Size of Cable on Secondary Side of Transformer (11KV/433V) Ref: KSEI Handbook X3 95mm2 or (2 50 mm2)

Similar documents
CHAPTER V RESIDENTIAL WIRING

Modular contactor for installation into distribution boards

MODULAR DEVICES. 21. Isolator Switches. Low Voltage (Bell) Transformers. Time Switches (electromechanical)

Latch for Contactors 4-pole see page 36. Ratings Rated Aux. Contacts Type Coil voltage 2) AC2 Current Built-in Additional 24 24V= DC 5

3 rd Stakeholder Meeting Residential Lighting

MILLWRIGHT. Learner Program Content:

Modular contactors and relays

A. This section includes unit capacitors for power factor correction.

Equipment model: auxiliary control. Pack Cat.Nos 10/16 A V± P + T shuttered module module

Amount (Rs) 1.5 sq. mm ISI marked, FR

T his chapter provides data on lighting technologies, including

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith

DS-1 (Residential) Customer Charge Per electric service account $ 8.23 $ 8.23 $ 8.23 Meter Charge Per electric service account $ 6.06 $ 6.06 $ 6.

INSTRUCTIONS INSTALLATION OF LOAD-SHARE TERMINALS FOR VLT DRIVES

Approved Standards. Motor Contactor. Main contactor. Accessoires. 21 Motor Contactor J7KN

The following lighting types are NOT compatible with the TT- 402Wireless Inline Dimmers:

Electrical Existing Conditions and Building Load Summary Report

Customer Requirements Downtown Secondary Network Service

A. This section includes enclosed dry type transformers for lighting and power loads, with primaries and secondaries rated 600 volts and less.

For Info: Phone: Fax:

Other Devices. Installation Contactors Z-SCH. Connection diagrams Z-SCH NO 3 NO / 1 NC. Permitted Installation Positions

Total duration of course = 3 Months (12 weeks) Total training hours = 400 hrs.

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

ROUND CEILING DIFFUSERS DIMENSIONAL DETAILS

Average Retail Electricity Costs in North Carolina

LETTER TO FAMILY. Science News. Cut here and glue letter onto school letterhead before making copies.

SERIES NV. Vision Proof Transfer Grilles

W Datasheet: DIN Rail Contactors, series AMPARO

GLX. Series. 1kW to 16kW Central System

TECHNICAL TERMS AND ABBREVIATIONS. Alternating Current An electric current that reverses its direction at regularly recurring intervals.

Indoor electrical installation

Pretest Module 24 Three-phase Service Entrance

IMPROVED LIGHTING CONTROLS

ELECTRICIAN S THEORY EXAMINATION 11 September 2010 QUESTION AND ANSWER BOOKLET

Modular Air-cooled Scroll Chiller

1.7. Portable insulation fault location system EDS3060/EDS3360 in combination with EDS460/461 systems

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

Spring Test 7 due 05/03/2013

Electrical Equipment and Terminology

Electrical Tech Note 105 Agricultural Engineering Department Michigan State University

DX 3 MCBs. Choice of DX 3 MCBs for capacitor banks. Technical data

IESNA Lighting Design Guide Transportation-1

Model Number Legend. Motor Contactor J7KN. Motor Contactor J7KN 1

BUILDING ELECTRICAL SERVICES DESIGN FOR A PROPOSED COLLEGE ADMINISTRATION BLOCK

Non-Summer, First 800 kwh $ $ $ Non-Summer, Over 800 kwh $ $ $

Schedule of Electrical Permit Fees. Contractor

UNDERGROUND SERVICES - SECONDARY

` Table 1: Status of Kuthur PHC... 2 Table 2: Source and Quality of Power at Kuthur PHC... 2 Table 3: Average Metrological Data of the Site at Kuthur

SERIES C. Adjustable Deflection Grilles for Circular Ducting

Year 11 GCSE PHYSICS REVISION QUESTIONS PAPER 1. Higher Level. Energy and Electricity

: HOUSE WIRING. Attendance : 90% attendance is must to appear for the examination COURSE THEORY PRACTICAL TOTAL HOUSE WIRING

2011 NEC Significant Changes Part 1 The following course will summarize many of the important changes to the NEC code.

CHAPTER 94. Notes. 1. This chapter does not cover: (a) pneumatic or water mattresses, pillows or cushions, of Chapter 39, 40 or 63;

Lighting Tables for New Equipment 7/16/2008

SUBSTATION DESIGN TRAINING

Medium Voltage. Power Factor Correction Reactive Compensation Harmonic Filters. Electrical Power Quality Management at its best.

3 o/c 2 An area or temporary structure used for display, marketing or sales is defined as a a booth b a stand c an exhibition d a show.

DIVISION 400 OFF-STREET PARKING AND LOADING

Electrical and Power Transmission Installers, Other CIP Task Grid. Secondary Competency Task List. Level 1 Level 2 Level 3

GE Energy Industrial Solutions. EV Charging Station. Application Guide. imagination at work

Generator Fire Safety: Generator assemblies should be located outside the building.

Electric & Gas Service Requirements (Greenbook) Overview

SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test)

Lighting Tables for Existing/Base Equipment 4/15/2011

STL. Series. Emergency Lighting Inverter 3kW to 160kW Central System

NOTICE INVITING QUOTATIONS

FACT SHEET Standard: Electrical Safety

HLS Watt Halogen Illuminator Service Manual

Electrical Design/Build Guide

Air-insulated switchgear UniGear type ZS1

ZONING. 235 Attachment 3. Town of Montgomery. Table of Use Regulations for Business and Industrial Districts (See )

Home Elevator. Planning Guide

VENUE - TECHNICAL DATA

Lighting Tables for Existing/Base Equipment 4/15/2011

OVERHEAD SERVICE. Items to consider

Tender Schedule for Electrical Works at Varagani Branch. Sl. No. Particulars Quantity Unit Rate Amount

Definitions of and have been revised. a. automatic b. nonautomatic c. none of the above d. both a and b

SELECT MEMBERSHIP NUMBER Full Installation 75% new and 25% alteration to exsisting

Chapter 3.10: Energy Efficient Technologies in Electrical Systems

Gas Insulated Metal-clad Switchgear, HMGS!

SECTION ELECTRICAL DESIGN AND CONSTRUCTION STANDARDS _ February A. Use heavy duty type fused and non-fused, enclosed switches only.

Chapter 2 Wiring and Protection Article 200 Use and Identification of Grounded Neutral Conductor Chapter 1 General...9

Lighting Technologies

AF series contactors (9 2650)

Electrical Circuits Discussion Questions:

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

ELVORON HOME ELEVATOR

systems Systems Emergency Lighting Inverter 120 or 277V 60 Hz Power

ELECTRICIAN S THEORY EXAMINATION 19 June 2010 QUESTION AND ANSWER BOOKLET

ADVANCED CALCULATIONS

Demand Switch NEFA20 Plus. Installation Guide. Please read this entire guide before beginning the installation!

Elegance Electrician s Installation Guide

BILL OF QUANTITY (BOQ) FOR ELECTRICAL WORKS BOGAPURAM BRANCH

Building Energy Code (BEC) and Energy Audit Code (EAC) (2012 Edition) for Buildings Energy Efficiency Ordinance (Chapter 610)

Training & Didactic Systems. Fundamentals of Electrical Engineering

FORMAT-III B - ANNEXURE-III

M-1.0 FILE NAME: CAFE BIZOU CLIENT: CATHERINE MCKENNA PROJECT: PROJECT NO. REV DESCRIPTION DATE PLAN CHECK

ELECTRICIANS REGULATIONS EXAMINATION 29 June 2013 QUESTION AND ANSWER BOOKLET

METERING REQUIREMENTS

Chapter 4 Utility Systems Electrical

Transcription:

Size of Cable on Secondary Side of Transformer (11KV/433V) Ref: KSEI Handbook Rating of T/C Primary (KVA) current Secondary (Amp) Current Min. (Amp) Size of Neutral Minimum Earthing Size Conductor of Cable (mm2) (mm2) 63 3.3 84 25X3 50mm2 100 5.25 133.3 25X3 95mm2 or (2 50 mm2) 160 8.4 213.3 25X3 185mm2 or (2 95 mm2) 200 10.49 266.6 25X3 300mm2 or (2 120 mm2) 250 13.12 333 25X3 2 185 mm2 315 16.53 420 31X3 or 25X4 (2 300 mm2) or (3 185 mm2) 400 21.80 533 38X3 (3 300 mm2) or (2 400 mm2) 500 26.20 666.5 25X6 (3 400 mm2) or (4 240 mm2) 630 33 840 31X6 4 400 mm2 750 39.36 1000 50X4 Bus Bar Trucking (min. Isc 50KA) 1000 52.50 1333 210mm2 Bus Bar Trucking (min. Isc 50KA) 1250 65.50 1667 290mm2 Bus Bar Trucking (min. Isc 50KA) 1600 83.98 2133 380mm2 Bus Bar Trucking (min. Isc 50KA) 2000 105.00 2666 450mm2 Bus Bar Trucking (min. Isc 50KA) HT Fuse on Primary Side of Transformer (11KV/433V) Rating of T/C Primary (KVA) current Secondary (Amp) Current HT Fuse (Amp) 1 / 10

Min (Amp) Max(Amp) 63 3.3 84 10 16 100 5.25 133.3 16 25 160 8.4 213.3 16 40 200 10.49 266.6 25 40 250 13.12 333 32 40 315 16.53 420 40 63 400 21.80 533 40 63 500 26.20 666.5 50 100 630 33 840 63 100 750 39.36 1000 75 160 1000 52.50 1333 100 160 1250 65.50 1667 100 200 1600 83.98 2133 160 250 2000 105.00 2666 200 250 Capacitor Bank for Power Supply Voltage System Voltage Minimum rating of capacitor bank 3.3 KV, 6.6KV 75 Kvar 11 KV 200 Kvar 22 KV 400 Kvar 33 KV 600 Kvar Capacities of PVC conduits Nominal conductor Size mm 16 mm 20 mm 25 mm 32 mm 2 / 10

Number of Cables (maximum) 1.0 6 5 19 30 1.5 5 4 15 24 2.5 3 3 11 17 4 2 2 8 13 6 2-6 10 10 - - 4 6 16 - - 3 4 25 - - 2 3 35 - - - 2 System Highest and Lower Voltage System Voltage Highest Voltage Lowest Voltage 240 V 264 V 216 V 415 V 457 V 374 V 3.3 kv 3.6 kv 3.0 kv 6.6 kv 7.2 kv 6.0 kv 11 kv 12 kv 10 kv 22 kv 24 kv 20 kv 33 kv 36 kv 30 kv 66 kv 72.5 kv 60 kv 66 kv 72.5 kv 60 kv 132 kv 145 kv 120 kv 220 kv 245 kv 200 kv 400 kv 420 kv 380 kv Number of Points for Dwelling Unit No. Description Area for the Main Dwelling Unit (m2) 35 mm2 45 mm2 55 mm2 85 mm2 140 mm2 3 / 10

1 Light points 7 No 8 No 10 No 12 No 17 No 2 Ceiling fans Pont 2 No 3 No 4 No 5 No 7 No 3 Ceiling fans No s 2 No 2 No 3 No 4 No 5 No 4 6A Socket outlets 2 No 3 No 4No 5 No 7 No 5 16A Socket outlets - 1 No 2 No 3 No 4No 6 Call-bell (buzzer) - - 1 No 1 No 1 No Recommended Schedule of Socket-Outlets Description Number of Socket 6A Socket 16A Socket Bedroom 2 1 Living room 2 2 Kitchen 1 2 Dining room 2 1 Garage 1 1 For refrigerator - 1 For air-conditioner - 1 for each Verandah 1 per 10mter2 1 Bathroom 1 1 Power requirements of the building Part of ElectricalInstallation Part of the Total Power Requirement DiversityFactor in % Ventilation, heating (air-conditioning) 45% 1.0 Power plant (drives) 52% 0.65 Lighting 30% 0.95 Lifts 20% 1.0 Kitchen 10% 0.6 Laundry 5% 0.6 4 / 10

Lift Car Speed Occupancy No. of Floors ServedCar Speed m/s Office building 4 to 5 0.5 to 0.75 m/sec Office building 6 to 12 0.75 to 1.5 m/sec Shops and departmental stores 13 to 20 More than 1.5 m/sec Passenger lifts for low and medium lodging houses - 0.5 m/sec Hotels 4 to 5 0.5 to 0.75 m/sec Normal load carrying lifts - 2.0 to 2.5 m/sec Hospital passenger Lift 4 to 5 0.5 to 0.75 m/sec Hospital passenger Lift 13 to 20 More than 1.5 m/sec Hospital bed lifts (Short travel lifts insmall hospitals) - 0.25 m/sec Hospital bed lifts (Normal) - 0.5 m/sec Hospital bed lifts (Long travel lifts ingeneral hospitals) 0.6 to 1.5 m/sec Capacitor Ratings at Rated Voltage Motor Rating(Kw) Capacitor Rating in kvar for Motor Speed 3 000rev/min1 500rev/min 1 000rev/min750rev/min 600rev/min 500rev/min 2.25 1 1 1.5 2 2.5 2.5 3.7 2 2 2.5 3.5 4 4 5.7 2 3 3.5 4.5 5 5.5 7.5 3 4 4.5 5.5 6 6.5 11.2 4 5 6 7.5 8.5 9 15 5 6 7 9 11 12 18.7 6 7 9 10.5 13 14.5 22.5 7 8 10 12 15 17 37 11 12.5 16 18 23 25 57 16 17 21 23 29 32 75 21 23 26 28 35 40 102 31 33 36 38 45 55 5 / 10

150 40 42 45 47 60 67 187 46 50 53 55 68 76 :Maximum Current Demand for Motor: Nature of supply Size of installation Maximum current demand Single phaseor Three Up phase to and including 0.75 kw Six times the full load current Above 0.75 kw and up to 7.5 kw Three times the full load current Above 7.5 kw up to and up to11 kwtwo times the full load current Above 11 kw One and half times the full load current Rated Basic Insulation Level (BIL) Nominal System Voltage (kv) Rated BIL (kvp) 33 KV 170 22 KV 125 11 KV 75 6.6 KV 60 3.3 KV 40 Illumination Level Location Illumination Level (Lux) Residence Entrance / Hallways 100 Living room 300 Dining Room 150 Bed Room (General) 300 Bed Room (Dressing, Bed Heads) 200 Kitchen 200 Kitchen sink 300 Bathroom 100 Sewing 700 Workshop 200 Staircase 100 6 / 10

Garage 70 Study Room 300 Office Building Entrance hall / Reception 150 Conference Room / Executive Office 300 General Office Space 300 Business Machinery Operation 450 Drawing Office 450 Corridors 70 Lift landing 150 Hospital Building Reception & Waiting 150 General ward 100 Bed Side 150 Toilet 70 Operation Theatre (General) 300 Operation Theatre (Operation Table) Special Laboratories 300 Radiology 100 Causality 150 Dispensaries 300 Laundry 200 Dry Cleaning 200 Ironing 300 General Office 450 Kitchen 200 Assembly & Concert Halls Foyers 100 to 150 Auditoria 100 to 150 Platform 450 Corridors 70 Cinema Halls Foyers 150 Auditoria 50 Corridors 70 Theatres Foyers 150 Auditoria 70 Corridors 70 School / College Building Assembly Halls 7 / 10

General 150 Examination center 300 Platform 300 Classes Desktop 300 Blackboard 200 to 300 Libraries Shelves 70 to 150 Reading Room 150 to 300 Reading Table 300 to 700 Cataloguing 150 to 300 General Office 300 Staff Room 150 Corridors 70 Lamp s Lumen Data Rating (Watt) Life (Hours) Initial Lumens Incandescent Lamp 60 1000 870 100 750 1750 150 2000 1740 200 2000 2300 500 2000 6500 Fluorescent Lamp 18 7000 1120 20 7000 1020 36 7000 2800 40 7000 2700 2X40 7000 4000 Compact Fluorescent Lamp 5 10000 220 7 7000 380 11 7000 560 13 7000 680 15 7000 810 18 7000 1050 23 7000 1500 26 7000 1800 32 7000 2400 Mercury Vapour Lamp 100 18000 3700 8 / 10

175 24000 8600 250 24000 12100 400 24000 22500 1000 24000 57000 Metal Halide Lamp 50 15000 3400 70 15000 5600 100 15000 9000 150 10000 13500 175 10000 15000 250 10000 20500 400 20000 36000 1000 12000 110000 High Pressure Sodium Vapour Lamps 35 16000 2250 50 24000 4000 70 24000 5800 100 24000 9500 150 24000 16000 250 24000 27500 400 24000 47500 1000 24000 140000 Pulse Start Metal Halide Lamp 50 15000 3400 70 15000 5600 100 15000 9000 150 15000 15000 175 15000 17500 200 15000 21000 250 15000 26300 320 20000 34000 400 20000 44000 450 20000 50000 :Duty Type of Motor: Ref: IS-325 Duty Type SymbolDuty Type Application S1 Continuous Duty Pumps, Bowers, Compressors, Fans S2 Short Time Duty Siren, Flood relief Gates S3 Intermittent Periodic Duty Valve, Actuators, Wire drawing machine S4 Intermittent Periodic Duty with starting Hoist, Cranes, Lifts, Escalators S5 Intermittent Periodic Duty with starting Hoist, / Cranes Breaking (with electronics Breaks), S6 Continuous Duty with Intermittent Periodic Machine Duty tools, Conveyors Ro 9 / 10

S7 Continuous Duty with starting / Breaking Machine tools, S8 Continuous Duty with periodic load Pole changes Channing Applications Type of Distribution System As per IEC 60364-3 Unearthed System Earthed System IT TT / TN (TN-S,TN-C,TN-C-S) First Letter (the neutral point in relation to earth):t= directly earthed neutral (from the French word Second letter (Exposed conductive parts of the electrical installation in relation to earth):t =directly -- Credits: Mr. Jignesh Parmar About Jignesh Parmar Jignesh Parmar has completed his B.E(Electrical) from Gujarat University. He is member of Institution of Engineers (MIE),India. Membership No:M-1473586.He has more than 12 years experience in Transmission -Distribution-Electrical Energy theft detection-electrical Maintenance-Electrical Projects (Planning-Designing-Technical Review-coordination -Execution). He is Presently associate with one of the leading business group as a Assistant Manager at Ahmedabad,India. He has published numbers of Technical Articles in "Electrical Mirror", "Electrical India", "Lighting India", "Industrial Electrix"(Australian Power Publications) Magazines. He is Freelancer Programmer of Advance Excel and design useful Excel base Electrical Programs as per IS, NEC, IEC,IEEE codes. He is Technical Blogger and Familiar with English, Hindi, Gujarati, French languages. He wants to Share his experience & Knowledge and help technical enthusiasts to find suitable solutions and updating themselves on various Engineering Topics. 10 / 10