CONTENTS. 1.0 Scope. 2.0 Short term storage procedures. 2.1 Indoor storage 2.2 Outdoor storage. 3.0 Long term storage procedures

Similar documents
STANDARD PROCEDURE FOR STORAGE OF ACCO SPEEDWAY & WORK-RATED ELECTRIC WIRE ROPE HOISTS AS RECOMMENDED BY ACCO MATERIAL HANDLING SOLUTIONS

Trimline Car and Sling

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

E L E C T R I C WIRE ROPE H O I S T S

Installation Instructions

LB LB LLY LLY 1000

Installation Instructions

ELECTRONIC OVERHEAD TRAVELLING CRANE DIMENSIONS & LOAD DATA

Installation Instructions

FUME HOOD. Installation and Operations Manual

LEAD ACID BATTERY CHARGER

A. VEHICLE INSPECTION PROCEDURE

Installation Instructions

305 Series Can Tumblers Operator s Manual for Morse Can Tumblers 305 Series

DETAIL SPECIFICATION SHEET

Installation Instructions

STRIP-TEC WIRE STRIPPER

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

Spare Parts, Instruction and Maintenance Manual for SPANCO Model 301 Jib Cranes

OIL CAPACITIES FOR SERIES HP APPROXIMATE CAPACITIES IN QUARTS AND GALLONS

GENERAL PURPOSE MIXERS

Installation Instructions

HANDY GATE ASSEMBLY, INSTALLATION AND OPERATING INSTRUCTIONS

GE Industrial Solutions. DEH Installation and Maintenance Manual AKD-20 AR / Entellisys AR Exhaust Plenum System

Installation Instructions

! WARNING! WARNING. Dock Boxes Unlimited, Inc. strongly recommends that these products be installed by a qualified electrician.

If you have any questions with respect to this policy, please call Skyjack at You may any questions to

Transformer Installation, Operation, and Maintenance Manual

RH Electric Wire Rope Hoists

4-SIDED HOCKEY SCOREBOARD LED BAR DIGIT INSTRUCTION MANUAL REVISION DATE: PART#:

ECO# 1801 REVISION# 000 ES DATE

Technical Manual. DLM Module. This manual should remain with the unit.

Installation Instructions

Installation Instructions

Model APS 3B Snow and Ice Melting Control

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Installation Instructions

Please visit for the latest version of these installation instructions.

Installation Instructions

SEPARATOR PURGE KIT OPERATION & MAINTENANCE MANUAL

DEINES MANUFACTURING CORPORATION

Installation manual. Rear traction bars. Ram Ram Part # Part # Important customer information:

SCHEDULED MAINTENANCE SERVICE PROGRAM

Installation manual. Rear ladder bars. Chevy/GMC 2500/3500 HD. Part # Part # Important customer information:

Lbs Kgs Ft M

COMPACT GLYCOL FEED SYSTEMS OPERATION & MAINTENANCE MANUAL

201 Series Portable Drum Rotators Operator s Manual for Morse Portable Drum Rotators

Installation Instructions

Important Operating Instructions and Warranty Information On Your New Electronic AMSEC Safe

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

BX Jeep Liberty Renegade 2012 Jeep Liberty Sport Installation Instructions

Installation manual. Front leveling kit. Part # Part # Important customer information: Ram WD Ram WD

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

LEAK TEST PROCEDURE MRT4-DC LIFTERS SINGLE VACUUM SYSTEMS TESTING AND MAINTENANCE MUST BE DONE BY A QUALIFIED PERSON KEEP FOR FUTURE REFERENCE

Instructor Guide. 215: Elevator: Mechanical Drive Systems Module 3: Gearless Drive Systems

H-SERIES HOPPERS Instruction Manual

HAMMERHEAD PATENTED PERFORMANCE, INC.

SILVERLINE OVERLOAD LIMITER FOR OVERLOAD SAFETY OF CRANE

Installer s Manual. PCO/UV N-Duct Model

Installation Instructions

Ride Rite Warranty Evaluation Guide

Users Manual Certified Series Direct Drive Pump 1-7 LPM

Pro Dunk Goal Light LED OWNER S MANUAL

Chicane Coilover Kit For '64 to '72 Chevelle/ A Body. Installation Instructions

2018 MODEL-EXPEDITION MAX PREMIUMCARE LIMITED WARRANTY

JBL VTX-V20-DF SUSPENSION MANUAL

Owner s Guide ca4054 ca4554

Installation Instructions

Grommet pullers Soapy water Safety glasses Torque Wrench

Installation Manual. 3 suspension system Toyota Tacoma 4WD & 2WD prerunner. Part # Part # Important customer information:

Commercial Plan Submittal Form Utility Service Requirements

Owner's/Installation Manual

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

Nuheat WEATHER-READY HEAT TRACE PIPE FREEZE PROTECTION SYSTEM. Self-Regulating Heating Cable Installation Guide. UV Resistant Polyolefin Outer Jacket

KEEP FOR FUTURE REFERENCE POWER TRANSFORMER READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

Outdoor Nema Enclosure For Dotworkz CoolDome Power Supply Product Code: NM-CDPS. User Manual

Installation, Operation and Maintenance. VA(M)S24-27 (T)-T Series Actuator

YALE MOTOR DRIVEN TROLLEYS. For 1/2 thru 15 ton YALE Wire Rope Electric Hoists

INSTALLATION AND OPERATION

OVERHEAD & GANTRY CRANE / RIGGING

Please visit for the latest version of these installation instructions.

Please visit for the latest version of these installation instructions.

MY-TE. OPERATION and MAINTENANCE. Winch and Hoist. Provided by: Model AC 36B OF MAX AC VOLT AC

Low Loader Trailer Manual

Installation Instructions

Fire Curtain Hoist. (Part No P) Maintenance Manual IMPORTA T SAFETY I FORMATIO... 2 PRODUCT USE REQUIREME TS... 3 MAI TE A CE SCHEDULE...


COOL DRAFT INSTRUCTIONS OWNER S MANUAL CONTENTS. Cool Draft MiniMister 14 Misting Fan CDMP1420BLU

feeder Vibratory feeder

1500 Hour PM Inspection

VERDUZCO INDUSTRIAL Group appreciates your preference when you purchase our products.

Open Frame Gas/Diesel Engine Driven Rotary Screw Compressor. Installation Guide

Please visit for the latest version of these installation instructions.

SPECIFICATIONS OF SINGLE GIRDER UNDER SLUNG E.O.T. CRANE CAPACITY: 5 MT

THIS IS A HIGH PERFORMANCE PRODUCT - USE AT YOUR OWN RISK!!!

Installation manual. 2 front / 1 rear spacer kit Jeep Wrangler JK 2 & 4 door Part # 42005

Please visit for the latest version of these installation instructions.

NECO Pumping Systems

Transcription:

STANDARD PROCEDURE FOR STORAGE OF ELECTRIC HOISTS Revision: August 25, 2011

CONTENTS 1.0 Scope 2.0 Short term storage procedures 2.1 Indoor storage 2.2 Outdoor storage 3.0 Long term storage procedures 3.1 Indoor storage 3.2 Outdoor storage 4.0 Extension of Warranty after long term storage 4.1 Recertification after long term storage 4.2 Access to equipment for on-site inspection 4.3 Rework required for recertification 4.4 Purchase order and billing information in connection with on-site inspection. 4.5 Lead time requirement for on-site inspection. 5.0 Commissioning after short term storage 5.1 Examination of equipment after short term storage 6.0 Commissioning after long term storage. 6.1 Revalidation of Warranty after long term storage 6.2 Preliminary inspection check list. 7.0 Installation of Hoist 7.1 Installation after preliminary inspection 7.2 Testing after installation 2

1.0 SCOPE This procedure covers the following: (a) Storage of electric powered hoists in the field, both short term (365 days or less) to a maximum time limit of 1000 days. (b) Extension of warranty after prolonged storage. (c) The commissioning procedure at the time the equipment is put into service. 2.0 SHORT TERM STORAGE PROCEDURES 2.1 Indoor Storage: When indoor, heated space is available, no special storage procedures are necessary. 2.1.1 Other equipment shall not be stacked on the hoist crate. 2.2 Outdoor Storage Storage outdoors is not recommended and will void the product warranty. 3.0 LONG TERM STORAGE PROCEDURES 3.1 Indoor Storage: Refer to paragraph 2.1 and 2.1.1. 3.1.1 We suggest that prior to going into storage that wire rope hoists be un-reeved with the cable stowed loose in a large coil. 3.1.2 Lubricate control enclosure hinges, equalizer sheave pins as well as all other areas which can oxidize with lubricants recommended in the Parts and Service Manual. Chain shall be lubricated per the manual and bagged to prevent corrosion. Frequency will be determined by ambient conditions. 3.1.3 Protect all exposed, machined, unpainted surfaces with cosmoline or similar type of protective coating. This procedure should be repeated as often as necessary to prevent oxidation. 3.1.4 For oil filled gear cases, fill hoist gear case with the correct lubricant as specified in the Parts and Service Manual. Hoist gear case breather plug should be taped closed for the duration of the storage period. 3.2 Outdoor Storage: Storage outdoors is not recommended and will void the product warranty. 3

4.0 EXTENSION OF WARRANTY AFTER LONG TERM STORAGE 4.1 Recertification after long term storage: Equipment that has been in storage for more than 365 days will have to be recertified by Columbus McKinnon or their representative before the extension of the warranty commences. 4.2 Access to equipment for on-site inspection: It shall be the responsibility of the dealer or user to provide easy access to the equipment during the inspection. In extreme cases, this may require removing the equipment from its permanent mountings. Expense of removal and reinstallation of the equipment will be borne by the dealer or user. 4.3 Rework required for recertification: Any work performed on the equipment is the responsibility of the dealer or user. Columbus McKinnon can recommend local qualified service organizations. Equipment will be shipped to the point of rework, freight prepaid and returned to the dealer or user, freight collect or prepaid and charge. 4.4 Purchase order and billing information regarding on-site inspection: Before a Service Rep will be dispatched, it will be necessary to have a valid purchase order to cover the inspection. Charges will include labor at the rate in effect at the time of inspection, plus all expenses (room and board, air fare, auto rental fee, telephone, etc.) associated with the inspection. 4.5 Lead time requirement for on-site inspection: Columbus McKinnon requires a minimum of 2 weeks notice to arrange for factory representation on the job site to perform an inspection. 4

5.0 COMMISSIONING AFTER SHORT TERM STORAGE 5.1 Examination of equipment after short term storage: Following short term storage the hoist should be visually examined for signs of oxidation or other damage. If no discrepancies are noted, installation may proceed in accordance with procedures outlined in the installation manual that accompanies the hoist. 5.1.1 If any discrepancies are found, we suggest you contact the Columbus McKinnon Service Department for information on how to proceed. 6.0 COMMISSIONING AFTER LONG TERM STORAGE 6.1 Revalidation of warranty after long term storage: Refer to section 4.0 for information regarding on-site inspection of the equipment to revalidate the warranty. 6.2 Preliminary inspection check list: It is suggested the dealer or user perform the following checks before calling for on-site inspection. 6.2.1 Visually inspect the equipment for signs of damage or oxidation. If none is noted, proceed to 6.2.2. If discrepancies are found, contact the Columbus McKinnon Service Department for information on how to proceed. 6.2.2 For oil filled gear cases, drain gear case completely and refill with fresh oil as specified in the hoist parts and service manual and remove tape from hoist gear case breather plug. Lubricate all other lube points on the hoist. 6.2.3 Inspect all motors for signs of moisture or moisture damage. 6.2.4 Inspect all electrical enclosures for signs of moisture or moisture damage. All contactors and relay tips, both moving and stationary should be inspected for signs of damage or deterioration at this time. 6.2.5 Inspect electrical cords for signs of damage or deterioration. 6.2.6 Elevate hoist and apply temporary power. For wire rope hoists, load hoist cable onto rope drum and complete reeving of hoist, setting upper and lower limits as required. Consult parts and service manual for reeving diagram and instructions This step may be deferred until after the hoist has been installed on its permanent place, but should be accomplished beforehand to simplify the procedure. 5

7.0 INSTALLATION OF HOIST 7.1 Installation after preliminary inspection: After completing the preliminary inspection as outlined in paragraph 6.2.1 through 6.2.5, the equipment is ready for installation in accordance with the procedures in the installation manual which accompanies the hoist. 7.2 Testing after installation: After completion of installation and wiring, hoist shall be tested. Functional (unloaded) with load of rated capacity and proof load (minimum 125% capacity, maximum 150% capacity). After testing has been completed satisfactorily, hoist will be considered installed and warranty will commence on that date. End of document 6