Department of the Environment. Moving Away From Stage II Vapor Recovery

Similar documents
Stage II Vapor Recovery at Gasoline Dispensing Facilities

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

Widespread Use Assessment for On-Board Refueling Vapor Recovery. Gasoline Vapor Recovery Conference Manchester, NH May 1, 2007 Eric Skelton

Update on Enhanced Vapor Recovery (EVR) and In-Station Diagnostics (ISD) at Gasoline Dispensing Facilities

The VST Enviro-Loc Vapor Recovery System

MANE-VU Future Year Inventories. Megan Schuster MARAMA/ MANE-VU RPO Technical Meeting June 9-10, 2005

Alternative and Renewable Fuel and Vehicle Technology Program. Advisory Committee Meeting

Fuel Tank Management: PBS, USTs and the Energy Policy Act of 2005

For personal use only

California Low Carbon Fuel Standard Status Report. John D. Courtis October 17, 2011

San Joaquin Valley Air Pollution Control District Vapor Recovery Requirements for Permitted Agricultural Gasoline Storage and Dispensing Operations

The California Low Carbon Fuel Standard. John D. Courtis August 10-12, 2009

Merger of the generator interconnection processes of Valley Electric and the ISO;

RFS2: Where Are We Now And Where Are We Heading? Paul N. Argyropoulos

Overview of Revisions to the Federal Underground Storage Tank (UST) Regulations. Storage Tank Advisory Committee Harrisburg, PA September 1, 2015

SWCAA 492. Oxygenated Fuels

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

2019 New Transit Service Plan

Overview Air Qualit ir Qualit Impacts of

California Energy Commission. December 7, 2015

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Electric Vehicle Cost-Benefit Analyses

Ohio EPA. Division of Air Pollution Control. Engineering Guide #12

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton

Mobile Source Committee Update

Dean Saito Manager, On-Road Mobile Source. South Coast Air Quality Management District

Compliance Strategies and Benefits

Grant Guidelines To States For Implementing The Secondary Containment Provision Of The Energy Policy Act Of 2005

Update: Estimated GHG Increase from Obama Administration Inaction on the 2014 RFS

PETROLEUM PRODUCT STORAGE TANK REGULATION SAFETY AND BUILDINGS DIVISION BUREAU OF PETROLEUM INSPECTION AND FIRE PROTECTION

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017.

Mobile Source Committee Update

NYSERDA Alternative Fuel Vehicle Programs. Patrick Bolton and Adam Ruder NYSERDA April 24, 2013

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping

New Ultra Low Sulfur Diesel fuel and new engines and vehicles with advanced emissions control systems offer significant air quality improvement.

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Electric Vehicle Cost-Benefit Analyses

Review Draft Prepared by: Stan Payne December 14, 2012

Electric Vehicles and EV Infrastructure Municipal Electric Power Association

January 24, Re: Small Refiner Exemptions. Dear Administrator Pruitt:

Sunoco, Inc Market Street LL Philadelphia, PA June 29, 2006

The purpose of this rule is to limit emissions of gasoline vapors from the transfer of gasoline into motor vehicle fuel tanks.

UST Program Overview. NISTM Conference June 17, Mark Barolo EPA, Office of Underground Storage Tanks

Arizona Tank Closure, Assessment and Response

Clean Taxicab Initiative Code Amendment to Provide an Extended Age Limit for Low Emission Taxicabs

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

A Regional Look at the Inventories

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

Heavy-Duty Low-NOx and Phase 2 GHG Plans

Mobile Source Committee Update

Monthly Biodiesel Production Report

Planning for Sustainability: Electric Vehicles

Massachusetts Department of Environmental Protection Underground Storage Tank Program

RULE 449 TRANSFER OF GASOLINE INTO VEHICLE FUEL TANKS

California s Emission Reduction Plan for Ports and International Goods Movement

Decision on Merced Irrigation District Transition Agreement

Overview of California AB32 Regulations

Taxis and Accessible Services Division Medallion Reform Background May 1, 2018

The Energy Independence and Security Act (EISA): Proposed Changes to the Renewable Fuel Standard Program (RFS2)

California Greenhouse Gas Vehicle and Fuel Programs

Caltrans Zero Emission Vehicle (ZEV) Experience. California Department of Transportation (Caltrans) Division of Equipment (DOE)

Department of Energy Analyses in Support of the EPA Evaluation of Waivers of the Renewable Fuel Standard November 2012

Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective 1/11/2017

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

Alamo Natural Gas Vehicle Consortium

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION

The purpose of this rule is to limit emissions of gasoline vapors from the transfer of gasoline into motor vehicle fuel tanks.

Discussing the Ratepayer Benefits of EVs On the Electrical Grid

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

Electric Vehicle Basics for Your Business

New rules regarding. January 2012

4/15/2015 Item #10D Page 1

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

Flexible-Fuel Vehicle and Refueling Infrastructure Requirements Associated with Renewable Fuel Standard (RFS2) Implementation

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-204-U. Relating to Certification of Vapor Recovery Systems

Car Sharing at a. with great results.

George Carter III Dept. of Enterprise Services Olympia Washington

State of New Jersey. Department of Environmental Protection Air Quality Permitting

Modernising the Great Western railway

E. Augusta, Spokane, WA (509) E. Augusta, Spokane, WA (509)

New York State and EVs

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

EVSE Impact on Facility Energy Use and Costs

Technological Viability Evaluation. Results from the SWOT Analysis Diego Salzillo Arriaga, Siemens

FINAL UNDERGROUND STORAGE TANK RULE CHANGES. Heather Peters UST Compliance and Technology Unit

Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements

Mobile Source Air Toxics: Overview and Regulatory Background

Clean Cities 101. Dallas-Fort Worth Clean Cities Coalition North Central Texas Council of Governments Transportation Department 1

New Jersey Electric Vehicle Infrastructure Stakeholder Group Kickoff Meeting

Department of Agriculture Weights and Measures Services Division MAY 9, 2017

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

Note: This rule is effective on July 1, 2018, through June 30, 2019.

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT

Pilot Study for Plug-In Hybrids

Implementation of AASHTO s Manual for Assessing Safety Hardware (MASH) 2016

Electric Vehicle Charge Ready Program

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

DIVISION OF AIR QUALITY AIR QUALITY, ENERGY, AND SUSTAINABILITY

DART Priorities Overview

PURPOSE RESPONSIBILITY

Transcription:

Department of the Environment Moving Away From Stage II Vapor Recovery 2013 Stage II Regulations Stakeholder Meeting November 12, 2013

Topics Covered Background The technical analyses What does it tell us Addressing the potential loss of emission reductions Overview of the draft regulations New units Decommissioning Electric vehicle charging incentives Next Steps/Schedule

Background - EPA s Stage II Policy On July 8, 2011, EPA released a policy called Widespread Use for Onboard Refueling Vapor Recovery (ORVR) and Stage II Waiver The Clean Air Act (CAA) allows EPA to waive Stage II Vapor Recovery Programs when these new on-board or ORVR systems are in widespread use in the vehicle fleet. This EPA action proposed June 30, 2013 as the date that ORVR will be in widespread use nationwide

EPA s Guidance on Stage II EPA s final version of their guidance document was released on August 7, 2012 The document entitled "Guidance on Removing Stage II Gasoline Vapor Control Programs from State Implementation Plans and Assessing Comparable Measures" can be viewed on EPA's website at the following link: http://www.epa.gov/airquality/ozonepollution/pd fs/20120807guidance.pdf EPA s guidance was never meant to force states to shut down the program immediately. State s are required to perform analyses to determine the loss of emission reduction benefits and to identify further reductions needed if Stage II is eliminated

Why is a Regulation Needed and what is a SIP? The guidance requires states to submit a SIP revision (a modification to the States air quality plan called the State Implementation Plan or SIP ) to remove Stage II. In general terms, the SIP is a large package of regulations and other programs designed to clean the air and meet the federal standards. Stage II is currently required by regulation and is part of the Maryland SIP To move away from Stage II - That regulation will need to be amended and approved by EPA as a SIP revision States that shut down Stage II without going through the appropriate analysis and without formally amending their SIP face third party litigation (and at least the threat of an EPA finding of failure to implement).

Addressing the Shortfall Before Stage 2 can be removed from the SIP, the emission reductions that will be lost (the shortfall ) must be addressed MDE technical analyses (more later) shows that there is a small loss of emission reductions This shortfall decreases over time Larger in 2014 Smaller in 2017 As an example, refilling gas cans will result in a small emissions increase without Stage II in place More on addressing the shortfall later

Other State Actions EPA has not yet received a SIP revision from any other states in Region 3 to formally remove Stage II Region 3 states are still analyzing their program benefits and potential substitute measures, and in some cases are also meeting with stakeholders. EPA is not pushing states to act quickly

Status in Other States States with air quality problems similar to Maryland s PA evaluating alternatives. Enforcement discretion policy for new Gasoline Dispensing Facilities (GDFs) VA policy for new GDFs through enforcement discretion. DE evaluating all options for potential decommissioning NJ is working on evaluating emissions, emission benefits and costs of the Stage II systems CT law requires decommissioning by July 1, 2015. MA enforcement discretion directive. Working on regulations.. New York enforcement directive exempts new, modified and existing GDFs. Continuous monitoring required. Reg in works. States with less difficult air quality problems New Hampshire to propose regulation - hearing Oct 30 th. State law exempts new and modified stations. Maine adopted regulation on January, 1 2013 to discontinue Stage II. EPA has not yet approved SIP revisions to move away from Stage II for any of these states

MDE s Technical Analysis Comprehensive analysis consistent with EPA requirements Analysis is based on EPA or MD SIP approved methodology. Uncontrolled refueling emissions are derived from the EPA s MOVES and NONROAD emissions models. ORVR effectiveness data developed by the EPA. EPA and Maryland data for Stage II effectiveness form the backbone of the analysis Full analysis discussed during last stakeholder meeting (12-17-12) http://www.mde.state.md.us/programs/regulations /air/pages/stakeholdermeetings.aspx

Technical Analysis Bottom Line In Maryland Widespread Use occurs around 2017 A shortfall (loss of VOC emission reductions) will be created by eliminating Stage II Shortfalls decrease over time as more ORVR equipped vehicles enter fleet 2014 1.74 tons per day (tpd) 2017 0.62 tpd 2020 0.17 tpd VOC Shortfall from Eliminating Stage II Requirements (tpd) 2014 2017 2020 All refueling (ORVR & non-orvr) 1.74 0.62 0.17

Addressing the Shortfall The draft regulation will result in a VOC shortfall that will need to be addressed Stage II provides a VOC benefit that diminishes over time Between 1-2 tons per day of lost VOC reductions resulting from elimination of Stage II at existing stations between 2014 and 2017

Measures to Address the Shortfall MDE VOC regulations Some of the reductions from the recently adopted update to MDE s autobody refinishing rule may need to be used to make up for this loss of reductions MDE regulations for other sources Several new initiatives that could help address this shortfall are under development Power plant regulation Distributed generation regulation Consumer products regulation Coatings regulation Stage II Decommissioning Policy Electric Vehicle Charging Requirements Low permeation hoses Dripless nozzles Stage I requirements Enhanced testing and monitoring

The Basic Structure of the Regulation New units As soon as the regulation is adopted Small GDFs - Not required to install Stage II Larger GDFs - May either install Stage II or implement an MDE approved Electric Vehicle Charging Plan (EV Charging Plan) Decommissioning of existing units Small GDFs May decommission after January 1, 2017 May decommission after January 1, 2014 with EV Charging Plan or if UST replaced or GDF modified Large GDFs May decommission after January 1, 2017 with approved EV Charging Plan May decommission early (after 1/1/14) with approved EV Charging Plan that includes early installation The EV Charging Plan 10 year plan to invest a part of the savings from elimination of Stage II into EV charging infrastructure

New Stations GDFs constructed after January 1, 2014 Smaller stations Page 1 of the regulation -.03A-1(1) Monthly gasoline throughput of 300,000 gallons or less Not required to install and operate a Stage II vapor recovery system

New Stations (Continued) GDFs constructed after January 1, 2014 Larger Stations Page 1 of the regulation -.03A-1(2) Monthly gasoline throughput of greater than 300,000 gallons May install and operate a Stage II vapor recovery system or Not install Stage II vapor recovery system but meet the requirements of.03-2 for EV Charging Plans

Decommissioning Existing Stations Smaller stations Page 2 of the regulation -.03-1A(1 3) Monthly gasoline throughput of 300,000 gallons or less May decommission Stage II vapor recovery systems after January 1, 2017; May decommission Stage II vapor recovery systems after January 1, 2014 if an underground storage tank is replaced or the gasoline dispensing facility is significantly modified May decommission Stage II vapor recovery systems after January 1, 2014 if the requirement to implement an EV Charging Plan (.03-2) is met

Decommissioning (Continued) Larger Stations Page 2 of the regulation -.03-1A(4-5) Monthly gasoline throughput of greater than 300,000 gallons May decommission Stage II vapor recovery systems after January 1, 2017 if the requirement to implement an EV Charging Plan (.03-2) is met May decommission Stage II vapor recovery systems earlier (after January 1, 2014) if the requirement to implement an EV Charging Plan with earlier installation(.03-2) is met Includes situations involving UST replacement other significant modifications

Decommissioning Procedures Decommissioning procedures from the Petroleum Equipment Institute Page 2 of the regulation -.03-1B An owner or operator of a gasoline dispensing facility that decommissions a Stage II vapor recovery system shall perform the decommissioning of the Stage II vapor recovery system in accordance with the Recommended Practices for Installation and Testing of Vapor Recovery Systems at Vehicle Refueling Sites of the Petroleum Equipment Institute, Section 14, 2009.

Additional Requirements Stage I requirements for GDFs moved to COMAR 26.11.24.03J Page 2 of the regulation -.03J Low Permeation Hose Page 2 of the regulation -.03K An owner or operator of a gasoline dispensing facility subject to this regulation that does not install and operate or decommissions a Stage II vapor recovery system must install and operate low permeation hoses Dripless Nozzles Page 2 of the regulation -.03L An owner or operator of a gasoline dispensing facility subject to this regulation that does not install and operate or decommissions a Stage II vapor recovery system must install and operate dripless nozzles at every pump

New Testing Requirements Will insure minimum emissions after Stage II equipment is removed Leak rate and cracking pressure testing of pressure/vacuum vent valves (TP- 201) Page 2 of the regulation -.04A(6) Tie-Tank Test Page 2 of the regulation -.04A(7) Testing of Vapor Piping Connections to Underground Gasoline Storage Tanks (TP- 201.3C) All GDFs will be subject to the new tests Decommissioned stations conduct standard leak tests and the new tests

Minor Update - Reporting Requirements To insure timely reporting consistent with testing requirements Page 3 of the regulation -.07E(3) Requires all test results to be forwarded to the Department within 30 days of each test

The EV Charging Plan Electric Vehicle Charging Plan Part of addressing the loss of emission reductions associated with the elimination of Stage II Page 2 of the draft regulation..03-2 is now just a placeholder. MDE would like to form a small work group to develop the EV Charging Plan policy and regulation language How to offset EV charging costs with a percentage of savings from Stage II Address strategic placement of charging stations Savings from decommissioning Stage II are significant and could support EV charging infrastructure investment Over 10 year period, large businesses could save up to $4.5 million in avoided O&M costs At least $1 million for most large businesses

Key Issues to Address in implementing the EV Charging Plan requirements Focus on owners of large GDF systems Many owners have more than 50 stations in Maryland These owners have flexibility within their network of stations to be strategic when investing in EV charging infrastructure Some companies already considering investment into EV charging equipment Larger GDF systems are responsible for 90% of the lost emission reductions that result from the elimination of Stage II Focus on new stations within large GDF systems Costs for EV charging infrastructure are much lower if installed during pre-planned excavation and construction

Revenue source for host site DC Fast Chargers good for the environment good for business Attracts retail business and host can charge for charging Works well at retail sites where EV drivers stop to shop and eat for short periods 30 minutes provides an 80% charge Can top off if less than full charge needed Electric vehicle sales growing rapidly in Maryland Over 1700 registered EVs and growing Over 400% growth in sales from 2011 to 2102 2013 monthly sales significantly ahead of 2012 Can be located strategically where EV owners live and travel Supported by a growing public and private charging network

Fast Chargers and Stage II Savings Charger installation costs vary depending on site conditions Proximity to power, power upgrades, trenching to lay conduit Smartest/cheapest to install during station design/construction or upgrades (e.g. UST replacements) As low as $25,000 Costs go up if not coordinated with other station improvements $50,000+ Trenching a major part of cost Over 10 years larger owners can save $4 to $5 million by decommissioning $30,000 per station in avoided Stage II O&M Each new station can save $60,000+ in avoided Stage II installation and 10 years O&M Very reasonable trade-off to invest a percent of the savings in chargers over the next 10 years

Developing the EV Charging Plan Policy MDE would like to set up a small workgroup to meet several times over the next few weeks to develop this policy and to draft the language for the regulation Interested stakeholders see Randy Mosier to begin to schedule discussions

Regulation Adoption Schedule Stakeholder meetings April 27, June 14 and December 17, 2012 November 12, 2013 Additional meetings Winter 2013/14 Ad-Hoc Oil Committee meetings Proposed Regulation Discussion at AQCAC (Air Quality Control Advisory Committee) meeting December 9, 2013 AQCAC approval and proposed regulation in the Maryland Register Early 2014 Adoption Spring 2014