SS-LVC THERMOSTATIC MODEL Serial No. LV and higher ½ top inlets INSTALLATION INSTRUCTIONS

Similar documents
SS-PAM PRESSURE ACTUATED MIXER Serial No. PGS0001 and higher ½ top inlets INSTALLATION INSTRUCTIONS 7 6

INSTALLATION ADJUSTMENT SERVICE HIGH-LOW MANIFOLD SYSTEMS TM , 8015, 12520, PRV

THREE-VALVE BATH & SHOWER Cast Brass Body

INSTALLATION INSTRUCTIONS

Installation Instructions for Pressure Balancing Valve Set with Volume Control. Limited Lifetime Faucet Warranty

INSTALLATION INSTRUCTIONS

J Flow Controls Model Numbering

Installation Guidelines

FOR TECHNICAL ASSISTANCE

Central Brass REPLACEMENT PARTS. MODEL NOS Three-Valve Bath & Shower Fitting Direct Sweat 8-inch Centers

INSTALLATION INSTRUCTIONS

Installation For Service Only

INSTALLATION INSTRUCTIONS

Installation Guidelines

Installation Instruction for Valve: DFPHY.ID Trim Application: Pressure Balance Tub & Shower

Supplies Required. Teflon Tape Allen Key Wrenches Screwdriver 1/2" NPT Brass Pipe Plug Adjustable Wrench IMPORTANT!

Installation Guide. Single-Control Bath and Shower Trim A K K K 12021

Lucetta. Shower-Hand Shower System, 4605 / 4600 Installation and Service Instructions. Visual Guide Lucetta Shower-Hand Shower System, 4605 (4600)

Installation Instructions

INSTALLATION INSTRUCTIONS

PILLOWS DECK-MOUNT BATH FAUCET WITH FLUME SPOUT

1 - S-2251 Showerhead 6 - S-2288 Showerhead AP - Anchor Plate (S-2280 Showerhead Only)

DYNAFLUID 2000 STEAM & WATER MIXING VALVE INSTALLATION & OPERATING MANUAL

SLM - Sealing Liquid Monitor INSTRUCTIONS FOR USE

Dia. S Shower Valve System. S-3500TS-X... Valve includes stops. Arm and flange 300S. Screwless escutcheon kit RTS-011, brass RTS-012, plastic

INSTALLATION MANUAL IMPORTANT CONSIDERATIONS TECHNICAL INFORMATION. Tools you may need

Dia. Installation and Service Instructions. Tub-Shower Systems 3520-B, 3521-B, 3522-B Series

RISER PIPE, SHOWER ARM, ADJUSTABLE BRACKET & 2 WAY RISER DIVERTER ASSEMBLIES INSTALLATION GUIDE

Installation Instructions To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin.

SB-1821-E. Instructions for Models: What You Need To Know: Tools: Required: Need Help? For additional assistance or service call: Helpful:

Degas. Installation and Service Instructions. Tub-Shower Systems S-5400, S-5401, S-5402 Series

INSTALLATION MANUAL IMPORTANT CONSIDERATIONS TECHNICAL INFORMATION. Tools you may need

FIREFLO - MODEL F-06 INSPECTION, INSTALLATION & MAINTENANCE MANUAL. Item No.s/Description

DISCONTINUED. Installation. Aerada 900 Series Futura Faucet. With Accu-Zone (AZ) Infrared Control

Instructions for INSTALLATION -- OPERATION -- MAINTENANCE of the SELAS AIR/GAS BLENDER VALVE. (for PROPANE/AIR, BUTANE/AIR AND OTHER BLENDS)

Finding Top Center Position for No. 1 Piston. Set The Top Center Position By Temporary Marks On Type 1 Engines and 9RM Engines

INSTALLATION INSTRUCTIONS

ZTM AND ZTMB ZENNER TURBINE METERS INSTALLATION, MAINTENANCE AND SERVICING

Installation Guidelines

INSTALLATION INSTRUCTIONS

WARNING DYNABRADE. Air Powered Abrasive Belt Machine

INSTALLATION & SERVICE INSTRUCTION MANUAL W.A. KATES FLOW CONTROLLERS FC VALVE MODELS E THRU M

Installation Instructions

KLINGER Piston Valves KVN DN PN 16 I/III with valve ring KX-GT Modul

S-9100, S-9200, S-9300, S-9400, S-9700, S-9800

Basin Set INSTALLATION INSTRUCTIONS

CONTROL VALVES SINGLE PORTED CLASSES DL, DDL, DOS, DDOS

WARNING Carefully Read These Instructions Before Use

RSV16 Retro-Fit Cartridge Acorn Controls SV16 Valve Cartridge

Installation Instructions

Installation Instructions

Degas Shower Valve System 5400-X... Valve includes stops 5400-TRM... Trim only

Maintenance Information

3.0 CHARACTERISTICS E Type CO-4 Step-Time Overcurrent Relay

Fisher 1061 Pneumatic Piston Rotary Actuator with Style H & J Mounting Adaptations

Table of Contents Visual Inspection and Neutralizing... 3 Disassembly

Serie 2003/2013. Three-way Control Valve, mixing/diverting. Wörth am Main. Service. Control Valve Division

LIMITED WARRANTY. Exposed Urinal Flushometer for 1-1/4" Top Spud MODEL 180 Exposed Urinal Flushometer for 3/4" Top Spud MODEL 186

INSTALLATION INSTRUCTIONS

Deck-Mounted Bath Set with Diverter

Installation Instructions 1662SG SG.223

Maintenance Information

I & M 8000 Series. Ideal Installation Schematic. Preferred Installation. Trouble Shooting

INSTALLATION, OPERATION & SERVICE INSTRUCTIONS

INSTALLATION/OPERATION/MAINTENANCE INSTRUCTIONS FOR ARCHON MODELS WD2010L, WD2010, WD2010H WASHDOWN STATIONS. ARCHON Industries, Inc.

Disassembly and Assembly

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Mounting and Operating Instructions EB 8135/8136 EN. Series V2001 Valves Type 3535 Three-way Valve for Heat Transfer Oil

Installation Instructions 1662SG SG.222

Diaphragm Valves Type 15

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR INSTRUMENT ISOLATION VALVE

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 13 Engine-Crankshaft, Cylinder block (Page GR-13)

Installation Vertical Pump: Installation 'CM' and 'CDM' Style: Operation:

Installation Instructions 1662SG SG.224

Technical Data PRESSURE (PSI) DIMENSIONS inches AND WEIGHTS pounds

TYPE E Main Valve Sizes 3 /8 through 12

INSTALLATION INSTRUCTIONS FOR SLIMLINE BEDPAN WASHER WITH EXPOSED ROYAL FLUSHOMETER

ROMAN WATERFALL BATHTUB FAUCET

WALKING TREADMILL SF-T1407M USER MANUAL

E-SERIES: 1/2 THERMOSTATIC W/VOLUME CONTROL OR VOLUME CONTROL/2-WAY DIVERTER MODEL: KEEP THIS INSTRUCTION BOOKLET FOR FUTURE REFER

Operation and Service Guide: Showers

Installation, Operation and Maintenance Instructions

EBF-750 Deck-Mounted Battery Powered Sensor Operated Gooseneck Faucets

SAVE FOR CONSUMER INSTALLATION / OWNER'S MANUAL. Single Handle Kitchen Faucet Model # LK2500. Important! You choose the flow rate!

Page Hardwire Showers Single Program. SHOWER ACCESSORIES See Page 5

V46 and V47. Repair Parts and Service Instructions. Applications. Adjustments. Installation Guidelines

Athletic Field Painting Pointers Line Star Drawing Line Star Parts List 3-4. Spray Boom Drawing Stainless Steel Tank 6

Maintenance Information

Removing and installing cylinder head

INSTALLATION INSTRUCTIONS

Installation Guide. Single-Control Bath and Shower Trim A K T948, K T949, K T950 K 951, K 952

Tri-Clover Manual and Air Actuated Fractional Valves

Operating and Maintenance Manual for Type S Flowmeters. M101 Rev. B Type S Flowmeters: 5 8, 3 4 and 1 with 157 & 600 Series Registers

TECHNICAL INSTRUCTIONS

MAR031615A 1. PABD Installation & Maintenance. Guide *Parts will differ for high pressure valves.

Pressure Relief Valve Maintenance Manual

Technical Data TYPE A SERIES AIR ADJUSTED PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4011 OPERATING PRINCIPLE

CSO / CP PUMPS Vertical Spindle Type Installation, Operation and Maintenance Manual

DeZURIK MANUAL G-SERIES ACTUATORS USED ON PEC ECCENTRIC VALVES

INSTALLATION, OPERATION & SERVICE INSTRUCTIONS

Transcription:

SS-LVC THERMOSTATIC MODEL Serial No. LV 53392 and higher ½ top inlets INSTALLATION INSTRUCTIONS LVC SS November 2000 1. Remove item (6), 2- #1/4-20 X 3/4 long, allen screws from showerhead, and remove. 2. Loosen pointer screw (8), remove pointer (2), surfashower flange (3). 3. Remove stainless steel cover (4). 4. Mount valve and piping assembly directly to wall at desired height, using the integrally cast mounting fittings. See page 2 for drilling dimensions. 5. Connect hot water to the left inlet, and the cold water to the right inlet. Use solder flux sparingly. After connections are made, flush pipes thoroughly to remove dirt and excess materials. 6. Replace cover, and reassemble in reverse order. 1. Note: when re-installing be sure not to cut o ring (7) (TM-25-6B), when installing into showerhead bracket. 7. Screws for end caps (5) are #10-24 X 3/8 long allen screws. REMEMBER!! THIS IS A CONTROL DEVICE WHICH MUST BE CLEANED AND MAINTAINED ON A REGULAR BASIS, (SEE MAINTENANCE GUIDE AND RECORD MGR-1000). 1360 Elmwood Avenue, Cranston, RI 02910 USA Phone: 401.461.1200 Fax: 401.941.5310 Email: info@leonardvalve.com Web Site: http://www.leonardvalve.com

Standard Unit Mounting Dimensions 1. It is recommended that the valve be furnished with inlet stops or checkstops on each supply. 2. Solder flux must be used sparingly. After connections are made to the valve, flush pipes thoroughly to remove dirt and excess materials, which might become lodged on the working parts of the valve. OPERATION The LVC is a thermostatic water mixing valve which will compensate for changes in the temperature or pressure of hot and cold supplies and maintain shower temperatures. The easy to read dial with directional indicators helps to eliminate confusion as to where the handle should be located for a particular temperature. Turn the handle counter-clockwise from the "OFF" position through the BLUE ARROW (COLD) area on the dial plate, the shower is on and temperature is cold. As the handle is turned toward the RED DOT (HOT) area, shower temperature becomes progressively WARMER until the high temperature limit is reached in the full "HOT" position.( the BLACK dot on the pointer lines up with the RED dot on the cover) To turn OFF move handle back in clockwise direction to the "OFF" position (the BLACK dot on the pointer lines up with the BLACK dot on the cover). SERVICING INSTRUCTIONS WARNING WARNING! THIS MIXING VALVE IS EQUIPPED WITH AN ADJUSTABLE HIGH TEMPERATURE LIMIT STOP FACTORY SET AT APPROXIMATELY 110 F (43 ) WITH AN INCOMING WATER SUPPLY TEMPERATURE OF 135 F (57 C). IF INCOMING HOT WATER ON THE JOB IS HIGHER THAN 135 F, THE VALVE WHEN TURNED TO FULL HOT MAY DELIVER WATER IN EXCESS OF 110 F, AND THE HIGH TEMPERTURE LIMIT STOP MUST BE RESET BY THE INSTALLER. (SEE REVERSE) HOT WATER IN EXCESS OF 110 F IS DANGEROUS AND MAY CAUSE SCAULDING!! SYMPTOM: KIT REQUIRED: PARTS INCLUDED: PACKINGS & GASKETS 1. Leak at handle. 2. Valve will not shut off completely. 3. Valve is difficult to pull apart. Kit 1/LVC (see DWG 6) LVC-3C, 2 each LVC-22B, 27B, 25C, 3 each LVC-16B PORT SLEEVE ASSEMBLY 4. Valve delivers either all hot or all cold water, or will not mix consistently. 5. After packings and gaskets have been replaced, valve will not shut off completely. Replace parts noted DWG.6) or KIT R/LVC LVC-G1, LVC-3B (2 Req) or LVC-1-8B, plus packings noted. or Kit R/LVC (LVC-TCA2, LVC-3C) THERMOSTAT GROUP 6. After replacing port sleeve assembly, valve will not hold temperature. 7. Valve does not respond when handle is turned (tension nut has been tampered with). Kit R/LVC (see DWG.5) LVC-TCA-2, LVC-3C NOTE: DO NOT TOUCH TENSION NUT LOCATED BELOW LVC-16B O'RINGS CHECKSTOP 8. Supplies cannot be shut off completely. 9. Leak at checkstop (or stop) bonnet or stem. KIT "C" SEE DWG #7 FOR REPAIR KIT 2

SERVICING INSTRUCTIONS SERVICING INSTRUCTIONS 1. Remove pointer (LVC-5DT) by loosening #6910 set screw (5/64 allen wrench). 2. Turn off hot and cold supplies to valve (using the inlet stops). 3. Remove the 4 cover screws (MU-2C) and release the cover and thermostatic control assembly (DWG. 4). Do not misplace cover gasket (LVC-3C). DO NOT LOOSEN FACTORY SET TENSION NUT. (DWG. 6) 4. To clean, submerge the assembly in clear warm water to remove deposit or stain. Use a mild solution ammonia or non-corrosive cleaning solution to remove stubborn deposits. Replace the pointer on the valve stem and move to the left to make certain the inlet valve cups open and close vertically and that the thimble moves freely on the port sleeve (DWG. 5). 5. If the port sleeve assembly requires further cleaning, remove the control rod nuts (LVC-10B) and valve cups (LVC-25C), to release the bridge assembly (LVC-1-8B) and clean as noted above, becarefull not to misplace stud (2998) and spring (2997). The bridge assembly may be further disassembled by removing the two holder nuts (LVC-5B) to clean the port sleeve (DWG. 5). 6. When cleaning the port sleeve assembly, DO NOT USE ABRASIVES. DO NOT LUBRICATE THE PORT SLEEVE ASSEMBLY as it will limit the performance of the valve. 7. Place cover gasket in recess, return complete assembly to valve base and tighten cover screws, NOTE TEMPERATURE LIMIT STOP MUST BE RESET AFTER ASSEMBLY. TO RESET HIGH TEMPERATURE LIMIT STOP (DWG. 3): 1. Turn pointer to the left or right until valve is delivering the highest desired temperature of 110 F (43 C) or lower. 2. Remove the pointer from spline. 3. Replace pointer on the spline with the STOP, which is cast on the underside of the pointer, resting against the TOP side of the WEB which is cast on the cover. 4. If properly adjusted, the pointer should move fully from the HOT position, where the BLACK dot on the pointer lines up with the RED dot on the cover, clockwise to the OFF position., where the BLACK dot on the pointer lines up with the BLACK dot on the cover. REMEMBER!! THIS IS A CONTROL DEVICE WHICH MUST BE CLEANED AND MAINTAINED ON A REGULAR BASIS, (SEE MAINTENANCE GUIDE AND RECORD MGR-1000).

3 INSTRUCTIONS FOR HANDICAPPED UNITS MOUNTING INSTRUCTIONS 1. Remove item (9), 2-#1/4-20 X 3/4 long allen screws from showerhead, and remove. 2. Loosen pointer screw (11), and remove pointer (2), surfashower flange with dial plate (3). 3. Loosen item (7), diverter escutcheon flange and, diverter hub, (see diagram page 5). 4. Then remove hand spray unit and hand shower elbow item (6). 5. Remove stainless steel cover (4). 6. Mount valve and piping assembly (5) directly to wall at desired height, (Check Local codes), using the integrally cast mounting fittings. See page 5 for drilling dimensions. 7. The inlets are clearly marked on mixing valve. Connect hot water to the LEFT inlet, and the cold water to the RIGHT inlet. Use solder flux sparingly. After connections are made, flush pipes thoroughly to remove dirt and excess materials. 8. Replace cover, and reassemble in reverse order. a. Note: when re-installing showerhead be sure not to cut o ring (10) TM-25-6B when installing into showerhead bracket. 9. Screws for end caps, item (8) are #10-24 X 3/8 long allen screws. 4 Handicapped Unit Mounting Dimensions

1360 Elmwood Avenue, Cranston, RI 02910 USA Phone: 401.461.1200 Fax: 401.941.5310 Email: info@leonardvalve.com Web Site: http://www.leonardvalve.com 5