Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

Similar documents
Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

Part 70 Operating Permit Amendment

Facility Name: Packaging Corporation of America City: Clyattville County: Lowndes County AIRS #: Application #: 22133

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton

RICE NESHAP Frequently Asked Questions (FAQ)

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

Area Source NESHAPS and Air Permits

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

DEP7007CC Compliance Certification

VALMET IBMACT & Utility MATS. Boiler Tune-ups

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

Streamlining Multiple Applicable Requirements

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

RICE NESHAP Implementation. Ray Lukkarinen, P.E. Stanley Consultants, Inc.

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

New Federal Regulations for Internal Combustion Engines. Doug Parce

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

Industrial, Commercial and Institutional Boilers Maximum Achievable Control Technology ( IB-MACT) 5/28/15 Katie Cunningham

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

Federal Engine Regulations NSPS JJJJ/NESHAP ZZZZ

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

Internal Combustion Engines Air Updates 2010

STATEMENT OF BASIS Boise Cascade Wood Products, LLC Thorsby Engineered Wood Products Thorsby, Chilton County, Alabama Facility/Permit No.

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: Application #: 40890

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

State of New Jersey. Department of Environmental Protection Air Quality Permitting. General Permit (GP-017A) For

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

The subject renewal application was received on February 28, 2017 and was determined to be administratively complete on March 9, 2017.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

SECTION.1400 NITROGEN OXIDES

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

MAJOR SOURCE OPERATING PERMIT

Engineering Summary New NGC, Inc.

Electrical Power Generator Use and Procurement Guidance

Facility Name: Anheuser-Busch, LLC City: Cartersville County: Bartow AIRS #:

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines

August CFR Part 63 Subpart ZZZZ review

RICE NESHAP RECORD KEEPING Stationary Engines

ALLEGHENY COUNTY HEALTH DEPARTMENT (ACHD) AIR QUALITY PROGRAM

Applicable Requirements - NSPS Subpart JJJJ

Regulatory and Permitting Requirements of Stationary Generators In Delaware

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

North Carolina Department of Environment and Natural Resources Division of Air Quality

Georgia Drycleaner Compliance Calendar

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

Board Administration and Regulatory Coordination Unit. Division 3. Air Resources Board

PART 70 OPERATING PERMIT FACT SHEET U.S. ARMY GARRISON AT FORT DETRICK 201 BEASLEY DRIVE, FREDERICK, MD PART 70 PERMIT NO.

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

Permit Holder. Permitted Equipment

Fuel Oil Conversions. Association of Energy Engineers (AEE) September 20, 2011

Full Compliance Evaluation Report Off-Site Report

State of New Jersey. Department of Environmental Protection Division of Air Quality

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

Air Permitting: Municipal Facilities with Emergency Generators

WRBA 45 th Annual Meeting

Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX 112U3. MARINE TANK VESSEL LOADING OPERATIONS NESHAP (40 CFR 63 Subpart Y) CAA SECTION 112 NESHAP

RICE MACT / NSPS Update: How to Make Sense of this Difficult Issue

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

O&M Plan Template For PCMACT

US oil production hits 15-year high: DEC 04, 2012

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

Permit Holder. Permitted Equipment

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

AIR QUALITY PERMIT P 01 0 May 14, 2007

State of New Jersey. Department of Environmental Protection Air Quality Permitting

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES

Regulatory Impacts of Biogas-fired Internal Combustion Engines

3. GENERAL CONDITIONS

AIR EMISSION SOURCE CONSTRUCTION PERMIT

New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

A Tool for Specifying Diesel Genset Replacements Steve Stassel, Gray Stassel Engineering

Part 70 Operating Permit Amendment

RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1

Transcription:

Major/Area Source Boiler MACT Rule Speaker: Eric Swisher 23rd Virginia Environmental Symposium April 11, 2012 Your environmental compliance is clearly our business.

Overview Ground Rules Regulatory Framework Regulated Pollutants Emission Limitations Compliance Options Work Practice Standards Startup, Shutdown, and Malfunction Things to Take Away 2

Ground Rules NHSM Rule Fuel is a Solid Waste CISWI Rule Fuel is not a Solid Waste Boiler MACT Rules Area Major 3

General Information Area or Major Source New, Reconstructed, or Existing Fuel Type Design Type 4

Comparison Area Source Major Source 5

Facility Type Area Source Major Source Not a Major Source >10 tons per year any single HAP OR > 25 tons per year of any combination of HAPs 6

Regulatory Citation 40 CFR Part 63 National Emission Standards for Hazardous Air Pollutants for Source Categories (NESHAP): Subpart JJJJJJ Area Source Boiler MACT (ASBM) Subpart DDDDD Major Source Boiler MACT (MSBM) 7

History Area Source Major Source January 13, 2003 March 21 2011 December Proposed 23, 2011 Comments Due March 14, 2003 September 13, 2004 Promulgated June 04, 2010 Proposed Comments Due July 19, 2010 June Promulgated 09, 2010 Comment Period Extended to August 03, December 2010 23, 2011 July 22, 2010 Comment Period Extended to August 23, 2010 March February 21, 2011 21, 2012 Promulgated December Comments 23, 2011 Due Proposed Amendments February March 21, 13, 2012 2012 Comments Due March 13, 2012 No Action Assurance Letter March 21, 2011 Proposed Amendments No Action Assurance Letter Proposed Compliance Date September 13, 2007 October 31, 2005 Notice of Reconsideration Proposed Amendments December 28, 2005 February 07, 2012 No Final Rule Action (with Amendments) Assurance Compliance Date September 13, 2007 December 06, 2006 Letter Final Action on Reconsideration June 04, 2010 Proposed Comments Due July 19, 2010 June 09, 2010 Comment Period Extended to August 03, 2010 July 22, 2010 Comment Period Extended to August 23, 2010 March 21, 2011 Promulgated 8

Act of Congress March 08, 2012 Senate did not pass the Collins Amendment to the Highway Bill that would delay the MSBM. 9

Current Status Area Source Major Source Effective Now Proposed Rule Compliance Date March 21, 2014 No Action Assurance Letter March 13, 2012 December 23, 2011 Compliance Date Date to Change No Action Assurance Letter February 07, 2012 10

Source Applicability Area Source Major Source Boiler Boiler Exemptions Process Heaters Exemptions 11

Regulated Pollutants Area Source Major Source Mercury (Hg) Mercury (Hg) Non-Mercury Metallic Non-Mercury HAP Metallic HAP Non-Metallic Inorganic Organic HAP HAP (including POM) Non-Dioxin Organic HAP Dioxins/Furans (D/F) 12

Emission Limits Area Source Major Source Mercury Carbon Monoxide Mercury Carbon Monoxide Particulate Matter Particulate Matter OR Total Selected Metals (TSM) Hydrogen Chloride 13

Compliance Options 1. Comply with the Emission Standards Area Source Major Source Fuel Sampling Fuel Sampling Emission Testing Emission Testing 14

Fuel Sampling Area Source Major Source Hg Determine Worst- Case Fuel Mixture Hg, HCl, & TSM Determine Worst- Case Fuel Mixture Fuel Sampling & Analysis Plan Monthly Fuel Analyses 15

Emission Testing Area Source Major Source PM Hg CO CO PM or TSM Hg HCl 16

Compliance Options 2. Evaluate Emission Standard Alternatives Area Source Major Source None Emission Averaging Output-based Emission Standard Emission Reduction Credits 17

Emission Averaging PM, HCl, or Hg Input or Output-based Emission Standards Existing Boiler Only Subcategory Requirements 10% Discount Factor Common Stack Considerations Emission Averaging Plan 18

Compliance Options 3. Can Not Comply with the Emission Standards Area Source Major Source Fuel Management Fuel Switching Controls Controls Fuel Management Fuel Switching Synthetic Minor Energy Efficiency i Improvements 19

Output-based Emission Standards Output-based Emission Standards Incentivizes implementation of energy efficient technologies to minimize the generation of emissions 20

Output-Based Emission Standards Fuel Input Energy (lb pollutant per MMBtu heat input) Steam Output Energy (lb pollutant per MMBtu steam output) 21

Capital Investment Add-on Control Device(s) Energy Efficiency Project(s) 22

Output-Based Emission Standards How were they determined? Boiler Efficiency Heat-Input Based Limits Subcategory Hg Emission Limit (lb Hg per MMBtu of heat input) Hg Emission Limit (lb Hg per MMBtu of steam output) Boiler Efficiency (%) Existing Boiler Designed to Burn Solid Fuel 3.10E-06 3.50E-06 88.6 23

Output-Based Emission Standards How are they used? Determine Current Boiler Output-Based Emissions Establish Output t Energy Benchmark Investigate Energy Efficiency Projects Quantify Emission Reductions Apply Percent Reduction to Current Boiler Output-Based Emissions 24

Energy Output Reduction Example Benchmark Year* = 2,175,000 MMBtu/yr Year After* = 1,957,500 500 MMBtu/yr Tested Hg Tested Hg Adjusted Hg Emissions (lb Hg per MMBtu of heat input) Emissions (lb Hg per MMBtu of steam output) Emissions (lb Hg per MMBtu of steam output) 3.40E-06 (Limit 3.10E-06) 3.84E-06 (Limit 3.50E-06) 3.45E-06 *Production is assumed to be the same for both years. 25

Energy Output Reduction Example Subcategory Hg Emission Limit (lb Hg per MMBtu of steam output) Hg Adjusted Emissions (lb Hg per MMBtu of steam output) Result Existing Boiler Designed to 3.50E-06 06 3.45E-06 PASS Burn Solid Fuel 26

Output-Based Other Considerations Implementation Plan Pollutant-by-Pollutant Applicability Emissions Averaging Shutdown Boilers Future Boiler Operations Other Permitting Requirements Energy Assessment 27

What is Left? Ground Rules Regulatory Framework Regulated Pollutants Emission Limitations Compliance Options Work Practice Standards Startup, Shutdown, and Malfunction Things to Take Away 28

Work Practice Standards Area Source Major Source Tune-up Tune-up Energy Energy Assessment Assessment Startup Good Combustion Shutdown Practices Startup Shutdown 29

ASBM ASBM Tune-ups Final Rule (March 21, 2011) ASBM Amendments (December 23, 2011) Every 2 years Every 2 years March 21, 2012 No Action Assurance Letter Every 5 years (Seasonal Boilers) March 21, 2013 Fuel Type Requirements Common Fuel Meter 30

Tune-up Applicability Area Source Major Source New or Existing Coal-fired Boiler <10 MMBtu/hr New or Existing Biomass-fired Boiler New or Existing Oil-fired Boiler Limited-use it Boilers Natural gas, Refinery Gas or Gas 1 (Other) Boilers < 5 MMBtu/hr Gas 2 (Other), Light Liquid Boilers 31

Tune-up Requirements Area Source Burner Inspection Flame Pattern, p y Inspection Air-to-fuel system Inspection CO Optimization Recordkeeping No Report Submittal (1) As applicable, inspect the burner, and clean or replace any components of the burner as necessary (you may delay the burner inspection until the next scheduled unit shutdown, but you must inspect each burner at least once every 36 months). Major Source Burner Inspection Flame Pattern Inspection Air-to-fuel system Inspection CO Optimization Recordkeeping Report Submittal (1) Inspect the burner and clean or replace any components of the burner as necessary. 32

Energy Assessment Why? When and how often? Who is qualified? What equipment or systems need to be included? What does cost-effective mean? What needs to be done? 33

Energy Assessment ASBM Existing Final Rule (March 21, 2011) 10 MMBtu/hr Boiler System Energy Use System Qualified Personnel Maximum Duration March 21, 2014 ASBM Amendments (December 23, 2011) Existing 10 MMBtu/hr Boiler System Energy Use System Onsite O i Only Qualified Personnel Maximum Duration March 21, 2014 34

Energy Assessment Major Source Scope Maximum Time Compliance Date Date to Change Emission Reduction Credits 35

Good Combustion Practices O 2 Trim Systems Monitor Optimize Report Operator Training Startup Procedures Shutdown Procedures 36

Startup/Shutdown Periods Boiler MACT standards apply at all times. No exemptions from Boiler MACT standards during periods of Startup and Shutdown. U.S. EPA requires work practice standards for periods of Startupt and Shutdown in lieu of numerical emission limits. 37

Startup/Shutdown Area Source Major Source Minimize i i the boiler s startup and shutdown periods following the manufacturer s recommended procedures. Good Combustion Practices 38

Misc. Startup/Shutdown Area Source Major Source Startup/Shutdown t td Definitions Startup/Shutdown t td Definitions No SSM Plans No SSM Plans 39

Malfunction Malfunction means any sudden, infrequent, and not reasonably ypreventable failure of air pollution control and monitoring equipment, process equipment, or a process to operate in a normal or usual manner which causes, or has the potential to cause, the emission limitations in an applicable standard to be exceeded. Failures that are caused in part tby poor maintenance or careless operation are not malfunctions. 40

Periods of Malfunction Boiler MACT standards apply at all times. No exemptions from Boiler MACT standards during periods of Malfunction. U.S. EPA determines if a facility demonstrated a good faith effort to minimizing i i i emissions i and correcting a Malfunction. 41

Malfunction Process Notification of a Malfunction submitted to U.S. EPA within two (2) business days. Follow-up report submitted to U.S. EPA within 45 business days. U.S. EPA evaluates the reported information concerning the Malfunction to determine if further inquiry or enforcement action is required. Facility can only use Affirmative Defense in response to civil penalties if notification and report is submitted. 42

Affirmative Defense To use Affirmative Defense facilities must show a preponderance of evidence that: The excess emission was caused by a malfunction and was not preventable or reoccurring, and The facility expedited repairs, actions were documented in signed logs, and a root-cause analysis was completed. 43

SSM Plan No SSM Plan required; however may be more important now than ever due to potential enforcement action. 44

Things to Take Away The current status of the Boiler MACT rules? Where do I stand now? What are my compliance options? What are my compliance plans? Be in action! 45

Questions? Speaker Contact Info: Eric M. Swisher eswisher@all4inc.com 610.933.5246 x17 All4 Inc. - 2393 Kimberton Road - P.O. Box 299 - Kimberton, PA 19442 610.933.5246 - www.all4inc.com 46