Applus IDIADA CHINA Proving Ground

Similar documents
Tyre and Vehicle Winter Testing.

Tyre and Vehicle Winter Testing.

Motor Vehicles Working Group (MVWG)

Characteristics of wheel-rail vibration of the vertical section in high-speed railways

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

TÜV SÜD Tire Test 2017

TÜV SÜD - Tire Test 2017

TBR TYRE 2018/19 QINGDAO HANS TYRE CO.,LTD

Contribution of the tyre to further lowering tyre/road noise

POWER MEASUREMENT AND ROAD LOAD DATA ACQUISITION FOR SPEED EPACS

Lateral skid resistance in bends

Michelin X Tweel Airless Radial Tire Family

Workshop Tips Steering Parts

Introduction Elastomeric Bearing Expansion Joints Construction Profiles Projects

PREMIUM SOLID TIRES FOR THE CONSTRUCTION INDUSTRY

High Reach Construction. Telescopic Handlers

Tyre performance, evaluation on: Stopping Distance

Millbrook Group.

SECTIO N 610 PAVEMENT SMO O THNESS

The INDOT Friction Testing Program: Calibration, Testing, Data Management, and Application

Freight Wagon Development in China, Review and Prospect

n Photo may include optional equipment HYUNDAI LPG FORKLIFT TRUCKS - Applied Tier 4 Engine 15/18/20L-7M

TÜV SÜD - Tire Test 2015

NTR30N. Specifi cations. Tow truck 3.0 tonnes

Simulated EV Dynamics: Safety & etvc

Measurement methods for skid resistance of road surfaces

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

Translohr Tramways on tyres

Irizar Group electric bus. Zero emissions Irizar Group Technology

TÜV SÜD Tire Test 2016

Product Catalog

RESEARCH AND DEVELOPMENT

LOW-PROFILE CONCRETE MIXER FOR MINING

EUROPEAN NEW CAR ASSESSMENT PROGRAMME (Euro NCAP) TEST PROTOCOL Lane Support Systems

Simulation of railway track maintenance trains at MATISA

Research on Signal System Interoperability of Urban Rail Transit. Page 1

The benchmark for perfect concrete paving in the 9-m class. Slipform Pavers. SP 92 SP 92 i SP 94 SP 94 i

Procedure for assessing the performance of Autonomous Emergency Braking (AEB) systems in front-to-rear collisions

TÜV SÜD - Tire Test 2017

SPECIFICATION FOR SKID RESISTANCE INVESTIGATION AND TREATMENT SELECTION

Road Signs. 1) Which one of the following is correct when encountering this sign:

Simulation of Collective Load Data for Integrated Design and Testing of Vehicle Transmissions. Andreas Schmidt, Audi AG, May 22, 2014

Tango. Setting a new standard in powered wheelchairs. Comprehensive standard configuration includes:

Essentially, the Ralla 25 has eleven main structural elements:

Passenger cars - Steady-state circular test procedure. Vägfordon - Personbilar - Cirkelprovning vid stationärt förhållande

Powerful, compact cold milling machine in the half-metre class. Cold Milling Machine W 50 H / W 55 H

GRAVEL ASPHALT SNOW ICE SNOW

Overview Presentation. Copyright of Vectus Ltd May 2013 Page 1

RUBBER TRACK OPERATING MANUAL FOR AG TRACTORS

WHOLE SCHEME SOLUTIONS

THE BEST PERFORMANCE IN ANY APPLICATION

RX 60 Technical data. Electric forklift trucks RX RX RX RX 60-35/600 RX 60-40/600 RX 60-45/600 RX 60-50/600

Ultra Light and Compact HVAC

Full Vehicle Durability Prediction Using Co-simulation Between Implicit & Explicit Finite Element Solvers

SCISSOR LIFT PLATFORM FOR MINING

SANY PAVERS.

Slipform Pavers SP 90 model series

35/40/45DS-7E 50DA-7E DIESEL FORKLIFT TRUCKS Environmental - Friendly. n Photo may include optional equipment.

Ch. 157 ESTABLISHED SOUND LEVELS CHAPTER 157. ESTABLISHED SOUND LEVELS

A Tire Friction Characteristic and Braking Performance in High-Speed Driving

THE PRESENT EUROPEAN TYRE DESASTER Egon-Christian von Glasner 28

ELASTOMERS CLEVITE ELASTOMERS. Noise, vibration and harshness control technology, accelerated

Data Sheet WÖHR PARKING PLATFORM 501

n Photo may include optional equipment HYUNDAI LPG FORKLIFT TRUCKS - Applied Tier 4 Engine 35L/40L/45L/50L-7A

Whether you are looking for a performance, passenger or commercial van tire; we ve got the product to suit your lifestyle.

ITEM 585 RIDE QUALITY FOR PAVEMENT SURFACES Description. Measure and evaluate the ride quality of pavement surfaces.

ADVANCING THE LEGEND TYPICAL EXCAVATOR MARKETS APPLICATIONS. New with GRADALL Series V excavators

Electrification and Power Supply. Andrea Nardinocchi Technological Design Department Italferr S.p.A., Rome, Italy

15D/18D/20DA-7E. EUROTRADING MORTIER Torhoutbaan ICHTEGEM Tel Fax

EM, MPT & Industrial Tyres TECHNICAL DATABOOK 12 TH EDITION

Regulations relating to the Use of Vehicles, Chapter 5

Standard Kerb, Channel and Edging BS Standard Concrete Kerb, Channel and Edging

RX 60 Technical data.

Product presentation RAILWAY

Vibration Analysis of Gear Transmission System in Electric Vehicle

SANY PAVERS.

DYNAS3 LEADING SOLUTIONS FOR DYNAMIC ENGINE TESTING. Explore the future

file://c:\users\salearners\desktop\e-books2\road Signs Two K53 Learners Licenc...

O P E R A T I N G M A N U A L

IHS Automotive. The Advanced Automotive Steering Systems Report. SupplierBusiness. Topical Report edition. supplierbusiness.

Improving Heavy Vehicle Emergency Braking Systems. Jonathan Miller and David Cebon Cambridge University, UK

SMOOTH PAVEMENTS LAST LONGER! Diamond Grinding THE ULTIMATE QUESTION! Rigid Pavement Design Equation. Preventive Maintenance 2 Session 2 2-1

Thinking in your Visions

Management Strategy and Cases of Chinese Urban Mobility. Gong Liyuan Jinan Transport Research Center

CSO/STORMWATER MANAGEMENT. HYDROVEX FluidHook Control Gate Valve

Robustness to unintended ignition key rotation with key ring only

Water influence on skid resistance. Standardisation: input of the HERMES programme

China Gas Station Industry Report,

Electro-Mobility Battery Standardization. Alfons Westgeest Secretary General EUROBAT Battery Day 30 November 2010

SANY CONCRETE PLACING BOOMS SANY CONCRETE PLACING BOOMS

AP755 Asphalt Paver Product Introduction

Private Roads & Municipal Waste Collection Policy POLICY NUMBER: 12 DATE APPROVED: April 21, 2015 (# ) DATE REVISED:

TALL TREES AND EXTENSIVE FARMS

Innovating hydraulic systems and tools for the wind energy industry

Motorways, trunk and class 1 roads and heavily trafficked roads in urban areas (carrying more than 2000 vehicles per day) C All other sites 45

Reinforced edge channels KE-100

APPLICATION GUIDE VOLVO TRUCK AND BUS MAY 2018

SANY CONCRETE PLACING BOOMS

Electric transverse seat / tri-lateral stacker ( kg)

RAILWAYS. Design of track geometry2. Jarosław Zwolski, PhD CE

Transcription:

Applus IDIADA CHINA Proving Ground

Applus IDIADA will be managing a new proving ground complex in China open to all companies in the automotive sector. EUROPE + CHINA Applus IDIADA is contributing to the design of the new proving ground, which keeps the same level of track quality and follows the same rules and standards of safety and confidentiality that apply in Applus IDIADA s proving ground in Spain. Same customer services and client orientated procedures Same standards of safety Construction started in October 2013 and will start operation in 2016. State-of-the-art test tracks and workshops

1 2 11 7 5 14 9 16 3 15 8 10 6 13 12 4 1 2 3 High speed circuit External noise Dynamic platform 9 10 11 Wet handling Wet circle Drift and pull Client s workshops (Passenger cars and commercial vehicles) Internal emergency services (Infirmary, fast intervention emergency vehicles, ambulance) 4 Straight line braking 12 Kerbs (sidewalks) Safety cars 5 NVH and comfort 13 Durability and fatigue 6 Multipurpose platform 14 General road Offices and meeting rooms for customers 7 Off-road 15 Test hills Internal fuel station 8 Dry handling 16 Straight line braking B Sample storage

1 High speed circuit Length of straights: 1500 m Bends 4 parking areas Direct access to dynamic platform Total length: 5290 m Neutral steer speed: 170 km/h Maximum banking: 111% (49º) Track width: 18 m Longitudinal gradient: 0.75% Radius of the curves: 275 m 4 lanes

2 External noise Length of acceleration lane: 500 m ISO 10844: 1994 ISO 10844: 2011 Truck and bus testing capability Several turnaround areas Extra space for ISO asphalt to enhance testing capabilities (30 x 30 m platforms)

3 Dynamic platform Length of central acceleration lane: 400 m Length of tangential acceleration lane: 400 m Trapezoidal area: 350 x 100 m Fast access from High speed circuit Longitudinal gradient: 0.0% Transversal gradient: 0.5% Circular plate diameter: 300 m

4 Straight line braking High-adherence asphalt (µ=0.8) Basalt tiles (µ=0.3) Ceramic tiles (µ=0.1) Polished concrete (µ=0.4) Checker board (µ=0.8-0.1) Low-adherence asphalt (µ=0.6) Length of testing area: up to 300 m Length of acceleration lane: 580 m Split µ testing capability Watering system: flooding (1mm water film depth) Wide safety areas Straight aquaplaning (µ=0.8)

5 NVH and comfort Simplified view Length of testing area: 600 m Width of testing area: 24 m Length of acceleration lane: 250 m Tyre testing surfaces Different types of inputs (steps, manholes, speed reducers, ) Expansion Irregular concrete (badly mantained road) Rough asphalt / Smooth asphalt Steps (positive) Steps (negative) Belgian pave Speed reducers Manhole road Railway crossing Washboard Longwave road U shape (negative) U shape (positive) Repaired asphalt

6 Multipurpose platform 5-metre gravel run-off area around circular plate Longitudinal gradient: 0.0% Transversal gradient: 0.5% Length of tangential acceleration lane: 225 m Circular plate diameter: 70 m

7 Off-road Different testing elements: Slopes Mud pools Bumps Rocks Dimensions of testing area: 120 x 135 m Vehicle cleaning area Possibility to customize

8 Dry handling Length of main circuit: 1915 m Asphalt paved run-off areas Parking area Alternative circuits 4 different circuits Total track length: 2300 m Counterclockwise direction of travel Track width: 8 m

9 Wet handling Length of main circuit: 1535 m Asphalt paved run-off areas Parking area Alternative circuits Lateral hydroplaning curve: 100 m radius 4 different circuits Total track length: 1700 m Counterclockwise direction of travel Track width: 7 m Water film depth: 1 mm Hydroplaning water film depth: 6 mm

10 Wet circle Low-adherence asphalt (µ=0.6) Basalt tiles (µ=0.3) Polished concrete (µ=0.4) High-adherence asphalt (µ=0.8) 5 testing surfaces with different µ values Diameter of lanes: 41 to 55 m Width of lanes: 7 to 10 m Low profile kerbs for water distribution

11 Drift and pull Length of testing area: 450 m Length of acceleration lane: 100 m Width of testing area: 20 m Longitudinal gradient: 0.0% Transversal gradient: 1% and 2%

12 Kerbs (sidewalks) Sidewalk 1: 100mm Sidewalk 2: 150mm Sidewalk 3: 200mm Sidewalk 4: 250mm Sidewalk 5: 300mm 5 different heights (100 to 300 mm) Dimensions of test platforms: 5 x 25 m Dimensions of approaching area: 85 x 25 m Passenger cars and trucks Approach in different angles

13 Durability and fatigue Gravel road Belgium pave (passenger cars) Asphalt (neutral) Potholes Rough road (commercial vehicles) Rough road (passenger cars) Cobblestone (passenger cars) Cobblestone (commercial vehicles) Water wade (commercial vehicles) Salt water wade Water wade (passenger cars) Length of main circuit: 1715 m Total testing length: 3260 m Passenger cars and commercial vehicles testing capabilities: different input severities Neutral asphalt lane and lane selection sectors to enhance flexibility for different durability programs Parking area for cooling

14 General road 1 flat straight: 360 m 0% Long straights over 400 m Circuit C1 lenght 2240 m 2 different circuits Total length of track: 3990 m Width of track: 10 m Circuit C2 length 1750 m

15 Test hills 10% (with low µ area) 12% 15% (with low µ area) 18% 20% (with low µ area) 30% 6 different slopes Split µ testing capability

16 Straight line braking B Length of testing area: 200 m Length of acceleration lane: 440 m Width of testing lane: 5 m Wide safety areas Watering system: flooding (1 mm water film depth)

Client s workshops PASSENGER CARS Total size: 620 m² Storage: 75 m² Vehicle preparation area: 165 m² P Confidential vehicle parking area: 170 m² Office area: 210 m² Equipped kitchen High-speed DSL network + WiFi network Changing room and showers GROUND FLOOR FIRST FLOOR SECOND FLOOR

COMMERCIAL VEHICLES Total size: 1030 m² Vehicle preparation area: 760 m² Office area: 250 m² Storage: 20 m² Inspection pits Equipped kitchen GROUND FLOOR FIRST FLOOR High-speed DSL network + WiFi network Changing room and showers Overhead crane

CONSTRUCTION SITE: October 2013 - October 2015

October 2015 edition Applus IDIADA Group icpg_client@idiada.com YANTAI (45 min) SHANDONG PENINSULA ZHAOYUAN (20 km) QINGDAO (2 hours) Shanghai T +86 (21) 6210 0894 F +86 (21) 5208 0556 Beijing T +86 (10) 8446 3317 Changchun T +86 (431) 8190 9680 Chongqing T +86 (23) 6756 8060 Guangzhou T +86 (20) 2282 9202 Liuzhou T +86 (772) 3166 619 Shenzhen T +86 (755) 2918 4532 Barcelona (European Headquarters) T +34 977 166 004 Follow us in: www.applusidiada.com