BUCKET TRUCK SAFETY EQUIPMENT

Similar documents
Health, Safety, Security and Environment

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD STANDARDS

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD

SECTION 14: AERIAL LIFT PROGRAM

Section 27 Brieser Construction SH&E Manual

AERIAL LIFTS/MAN-LIFTS

Ground Controls. Cage Control Levers. 1) Cage/Platform 2) Cage Controls 3) Ground Controls Buttons. Ground Control Levers

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

Vehicle-mounted elevating and rotating work platforms 29CFR

Wind and Temperature Tip Over Hazard Do not add notice boards or similar

Nifty 120T (12043) Ground Controls. Cage Control Levers. 1) Cage/Platform 2) Cage Controls 3) Ground Controls Buttons. Ground Control Levers

GUIDELINES FOR THE USE OF SCISSOR LIFTS (ELEVATING WORK PLATFORMS) AND AERIAL BOOM LIFTS (EXTENSIBLE BOOM PLATFORMS)

Cranes and Derricks. Objectives. Construction Safety Lecture 18

Definitions. Exposed part. Live or energized part. De-energized part

Revision #: 14.4 Document #: Page: 1 of 5 Title: Mobile Aerial Work Platforms

PLATFORM WHEEL WELL ACCESS STAND

ELECTRICAL SAFETY-RELATED WORK PRACTICES

Powered Industrial Truck Safety Program

Aerial Lifts. Man-lifts are electric or air-powered compact lifts that allow units access through standard doorways and operation in narrow corridors.

Grease Stand MODEL# DF MAINTENANCE AND OPERATION MANUAL. Page 1

Energized Electrical Work

CLEARWATER FIRE & RESCUE TRAINING BUREAU

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

SAFETY GUIDANCE MATERIAL

OVERHEAD & GANTRY CRANE / RIGGING

Management Plan for Aerial Lifts (ANSI/SLA ) ISD #535

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

AVOIDING ELECTROCUTION HAZARDS

Maintenance and Operation Manual for Landing Gear Access Stand

Cranes. OSHA Office of Training & Education 1

Boom Lift Platform Capacity Reduction Manual. For Set Lighting Technicians and Studio Grips

Document Number: HSE May 1, 2014 LADDERS. Author: A Holland. Rev Date Rev # Description Revised By 05/01/14 1 Reformat A.

CRANE & HOIST SAFETY PROGRAM

CLEARWATER FIRE & RESCUE TRAINING BUREAU

Appalachian Power Company Policy No. 2 Cover Up Procedures. Policy Summary:

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

Forklift Safety Plan Contents: Forklift Safety Plan

shortform operating instructions

Important. Contents. Contact us: First Edition Third Printing. Operator's Manual

Industrial Truck (Forklift) Safety Program

ESSENTIAL SAFETY RESOURCES

Powered Industrial Trucks

STANDARD PRACTICE INSTRUCTION

Electrical Safe Work Practices

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Unqualified persons: People with little or no such training related to electrical equipment and safety.

SECTION 11 POWERED INDUSTRIAL TRUCKS

Work safely. Stowing The Digger. Digging

OSHA Update. Electric Power Generation, Transmission and Distribution Standard (Part 1910 & 1926)

Regulation Respecting Occupational Health and Safety. 1. Definitions: In this regulation, the following words and expressions mean:

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

shortform operating instructions

Work Platforms. Operators Manual Warning Stickers ANSI Standards. ( Model # MWP 4x4 ) ( Model # MWP 4x6 ) ( Model # MWP 4X8 ) ( Model # MWP 4x116 )

Provide a safe working environment, Govern operator use of heavy equipment, and Ensure proper care and maintenance of heavy equipment.

ROUGH TERRAIN VEHICLES

STANDARD PRACTICE INSTRUCTION

Crane & Derrick Operation Procedures for Construction

Table of Contents. GR-26J Part No Copyright 2010 by Terex Corporation

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

29CFR 1910 Subpart D Walking-Working Surfaces Ladders

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

PORTABLE LADDER SAFETY PROGRAM

The following material is Government of Prince Edward Island. Cap. O-1.01 Occupational Health and Safety Act PART 33

RUTGERS UNIVERSITY POWERED INDUSTRIAL TRUCK PROGRAM

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD STANDARDS

LIFTING/MOBILE EQUIPMENT CRANES AND DERRICKS. Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio (330)

Operator s Manual Z-45/25 Z-45/25J. DC Power Bi-Energy Power. ANSI/CSA North America South America Asia. AUS Australia. with Maintenance Information

Working in Proximity to Overhead Power Lines

Powered Industrial Truck Program SAMPLE. Procedure Revision History Number Date Approval

Fixed Ladder: A ladder that cannot be readily moved or carried because it is an integral part of a building or structure

shortform operating instructions

VP, Facilities and Construction Management

Technical Publications AWP. Operator's Manual. Fourth Edition, First Printing Part No

PAD-MOUNTED SWITCHGEAR INSPECTION & MAINTENANCE RECOMMENDATIONS TYPE PSI/II. 15kV 25kV. Qualified Persons

36CSR27 TITLE 36 LEGISLATIVE RULE BOARD OF COAL MINE HEALTH AND SAFETY SERIES 27 RULES AND REGULATIONS GOVERNING SURFACE AREAS

Big Ox Energy - Siouxland LLC. Safety Management System. Authority: President

AERIAL LIFT Revision Date: 04/2017

Surface Regulations and Policies

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED

ESSENTIAL SAFETY RESOURCES

Powered Industrial Trucks Workgroup The workgroup met on to discuss the applicability of the proposed rule for general industry on Powered

Operation of Fork Lift Trucks

WORKERS COMPENSATION (OCCUPATIONAL HEALTH AND SAFETY) AMENDMENT ACT, 1998

OSHA 29CFR 1910 Subpart D Walking-Working Surfaces Content

Important. Contents. Contact us: Operator's Manual. Eighth Edition Third Printing

29 CFR Material handling equipment

Important. Contents. Contact us:

Powered Industrial Vehicle Policy

NEW! CMC MODEL 83 HD+ ARBOR PRO

STANDARDS PRESENTATION Attachment No. 1 TO Page 1 of 6 CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD

CAL/OSHA ELECTRICAL LOW VOLTAGE

Chapter 5. Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI)

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program

Operator's Manual GS-2669RT GS-3369RT GS-4069RT. ANSI/CSA North America South America Asia. with Maintenance Information

CALIFORNIA STATE UNIVERSITY, LOS ANGELES LADDER SAFETY PROGRAM

Operator's Manual S-40 S-45 ANSI/CSA. North America South America. Asia. with Maintenance Information. Sixth Edition First Printing Part No.

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on

Owner s Manual, Operating Instructions Manual, and Replacement Parts Manual

Parts Manual. Operator's Manual Supplement. Special Supplement to Genie Industries Operator's Manual

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...

Transcription:

BUCKET TRUCK SAFETY EQUIPMENT Phone Number 800.222.4664 General Safety Guidelines - Safe Use of Bucket Trucks, Aerial Lifts) (Per OSHA Standard 1910.67, 1926.453) Definitions: An aerial device, by definition, includes any vehicle-mounted device, telescoping or articulating, or both, which is used to position personnel. An articulating boom platform, by definition, is an aerial device with two or more hinged boom sections. An extensible boom platform, by definition, is an aerial device (except ladders) with a telescopic or extensible boom. Telescopic derricks with personnel platform attachments are considered to be extensible boom platforms when used with a personnel platform. A mobile unit, by definition, is a combination of an aerial device, its vehicle, and related equipment. A platform, or elevated platform, by definition, is any personnel-carrying device (basket or bucket) which is a component of an aerial device. A vehicle, by definition, is any carrier that is not manually propelled. A vertical tower, by definition, is an aerial device designed to elevate a platform in a substantially vertical axis. General Use Requirements: ANSI/SIA A92.5-1992 (Boom Supported Elevating Work Platforms), including Appendix items, specify the design and construction requirements for aerial lift devices. Aerial lift devices are used to elevate personnel to job sites above the ground. These include extensible boom platforms, aerial ladders, aerial ladder trucks, articulating boom platforms, vertical towers, and any combination of these devices. Aerial lift devices may be constructed of metal, wood, fiberglass, reinforced plastic (RFP), or other materials. Aerial lift devices may be "field modified" for use other than those intended by the manufacturer, provided the modification has been approved, in writing, by the manufacturer or by an equivalent authority, such as a nationally recognized testing laboratory, to be in conformity with ANSI/SIA A92.5-1992 requirements, to be at least as safe as the equipment prior to modification. Aerial lift devices and personnel working near electrical power lines must meet the requirements contained in the OSHA Standard 1910.333 (c) (3), Subpart S-Electrical, Selection and Use of Work Practices (e.g. de-energizing procedures; grounding overhead lines; required work distances relative to overhead electrical power lines; unqualified and qualified employees working in the vicinity of overhead electrical power lines; and vehicular and mechanical equipment in the vicinity of overhead power lines). See OSHA Standard 1910.333 (c) (3) for details. General Aerial Lift Device Use Practices Include:: On ladder trucks and tower trucks, secure aerial ladders in the lower traveling position by locking the device on top of the truck cab, and the manually operated device at the base of the ladder prior to moving the truck. Insure outrigger devices (if equipped) are properly stored prior to moving. Set the brakes and position the outrigger devices (if equipped) on pads or similar solid surfaces and install the wheel chocks before using aerial lift equipment (especially on inclines). MAB@Telcominsgrp.com Page 1 of 6 www.telcominsgrp.com

Do not move aerial lift trucks with employees located in the elevated work boom position, except for equipment specifically designed or certified as "field modified" for this type of operation. Insure that aerial lift devices equipped with working elevated platforms contain both elevated platform (upper) and lower controls. Upper controls are located in or beside the elevated platform, within easy reach of the operator. Lower controls are designed to override the upper controls. Check to be sure that controls are plainly marked as to their function. Test lift controls each day prior to use to insure safe working conditions. Insure loads and distribution on working platforms and platform extensions are in accordance with manufacturer's rated capacity and do not exceed rated load limits. Affix stickers to vehicle that indicate manufacturer's rated load capacity of the working elevated platform and/or elevated platform extensions. Insure all personnel in the working elevated platform are wearing appropriate personal protective devices at all times (e.g. hard hats to protect from overhead falling objects, being struck with nearby objects, struck by flying objects; safety shoes/boots; goggles/safety glasses with side shields/hard hat with shield; gloves; other protective clothing). Insure that each employee uses an appropriate body belt/harness and lanyard device attached to the boom or basket or other appropriate passenger device as fall protection when working from an aerial lift device. Insure that only trained and authorized employees operate aerial lift devices. Keep feet firmly on the floor of the basket or elevated platform at all times. Do not sit, climb or position yourself on the edge of the basket or elevated platform. Do not use planks, ladders or other devices as substitute work positions. Do not operate lower controls unless permission has been obtained from the employee(s) in the elevated platform, except in case of an emergency. Do not position the aerial lift device against another object to steady the elevated platform. Do not use aerial lift devices as a crane or other lifting device. Do not operate aerial lift devices from trucks, scaffolds, or similar equipment unless approved in writing by the manufacturer. Limit travel speeds of aerial lift devices according the conditions of the ground surface, congestion, visibility, slope, location of personnel and other factors that may cause hazards to other nearby personnel. Shut down the aerial lift device engine prior to fueling. Fuel engines or charge fuel cylinders in well ventilated areas free of flames, sparks or other hazards which may cause fires or explosions. Charge batteries in well ventilated areas free of flames, sparks or other hazards which may cause fires or explosions. Be sure to maintain a clear view of the path of travel, maintain a safe distance from other obstacles, debris, drop offs, holes, depressions, slopes and other hazards. Maintain a safe distance from overhead obstacles (including overhead electrical power lines). Stunt driving and horseplay are prohibited. Do not position booms and elevated platform devices in an attempt to jack the wheels off the ground. Do not operate aerial lift devices on grades, side slopes or ramps that exceed the manufacturer's recommendations. If elevated platforms or elevated work areas become caught, snagged or otherwise do not operate MAB@Telcominsgrp.com Page 2 of 6 www.telcominsgrp.com

properly, remove personnel from the platform prior to freeing the elevated platform using ground controls. Do not alter the insulated portion of an aerial lift device in any manner that might reduce its insulating effectiveness. Insure the area surrounding the elevated platform is clear of personnel and equipment prior to lowering the elevated platform. Perform inspections of aerial lift devices per manufacturer's, ANSI/SIA and other regulatory agency schedules. Make repairs immediately. Do not operate aerial lift devices with noted, reported deficiencies until repairs are made and equipment is authorized for use. Perform electrical system safety tests on aerial lift devices per ANSI/SIA A92.5-1992 requirements. Inspect hydraulic and pneumatic system components (Bursting Safety Factor) on aerial lift devices per ANSI/SIA A92.5-1992 requirements. Conduct welding operations on aerial lift devices per Automotive Welding Society (AWS) Standards. Training - Employees Using Aerial Lift Devices will be trained in: Employees authorized to use aerial lift devices will receive training in accordance with manufacturer's operating instructions and routine maintenance requirements (as appropriate) prior to actual operation. Employees authorized to use aerial lift devices will receive hands-on training on the actual aerial lift device (or duplicate model) he/she will be expected to operate prior to actual use. Training will be under the direction of a qualified, competent individual capable of determining an employee's proficiency and knowledge and actual operation of the aerial lift device. Only properly trained and authorized employees are permitted to operate aerial lift devices. Employees will be given and display, when requested, cards, certificates or other form of identification that denotes successful completion and authorization to operate specific aerial lift devices. Records Retention: Departments will retain initial employee training records for individuals authorized to operate specific aerial lift devices for a minimum of 3 years. Subsequent refresher and other specialized training records will be maintained for a similar period. Previous employee training records may be replaced with copies of subsequent and other specialized training records. Departments will retain written records of initial and subsequent inspections performed on each aerial lift device for a minimum of 3 years. Subsequent inspection records will be maintained for a similar period. Previous inspection records may be replaced with copies of subsequent inspection records. Departments will retain written records of repairs performed on each aerial lift device for a minimum of 3 years. Records will include the date of repair, a description of the work accomplished and identification of persons performing the repair. Previous repair records may be replaced with copies of subsequent repair records. MAB@Telcominsgrp.com Page 3 of 6 www.telcominsgrp.com

Departments will retain written records of all paperwork in connection with authorized "field modifications" made with respect to specific aerial lift devices. (Revised 10/22/2001) Attachment OSHA Standard 29 CFR 1910.333 (c) (3) - Subpart S - Electrical, Selection and Use of Work Practices: (c)(3) "Overhead lines." If work is to be performed near overhead lines, the lines shall be de-energized and grounded, or other protective measures shall be provided before work is started. If the lines are to be de-energized, arrangements shall be made with the person or organization that operates or controls the electric circuits involved to de-energize and ground them. If protective measures, such as guarding, isolating, or insulating, are provided, these precautions shall prevent employees from contacting such lines directly with any part of their body or indirectly through conductive materials, tools, or equipment. Note: The work practices used by qualified persons installing insulating devices on overhead power transmission or distribution lines are covered by 1910.269 of this Part, not by 1910.332 through 1910.335 of this Part. Under paragraph (c)(2) of this section, unqualified persons are prohibited from performing this type of work. (c)(3)(i) "Unqualified persons." (c)(3)(i)(a) When an unqualified person is working in an elevated position near overhead lines, the location shall be such that the person and the longest conductive object he or she may contact cannot come closer to any unguarded, energized overhead line than the following distances: (c)(3)(i)(a)(1) For voltages to ground 50kV or below - 10 feet (305 cm); (c)(3)(i)(a)(2) For voltages to ground over 50kV - 10 feet (305 cm) plus 4 inches (10 cm) for every 10kV over 50kV...1910.333(c)(3)(i)(B) (c)(3)(i)(b) When an unqualified person is working on the ground in the vicinity of overhead lines, the person may not bring any conductive object closer to unguarded, energized overhead lines than the distances given in paragraph (c)(3)(i)(a) of this section. MAB@Telcominsgrp.com Page 4 of 6 www.telcominsgrp.com

Note: For voltages normally encountered with overhead power line, objects which do not have an insulating rating for the voltage involved are considered to be conductive. (c)(3)(ii) "Qualified persons." When a qualified person is working in the vicinity of overhead lines, whether in an elevated position or on the ground, the person may not approach or take any conductive object without an approved insulating handle closer to exposed energized parts than shown in Table S-5 unless: (c)(3)(ii)(a) The person is insulated from the energized part (gloves, with sleeves if necessary, rated for the voltage involved are considered to be insulation of the person from the energized part on which work is performed), or (c)(3)(ii)(b) The energized part is insulated both from all other conductive objects at a different potential and from the person, or (c)(3)(ii)(c) The person is insulated from all conductive objects at a potential different from that of the energized part. TABLE S-5 - APPROACH DISTANCES FOR QUALIFIED EMPLOYEES - ALTERNATING CURRENT Voltage range (phase to phase) Minimum approach distance 300V and less... Avoid Contact Over 300V, not over 750V...1 ft. 0 in. (30.5 cm). Over 750V, not over 2kV...1 ft. 6 in. (46 cm). Over 2kV, not over 15kV...2 ft. 0 in. (61 cm). Over 15kV, not over 37kV...3 ft. 0 in. (91 cm). Over 37kV, not over 87.5kV...3 ft. 6 in. (107 cm). Over 87.5kV, not over 121kV...4 ft. 0 in. (122 cm). Over 121kV, not over 140kV...4 ft. 6 in. (137 cm)...1910.333(c)(3)(iii) (c)(3)(iii) "Vehicular and mechanical equipment." (c)(3)(iii)(a) Any vehicle or mechanical equipment capable of having parts of its structure elevated near energized overhead lines shall be operated so that a clearance of 10 ft. (305 cm) is maintained. If the voltage is higher than 50kV, the clearance shall be increased 4 in. (10 cm) for every 10kV over that voltage. However, under any of the following conditions, the clearance may be reduced: MAB@Telcominsgrp.com Page 5 of 6 www.telcominsgrp.com

(c)(3)(iii)(a)(1) If the vehicle is in transit with its structure lowered, the clearance may be reduced to 4 ft. (122 cm). If the voltage is higher than 50kV, the clearance shall be increased 4 in. (10 cm) for every 10 kv over that voltage. (c)(3)(iii)(a)(2) If insulating barriers are installed to prevent contact with the lines, and if the barriers are rated for the voltage of the line being guarded and are not a part of or an attachment to the vehicle or its raised structure, the clearance may be reduced to a distance within the designed working dimensions of the insulating barrier. (c)(3)(iii)(a)(3) If the equipment is an aerial lift insulated for the voltage involved, and if the work is performed by a qualified person, the clearance (between the uninsulated portion of the aerial lift and the power line) may be reduced to the distance given in Table S-5. (c)(3)(iii)(b) Employees standing on the ground may not contact the vehicle or mechanical equipment or any of its attachments, unless: (c)(3)(iii)(b)(1) The employee is using protective equipment rated for the voltage; or..1910.333(c)(3)(iii)(b)(2) (c)(3)(iii)(b)(2) The equipment is located so that no uninsulated part of its structure (that portion of the structure that provides a conductive path to employees on the ground) can come closer to the line than permitted in paragraph (c)(3)(iii) of this section. (c)(3)(iii)(c) If any vehicle or mechanical equipment capable of having parts of its structure elevated near energized overhead lines is intentionally grounded, employees working on the ground near the point of grounding may not stand at the grounding location whenever there is a possibility of overhead line contact. Additional precautions, such as the use of barricades or insulation, shall be taken to protect employees from hazardous ground potentials, depending on earth resistivity and fault currents, which can develop within the first few feet or more outward from the grounding point. MAB@Telcominsgrp.com Page 6 of 6 www.telcominsgrp.com