Investor Presentation

Similar documents
SUCCESSFUL GAS TO POWER PLANT DEVELOPMENT CTRG, MOZAMBIQUE

The Group is expected to continue benefiting from stable coal prices, but in the car market, competitive pressures are likely to intensify.

PT Astra International Tbk 2011 Full Year Financial Statements

2017 Rp bn. Net revenue 150, , Net income* 14,184 11, Net earnings per share As at 30th September 2017 Rp bn

Bald Hill on track to start lithium concentrate production this quarter


Doing business with Petrobras - Procurement Strategies and Local Content. Policy.

Electrovaya Provides Business Update

PT Astra International Tbk 2012 Half Year Financial Statements

Valvoline Fourth-Quarter Fiscal 2016 Earnings Conference Call. November 9, 2016

(1) Current State and Issues of the Electricity Sector in Indonesia

Group Results 6 months ended 30th June. Net revenue 88,208 92,505 (5) Net income* 7,116 8,052 (12) Net earnings per share (12)

2010 Interim Results Presentation. August 23, 2010 Hong Kong

PT Astra International Tbk 2018 Third Quarter Financial Statements

1QFY2018 Financial Results. Quarter Ended 30 June 2017

PT Astra International Tbk 2014 Third Quarter Financial Statements

2015 Interim Results Announcement


The Performance of Year 2017

ABATEMENT TECHNOLOGY, RFO vs DISTILLATE - impact on costs & emissions

PT Astra International Tbk 2017 Full Year Financial Statements

National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA )

The Future of Automotive and Industrial Lubricants

NAVISTAR ANNOUNCES WIDE-RANGING STRATEGIC ALLIANCE WITH VOLKSWAGEN TRUCK & BUS

MONRO MUFFLER BRAKE, INC. PROVIDES FOURTH QUARTER AND FISCAL 2017 FINANCIAL RESULTS

PT Astra International Tbk 2011 Third Quarter Financial Statements

KONGSBERG MARITIME. Egil Haugsdal, President

PROTELINDO PT. SARANA MENARA NUSANTARA, Tbk. (TOWR) Indonesia s Premier Tower Company 1Q 2015 Results Presentation

Dr. Chris Dudfield. Chief Technology Officer Intelligent Energy. Sponsors

PT United Tractors Tbk YTD Sep 17 Performance Update AnalystGathering

Hong Leong Asia Ltd. Introduction. CEO s Presentation. Annual General Meeting 29 April 2008

DOING BUSINESS WITH PETROBRAS: PROCUREMENT STRATEGIES

LEAPING FORWARD, DELIVERING VALUE

PT INDUSTRI DAN PERDAGANGAN BINTRACO DHARMA Tbk. 1H 2018 Results. Aug 2018

ELECTRICITY SUPPLY INDUSTRY OF BOTSWANA

PT Astra International Tbk 2009 Full Year Financial Statements

YULON MOTOR CO., LTD. Investor Conference

PT INDUSTRI DAN PERDAGANGAN BINTRACO DHARMA Tbk. Q Results

3QFY2018 Financial Results. Quarter Ended 31 December 2017

FOR IMMEDIATE RELEASE November 15, 2013

Plug Power and Workhorse Provide FedEx Express With First ProGen Fuel Cell-Powered Electric Delivery Van

2010 Annual Results Announcement

ASX RELEASE. PAK receives drilling permit for Elko Coking coal project. Summary

Successfully funding a biofuels project biodiesel example. Petrofed Conference 11t h May 2016

Volkswagen Group Capital Markets Day 2017 Volkswagen Truck & Bus

For Immediate Release 31 August 2010

ORCA GOLD PROVIDES GALAT SUFAR SOUTH UPDATE

INCREASING SALES FOR MINING RELATED BUSINESS

Managing the Challenge of Cost Effective Lubrication & Prolonging Engine Lifetime

Zur Rose Group Q Trading Update

HONDA CANADA FINANCE INC. AUTO FINANCE FORUM February 15, ACCORD

9M 2003 Financial Results (US GAAP)

FIRST RESOURCES LIMITED

Certification Experience from A Biofuels Processor. ISCC Technical Committee South East Asia Meeting Bangkok, 9 April 2012

Phönix SonnenStrom AG

Sinopec Corp. Q Results Announcement. 29 October 2010

US$82,814m. Total assets. US$3,403m. Net debt. By Sector # US$411m Property. US$157m Insurance broking & financial services.

Welcome and Introduction June 2007

PROPOSED ACQUISITION OF 13 ENTITIES IN PAWN BROKING BUSINESS IN MALAYSIA

RSPO Membership Rules

Tlou Energy Limited. ("Tlou" or "the Company") Tlou announces development partner for CBM to Power Project

NEWS RELEASE. Continental Aerospace Technologies announces partnership with Piper Aircraft to launch the Pilot 100 training aircraft

ANNUAL GENERAL MEETING OF SHAREHOLDERS PT PETROSEA Tbk. Grand Kemang Hotel, Jakarta Wednesday, 27 May 2009

Indonesia Coal Industry Update 2016

Mozambique Gas Master Plan: GTL Plant Project

WashTec AG Baader Bank Investment Conference Karoline Kalb WashTec AG

Annual Press Conference 2011 Results

TEXTILE INDUSTRY OF INDONESIA. By Indonesian Consul General in Mumbai

SAUDI ARAMCO AND TOTAL AWARD EPC CONTRACTS FOR JUBAIL. DHAHRAN, SAUDI ARABIA AND PARIS, FRANCE (June 18, 2009) Saudi

Investor presentation

Jointly towards a long term sustainable energy supply

MONRO, INC. ANNOUNCES SECOND QUARTER FISCAL 2018 FINANCIAL RESULTS

Investor Presentation I October 2014

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

HONDA CANADA FINANCE INC. AUTO FINANCE FORUM February 13, 2014 First Canadian Place, 68 th Floor, York Room Honda Fit

Joint Venture Agreement ( JVA ) with Nissan in respect of the establishment and operation of NVL ( Proposed Joint Venture ).

Conference Call H Düsseldorf August 4, 2016

FY2014 2nd Quarter Business Results. Yamaha Motor Co., Ltd. August 5, 2014

Highpower International (NASDAQ: HPJ) Investor Presentation December 2017

Judith Tanselle White Energy Company Limited

MBM Resources Berhad. 17 th Annual General Meeting 14 June 2011 The Learning Academy, Federal Auto Holdings Berhad, Glenmarie

LSC LITHIUM ANNOUNCES OPERATIONAL UPDATE AND COMMENCEMENT OF ADVANCED EXPLORATION ON POZUELOS, PASTOS GRANDES AND RIO GRANDE

Quarterly Activities Report

Selected Unaudited 2017 Third Quarter Financial Data. 9 November, 2017

A2A-LGH Partnership. Milan, September 8 th, Borsa Italiana Italian Infrastructure Day

For personal use only

CONFERENCE CALL RESULTS Q1 2017

Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People s Republic of Bangladesh

Ronnie van Eeden. Senior Mining Engineer. Overview

X5 RETAIL GROUP NET RETAIL SALES GROW 24.9% IN Q Total net retail sales growth remained strong at 24.9% y-o-y in Q3 2017, driven by:

ESIA Study for 1,050MW Coal Fired Power Plant, Lamu County, Kenya Need for the Project. 3 Need for the project... 2

2.2 Deep-dive E-Mobility

Mazda Motor Corporation June 17, 2011

Fission Winter Program; 26.41% U3O8 over 12.0m (line 855E); Three New High-Grade Holes

Renascor Resources Limited ASX code: RNU. Siviour: a Tier-1 Graphite Deposit in Australia. For personal use only. Investor Presentation July 2017

CORPORATE PRESENTATION. Non Deal Roadshow February 2018 STRONGER FACING CHALLENGES

Laboratory worker at Goedgevonden Coal Mine

2 ND QUARTER 2016 INVESTOR PRESENTATION 26 AUGUST Geir Håøy, President and CEO Hans-Jørgen Wibstad, CFO

Yixin Group Limited (2858.HK)

Q SALES Strong organic growth, confirmed momentum. October 12, 2017

Transcription:

Investor Presentation Investor Presentation October November 2017 2017 Mine-mouth Power 1 Plant Photo Photo for illustrative for illustrative purposes only only

Agenda 4 About BlackGold 13 Industry Statistics 16 The Riau-1 Project 2

Disclaimer Forward looking statements This document contains statements that are, or may be deemed to be, forward looking statements which are prospective in nature. These forward looking statements may be identified by the use of forward looking terminology, or the negative thereof such as "plans", "expects" or "does not expect", "is expected", "continues", "assumes", "is subject to, "budget", "scheduled", "estimates", "aims", "forecasts", "risks", "intends", "positioned", "predicts", "anticipates" or "does not anticipate", or "believes", or variations of such words or comparable terminology and phrases or statements that certain actions, events or results "may", "could", "should", shall, "would", "might" or "will" be taken, occur or be achieved. Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Forwardlooking statements are not based on historical facts, but rather on current predictions, expectations, beliefs, opinions, plans, objectives, goals, intentions and projections about future events, results of operations, prospects, financial condition and discussions of strategy. By their nature, forward looking statements involve known and unknown risks and uncertainties, many of which are beyond the BlackGold Group s control. Forward looking statements are not guarantees of future performance and may and often do differ materially from actual results. Important factors that could cause these uncertainties include, but are not limited to, those discussed in the BlackGold Group s Annual Report 2016. Neither the BlackGold Group nor any of its associates or directors, officers or advisers, provides any representation, assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statements in this document will actually occur. You are cautioned not to place undue reliance on these forward-looking statements which only speak as of the date of this document. Other than in accordance with its legal or regulatory obligations (including under the SGX-ST Listing Manual Section B: Rules of Catalist), the BlackGold Group is not under any obligation and the BlackGold Group and its affiliates expressly disclaim any intention, obligation or undertaking to update or revise any forward looking statements, whether as a result of new information, future events or otherwise. This document shall not, under any circumstances, create any implication that there has been no change in the business or affairs of the BlackGold Group since the date of this document or that the information contained herein is correct as at any time subsequent to its date. No statement in this document is intended as a profit forecast or a profit estimate. This document does not constitute or form part of any offer or invitation to sell or issue, or any solicitation of any offer to purchase or subscribe for any securities. The making of this document does not constitute a recommendation regarding any securities. 3

About BlackGold Indonesia-focused coal mining company targeting Indonesia s rapidly growing power plant industry. Currently in production and holds interests in three coal concessions in Sumatra, namely PT Samantaka Batubara ( PT SB ), PT Ausindo Andalas Mandiri ( PT AAM ), and PT Ausindo Prima Andalas ( PT APA ), covering over 45,550 hectares in combined acreage. Possesses strong potential, with 520Mt of Measured and Indicated Coal resources and 147Mt of Probable Coal Reserves, as at 9 th June 2017 (JORC 2012). PT SB Concession PT AAM Concession PT APA Concession = Exploration Phase = Production Phase 4

Group Structure BlackGold Natural Resources Limited (Singapore) 100% 100% 100% BlackGold Asia Resources Pte Ltd (Singapore) BlackGold Power Pte Ltd (Singapore) BlackGold Energy Ltd (Hong Kong) 99% (2) PT BlackGold Energy Power (Indonesia) 99% (1) PT BlackGold Energy Indonesia (Indonesia) 99% (2) PT Samantaka Batubara (Indonesia) 99% (2) PT Ausindo Prima Andalas (Indonesia) 99% (2) PT Ausindo Andalas Mandiri (Indonesia) Notes: 1) 1.0% non-controlling interests held by PT Bahagia Sakti Makmur (Indonesia), an investment holding company incorporated in Indonesia to own 1.0% of PT BlackGold Energy Indonesia to comply with Indonesian laws, which require a minimum of 2 shareholders in a limited liabilitycompany. 2) 1.0% non-controlling interests held by PT Serasi Duta Pratama (Indonesia), an investment holding company incorporated in Indonesia to own 1.0% of PT SB, PT AAM, PT APA, and PT BlackGold Energy Power to comply with Indonesian laws, which require a minimum of 2 shareholders in a limited liability company. Listed Parent and Issuer Group Companies Asset Holding Companies 5

Milestones 2011-2012 OCTOBER 2011 Incorporation of BlackGold Energy Ltd NOVEMBER 2011 Incorporation of BlackGold Energy Indonesia MARCH 2012 Incorporation of BlackGold Asia Resources Pte Ltd 2014 NOVEMBER Coal Sales/Purchase Agreement with PT Santosa Makmur Sejahtera Energy Coal Sales/Purchase Agreement with PT Soma Daya Utama DECEMBER Awarded tender by PT Perusahaan Listrik Negara ( PT PLN ) coal supply of 500,000 tonnes per annum 2015 MARCH Successfully completed Reverse Takeover and listed on the Catalist board of the SGX-ST DECEMBER Signed a consortium agreement with China Huadian Engineering Co., Ltd. ( CHEC ) for the construction and development of a coal fired power plant in Riau Indonesia ( Riau-1 Project ) 2016 APRIL PT SB Concession commenced production and signed a coal sales contract with a Riau stateowned enterprise JUNE Successfully completed first coal delivery to a Riau state-owned enterprise DECEMBER Signed a 5 year coal sales contract with Indonesia s state-owned enterprise, PT PLN 2017 FEBRUARY Successfully completed first barge delivery of 5,000 tonnes to PT PLN Received US$12.6 million purchase order for the supply of coal to an Indonesian state-owned cement company, PT Semen Padang ( Cement Padang ) MARCH Signed a non-binding Memorandum of Understanding with PT PLN Batubara for potential cooperation to supply coal from PT SB Concession to power plants in Indonesia APRIL Successfully completed share placement agreement with SAC Capital as placement agent to raise S$3.23 million MAY Successfully completed share placement agreement with Mr Johanes Budisutrisno Kotjo to raise S$3.56 million JUNE Signing of a conditional term sheet with CHEC for the Riau-1 Project JULY Completed a placement with SAC Capital as a placement agent to raise up to S$8.2 million SEPTEMBER Signed a Heads of Agreement with CHEC and PT PLN to form a new consortium in relation to an ongoing cooperation for the Riau-1 Project. The new consortium involve the addition of certain subsidiaries of PT PLN, namely PT Pembangkitan Jawa-Bali ( PJB ) and PT PLN Batubara ( PLN BB ). Signed an addendum to the Coal Sales Contract with PT PLN in relation to the PT Tenayan project, translating to an upward revision of the selling price of coal by approximately 10% on coal sales from March 2017 onwards. 6

Key Shareholders / Advisors SUDIARSO PRASETIO A civil engineer with more than 40 years experience in the construction and mining industry, Mr. Prasetio brings to the BlackGold Group a deep understanding of the Indonesian mining industry, having had senior and managerial positions with responsibilities in construction, infrastructure, plant management, logistics, heavy machinery and finance. Mr Prasetio was the President Director of PT Pamapersada Nusantara, one of Indonesia s largest mining construction and contracting companies and part of the multi-billion dollar PT Astra International group. Mr Prasetio was appointed as a director of PT Pamapersada Nusantara in 1992, became its managing director in 1993, and was appointed as its President Director in 1999. Mr Prasetio has led PT Pamapersada Nusantara through several milestones and contracts for construction, logging and mining service contracts in a multitude of natural resources. Under his stewardship, PT Pamapersada Nusantara grew to become one of Indonesia s largest mining contractors. JOHANES BUDISUTRISNO KOTJO Mr Kotjo brings to the Group more than 22 years of experience in the mining and energy industries, having assumed key roles in various companies, including President Commissioner of IDX-listed PT Apac Citra Centertex Tbk from 1995 to 2014. He entered into his first resource venture together with a major mining player, Robert Friedland, in 1994, and has successfully invested in various mining ventures. Over the last 25 years, Mr Kotjo has been recognised as one of South East Asia s top business leaders, specializing in acquisitions and capital markets transactions, including those with public listed entities. Mr Kotjo graduated from the Technical University of Berlin in 1977, majoring in Chemical Engineering. 7

Management Team PHILIP CECIL RICKARD Chief Executive Officer and Executive Director Joined the Group in 2011, serving as CEO and Executive Director since March 2015; he is responsible for overall strategic direction and growth of the Group Proven entrepreneur with over 26 years experience in energy and mining; founded and grew several resource and mining ventures amidst volatile markets Led significant acquisitions, capital raisings, mining development and expansion projects; was previously Country Manager (Indonesia) for Norsk Hydro JAMES RIJANTO Chief Investment Officer and Executive Director Serving as CIO and Executive Director since March 2015; in charge of managing the Group s investments, sales & marketing, and sourcing of new opportunities Served as Director of an Indonesian power generation company and Advisor to an Indonesian energy & infrastructure construction & development company Started his career at Ernst & Young Corporate Finance; holds a Bachelor of Arts (Economics) from Boston University JEREMY NG Chief Financial Officer Joined the Group in 2015 as Deputy Chief Financial Officer before promotion to Chief Financial Officer in September 2017, in charge of overseeing capital markets and corporate activities Previously audit manager at PricewaterhouseCoopers LLP; has also served as the Chief Financial Officer of a coal trading company based in China, possesses 7 years experience in the coal mining and trading industry. Holds a Bachelor of Accountancy degree from Nanyang Technological University; is an associate member of the Institute of Singapore Chartered Accountants 8

PT SB An Overview Overview of PT Samantaka Batubara concession ( PT SB ) Located in Riau, Sumatra. Area of 15,000 hectares Three exploration programs conducted between 2006-15 significant geotechnical drilling (over 650 bore holes) done; detailed high-quality topographic surveys and data available Licence awarded in 2011 and upgraded to IUP (Mining Business Licence) Operation and Production in 2013 Coal production commenced in 1Q 2016; sales and delivery started in April 2016; current focus is to ramp-up production and sales from PT SB PT SB Coal with appropriate calorific value, low sulphur and moisture content, ideal for power production QUICK FACTS Location Concession area Riau Province, Sumatra, Indonesia c.15,000 ha. IUP Award 26 February 2013 Coal Grade Lignite CUSTOMER 04 PT. SDU (KARIMUN) Excellent location in a major coal producing region with the necessary infrastructure, and area with rapidly increasing power demand 4-5 hours drive from Pekanbaru, the capital of Riau Province (30 minutes by flight from Singapore) Well-developed road network near Indragiri Hulu river (15km north of PT SB) accessible for getting plant and equipment in and outbound transportation of coal Water supplies for mining operations easily available from nearby rivers and creeks Abundant labour-force and mining contractors in the region Several towns and villages with increasing power demand but limited availability coal-fired power to fill the gap CUSTOMER 02 PT. SEMEN PADANG (INDARUNG VI) CUSTOMER 01 PT. PLN TENAYAN IPP 2X110MW IPP PLAN RIAU-1 * PT SMS not pictured, located in East Nusa Tenggara CUSTOMER 03 PT SMS* 9

PT SB Reserves & Resources CATEGORY RESERVES MINERAL TYPE GROSS ATTRIBUTABLE TO LICENCE TONNES (MILLION) GRADE/RANK TONNES (MILLION) NET ATTRIBUTABLE TO ISSUER GRADE/RANK CHANGE FROM PREVIOUS UPDATE (%) Proved Coal 55 Lignite 55 Lignite - Probable Coal 92 Lignite 92 Lignite +104% Total Coal 147 Lignite 147 Lignite +227% RESOURCES Measured Coal 140 Lignite 140 Lignite +324% Indicated Coal 250 Lignite 250 Lignite +108% Inferred Coal 130 Lignite 130 Lignite +136% Total Coal 520 Lignite 520 Lignite +150% Source: PT GMT Indonesia (Independent Qualified Persons Report dated 10 August 2017) Reserves and measured & indicated resources have shown strong growth; this is expected to continue 227% increase in coal reserves and 150% in coal resources from previous year s estimates Drilling and topographical work has been performed over 2015 and 2016, which led to reserves and resources growth More resources to migrate to reserves with continued capex, drilling, data collection and geological mapping BlackGold s coal is competitive and well-suited for power production in the region Low sulphur and low ash endow BlackGold s coal with better heat generating properties This places BlackGold as the preferred coal supplier in the region 10

BlackGold s Customers No. Customer/Project Status Duration Remarks 1 PLN Tenayan On-going delivery 5 years (option of three 5-year extensions) 500,000 tonnes of coal per annum 2 Cement Padang On-going delivery <1 year Purchase order with a value of US$12.6 million 3 PT Santosa Makmur Sejahtera Energy (PT SMS) Expected to commence by 4Q2017 10 years 360,000 tonnes of coal per annum 4 PT Soma Daya Utama (PT SDU) Expected to commence by 1H2018 10 years 360,000 tonnes of coal per annum 5 Riau-1 mine-mouth IPP Consortium bid underway. Currently not yet awarded. Expected tenure of 30 years Approximately 3.6 million tonnes of coal per annum 11

Competitive Strengths STRATEGIC LOCATION Increased number of power-plants in Sumatra which are located in close proximity to BlackGold s assets 3 concessions located in Riau, Sumatra, where electricity demand is expected to grow by 11% annually LARGE ESTIMATED RESERVES AND RESOURCES 147 million tonnes of JORC compliant Proved and Probable Reserves 520 million tonnes of Measured and Indicated Resources COAL QUALITY Highly suitable for power production Calorific value ranging between 4,370 5,210 kcal/kg ADB LONG-TERM SALES CONTRACTS SECURED 2 contracts with state-owned companies + 2 long-term contracts with 2 independent power producers Source: RUPTL PLN 2017-2026 12

Industry Statistics Coal in Indonesia The Future Local power demand to benefit the coal industry Coal expected to remain an important part of Indonesia s energy mix approximately 84 million tonnes of coal to be consumed per year Under the Government s fast track program, approximately 56.8% of the planned power plants in the program are coal-fired State-owned electricity company, PT Perusahaan Listrik Negara ( PT PLN ) is currently transitioning from diesel to coal-fired power plants as coal is a cheaper source of energy Industrialization driving energy demand and coal consumption Source: RUPTL PLN 2017-2026 13

Industry Statistics South East Asia s largest economy The lowest electricity consumption per capita in South East Asia Economic growth largely driven by consumption, driving large energy demand Power demand in Indonesia projected to grow 8.3% 1 annually Political momentum towards greater electrification Indonesia s electrification rate is lower than its regional peers The Government of Indonesia s fast track program adding 35,000 MW generation capacity to meet domestic energy demand and attract foreign investments (GWh) 500 450 400 350 300 250 200 150 100 50 0 235 254 276 Projected Energy Consumption 1 302 330 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 357 386 417 450 483 Energy Consumption (GWh) Note: 1. Source: RUPTL PLN 2017-2026, Ministry of Energy and Mineral Resources of the Republic of Indonesia 14

Industry Statistics Local power demand to benefit the coal industry Coal expected to remain an important part of Indonesia s energy mix approximately 84-152 million tonnes of coal to be consumed annually over the next 10 years 1 Under the Government s fast track program, approximately 56.8% of the planned power plants in the program are coal-fired State-owned electricity company, PT Perusahaan Listrik Negara ( PT PLN ) is currently transitioning from diesel to coal-fired power plants as coal is a cheaper source of energy Industrialization driving energy demand and coal consumption (TWh) Coal as a component of Total Electricity Production 1 600 500 400 300 200 100 0 562 528 492 454 421 356 319 267 290 289 277 266 283 232 251 270 205 148 165 181 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Projected Total Electricity Production (TWh) Projected Electricity Produced from Coal (TWh) Note: 1. Source: RUPTL PLN 2017-2026, Ministry of Energy and Mineral Resources of the Republic of Indonesia 15

Riau-1 Project General Information The Group to build, develop, maintain and operate a 2 x 300 MW mine-mouth coal-fired power plant project located at Riau Province (the Riau-1 Project ) together with its strategic partner(s) The Riau-1 Project is located in the the Province of Riau in Sumatera, to be connected to PLN s 275kV and 500kV distribution network The Riau-1 Project is listed on the state-sanctioned Electricity Supply Business Plan of PLN 1. The planned Commercial Operation Date for the Riau-1 Project is 2020 PT Samantaka Batubara ( PT SB ), a subsidiary of the Group, shall be the exclusive coal supplier to the Riau-1 Project 2. Designated as a mine-mouth scheme, the Riau-1 Project is located within 20 kilometers from PT SB s coal mine-site Typical term of power purchase agreement (PPA) with PLN is 25-30 years Note: 1. PLN (PT Perusahaan Listrik Negara (Persero)) is Indonesia s state-owned electricity company. The sole appointee of the Government to develop power projects in Indonesia 2. Pursuant to the Heads of Agreement signed on 15 September 2017 16

Riau-1 Project Location Planned location of the Riau-1 Project, relative to PLN s distribution network Riau- 1* Source: PLN s Electricity Supply Business Plan 2017-2026 17

Information on the Heads of Agreement PT SB has signed a Heads of Agreement to form a new consortium with PJB, a wholly-owned subsidiary of PLN, and CHEC (together, the Consortium ) on 15 September 2017 in relation to a project to construct, develop and operate the Riau-1 Project BOOT (Build-Own-Operate-Transfer) project for 2x300MW power plant units PJB shall procure its subsidiary, PT Pembangkitan Jawa-Bali Investasi ( PJBI ), to form a joint venture company together with BlackGold and China Huadian and collectively own equity interests in the Riau-1 Project (subject to the Consortium receiving award of the Riau-1 Project from PLN) PT SB, a wholly owned subsidiary of the Group, shall secure the exclusive rights to supply coal to the Riau-1 Project for the duration of the PPA i.e. up to 30 years at 3.6 million tonnes per year (total of 108,000,000 million tonnes). Planned location of regional power lines in vicinity of PT Samantaka Batubara mine pit RIAU 1 IPP Source: RUPTL PLN 2017-2026 18

Riau-1 Project Milestones 28 Dec 2015 Signing of a Consortium Agreement between PT SB and China Huadian 8 Jun 2017 Signing of a Term Sheet between PT SB with China Huadian 15 Sep 2017 Signing of a Heads of Agreement between BGNR 1, PJB 2, and China Huadian Note: 1. BlackGold Natural Resources Limited ( BGNR ) 2. PT Pembangkitan Jawa-Bali ( PJB ), PJB is a power generation company with the aim of promoting Indonesia s economic development by providing high-quality, reliable and sustainable energy supply. PJB is a wholly-owned subsidiary of PLN 19

Riau-1 Project Roadmap to Completion If successfully awarded the Riau-1 Project NO DESCRIPTION 1. The Assignment from PLN to PJB to develop, to build, operate and maintain Riau-1 Project 2. Signing Heads Of Agreement for Riau-1 Project 3. The requirements of procurement (TOR) 4. Submission of Riau-1 Project proposal 5. Award of Riau-1 Project Letter of Intent (LOI) 6. Establishment of a joint venture company for Riau-1 Project 7. Signing of 25-30 year, long-term, fixed offtake agreement with BlackGold's PT SB for the sale of coal to the Riau-1 Project 8. Signing of Power Purchase Agreement for Riau-1 Project 9. Financial Closing for Riau-1 Project 10. Commence construction for Riau-1 Project 20

Riau-1 Project Proposed Structure 中国华电科工集团有限公司 CHINA HUADIAN ENGINEERING CO., LTD. Coal Supply Agreement Project Company (2x300 MW Mine-mouth Power Plant) Power Purchase Agreement 21

Thank You 22 Photo for illustrative purposes only