of Hybrid Aircompressors

Island Smart Grid Model in Hawaii Incorporating EVs

Advanced Railway System Development Center, Research & Development Center of the JR East Group Hiroshi Nomoto

Innovation of Automobile Dealers in Hokkaido

Environmentally Conscious Green Mobility

OCS Inspection System for High-Speed Railways

INFRASTRUCTURE RENEWAL FOR THE NEXT GENERATION PATCO High Speed Line Power Infrastructure Renewal

Battery-powered Drive Systems: Latest Technologies and Outlook

Tension Control Inverter

Development of Motor-Assisted Hybrid Traction System

An Overwhelmingly Solid and Advantageo

Transfer of Rolling Stock to Indonesia and Technical Support for Maintenance

MiR Hook. Technical Documentation

To Our Business Partners

Development of Rolling Stock Inverters Using SiC

Latest Trend and Safety and Reliability Technology of Rolling Stock Doors

Development of Emission Control Technology to Reduce Levels of NO x and Fuel Consumption in Marine Diesel Engines

Elko County Enhanced 911 Advisory Committee Five-Year Master Plan (v.1.3.1) March 9, 2017

Next-generation Inverter Technology for Environmentally Conscious Vehicles

Fig.1 Sky-hook damper

Introduction of Overseas Technologies to JR East Track Maintenance

Inventing a new type of platform gate

MARINE STEERING COMPASS

Development of Assist Steering Bogie System for Reducing the Lateral Force

Train traffic control system on the Yamanashi Maglev test line

Electronic Vehicle Immobilization System EWS 2

Train Group Control for Energy-Saving DC-Electric Railway Operation

The Energy Efficiency Myth: When Motor Retrofits Go Wrong. A Case Study by Howard W. Penrose, Ph.D., CMRP President, SUCCESS by DESIGN

Maintenance Safety. Jim Seay, ICAE Chairman, IAAPA Global Safety Committee President, Premier Rides Immediate Past Chair, ASTM F24

HYLIFT-DEMO DELIVERABLE 8.4

User Guide Electronic Logging Device

Keynote from Andreas Renschler, CEO Volkswagen Truck & Bus GmbH and Yoshio Shimo, President & CEO Hino Motors Ltd.

SentryGOLD Fully-Automated Fuel Management System

Track test monitoring system using a multipurpose experimental train

The Fundamentals of DS3

Automatic train operation system for the high speed Shinkansen train

Late Starter. Tuesday, November 6, 2018

Shinkansen Technology Exportation

Development of a High Efficiency Induction Motor and the Estimation of Energy Conservation Effect

Journal of Emerging Trends in Computing and Information Sciences

Manifold QF. Contents. Description. Installation & Setup Guide. Safety 3. Introduction 3. Installation Standards 4. Specifications 5.

Decision. Mr. Narihiro Terazono President, the Mitsubishi Electric Building Techno-Service Corporation 2-6-2, Otemachi, Chiyoda-ku, Tokyo

Steering Actuator for Autonomous Driving and Platooning *1

eature Easy-to-Access Rail JR East s Initiatives Yoshihiko Ito Railway Universal Designs and Architectural Features Introduction

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Hybrid Wheel Loaders Incorporating Power Electronics

ZT-USB Series User Manual

Case 1:17-cv DLF Document 16 Filed 04/06/18 Page 1 of 2 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

Variable Speed Limit Pilot Project in BC

Divided Past To Integrated Future Developments in local public rail transport in Berlin

A production train diagram of train control to save power consumption used for dynamic programming

DECEMBER 12, Parking Meter and Time Limit Preliminary Evaluation

As the global energy sector

Introduction of Hydraulic Excavator PC240LC-11

The Great East Japan Earthquake and Lessons Learned ~Oil and Electricity~

H-IIA Launch Vehicle Upgrade Development

UAE Ministry of Interior pilot project for RFID-based SCHOOLBUS/STUDENT TRACKING SYSTEM

TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING

UPDATE OF THE SURVEY OF SULFUR LEVELS IN COMMERCIAL JET FUEL. Final Report. November 2012

Summary of Press Conference Comments Made by Satoru Katsuno, FEPC Chairman, on June 15, 2018

Design and Control of Lab-Scale Variable Speed Wind Turbine Simulator using DFIG. Seung-Ho Song, Ji-Hoon Im, Hyeong-Jin Choi, Tae-Hyeong Kim

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY

Simulating Trucks in CORSIM

2012 > F 1.0 DOHC > Language

Agreement for Use of the Hokkaido Expressway Pass

ZLogs Help. Tablet Applications. Contents. ZLogs Help

Why the original concept of HSL adopted in different countries has. differentiated situation.

Transcription:

Hitachi Review Vol. 66 (2017), No. 2 167 Featured Articles III Improving Onboard DS-ATC Equipment Functions in Response to Shinkansen Service Expansion Hiroyuki Yokoyama Satomi Minesaki Tomohide Kidachi Nobuyuki Ikeguchi Kazuya Suzuki Masanori Arima OVERVIEW: To enable adaptation to new mutual through services between multiple Shinkansen train companies, the authors and their respective companies (hereafter, collectively, we ) jointly developed two new functions for the onboard DS-ATC equipment used in Shinkansen rolling stock. One function divides the onboard DB (containing speed check patterns) into separate DBs managed independently by each train company, and the other function handles switching from one onboard DB to another while crossing company boundaries. Since the onboard DBs are an important safety element, we started by creating an organizational structure for building them, and approached development in a coordinated manner while listening to the opinions and requests of the client companies. We then implemented the new functions while operating the system and limiting changes in the existing DS-ATC system to only minor ones. Currently, the new system is running smoothly in the mutual through services between the Hokuriku Shinkansen and Hokkaido Shinkansen companies. INTRODUCTION WE have completed new development that divides the onboard database (DB) used in the Shinkansen s Digital Communication & Control for Shinkansen- Automatic Train Control (DS-ATC) system into separate DBs that are managed independently by each train company. The aim of the development was to enable adaptation to new mutual through services provided by multiple Shinkansen train companies. These new services coincide with the opening of the Seibi Shinkansen lines (a set of five Shinkansen lines, one each in Hokkaido, Tohoku, and Hokuriku, and two in Kyushu). The providers of the new services are the East Japan Railway Company (JR East), the West Japan Railway Company (JR West), and the Hokkaido Railway Company (JR Hokkaido). The onboard DS- ATC system previously managed all lines using a single DB, but with the start of the new mutual through services, we decided to upgrade the system by dividing the DB mounted in the onboard DS-ATC equipment (hereafter, onboard equipment) into separate DBs managed independently by each train company. The upgrade was necessary because each railway operator needs to take responsibility for managing its own DB, since the DB contains important safety-related data. When switching from one DB to another at company boundaries, the operating conditions require that the switch is done while traveling between stations. This article provides an overview of how we divided the onboard DS-ATC DB into separate DBs for independent management, and describes the process for controlling the switch between DBs at company boundaries. OVERVIEW OF THE ONBOARD EQUIPMENT The onboard equipment determines the train position using location information from position-correcting transponder beacons. The pulse integration values from the speed generator are subtracted from the remaining distance to continuously track the train position. Based on this train position and the stop position information in ATC messages sent from ground equipment, the system searches the DB for a speed check pattern that will stop the train by the time it reaches the stop position. Speed check patterns for all of the track circuits that could possibly become stop positions are stored in the DB in advance. These speed check patterns - 83 -

168 Improving Onboard DS-ATC Equipment Functions in Response to Shinkansen Service Expansion Brake output DS-ATC onboard equipment Receiver control unit Onboard DB Outside company DB Arithmetic processing unit Rail (track circuit) equipment ATC signal (ATC message) Speed check pattern Distance (position) ATC signal (ATC message) account for factors such as the line s slopes and curves, speed limits when traveling through branch points, and the train s brake performance (see Fig. 1). DEVELOPMENT OF ONBOARD DB SWITCHING FUNCTION Development Aims The aims of the development are shown below. (1) To enable each railway operator to manage its own DB, saving labor in terms of operation (2) To enable smooth DB updates [each company s DB is stored on a single memory board (MEM board), with the old version on one side and the new version on the other] (3) To ensure safety when switching from one DB to another while traveling [by developing a control process for switching DBs that incorporates company identification (ID) information] Onboard DB Configuration In the past, trains in the JR East jurisdiction were managed using a single DB, and the DB information for all of the Shinkansen rolling stock owned by JR East had to be modified when updating the DB. However, using this single-db system after the start of mutual through services would have had a major impact. Updating the DB at a single location in the JR East jurisdiction would have required the DBs for all of the areas of other companies to be updated too, because the geographic version information (information used to link ground equipment and DBs) Speed Speed generator Speed signal DS-ATC: Digital Communication & Control for Shinkansen-ATC ATC: automatic train control DB: database Power receiver Fig. 1 Configuration of DS-ATC Onboard Equipment. The receiver control unit forms the core of the onboard equipment. It contains the speed check patterns (DB) for all of the track circuits that could possibly become stop positions. sent from ground equipment in ATC messages needs to be updated for all areas at the same time. To avoid this problem, we decided to divide the DB into separate DBs managed independently by each company, to prevent one company from affecting other companies when it updates its DB. Specifically, the single DB used previously was divided into three DBs, the DB (hereafter, ), the DB (hereafter, JR West DB), and the JR Hokkaido zone DB (hereafter, JR Hokkaido DB). However, to enable switching from one DB to another while traveling across the boundary shared by two companies, the speed check pattern data for a fixed range before and after the company boundary has to overlap and be shared by both companies. The memory capacity of the old MEM boards is too low to accommodate all of the DBs for JR East, JR West, and JR Hokkaido, so they cannot store all of the speed check patterns. In addition, since each MEM board also needs to store the old DB on one side and the new DB on the other, we developed new MEM boards with four times the capacity of the old ones. The new MEM boards were allocated to each company so that each onboard equipment system is equipped with two boards. The was mounted on one board, and the JR West DB or JR Hokkaido DB was mounted on the other (see Fig. 2 and Fig. 3). Company ID Information To enable switching from one DB to another at a company boundary, company ID information was added to the ATC messages sent from ground equipment. The onboard equipment identifies the train position from the logic unit number (a number Side 1 Side 2 MEM: memory MEM board (first board) MEM board (second board) JR West DB JR West DB Fig. 2 Onboard DBs Mounted in Hokuriku Shinkansen Rolling Stock. Both the JR East and JR West DBs were mounted. - 84 -

Hitachi Review Vol. 66 (2017), No. 2 169 Side 1 Side 2 MEM board (first board) MEM board (second board) JR Hokkaido DB JR Hokkaido DB messages. Similarly, since the logic unit number is also used for position-correcting transponder beacon messages, company ID information was also added to unused bits in those messages. Adding company ID information has enabled multiple-operator service between companies, while keeping both ground equipment and onboard equipment modifications to a minimum. Fig. 3 Onboard DBs Mounted in Hokkaido Shinkansen Rolling Stock. Both the JR East and JR Hokkaido DBs were mounted. uniquely identifying each station) and the track circuit number contained in the ATC messages. When the DS- ATC system was developed around 2000, however, the developers did not anticipate multiple-operator service involving companies other than JR East, so they did not leave any logic unit numbers available, preventing logic unit numbers from being allocated for JR West and JR Hokkaido zones. This problem was solved by adding company ID information to unused bits in ATC messages. This added information is used to distinguish JR East (the home company) from other companies (outside companies). The onboard equipment was also upgraded to identify the train position (station on the track) from the set consisting of the company ID information and the logic unit number in ATC Control Process for Switching Onboard DBs An overview of the process used to control the switching of DBs at company boundaries is shown below. Through service from JR East to JR West is used as an example. (1) When onboard equipment is started When the onboard equipment is started, the train is in the, so the ATC messages received from the ground equipment contain Home company as the company ID information. The onboard equipment selects the, and searches it for the speed check pattern that matches the in-zone logic unit number and stop logic unit number in the ATC message (see Fig. 4). The onboard equipment uses the geographic version information in the ATC message to determine whether to select the old or new. (2) Before switching onboard DBs When the train is in the, the ATC messages it receives always contain Home company as the company ID information, and the onboard equipment continues to use the (see Fig. 5). Logic unit (4) Logic unit (5) Logic unit (6) Logic unit (1) Logic unit (4) Logic unit (5) Logic unit (6) Logic unit (1) Zone: 4, Stop: 5 Zone: 6, Stop: 2 Train equipment 2 equipment 3 equipment 2 Train equipment 3 ATC message Zone: In-zone logic unit number = 4 Stop: Stop logic unit number = 5 Company ID information: Home company (The logic unit numbers shown here are examples, and differ from the actual numbers.) When the onboard equipment is started, the company ID information is Home company, so the JR East DB is selected. The company ID information is Home company while traveling in the, so the JR East DB continues to be used. ATC message Zone: In-zone logic unit number = 6 Stop: Stop logic unit number = 2 Company ID information: Home company Fig. 4 Control Process when Onboard Equipment is Started. The speed check pattern matching the ATC message is retrieved from the DB and used for control. Fig. 5 Control Process Before Switching DBs. The pre-switch DB is used until just before a company boundary is crossed. - 85 -

170 Improving Onboard DS-ATC Equipment Functions in Response to Shinkansen Service Expansion (3) When switching onboard DBs When the train enters the (an outside company zone) from the, an ATC message containing Outside company as the company ID information is received from the ground equipment. Since the company ID information has switched to Outside company, the onboard equipment switches the current onboard DB from the to the JR West DB, and uses this DB to search for the speed check pattern that matches the in-zone logic unit number and stop logic unit number in the ATC message (see Fig. 6). To prevent accidental DB switches at locations other than company boundaries, the DBs contain preregistered information specifying the track circuits at which switching DBs is permitted. This information enables the onboard equipment to accurately determine whether switching DBs is permitted on the current track circuit. The onboard equipment is designed to discard the ATC message (and not switch DBs) if the message contains different company ID information even though the train has not crossed a company boundary. (4) Problem detection The onboard equipment always checks the company information in the ATC message against the preregistered company information in the onboard DB. So, if the DB has not been correctly switched to another DB after crossing a company boundary, the company information in the ATC message and onboard DB will not match, which will result in the detection Logic unit (4) Logic unit (5) equipment 2 equipment 3 After crossing the company boundary, the company ID information changes from Home company to Outside company, and the current DB is switched from the to the JR West DB. Logic unit (6) Logic unit (1) JR West DB Zone: 1, Stop: 5 Switched to Train ATC message Zone: In-zone logic unit number = 1 Stop: Stop logic unit number = 5 Company ID information: Outside company Fig. 6 Control Process when Switching Onboard DBs. The current DB is switched to the other DB after an ATC message is received from the other side of the company boundary. of a failure with checking error and the output of an emergency brake command. DB Division in JR East Jurisdiction Since the area in the JR East jurisdiction was previously managed by a single DB, updating the geographic version in ATC messages for all areas at once required updates to the DBs of all Shinkansen rolling stock (including trains that did not provide multi-operator service to locations updated in the DB). The divided DB management approach we developed was used to divide the previous single jurisdiction into four zones (Northern Tohoku, Southern Tohoku, Joetsu, and Hokuriku), which enabled the switching of DBs at zone boundaries. Since the company ID information in ATC messages is set to Home company (JR East) in all areas in the JR East jurisdiction, enabling switching of DBs at zone boundaries required the geographic version information in ATC messages to be set individually by zone in the ground equipment instead of being set for all areas at once. This change has eliminated the need to update the DBs of trains that do not provide multiple-operator service to locations updated in the DB when updating DBs in the JR East jurisdiction, which greatly reduces the DB update workload. Testing on Regular Service Routes We mounted the developed product in a test train, and subjected it to testing on regular service routes. Since the test pre-dated service into outside company zones, it was done at the boundaries of the four zones into which the JR East region has been divided. A total of 48 DB switches were performed over 6 days at zone boundaries between Morioka station and Kitakami station on the Tohoku Shinkansen line. We obtained good results, confirming that the DB switching operations could be done as specified. Because the process of switching DBs at zone boundaries is equivalent to switching DBs at company boundaries, the results indicate that it will be possible to perform these operations normally at company boundaries also. IMPLEMENTATION FOR SERVICE TRAINS The opening of the Kanazawa route on the Hokuriku Shinkansen line in March 2015 marked the start of through service from the to the JR West zone, and the start of the DB switching control process we developed. Through service to the JR Hokkaido zone started in March 2016 with the opening of the - 86 -

Hitachi Review Vol. 66 (2017), No. 2 171 Train speed Direction of travel Switch onboard DBs Speed check pattern Transponder beacon Fig. 7 Hokuriku Shinkansen Travel Data (Onboard Equipment Log Data Readout). The image shows a DB switch taking place as the train travels across a company boundary between the JR East and JR West zones. JR Hokkaido zone Switch onboard DBs This work required overcoming challenges such as a shortage of memory capacity in the existing MEM boards, and the lack of ATC message information to differentiate between the home company and outside companies. Ultimately, we needed to construct both new hardware and a new system, including new MEM boards, and also a way of adding company ID information to ATC messages for both onboard and ground equipment. This work ensured that the DBs of outside companies are not affected when the home company DB is updated, and that the number of trains affected by DB updates is kept to a minimum. It is also worth noting that we were able to implement the new functions while operating the system and limited changes in the existing DS-ATC system to only minor ones. ACKNOWLEDGMENTS Many parties lent their efforts to make this development possible, not only in technical areas, but also in areas such as database management, coordination between companies, and testing on service trains. The authors would like to once again express their gratitude to all those involved from the East Japan Railway Company, the Hokkaido Railway Company, and the West Japan Railway Company. Direction of travel Train speed Speed check pattern Transponder beacon Fig. 8 Hokkaido Shinkansen Travel Data (Onboard Equipment Log Data Readout). The image shows a DB switch taking place as the train travels across a company boundary between the JR East and JR Hokkaido zones. Hokkaido Shinkansen line s route to Shin-Hakodate- Hokuto station, and operation has been successful to date (see Fig. 7 and Fig. 8). CONCLUSIONS To adapt to the new mutual through services provided by multiple Shinkansen train companies, we completed new development that divided the existing single DB into separate DBs managed independently by each company. - 87 -

172 Improving Onboard DS-ATC Equipment Functions in Response to Shinkansen Service Expansion ABOUT THE AUTHORS Hiroyuki Yokoyama Rolling Stock Technology Center, Transport and Headquarters, East Japan Railway Company. He is currently engaged in the management of propulsion systems, auxiliary power supply systems, and automatic train protection systems. Mr. Yokoyama is a certified P.E.Jp (Professional Engineer, Japan). Satomi Minesaki Rolling Stock Technology Center, Transport and Headquarters, East Japan Railway Company. She is currently in charge of the design and development of onboard automatic train protection systems. Tomohide Kidachi Headquarters, Hokkaido Railway Company. He is currently in charge of the design and development of automatic train protection systems. Nobuyuki Ikeguchi Headquarters, West Japan Railway Company. He is currently engaged in the management of onboard automatic train protection systems, and train information network systems. Kazuya Suzuki Signalling Systems Design Department, Mito Rail Systems Product Division, Railway Systems Business Unit, Hitachi, Ltd. He is currently engaged in the management of onboard automatic train protection systems. Masanori Arima Signalling Systems Design Department, Mito Rail Systems Product Division, Railway Systems Business Unit, Hitachi, Ltd. He is currently in charge of the design and development of onboard automatic train protection systems. - 88 -