DRAFT CITY OF CULVER CITY PLANS FOR THE CONSTRUCTION OF TRAFFIC MONITORING CCTV GAP CLOSURE PROJECT PL-004 INDEX MAP CITY OF CULVER CITY

Similar documents
MAYWOOD FLORENCE CHESTERFIELD SQUARE WINDSOR HILLS CULVER CITY. MARINA del REY VENICE C1

We re using a giant machine to dig tunnels for trains.

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles April 2014

Exposition Light Rail Transit Project

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR

TRAFFIC IMPACT ANALYSIS FOR A PROPOSED CHICK - FIL - A RESTAURANT. Located at 8521 Sepulveda Boulevard. City of Los Angeles

Draft Date: February 9, 2018 DRAFT RESOLUTION

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014

JAMES G.FEATHERSTONE INTERIM FIRE CHIEF MUTUAL AID AGREEMENTS! DISASTER DECLARATIONS! POTENTIAL FISCAL IMPACTS

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015

APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010)

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Mobility Corridor Updates. Transit & Active Transportation Projects

Exposition Corridor Transit Project

Project Scoping Open House Welcome

Crenshaw/LAX Transit Corridor. Transit Coalition Meeting June 26, 2012

4.7 Construction Surface Transportation

Metro Highway Program

4.1 Traffic, Circulation, and Parking

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING

TRAFFIC IMPACT STUDY PROPOSED RESIDENTIAL CARE FACILITY (ASSISTED LIVING) AND 8 SINGLE FAMILY HOMES 3814 LENAWEE AVENUE CULVER CITY, CALIFORNIA

Mobility Corridor Updates. Transit & Active Transportation Projects

4.7 Construction Surface Transportation

The Role of Infrastructure Connected to Cars & Autonomous Driving INFRAMIX PROJECT

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

2.4 Build Alternatives

I b *A 1 I F IRPORT COMMISSIONERS REPORT TO THE QARD. "" 119,rte.1111.r;

Directions to Mt Pleasant, TX 252 mi about 5 hours 1 min

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

ME-IMhhhhhilE Emonohhhm

MANHATTAN VILLAGE ENHANCEMENT PROJECT

Study Area, Related Projects and Travel Markets

Welcome and Agenda. Thank you for joining us! 6:00 pm Open House. 6:30 pm Welcome & Presentation. 7:00 pm Q&A. 7:15 pm Open House Resumes

Community Meetings June 2018

Purple Line Extension Section 1 Construction Community Meeting January 17, 2019

2. PROJECT ALTERNATIVES

Directions to Grand Lake, CO 625 mi about 13 hours 10 mins. Loading... 1 of 5 2/13/09 8:26 AM

Appendix E. SHPO Correspondence and Determination. Crenshaw/LAX Transit Corridor Project June 2012 Supplemental Environmental Assessment

MTA Post 1989 Retrofit Soundwall Projects Phase I, Priority 1

Using Wheel Rail Interface Analysis to Evaluate Rail Transit Maintenance Priorities: A Case Study on Los Angeles Metro BLUE Line

Fresno Yosemite International Airport to 2233 Ventura St, Fresno, CA Google Maps

East San Fernando Valley Transit Corridor. Community Meetings April/May, 2012

APPENDIX C TRAFFIC IMPACT ANALYSIS

PINTSCH TIEFENBACH Micro Computer - Marshalling Yard. TMC-RaStw. Representative TMC-RaStw cabinet layout with the following advantages

ATTACHMENT B NOW, THEREFORE, THE BOARD OF DIRECTORS OF METRO DOES RESOLVE AS FOLLOWS: Page 1

To: Operations & Scheduling Committee Date: 09/21/2017. From: Ruby Horta, Director of Planning & Marketing Reviewed by:

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

APPENDIX I. Traffic Impact Analysis

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.

APPENDIX G NOISE CALCULATIONS

NOTICE OF PUBLIC HEARING Los Angeles County Metropolitan Transportation Authority

Section 5.8 Transportation and Traffic

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

WOODLAND HILLS CORPORATE CENTER. Class A Office with Unrivaled Walkability & VENTURA BOULEVARD

SANTA MONICA VENICE MARINA DEL REY PLAYA VISTA WESTCHESTER EL SEGUNDO. Wilshire Arizona Santa Monica Blvd. 4th

WOODLAND HILLS CORPORATE CENTER. Class A Office with Unrivaled Walkability & VENTURA BOULEVARD

Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

3.11 Land Use/Planning

APPENDIX B TRAFFIC IMPACT ANALYSIS

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

I-405 Sepulveda Pass Improvements Project

engineering phase and during the procurement of design build contracts.

WOODLAND HILLS CORPORATE CENTER. Class A Office with Unrivaled Walkability & VENTURA BOULEVARD

Saturday, March 31, :51:16 PM

Chief Capital Management Officer s Report

Lane Closure Manual. Route Report Index: US12-A US12-03 (WB) US12-01 (EB WB) US12-02 (EB)

spas Specific Plan Amendment Study

Using "Big Data" for Transportation Analysis: A Case Study of the LA Metro Expo Line

L. KASSAN, P.E. Consulting Traffic Engineer

Los Angeles World Airports. LAX Landside Transportation Program

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

Develop ground transportation improvements to make the Airport a multi-modal regional

R=Right, L=Left, C=Continue, S=Straight, BL= Bear Left, Super 8, 518 Borg Rd Delavan, WI. BR=Bear Right, SS=Stop sign, T=T intersection, Start 6:00 AM

Capital Improvement Plan Review

REGIONAL TRANSPORTATION SETTING

MATTHEW HEYN T Lic

MAINTENANCE OF TRAFFIC PLAN FOR UTILITY CONSTRUCTION AND STREETSCAPE IMPROVEMENTS LOCATED IN SOUTH OLD GLEBE ROAD FOR

STAFF REPORT. Consideration of Request Submitted by Athens Services for Rate Adjustment SUMMARY

Specific Plan. Ordinance No. 168,329 Effective December 13, Specific Plan Procedures Amended by Ordinance No. 173,455

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No.

CTCSP & WLA TIMP Specific Plans Amendments

CITY OF BEVERLY HILLS STAFF REPORT

COUNTY OF FRESNO ADDENDUM NUMBER: ONE (1) RFQ NUMBER: FUEL SITE REPAIRS, MAINTENANCE, TESTING AND TANK MONITORING UPGRADES

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

09/20/ :48 PM MONTGOMERY COUNTY PUBLIC SCHOOLS. Arrival Routes w/times Report

Everett Station Bay B2

Federal Way Link Extension

CENTRAL FLORIDA EXPRESSWAY AUTHORITY Master Plan Update Board Workshop #2

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA

3. ENVIRONMENTAL SETTING

09/20/ :48 PM MONTGOMERY COUNTY PUBLIC SCHOOLS. Arrival Routes w/times Report

B15. Bedford-Stuyvesant, Brooklyn and JFK Airport, Queens. Between. Local Service. Bus Timetable. Effective as of September 3, 2017

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA

R A M S E Arden Hills

MS150 Rider Route (Highlighted) Preferred Vehicle Alternate Route

3.14 Parks and Community Facilities

Transcription:

CITY OF CULVER CITY PLANS FOR THE CONSTRUCTION OF TRAFFIC MONITORING CCTV GAP CLOSURE PROJECT PL-004 THE HEART OF SCREENLAND DRAFT INDEX MAP CITY OF CULVER CITY TITLE SHEET 01

GENERAL NOTES, CONSTRUCTION NOTES, & LEGEND 02

S DRAFT GENERAL NOTES, CONSTRUCTION NOTES, & LEGEND 03

CITY OF CULVER CITY CITY OF LOS ANGELES DRAFT CITY OF LOS ANGELES CITY OF CULVER CITY CITY OF CULVER CITY CITY OF LOS ANGELES CCTV No. 59 CENTINELA AVE SEPULVEDA BLVD TO GREEN VALLEY CIRCLE 04

CULVER CITY LIMITS CULVER CITY LIMITS DRAFT CULVER CITY LIMITS CCTV No. 63, 67 SLAUSON AVE (BRISTOL PKWY TO BUCKINGHAM PKWY) & BRISTOL PKWY (SLAUSON AVE TO HANNUM AVE) 05

CITY OF CULVER CITY BALLONA CREEK (LAFCD) DRAFT CCTV No. 198 SEPULVEDA BLVD BALLONA CREEK TO JEFFERSON BLVD 06

CCTV No. 52 NATIONAL BLVD WASHINGTON BLVD TO HAYDEN AVE 07

CCTV No. 02 WASHINGTON BLVD GLENCOE AVE TO LYCEUM AVE 08

CITY OF LOS ANGELES CITY OF CULVER CITY CITY OF LOS ANGELES CITY OF CULVER CITY DRAFT WASHINGTON BLVD BEETHOVEN ST TO BOISE AVE 09

CCTV No. 07, 41 WASHINGTON BLVD (NEOSHO AVE TO CENTINELA AVE) & DUQUESNE AVE (WASHINGTON BLVD TO CULVER BLVD) 10

CCTV No. 15, 20 WASHINGTON BLVD SAWTELLE BLVD TO TILDEN AVE 11

CCTV No. 17, 25 CULVER BLVD (SAWTELLE BLVD TO SEPULVEDA BLVD) 12

CCTV NO. 48, 76, 199 WASHINGTON BLVD AT INCE BLVD, WASHINGTON BLVD AT KENSINGTON BLVD, SLAUSON AVE AT HANNUM AVE. 13

CITY OF CULVER CITY CITY OF LOS ANGELESDRAFT CCTV No. 95, 196, 197 SEPULVEDA BLVD (BANKFIELD AVE TO WESTFIELD AVE), JEFFERSON BLVD AT LEAHY ST/COLLEGE BLVD, SAWTELLE BLVD AT OVERLAND AVE. 14

CCTV NO. 79, 89, 97 JEFFERSON BLVD AT SLAUSON AVE JEFFERSON BLVD AT DUQUESNE AVE OVERLAND AVE/ PLAYA ST AT HANNUM AVE JEFFERSON BLVD AT OVERLAND BLVD 15 ALL WORK ON THIS SHEET INCLUSIVE OF ADDITIVE BID ITEM "A"

CITY OF LOS ANGELES CITY OF CULVER CITY DRAFT FIRE STATION NO. 1 CCTV NO. 14, 30, 44, 57 WASHINGTON BLVD AT WATSEKA AVE/ CULVER BLVD WASHINGTON BLVD AT OVERLAND AVE WASHINGTON BLVD AT LA CIENEGA BLVD SAWTELLE BLVD AT WASHINGTON PL 16 ALL WORK ON THIS SHEET INCLUSIVE OF ADDITIVE BID ITEM "A"

CCTV NO. 34, 54, 71, 81 SEPULVEDA BLVD AT JEFFERSON BLVD/ PLAYA ST SEPULVEDA BLVD AT CENTINELA AVE WASHINGTON BLVD AT NATIONAL BLVD CULVER BLVD AT OVERLAND AVE 17 ALL WORK ON THIS SHEET INCLUSIVE OF ADDITIVE BID ITEM "A"

CITY OF LOS ANGELES CITY OF CULVER CITY DRAFT CCTV NO. 06, 21, 83 WASHINGTON BLVD AT ZANJA ST/ WASHINGTON PL SEPULVEDA BLVD AT JEFFERSON/ SAWTELLE BLVD WASHINGTON BLVD AT SEPULVEDA BLVD 18 ALL WORK ON THIS SHEET INCLUSIVE OF ADDITIVE BID ITEM "A"

CCTV DETAILS CAMERA SITE LOCATION 19

JEFFERSON BLVD OVERLAND AVE SLAUSON AVE NATIONAL BL WASHINGTON BLVD DRAFT SEPULVEDA AVE CULVER BLVD CULVER BLVD CULVER BLVD SAWTELLE BLVD DUQUENSE AVE DUQUESNE AVE SAWTELLE BLVD SEPULVEDA BLVD CENTINELA AVE WASHINGTON BLVD WASHINGTON BLVD COMMUNICATION SCHEMATIC FIBER OPTIC NETWORK 20

LEGEND: (THIS SHEET) FIBER OPTIC SPLICE ASSIGNMENTS CITY HALL TO NORTHERLY LIMITS 21

LEGEND: (THIS SHEET) FIBER OPTIC SPLICE ASSIGNMENTS CITY HALL TO HUB C 22

LEGEND: (THIS SHEET) FIBER OPTIC SPLICE ASSIGNMENTS HUB C TO SLAUSON AVE 23

LEGEND: (THIS SHEET) FIBER OPTIC SPLICE ASSIGNMENTS HUB C TO SLAUSON AVE 24

LEGEND: (THIS SHEET) FIBER OPTIC SPLICE ASSIGNMENTS HUB C TO SEPULVEDA/ CENTINELA AVE 25

LEGEND: (THIS SHEET) FIBER OPTIC SPLICE ASSIGNMENTS CITY HALL TO HUB B 26

LEGEND: (THIS SHEET) FIBER OPTIC SPLICE ASSIGNMENTS CITY HALL TO HUB B 27

LEGEND: (THIS SHEET) FIBER OPTIC SPLICE ASSIGNMENTS HUB B TO SOUTHERLY LIMITS 28

COMMUNICATION DETAILS HUB LOCATIONS A, B and C 29

ROOM MODIFICATION LOCATIONS: CITY HALL BUILDING, 2ND FLOOR - PUBLIC WORKS DIRECTORS OFFICE CITY HALL BUILDING, 2ND FLOOR - TRANSPORTATION MANAGERS OFFICE CITY HALL BUILDING, 2ND FLOOR - PLAN LAYOUT ROOM CITY HALL BUILDING, 2ND FLOOR - TRAFFIC MANAGEMENT CENTER (TMC) FIRE STATION No. 01, 9600 CULVER BLVD - EMERGENCY OPERATIONS CENTER (EOC) CITY MAINTENANCE YARD BUILDING, 9505 JEFFERSON BLVD - SIGNAL SHOP ROOM DRAFT COMMUNICATION DETAILS VMS WORKSTATIONS 30

CONSTRUCTION DETAILS