Engineering (Signalling) Instruction S-60 Highway Grade Crossing Gate ESI Applicability. ARTC Network Wide

Similar documents
S-40EXIT RAILROAD HIGHWAY CROSSING GATE

S-40 RAILROAD HIGHWAY CROSSING GATE

S-20 RAILROAD HIGHWAY CROSSING GATE

S-60 HIGHWAY GRADE CROSSING GATE

PORSCHE V TO 32V CAM GEAR CONVERSION INSTRUCTIONS. For all 16V engines: USA 78-84, Euro

FORM NO GB Rev A OPERATOR S MANUAL MODEL NO & UP MODEL NO & UP REELMASTER 5100 CUTTING UNIT

THE 3597-FC-301 EXIT GATE MECHANISM FROM WESTERN-CULLEN-HAYES, INC. U.S. Patent 6,307,339

Tech Note Truck 14 & 15.5 Twin Plate Cast Iron Type Installation Guidelines

Grade Crossing Signaling Systems Products

INSTALLATION INSTRUCTIONS FOR DSP9600/9100 WHEEL BALANCER

Sentinel 250 Fire Hydrant

TIMING CHAIN COMPONENTS

Tools and Accessories

2005 Toyota Truck RAV4 2WD L4 2.4L (2AZ FE)

SERVICE PARTS LIST. 18 Volt Sawzall B58D BULLETIN NO CATALOG NO

SERVICE PARTS LIST. 18 Volt Sawzall STARTING SERIAL NO. B58B BULLETIN NO

SERVICE PARTS LIST SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS. 18 Volt Sawzall STARTING SERIAL NO. See note on page 3.

SERVICE PARTS LIST SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS. 18 Volt Sawzall STARTING SERIAL NO. Spindle (38) to be assembled

Recommended Installation Procedure (31 MARCH 2010) ATech Timing Belt Tensioner (979004) EA T 20 Valve Longitudinal Engine

SERVICE PARTS LIST. SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS M18 Sawzall STARTING SERIAL NO.

Certus Model 460 Turntable Manual. 25-Jun-2007

Tri-Spark Ignition System Installation Triple Cylinder TRI-0001

SERVICE PARTS LIST SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS. M18 Sawzall

Dresser TM Meters and Instruments Field Installation: Cartridge Replacement & Conversion; 1M/3M740/1480 HPC

ANDCO Eagle Actuator Instruction Manual

Model 10 Crossing Signal

Timer. TipTop Timers. Installation and Operation Manual

PLASTIC FOLDING ARM KIT This kit is designed for the 1600 model barrier gate operators only. Recommended for low headroom applications.

WARNING: Only perform this installation if you are experienced, fully equipped mechanic.

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate

OPERATOR S MANUAL R-Series Roust-a-Bout

E.P. (Extreme Pressure) & LUBRICITY TESTER OFI Part No

Grade Crossing Signaling Systems Products

and Original Series Pickup Lift Mounting Instructions Fullsize Nissan Titan Trucks present T-420 BOLT-ON GUSSET PART#5257

INSTALLATION GUIDE. Doc ID Revision

INSTALLATION AND OPERATION

TOYOTA TUNDRA SKID PLATE Preparation

LMPLC COOKSON OWNER'S MANUAL FDO A & B SOLID STATE INDUSTRIAL DUTY FIRE DOOR OPERATOR. B2/C2 Wiring 2 YEAR WARRANTY FDO 1/2 HP FDO A & B

UNION SERVICE SPECIFICATION NUMBER SU A

Level Crossing Light Crossarms

FULL HEIGHT ALUMINUM TURNSTILE DOUBLE UNIT AT-FAL SERIES I N STALLATION AND O P E RATING I N STRUCTIONS

Bthird, or power stroke by the expanding gases. As the

Electric motor testing

TOYOTA FJ CRUISER SKID PLATE Preparation

Preparing The Printer For Maintenance

Rusty s TJ Wrangler 3 Advanced Kit RK-300A-TJ INSTALLATION INSTRUCTIONS

M14 AUTOMOTIVE SPARK PLUGS AND WIRES CONVERSION KIT INSTALLATION INSTRUCTIONS

www. ElectricalPartManuals. com INSTRUCTIONS "INERTEEN AND OIL INSULATED FEEDER SWITCHES DESCRIPTION INSTALLATION MAINTENANCE

Rekluse Motor Sports. The z-start Clutch. Cannondale

SD Bendix Manual Slack Adjusters DESCRIPTION ADJUSTING MECHANISM OPERATION

TOYOTA TUNDRA SKID PLATE Preparation

SKF Flex Coupling Installation Instructions

Ocean Side-Feed Applicators

AUTO REWIND AIR HOSE REEL

THT-100 ASTG THT-100 ASTG2 Security Turnstiles. Installation, Operation and Maintenance Manual. 1 Rev

Model DFR 070/156/220 Rotary Actuator

INSTALLATION INSTRUCTIONS STUDIO S

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

REMOVING THRUST ASSEMBLY IN 90AD EXTRUDER

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

Recommended Installation Procedure ATech Timing Belt Tensioner and AUDI 2.0L 4V FSI & TFSI Engine (19 January 2015)

1. SUBJECT: Cyclic Trim System Cyclic Trim Assembly Kit for the Lateral and Longitudinal Trim Actuator Assemblies

MOREHOUSE INSTRUMENT COMPANY, INC. 60,000 LBS CAPACITY AIRCRAFT PART NUMBER SCALE S FORCE CALIBRATION PRESS PART NO.

STERNDRIVE UNIT 3 A DRIVE SHAFT HOUSING

Certus Model 450 Turntable Manual. 21- Dec- 2006

Valtek Auxiliary Handwheels and Limit Stops

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG

ichards MANUFACTURING COMPANY, SALES, INC. 517 LYONS AVENUE, IRVINGTON, NJ Phone Fax

CABINET REEL OPERATING INSTRUCTIONS

650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present

SL-6 & SL-6A. I UNION SWITCH & SIGNAL l[ml 645 Russell Street Batesburg, SC Service Manual Field and Shop Maintenance

EGR Performance Brakes Assembly Instructions DODGE DANA 70 '87 - '93 (Will not fit stock sized dual rear wheels)

INSTALLATION INSTRUCTIONS

S i. wp U-i >-;t(iw> - r^r? *. - * CHAPTER 5. CHASSIS

OWNER S MANUAL TRAIL BLAZERS

Fig.01 Fig.02 Fig.03. Disassembly & Reassembly Instructions SBV-HP - Page 3

Weistec CLK Black Series SUSPENSION

Wheeler Mfg. Div Rex Intl USA Inc Jefferson Road Ashtabula, OH Tel: Fax:

TRU-TIME CAM GEARS Dodge Neon Part number series

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION GUIDE

INSTRUCTION MANUAL. with ILLUSTRATED PARTS LIST. for TRAILER AND ACCESSORIES. Part Number (10,000 Pound Capacity)

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS

#92 DISC BRAKE ADJUSTMENTS # BRAKE MONITOR

INSTRUCTIONS FOR CONTINUED AIRWORTHINESS

TOYOTA im INTERIOR LIGHT KIT Preparation

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS SERVICE MANUAL

K81 Guardian Fire Hydrants. Operation & Maintenance Guide

INSTALLATION & OWNER S MANUAL

Table of Contents Visual Inspection and Neutralizing... 3 Disassembly

ASSEMBLY INSTRUCTIONS / OWNERS MANUAL AIR BIKE AB-1

Starting Systems & Traction Motor Systems. ATASA 5 th. ATASA 5 TH Study Guide Chapter 18 Pages Starting & Traction Motor Systems 62 Points

CROSBY SERIES 800 AND 900 OMNI-TRIM PRESSURE RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

Section Periodic Inspection and Lubrication (At First 25 Hours, First 50 Hours, First 100 Hours and Subsequently at 100-Hour Intervals)

Cybex Arc Trainer Owner s & Service Manual. 7 - Service

I-BFV.KIT Butterfly Valve Gear Operator Replacement

OPERATION & MAINTENANCE INSTRUCTIONS MODEL: TC-300

CM52 Network Protector with Arc Flash Reduction Module

ISO1000R Service Manual SALES: CUSTOMER SERVICE:

Transcription:

Engineering (Signalling) Instruction Applicability ARTC Network Wide Audience Main Points Amendment Record Signalling Engineers Installation and set up of the S-60 Crossing Gate First issue Signalling Maintenance Staff Maintenance of the S-60 Crossing Gate Scope This instruction is for Installation, Set up and Maintenance. It applies to all installed S-60 Highway Grade Crossing Gates. Background Poor set up and maintenance of the S-60 Barrier Mechanism can result in the barriers not descending as per requirement, barrier mechanisms must be accurately set up and maintained at all times. On loss of power, the booms should descend using gravity, but due to inconsistencies in setting up, the barriers can remain vertical. Irregularities in set up include but are not limited to: Vertical torque set lower than specified Horizontal torque set lower than recommended, and The upper buffer stop set to allow excessive over travel. Actions Installation and Set Up Preparation Action 1. Advise Network Controller before commencing work on equipment 2. Arrange worksite protection as necessary 3. Disable monitor 4. All work to be undertaken in accordance with environmental guidelines and procedures 5. Report environmental incidents or to get advice phone Enviroline 1300 550 402. Issued by Date Manager Standards 12 Apr 2013 Version 1.0 Date of last revision: 10 Apr 13 Page 1 of 8

Actions References S-60 Highway Grade Crossing Gate - Doc No. 074050 Installation & Maintenance config mgt. Recommended Battery and Wire Size 1. Check ohm reading of motor circuit should not be more than 0.1ohm Refer to Table 1 for recommended wire size 2. Check recommended battery size for gate arm length Refer to Table 2 for recommended battery quantities Section 4.2 Installation Procedure 1. Erect mast and base a. Junction box to be positioned on field side of post facing away from the barrier arms for both Invensys and GEC/United Group Cross arms. b. Mounting hole for front and back flashing lights will be on field side of post facing away from the barrier arms for both Invensys and GEC/United Group Cross arms 2. Mount support clamp on mast a. Support clamp casting to face 45 degrees from the field side towards track. b. Top of casting should be 130cm above top of foundation 3. Prepare mechanism a. Thread 90 degree flex conduit into back of gate cabinet b. Insert 4 square head machine bolts into slots on the back of cabinet. 4. Clamp mechanism in place a. Lift mechanism and set on top of the support. b. Clamp to mast with clamps, nuts and washers. 5. Install boom arm supports a. Mount gate arm supports with bolted on hubs over the keys on the main shaft ends. b. Install main shaft nuts and washers do not fully tighten until after installing conversion bracket. 6. Install arm coupling or conversion bracket a. Bolt to the arm support and fully tighten main shaft nuts. 7. Install flexible conduit a. Thread coupling into base and install conduit to base and rear of cabinet. 8. Mount flashing lights, bell and signs a. Refer to circuit book for detailing b. Mount the required signs Section 4.3 9. Connect power to mechanism Version 1.0 Date of last revision: 10 Apr 13 Page 2 of 8

a. Refer to circuit book for detailing b. Seal conduit opening c. For defroster wiring refer to manual. 10. Install counterweight stud plates a. Ensure the roller spacers are over the studs and in the arm support slot before mounting clamp bar and locking piece. 11. Install counterweights and gate arm as follows a. Install counterweights Install with the gate arm supports and counterweights with arm in the up position. See table 3 for number of counterweights b. Raise counterweights to horizontal using the Maintenance Switch c. Manual ratcheting of the mechanism can be accomplished using the Bi-directional Lock Bar on the motor pinion shaft. The Lock Bar needs to be installed to maintain horizontal position d. Install gate arm and Safetran shear bolts Refer to manual for quantity and positioning 12. Set horizontal torque and arm height a. Set horizontal torque to 200 ± 20 foot-pounds, b. Set arm height with horizontal buffer (upper position) 13. Raise and check vertical position of arm a. Adjust the vertical position by rotating contact cam #7 on the main shaft 14. Adjust the vertical buffer (lower position) a. Set to 8mm clearance from segment gear 15. Set vertical torque a. Determine vertical torque limits as per Table 3 16. Adjust descending time a. Recommended descend time is between 11-13 seconds. i. Adjust with Coarse Snub Fuse in the C position and R-29 Fine Snub Adjustment band in the lower (faster) position of the resistor. b. Re-check the descend time i. Move fuse to the left to increase or right to decrease descent time. c. Use the Fine Snub Adjustment resistor to fine tune desired descent time if required. Hand Cranking of Gate Mechanism 1. Prior to commencing hand cranking, disconnect the power by opening the test links (AREMA terminals 4 & 5) and the gold nut on the main PCB. Section 4.3.4 a. Place ratchet wrench with 7/16-inch socket over the hexagon shaft. The ratchet should be set in the direction to prevent its rotation backwards. b. Place the Lock Bar on the motor output shaft. Do not engage the Lock Bar with the Reaction Pin. Rotate the Lock Bar to move the gate. Once the gate is in position slide the Lock Bar over the Reaction Pin and secure in place using the Cotter Pin. Version 1.0 Date of last revision: 10 Apr 13 Page 3 of 8

Spring Buffer Adjustment 1. Check external adjustable spring buffers for horizontal gate arm positioning and vertical protection of the assembly. 2. Adjust the horizontal gate arm position - with arm horizontal a. Remove the buffer cap from the top buffer b. Loosen the locking ring and thread buffer into gate housing to raise the gate arm. 3. Adjust the vertical gate arm position buffer with arm vertical a. Remove the lower buffer cap b. Loosen the locking ring and adjust the buffer so that there is a 8mm clearance. c. Tighten locking ring and install buffer cover. Section 4.3.5 Counterweight Guidelines 1. Ensure correct counterweight and torque is applied for either fibreglass or Aluminium gate arms. Section 4.3.6 Refer to Table 3 Torque Adjustment (Using Spring Scale Pt# 073000-16 ) 1. Ensure correct horizontal torque is applied a. Follow horizontal Torque Adjustment as detailed below but replace Torque Wrench with Spring Scale. 2. Ensure correct vertical torque is applied a. Follow vertical Torque Adjustment as detailed below but replace Torque Wrench with Spring Scale. Spring Scale readings and locations are listed in the Torque Tables in table 3 Section 4.3.7 Torque Adjustment (Using Safetran Torque Wrench) (REFER TO CAUTION NOTE BELOW) 1. Ensure correct torque readings a. Torque wrench measurements to be taken from the ½ inch hexagon end of the motor shaft. 2. Ensure correct horizontal torque is applied a. Open the gate house cover and lower the gate to full horizontal position by opening the gate control gold nut TB-1. b. Once fully horizontal the gold test nuts on terminals 4 and 5 can be opened to remove all power to the PCB. c. Install the S60 Lock Bar orientated to keep the gate up and manually lift the gate arm around 5 degrees from horizontal. The lock bar will hold the gate in position. d. Place a 7/16-inch open-ended wrench on the extended motor shaft. Rotating the wrench slightly will enable the Lock Bar to be removed. e. Install the Safetran Torque Wrench to the pinion end of the motor shaft and slowly lower the torque wrench to rest against the cover. Record the torque value. f. Continue to take 5 more horizontal readings as follows: Section 4.3.8 Section 4.3.8.1 Version 1.0 Date of last revision: 10 Apr 13 Page 4 of 8

i. Rotate the brake end of the motor shaft slightly so the toque wrench can be removed ii. Rotate the torque wrench 60 degrees and reinstall iii. Lower the torque wrench to the cover edge and record the torque value iv. Repeat until 1 full revolution of the output shaft has been checked. v. The lowest reading recorded is the horizontal position. The use of a gate arm protection device may require a higher horizontal torque setting to keep the arm horizontal If done, add final checks of: i. Horizontal torque does not exceed 250 foot-pounds ii. iii. iv. Gate up current does not exceed 15 amps Snub adjustment provide acceptable descent time Vertical torque is within specified limits v. Increased gear and brush maintenance may be required. Clean gears and reapply AeroShell #7 or equivalent grease when signs of wear are evident. (MSDS for AeroShell 7 can be found in ChemWatch) 3. Ensure correct vertical torque is applied a. Make sure the torque wrench has been removed from the output shaft and the lock bar has been installed to keep the gate up. b. Close the test links on terminals 4 and 5 allowing the PCB to power up c. Close the Gold Nut on the PCB TB-1 and the gate should go to the vertical position. d. Once the gate is in the vertical position, remove power to the gate by first opening the test links on terminals 4 and 5 and then opening TB-1. The lock bar will hold the gate in the vertical position. e. Place a 7/16-inch open-ended wrench on the extended motor shaft on the brake end of the motor. Rotating the wrench slightly will enable the Lock Bar to be removed. f. Install the Safetran Torque wrench to the pinion end of the motor shaft and slowly lower the torque wrench to rest against the cover. Record the torque value. g. Take 5 more vertical torque readings by rotating the brake end of the motor shaft slightly until the torque wrench can be removed i. Then rotate the torque wrench 60 degrees and reinstall ii. iii. iv. Lower the torque wrench to the cover edge and record the torque value Repeat this until 1 full revolution of the output shaft has been checked. The lowest reading recorded is the vertical torque h. To make a vertical torque adjustment with the gate in the vertical position, reinstall the lock bar to keep the gate up, move the counterweights in or out to increase or decrease the torque and tighten the nuts i. Recheck the torque if needed but note that you just rotated the motor output shaft one turn and lowered the gate arm about 2 degrees. j. Remove the 7/16-inch wrench, torque wrench and lock bar and allow the gate to drop to horizontal by gravity. Section 4.3.8.2 Version 1.0 Date of last revision: 10 Apr 13 Page 5 of 8

k. Close the test links on the terminal board 4 and 5 and then close TB-1 and the gate should go to the vertical position. CAUTION COMMERCIALLY AVAILABLE TORQUE WRENCHES SHOULD NOT BE USED TO ADJUST HORIZONTAL AND VERTICAL TORQUES, AS THEY ARE NOT DESIGNED TO ACCOUNT FOR THE 240:1 GEAR RATION OF THE DRIVE TRAIN. (See type approval for Invensys Rail Torque Wrench Kit - part number 070981-X) Contact Adjustments 1. Ensure correct contact adjustments Refer to Table 4 a. Two contacts are required for gate operation (positions 6 & 7) and two contacts (positions 8 & 9) are factory adjusted and may be used as indicated in the table below. b. The contact opening can increase with use and should be checked periodically and adjusted if required. The openings should not exceed 1.5mm. c. Set the contact opening to where there is a light drag on a 1.5mm gauge. Always check contact operation after adjustment to be sure there is square contact and a good wiping action when the contact closes. d. Tension pressure of closed contact should be between 800g 1.3kgs. Section 4.3.10 Auxiliary (Sidewalk) Arms (if applicable) 1. Ensure correct Auxiliary Arm adjustment a. Lower the main gate arm to horizontal position. b. Loosen the four setscrews from the sidewalk arm gear c. Raise or lower the sidewalk Auxiliary Arm to the level horizontal position. d. Tighten the four cap screws e. Test the gate operation. Section 4.3.11 Final Inspection 1. Conduct a final inspection to ensure crossing barrier operates as per requirements Section 4.3.12 a. Voltage at terminal posts 4 & 5- Should be no less than 11 or more than 16 volts DC. b. Check for possible grounds. c. Check voltage and current during operation. i. Voltage should not drop below 11 volts during gate up cycle. ii. Gate up current should be 6-15 amps (longer arms require more current). Version 1.0 Date of last revision: 10 Apr 13 Page 6 of 8

iii. Power down current should be 6-15 amps. d. Check clearing and descending times. i. Clearing time varies with length of arm but should be between 6 and 10 seconds. ii. Descending time with power down is between 10 and 15 seconds. iii. Descending time without power down - Disable the power down circuit by blocking contact #6 with a plastic card and open Gold Test Link on PC Board. The descent time should not be more than 20 seconds. e. Check terminal board contacts. Check clearance, square contact and wiping action f. Brake air gap - using Air Gap Tools (part numbers 074070-C & 074070- D included within Maintenance & Installation Kit) verify air gap is no less than 4mm and no more than 5mm. Table 1 Distance from Battery Terminals to Mechanism Terminals Up to 18 meters (32 meters of wire) From 18 to 32 meters (64 meters of wire) Size of Soft Drawn Copper Wire to use 2.5mm 4mm Table 2 Gate Arm Length in Meters Number of Cells Lead Nickel Iron Nickel Cadmium Up to 7 6 9 9 7 to 12 7 11 11 Table 3 Fibreglass and Fiberglass/Aluminium Gate Arm Counterweights and Vertical Torque Counter weights mounted on one Support Arm Gate Arm Length in Meters Counterweight s Required Stud Plate 070757 Distanc e X in meters Std. Short Std. Short Min. (ft-lb) Scale Reading *1 Torque Range *1 Max. (ft-lb) Min. (ft-lb) 3.6 4.6 1 3-26X -30X 1.5 30 35 175 205 Max. (ft-lb) 4.8 6.1 2 5-26X -30X 1.5 35 37 175 210 6.4 6.7 3 7-26X -30X 1.5 35 38 175 210 7.0 8.2 4 10-26X -30X 1.5 38 46 190 230 8.5 9.8 5 10-26X -30X 1.8 39 44 235 260 Counter weights mounted on two Support Arm 10-11 6 13-26X(2) -30X(2) 2.1 41 48 260 300 11.2 12.2 7 17-26X(2) -30X(2) 3.0 34 38 300 350 *1 Safetran Torque Wrench (Calibrated for both inch-pound and foot-pound readings through the 240:1 gear reduction) The values listed above are approximate as there are differences between various Gate Arm Manufacturers Version 1.0 Date of last revision: 10 Apr 13 Page 7 of 8

Table 4 Terminal Board Position Number Contact Closed with Gate Arm at Function of Contact 6 70 degrees 90 degrees Power Down Control 7 0 degrees 89 degrees Power Up Control 8 83 degrees 90 degrees Spare (Flashing Light Control) 9 5 degrees 90 degrees Spare (Bell Control) Table 5: Tools supplied with each gate mechanism Description Part Number S-60 Maintenance & Installation Kit 074050-X Table 6: Additional tools required Description Part Number Invensys Rail Wrench Kit 070981-X Contact Spring Scale 073000-16 Maintenance Periodic Lubrication During the Signal maintenance inspection of the S-60 Level Crossing barrier equipment, the Signal Engineer or approved signal staff is to: 1. Ensure gears are coated with a thin film of all temperature grease (such as AeroShell 7) at 6 month intervals depending on the number of operations (MSDS for AeroShell 7 can be found ChemWatch) 2. Clean thoroughly and re-apply grease every two years or when signs of wear are present. Refer to section 5.3 of Doc No. 074050 Installation & Maintenance for detailing. Periodic Inspection During the Signal maintenance inspection of the S-60 Level Crossing barrier equipment, the Signal Engineer or approved signal staff is to: 1. Ensure air vents are unobstructed 2. Ensure flexible conduit between gate mechanism and junction box is sealed 3. Ensure an annual inspection of the brushes and commutator is conducted. Refer to section 5.4 and 5.5 of Doc No. 074050 Installation & Maintenance for details. Version 1.0 Date of last revision: 10 Apr 13 Page 8 of 8