Photovoltaic Solar Plan Review

Similar documents
This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

2016 Photovoltaic Solar System Plan Review List

CHAPTER 10 ELECTRICAL. Notes:

CHAPTER 10 ELECTRICAL

Solar PV Standard Electrical Plan

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

Solar PV Standard Electric Plan

Green Building Technology

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

Non-Residential Solar Energy Photovoltaic (PV) Packet

Residential Photovoltaic (PV) Packet

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

9/7/2010. Objectives. Article 90. Introduction NEC Significant Changes. Review significant revisions in the 2011 NEC

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

STREAMLINED SOLAR CHECKLIST Owner Name:

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

SOLAR PV INSTALLATIONS

City of Manhattan Beach Community Development

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

ENGINEERING SPECIFICATION

City of Manhattan Beach Community Development

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Spring Test 7 due 05/03/2013

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Applicant and Site Information Job Address: Permit #:

CHAPTER V RESIDENTIAL WIRING

Solar Photovoltaic Power. Overarching Objectives. How many questions? 9/16/2012. From plan review to Final Inspection

Bulletin Wiring methods for Solar Photovoltaic Systems Rules and , Tables 11 and 19

Bulletin Wiring methods for Solar Photovoltaic Systems Rules, 2-034, , and , Tables 11 and 19

Solar Power Installation Application

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Fee $20 Course: NEC Changes 1 This course is valid for these credentials: Credential Description Cred Code Credit Hours

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

SINGLE PHASE WIRING SPECIFICATIONS

Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS

Bulletin Wiring methods for Solar Photovoltaic Systems Rule and , Tables 11 and 19

EXPANSION JOINT DETAILS DURA-BLOK CONDUIT SUPPORT CONDUIT ATTACHMENT DETAIL SCALE: NOT TO SCALE GROUNDING WIRE DETAIL SCALE: NOT TO SCALE

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC

CP-250E-60/72-208/240-MC4 Microinverter with Modular Trunk Cable

Washoe County PLAN SUBMITTAL

CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1

Load Side PV Connections

SunWize SW and OEM Series Solar Modules GENERAL INSTALLATION & USER GUIDE

Know the Code: PV and NEC

Title Goes Here and Can Run Solar Photovoltaic up to 3 lines as shown here Systems as you see

THREE PHASE WIRING SPECIFICATIONS

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Spring Test 10 due 05/11/2013

NEC 2014 Code Changes

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

PHOTOVOLTAIC SYSTEMS

Questions from the AHJ To Fuse or Not to Fuse?

Technical Summary of Battery Energy Storage Systems

Expedited Permitting Process for Electric Vehicle Charging Stations

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

CPS 3Phs String Inverters NEC 2014 Compliance

NEC 2011 Code Changes

DIRECTORY, IDENTIFICATION, LABEL, MARKING, PLAQUE, AND SIGN REQUIREMENTS FOR SOLAR PV SYSTEMS

A Look at the 2017 NEC Significant Changes

Supply-Side PV Connections

33'-10"± ROOF #1 (2) SUNPOWER SPR E C-AC MICROINVERTER MODULES ROOF #2 (13) SUNPOWER SPR E C-AC MICROINVERTER MODULES 78'-9"± 25'-5"

the National PhotoVoltaic protection note 5 I rated Introduction points of interest When to Fuse, When Not to Fuse

Bulletin Wiring methods for solar photovoltaic systems Rules 2-034, , , , , Tables 11 and 19

Chapter 5. Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI)

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

Pretest Module 24 Three-phase Service Entrance

SunWize SWPB Series Solar Modules GENERAL INSTALLATION & USER GUIDE

Have You Been Grounded Lately

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Solar module user manual Conergy PM 225P-250P

APPROACHING. The Inverter. 92 IAEI NEWS May.June approaching the inverter

Job Address: Permit #:

Application Note Three Phase String Inverters NEC 2014 Compliance

SECTION SOLAR ENERGY ELECTRICAL POWER GENERATION SYSTEM

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

2014 NEC Changes (Homestudy)

Temporarily Approved Solar Photovoltaic System Electrical Schematics

32 IAEI NEWS March. April

2. Fire Department Inspections are required and available by appointment on Tuesdays and Wednesdays. See item number four for fees.

Copyright 2012 DelSolar Co. Ltd MQWRD installation manual-iec Ver. 1.4

2014 NEC Changes Part 1 (Homestudy)

The following permits are required to install a solar PV system with a maximum power output of 10 kw or less:

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

SECTION SOLAR ENERGY ELECTRICAL POWER GENERATION SYSTEM

NEC REQUIREMENTS FOR GENERATORS

Reference: Photovoltaic Systems, p References: Photovoltaic Systems, Chap. 7 National Electrical Code (NEC), Articles 110,

Transcription:

PAIGE B. VAUGHAN, CBO Director of Building and Safety Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail:lbutler@comptoncity.org Building & Safety Department Photovoltaic Solar Plan Review Plan Check Submittal Date: Plan Check #: Building Permit #: Job Address: Project Description: Applicant: Phone #: Email: Plan Examiner: Phone #: Email: _ GENERAL 1. The address of the building, assessor s parcel number (APN), zoning, the name, address and phone number of the owner(s) and person(s) preparing the plans are required on the first sheet (cover sheet) of the plans (R106.1.1) 2. Occupancy, construction type and proper Code Editions noted on the first sheet (cover page). 3. Plans shall have sheets numbered with a sheet index on the cover page. 4. Each sheet of the architectural and structural plans must bear the signatures, registration number and expiration date of an architect or engineer registered in the State of California. 5. Two sets of plans will be required during permit issuance Plans must be: (106.3.2.2.& 106.3.3.) a. Quality blue or black line drawings with uniform and light background color. b. Minimum 18 x 24 to Maximum of 30 x 42" size with minimum 1/8" lettering size. 7. Separate permits required for grading, retaining walls, swimming pools, demolition, detached accessory structures, outdoor bar-b-que cooking facilities, etc. 8. Obtain all clearances as noted on the attached Clearance Summary Worksheet. Prompt attention is suggested as it can take weeks for some departments to review the project. Comply with conditions given under approval prior to the permit issuance. 9. Delete all items, details, and notes that do not pertain to this project. 10. PLOT PLAN (OR Site Plan): Provide fully dimensioned plot plan to scale. Show property lines, easements and new and existing building locations. Dimension front, side and rear distances to property

lines and between buildings, indicate finish and existing ground slope grades. Provide drainage information. Show other relative information such as driveways, street centerline and alley. Provide North arrow, show fire safe standards features (water tank, hydrant, etc.). PLAN DETAILS 1. Provide the following information for the photovoltaic (PV) System: (CEC 690) a. Scope of the project, including system KW rating. b. Complete single line diagram of the PV and utility interconnect. c. Site plan, including location of system components, (i.e. inverter, convertor, batteries, modules, disconnects, etc). d. Type of system (i.e Alternating-Current Modules, Bipolar, grounded, ungrounded, Hybrid, isolated, interactive, stand-alone, etc). e. Utility service Operating voltage or class. f. Provide information on the size, type, and insulation ratings (voltage, temperature, etc) of all conductors and associated wiring components on the direct current (DC) and alternating (AC) side of the PV system. g. Indicate type, size and material of raceway(s). 2. Show the roof access and roof mounted equipment, on the roof plan. (CEC 240.24) 3. Provide the following information (as applicable) for the direct current (DC) side of the PV system: (CEC690) a. Number of series connected modules in every PV source circuit. b. Number of parallel connected modules or panels PV source circuits in each array or PV power source. c. Number of combiner boxes, control boxes, or PV power centers for each array, sub-array or PV power source. d. Number of PV output circuits. e. PV source circuit modules or panels connection arrangement. f. Operating and open-circuit voltage of each module or panel. g. Operating voltage of each array or PV power source. h. Operating current of every PV source circuit. i. Operating current of each array. j. Maximum array, panel or module system voltage. k. Short circuit current of modules or panels. l. Short circuit current of array and sub-arrays. m. Short circuit current of battery system. n. Disconnecting means electrical ratings. o. Disconnecting means wiring diagram. p. Disconnecting means rated short-circuit current per pole. 4. Provide the manufacturer s specification sheets for the PV modules (or panels), including manufacturer s name, catalog numbers, complete electrical information, required marked acceptable series back-feed fuse protection rating and installation instruction. 5. Provide the manufacturer s specification sheets for the inverters, converters, charge controllers, and AC modules, indicating the following ratings:

a. Maximum Input AC and DC voltage, and the range of operating voltage(s), b. Nominal AC output voltage, c. Nominal DC voltage and operating range for Utility Interactive or Stand-Alone systems with charge controller, d. Maximum Input AC and DC current, and maximum input short circuit current, e. Maximum inverter output short circuit current and duration. e. Maximum utility source back-feed current (short or open circuit) for utility interactive System with or without charge controller, f. Maximum continuous AC output current and power, g. Normal operation temperature range. 6. Provide the manufacturer s specification sheets for inverters manufacturer s name, model designation, and listing (UL safety standard 1741) requirements (i.e., grid-tie or not). 7. Provide information indicating if the inverter(s) or charge controller(s) contains current limiting devices that limits the output circuit current to the maximum inverter input DC current rating. 8. Provide the manufacturer s wiring details for combiner boxes, control boxes, or PV power centers manufacturer s name, model designation, and listing requirements. 9. Provide information on the size, type, and insulation ratings (voltage, temperature, etc) of all conductors and associated wiring components on the DC and AC side of the PV system. 10. Provide battery specification sheet(s) indicating the its type, nominal output voltage and the rated capacity in ampere-hours. (CEC 690.71(B)(1)) 11. Provide information indicating compliance with the NEC 690.61 requirement, Loss of Interactive System Power. (CEC 690.61) 12. Provide details for connector specification sheet(s) indicating configuration, construction, type, grounding member and circuit current interruption capability and method. (CEC 690.33) 13. Indicate if the photovoltaic system uses a diversion charge controller as the sole means of regulating the charging of a battery. (CEC 690.72(B)(1)) 14. Indicate method of access to the junction, pull or outlet boxes behind the modules or panels. CIRCUITS 1. The maximum system voltage of bipolar circuits shall be the highest voltage achieved between the ungrounded sides of each 2-wire circuits that are connected to bipolar source array when all of the following conditions are met: (LAEC 690.7(E)) (a) One conductor of each 2-wire circuit is solidly grounded. (b) Each 2-wire circuit is connected to a separate sub-array. (c) The equipment is clearly marked with a label as follows: WARNING BIPOLAR PHOTOVOLTAIC ARRAY. DISCONNECTION OF NEUTRAL OR GROUNDED CONDUCTORS MAY RESULT IN OVERVOLTAGE ON ARRAY OR INVERTER.

2. The circuit conductors and overcurrent protective devices shall be sized to carry not less than 125% of the maximum current as calculated in LAEC 690.8(A). (CEC 690.8(B)) 3. The overcurrent protection of output circuits with internal current limiting devices shall be not less than 125% of the maximum limited current of the output circuit. The conductors in such an output circuit shall be sized in accordance with CEC 690.8(B)(1).(CEC 690.8(B)(2)) 4. The common-return conductor of systems with multiple voltages (i.e., multi-tap battery banks) shall not be smaller than the sum of the ampere ratings of the overcurrent devices of the individual output circuits. (CEC 690.8(C)) 5. Where a single overcurrent device is used to protect a set of two or more parallel connected module circuits, the ampacity of each of the module interconnection conductors shall not be less than the sum of the (modules required marked acceptable series back-feed protection) fuse rating and 125% of the short-circuit from the other parallel-connected modules. (CEC 690.(D)) OVERCURRENT PROTECTION 1. Photovoltaic source circuits, output circuits, inverter output circuits, and storage battery circuit conductors and equipment shall be protected in accordance with the requirements of Article 240 of the California Electrical Code. (CEC 690.9(A)) 2. Circuits connected to more than one electrical source (i.e., parallel strings, inverters, storage-battery circuits, etc) shall have overcurrent protective devices providing overcurrent protection from all sources. (CEC 690.9(A)) 3. Overcurrent protective devices in the DC portion of the system shall be listed for use in DC circuits and shall have the appropriate voltage, current, and interrupting ratings. (CEC 690.9(D)) DISCONNECTING MEANS 1. Provide a disconnecting means for all current carrying conductors of PV sources from all other conductors in the building or other structure. This disconnecting means shall be installed at a readily accessible location either on the outside of the building or structure or inside nearest the point of entrance of the PV system conductors. (CEC 690.13&14) 2. Provide a disconnecting means for the following items: a. PV source circuit(s)(isolating switches), b. Overcurrent devices, c. Blocking diodes, d. Inverters, e. Batteries, f. Charge controllers, g. (CEC 690.14&15) 3. The PV disconnecting means shall be grouped together and the maximum number of disconnects shall not exceed six. (CEC 690.14(C)4&5) 4. Disconnecting means shall be provided to disconnect a fuse from all sources of supply if

the fuse is energized from both directions and is accessible to other than qualified persons. (CEC 690.16) 5. The switch or circuit breaker that is intended to disconnect ungrounded conductors of a PV system shall be readily accessible and comply with all applicable provision of the section 690.17 of CEC. (CEC 690.17) 6. Current carrying conductors of battery circuits, consisting of field serviceable batteries with more than twenty four 2-volts cells connected in series string (48 volts, nominal), shall have provisions to disconnect them into 24 cells (48 volts, nominal) or less segments for maintenance by qualified personnel. Non-load-break bolted or plug-in disconnects are permitted. (CEC 690.71(E)) WIRING METHODS 1. Wires used in PV system shall be of a type indicated in CEC 690.31(B). Indicate the wires intended to be used on this installation. (CEC 690.31(B)) 2. DC source and output circuits of a utility-interactive inverter must be installed in approved metallic raceways or enclosures from the point of penetration of the surface of the building or structure to the first readily accessible disconnecting means. (CEC 690.31(D)) 3. Ungrounded source and output circuits shall be provided with disconnects, overcurrent protection(s), ground-fault protection(s) and listed inverter or charge controller for the purpose as required in section 690.35 of CEC. (CEC 690.35) 4. The ungrounded source and circuit conductors shall be consist of sheathed (jacketed) multi-conductor cable or shall be in an approved raceway. (CEC 690.35(D)) GROUNDING 1. Indicate if the components of the system are negatively or positively grounded. 2. Provide a solidly grounded or other approved equivalent methods of system grounding for a grounded system. 3. The DC circuit grounding shall be made at a single point on the photovoltaic output circuit. (CEC 690.42) 4. Exposed non-current-carrying metal parts of module or panel frames, equipment and conductor enclosure shall be grounded in accordance with CEC 250.134 or 250.136(A) regardless of voltage. Provide information on the equipment grounding method. (CEC 690.43) 5. The equipment-grounding conductor for the photovoltaic source and photovoltaic output circuits for roof-mounted DC photovoltaic array in dwellings shall be sized per section 250.122 of the California Electrical Code. CEC 690.45) 6. Indicate grounding electrode system used for the AC, DC or combined AC/DC systems. (CEC 690.47) 7. Provide detail drawing or indicate the method used to insure the removal of an equipment from the system shall not disconnect the (equipment grounding) bonding connection between the grounding electrode conductor and exposed conducting surfaces. (CEC 690.48) 8. Provide detail drawing or indicate the method used to insure the removal of a DWP interactive

inverter or other equipment that does not disconnect(remove) the bonding connection between the grounding electrode conductor and the photovoltaic source and/or output circuit grounded conductor. (CEC 690.49) GROUND FAULT PROTECTION 1. Provided DC ground-fault protection for dwellings with roof mounted DC - PV arrays. (CEC 690.5) 2. The AC side of PV inverter connected to the load side of a service or feeder disconnecting means containing ground-fault relaying and sensing equipment (GFRSE) protection shall be protected by a listed Equipment Ground-Fault Protective Device (EGFPD), located immediately on the AC output side of the inverter. (CEC 690.64(B)(3) Exception) 3. All GFRSE and ground fault circuit interrupters must be listed for the back feed current when the AC side of an inverter(s) are connected to their load side. (CEC 110.3(B)) 4. The EGFPD shall not be installed in service equipment unless listed for such an installation. (CEC 110.3(B)) STORAGE BATTERIES 1. The storage batteries shall be installed in accordance with provisions of Article 480 and 702 of the California Electrical Code. (CEC 690.71 and Article 702) 2. In dwellings, provide information on how are the battery cells interconnected and what is their nominal operating voltage. 3. Provide a listed current limiting overcurrent device at the output of each battery circuit. This device must have adequate short circuit interrupting rating and be able to reduce the available short circuit below the withstand rating of other equipment in that circuit. (CEC 690.71(C)) 4. Battery systems consisting of more than twenty-four 2-volts cells connected in series (more than 48 volts, nominal) are permitted to operate with ungrounded conductors, provided the comply with the following: a. The photovoltaic array source and output circuits are solidly grounded according to provisions of sections of CEC 690.41. b. The DC and AC load circuits are solidly grounded. c. All main ungrounded battery input/output circuit conductors are provided with switched disconnects and overcurrent protection. d. A ground-fault detector and indicator installed to monitor for ground faults in the battery bank. (CEC 690.71(G)) 5. Provide either a battery charge control OR show that the photovoltaic source circuit is matched to the voltage rating and charge requirements of the interconnected battery cells. (CEC 690.72(A)) 6. Flexible cords used from battery terminals to a nearby approved junction box shall be sized 2/0 AWG or larger. (CEC 690.74)

SYSTEMS OVER 600 VOLTS 1. The photovoltaic system with maximum system voltage of over 600 volts shall comply with Article 490 and other applicable over 600 volts installation requirements of the code. ( CEC 690.80) 2. The voltage rating of battery circuit cable shall not be smaller than the charging or equalizing condition of the battery system.(cec 690.81) CALCULATIONS 1. Provide maximum system voltage calculation based on the expected ambient temperature of 14 to 31 EF. (CEC 690.7) 2. Provide maximum system open-voltage calculation based on manufacturer s instructions for photovoltaic power source modules made of materials other than crystalline or multicrystalline silicon. (CEC 690.7(A) 3. Provide maximum DC circuit current calculation for each PV source circuit.(cec 690.8(A)(1)) 4. Provide the maximum DC current calculation for each PV output circuit. (CEC 690.8(A)(3)) 5. Provide fault current calculation from Department of Water Power side to the AC disconnect(s) and inverter(s). 6. Provide calculations to determine the minimum overcurrent protection device rating for the DC side. Photovoltaic system currents shall be considered as continuous. (CEC 690.8(B), 690.8(B)(1), 690.8(B)(2)) 7. Provide proper size conductors, between inverter output of the stand alone systems and the building or structure disconnecting means, between the inverter output of stand-alone systems and the building or structure based on the output rating of the inverter and protected in accordance with Art. 240. (CEC 690.10(B)) 8. For flexible cords and cables exposed to direct sunlight the ampacities shall be derated by the correction factors given in Table 690.31(C) for an ambient temperature of 36-40 EC. 9. For conductors exposed to direct sunlight the ampacities shall be derated by the correction factors given in Table 310.16 for an ambient temperature of 36-40 EC. (LAEC 310.15(A)(2)) 10. Provide calculation showing the size of equipment-grounding conductor for the photovoltaic source and photovoltaic output circuits sized at not less than 125% of the short circuit from the photovoltaic source. (CEC 690.45) 11. Provide calculation showing the required maximum charging current of the interconnected battery cells. (CEC 690.72(A)) 12. Provide calculation for ampacity of the neutral conductor of a 2-wire inverter output connected to the ungrounded conductors of a 3-wire or a 3-phase, 4 wire systems.(cec 690.62) 13. For other than dwelling units, provide the sum of the ampere ratings of all overcurrent devices in circuits, connected on the load side of service disconnecting means, supplying power to a busbar or conductor. The sum shall not exceed the rating of the busbar or conductor. (CEC 690.64(B)(2)) 14. For dwelling units, provide the sum of the ampere ratings of overcurrent devices in circuits,

connected on the load side of service disconnecting means, supplying power to a busbar or conductor. This sum shall not exceed 120% of the rating of the busbar or conductor. (CEC 690.64(B)(2) Exception) 15. Provide calculation showing the total DC leakage current in the DC ground or DC grounded circuits in non-isolated photovoltaic systems does not exceed the EGFPD leakage current trip setting. (CEC 110.3(A) 16. Provide calculation showing the required current and voltage ratings of DC diversion charge controller and diversion load in a circuit. 17. Provide calculation showing the required conductor ampacity and overcurrent protective device rating for circuits containing DC diversion charge controller and diversion load.( CEC 690.72(B)(2)) 18. Provide calculation showing if expansion fittings are not required for the roof mounted raceways due to thermal expansion or building expansion joints if the raceway is used as equipment grounding conductor. (CEC 300.7(B) and 352.44) NOTES ON PLANS 1. Indicate the PV Electrical System Type, KW rating, and list all associated components. 2. Indicate the number of PV cells and modules in each PV Array. 3. Indicate the PV modules manufacturer s name, model or catalog number, physical size, weight and supporting means. 4. Indicate the following information on the DC side of the inverter in PV system: a. Input Voltage, b. Maximum Open circuit Voltage, c. Maximum Input Current, d. Maximum DC power, e. Maximum Short Circuit Current, f. Maximum Permitted system Voltage, 5. Indicate the manufacturer s name, model designation, complete electrical ratings (AC and DC), fault current withstanding and recognized listing agency name for each Inverter Unit. 6. Indicate the following AC output values of the PV system: a. Maximum Output Power, b. Nominal Output Power, c. Operating range, utility voltage, d. Maximum continuous Output Current, e. Frequency Operating range, f. Total Harmonic Distortion, g. Maximum Efficiency, h. Maximum allowable overcurrent protection. 7. Indicate the operating temperature range of the system. 8. Indicate on the plans that all PV system components shall be listed by a recognized testing agency (i.e., UL 1741, etc). 9. Indicate on the plans that the wiring material shall be suitable for the sun exposure and wet locations. Field applied protective coatings are not acceptable.

10. Indicate the maximum series fuse type and rating for each array. 11. Indicate on the plans that where the terminal of the disconnecting means may be energized in the open position, a warning sign shall be mounted on or adjacent to the disconnecting means. The sign shall be clearly legible and have the following words or equivalent: WARNING - ELECTRIC SHOCK HAZARD, DO NOT TOUCH TERMINALS. TERMINALS ON THE BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. (CEC 690.17) 12. Indicate on the plans that signs shall be posted adjacent to each PV disconnect and inverter to indicate, Photovoltaic SYSTEM. 13. Indicate on the plans that all PV modules and associated equipment and wiring material shall be protected from any physical damage. 14. Indicate on the plans, that in one- and two-family dwelling, live parts in PV source circuits and PV output circuits over 150 Volts to ground shall not be accessible to other than qualified persons while energized. (CEC 690.7(D)) 15. Indicate on the plans that all field installed junction, pull and outlet boxes located behind modules or panels shall be accessible directly or by displacement of a module(s) or panel(s) secured by removable fasteners. (CEC 690.34) 16. Indicate on the plans that in an ungrounded PV system, the power source shall be labeled with the following warning at each junction box, combiner box, disconnect and device where the ungrounded circuits may be exposed during service: WARNING ELECTRIC SHOCK HAZARD. THE CURRENT CIRCUIT CONDUCTORS OF THIS PHOTOVOLTAIC POWER SYSTEM ARE UNGROUNDED BUT MAY BE ENERGIZED WITH RESPECT TO GROUND DUE TO LEAKAGE PATHS AND/OR GROUND FAULTS. (CEC 690.35(F)) 17. Each side of a power transformer shall be considered as primary and protected in accordance with LAEC 450.3. (CEC 690.9(B)) 18. The grounded conductors of battery circuits consisting of more than twenty four 2-volts cells connected in series string (48 volts, nominal) shall have provisions to disconnect them into 24 cells (48 volts, nominal) or less segments for maintenance by qualified personnel. The disconnects shall only be accessible to qualified personnel. A non-load-break-rated switch is permitted. (CEC 690.71(F) 19. Single-conductor cable types SE, UF, USE and USE-2 are permitted to be used in the source circuits when installed in the same manner as Type UF multi-conductor cable in accordance with Part II of Article 340. (CEC 690.31(B)) 20. Removal of a DWP-interactive inverter or other equipment shall not disconnect the bonding connection between the grounding electrode conductor and the photovoltaic source and/or output circuit grounded conductor. (CEC690.49) 21. The roof mounted photovoltaic modules, panels or solar voltaic roll roofing material shall have the same or better listed fire-resistance rating than the building roof-covering material.