Applicant and Site Information Job Address: Permit #:

Similar documents
Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1

Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

2. Fire Department Inspections are required and available by appointment on Tuesdays and Wednesdays. See item number four for fees.

Use this plan ONLY for utility-interactive central/string inverter systems. This plan is not intended for bipolar systems,

SOLAR PV standard Plan-Simplified Central/String Inverter Systems for One and Two Family Dwellings

The following permits are required to install a solar PV system with a maximum power output of 10 kw or less:

STREAMLINED SOLAR CHECKLIST Owner Name:

Solar Rooftop Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Solar Standard Plan Simplified Systems for - and Two-Family Dwellings

Solar PV Standard Electric Plan

Job Address: Permit #: Contractor/Engineer Name: License # and Class: Signature: Date: Phone Number:

Solar PV Standard Electrical Plan

CITY OF SONOMA - TOOLKIT DOCUMENT #1

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Central/String Inverter Systems for One- and Two-Family Dwellings

Job Address: Permit #:

Solar PV Standard Plan Simplified Central/String Inverter Systems for 10 KW or less One- and Two-Family Dwellings

City of Daly City Department of Economic and Community Development Building Division th Street, Daly City. CA

Solar Power Installation Application

2016 Photovoltaic Solar System Plan Review List

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

Photovoltaic Solar Plan Review

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

PHOTOVOLTAIC SYSTEMS

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Residential Photovoltaic (PV) Packet

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC

City of Manhattan Beach Community Development

Non-Residential Solar Energy Photovoltaic (PV) Packet

City of Manhattan Beach Community Development

Solar Eligibility Checklist for Expedited Photovoltaic Permitting for One- and Two-Family Dwellings

SOLAR PV INSTALLATIONS

CHAPTER 10 ELECTRICAL. Notes:

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

EXPANSION JOINT DETAILS DURA-BLOK CONDUIT SUPPORT CONDUIT ATTACHMENT DETAIL SCALE: NOT TO SCALE GROUNDING WIRE DETAIL SCALE: NOT TO SCALE

Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS

Solar Photovoltaic Power. Overarching Objectives. How many questions? 9/16/2012. From plan review to Final Inspection

ENGINEERING SPECIFICATION

COVER VICINITY MAP SCOPE OF WORK ELECTRICAL NOTES GOVERNING CODES SHEET INDEX

ELIGIBILITY CHECKLIST FOR EXPEDITED SOLAR POOL HEATING PERMITTING

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

Technical Summary of Battery Energy Storage Systems

RGS PV-000. Sheet List

Green Building Technology

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

Load Side PV Connections

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

A Look at the 2017 NEC Significant Changes

XXX RESIDENCE : XXX kw DC GROUND MOUNTED PHOTOVOLTAIC SYSTEM

SAMPLE PERMIT APPLICATION PACKAGE

Bulletin Wiring methods for Solar Photovoltaic Systems Rule and , Tables 11 and 19

33'-10"± ROOF #1 (2) SUNPOWER SPR E C-AC MICROINVERTER MODULES ROOF #2 (13) SUNPOWER SPR E C-AC MICROINVERTER MODULES 78'-9"± 25'-5"

Bulletin Wiring methods for Solar Photovoltaic Systems Rules and , Tables 11 and 19

Pretest Module 24 Three-phase Service Entrance

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

Calculating AC Line Voltage Drop for M215 Microinverters with Engage Cables

First Responder System Identification Quiz. Presented by the NY-SUN PV Trainers Network

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

Temporarily Approved Solar Photovoltaic System Electrical Schematics

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

APPROACHING. The Inverter. 92 IAEI NEWS May.June approaching the inverter

Section 7: Price Schedule Form 1

March Commercial Distributed Generation with Optional Energy Storage Systems

Questions from the AHJ To Fuse or Not to Fuse?

CHAPTER 10 ELECTRICAL

Bulletin Wiring methods for Solar Photovoltaic Systems Rules, 2-034, , and , Tables 11 and 19

THIS PANEL FED FROM INV1. PER NEC 408.4(B) Part No NEC (C) Entrances to rooms or other guarded locations that contain exposed live

2014 NEC Changes (Homestudy)

PV Installations 2015 Electrical Code & more. Presented by: Ted Olechna Director Codes and Standards Support

Copyright 2012 DelSolar Co. Ltd MQWRD installation manual-iec Ver. 1.4

DIRECTORY, IDENTIFICATION, LABEL, MARKING, PLAQUE, AND SIGN REQUIREMENTS FOR SOLAR PV SYSTEMS

Washoe County PLAN SUBMITTAL

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

Installation and Operations Manual

Expedited Permitting Process for Electric Vehicle Charging Stations

Issued: February 27, 2017 Effective: March 29, 2017 Issued by: Darrin R. Ives, Vice President 1200 Main, Kansas City, MO 64105

Codes and Standards: Focusing on the Sustainability Aspects of Electrical Installations What, Why and How?

2014 NEC Changes Part 1 (Homestudy)

CP-250E-60/72-208/240-MC4 Microinverter with Modular Trunk Cable

NEC 2014 Code Changes

Product manual Rapid Shutdown (RSD) system for residential and small commercial

INSTALLATION MANUAL.

Solar Electric Installation Requirements

Spring Test 10 due 05/11/2013

Know the Code: PV and NEC

EV Charging Station Submittal Requirements

SPEEDFAX TM 2011 Renewable Energy Products Contents

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Transcription:

TOOLKIT DOCUENT #4 Planning and Building Services Solar Standard Plan Simplified icroinverter and Systems (One- and Two-Family Dwellings) SCOPE: Use this plan ONLY for systems using utility-interactive icroinverters or odules () not exceeding a combined system inverter output rating of 10 kw, with a maximum of 3 branch circuits, one module per inverter and with module ISC maximum of 10-A, installed on a roof of a one- or two-family dwelling or accessory structure. The photovoltaic system must interconnect to a single-phase service panel of 120/240 Vac with service panel bus bar rating of 225 A or less. This plan is not intended for bipolar systems, hybrid systems or systems that utilize storage batteries, charge controllers or trackers. Systems must be in compliance with current California Building Standards Codes and local amendments of the authority having jurisdiction (AHJ). Other articles of the California Electrical Code (CEC) shall apply as specified in section 690.3. ANUFTURER S SPECIFICATION SHEETS UST BE PROVIDED for proposed inverters, modules, combiner/junction boxes and racking systems. Installation instructions for bonding and grounding equipment shall be provided and local AHJs may require additional details. Listed and labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling (CEC 110.3). Equipment intended for use with system shall be identified and listed for the application CEC 690.4(D). Applicant and Site Information Job Address: Permit #: Contractor/Engineer Name: Signature: Date: Phone #: 1. General Requirements and System Information icroinverter Number of modules installed: Number of icroinverters installed: 1.1 Number of Branch Circuits, 1, 2 or 3: License # and Class: odule () Number of s installed: Note: Listed Alternating-Current odule () is defined in CEC 690.2 and installed per CEC 690.6 1.2 Actual number of icroinverters or s per branch circuit: 1 2. 3. 1.3 Total system power rating = (Total Number of icroinverters or s) * ( inverter power output) = Watts 1.4 Lowest expected ambient temperature for this plan in Table 1: For -1 to -5 C use 1.12 or for -6 to -10 C use 1.14 correction factors. 1.5 Average ambient high temperature for this plan: = +47 C Note: For lower expected ambient or higher average ambient high temperatures, use Comprehensive Standard Plan. 2. icroinverter or Information and Ratings icroinverters with ungrounded inputs shall be installed in accordance with CEC 690.35. icroinverter or anufacturer: odel: 2.1 Rated (continuous) output power: Watts 2.2 Nominal voltage rating: Volts 2.3 Rated (continuous) output current: Amps If installing s, skip [STEPS 2.4] 2.4 aximum input voltage rating: Volts (limited to 79 V, otherwise use the Comprehensive Standard Plan) 2.5 aximum output overcurrent protection device (OCPD) Amps 2.6 aximum number of microinverters or s per branch circuit: 3. odule Information (If installing s, skip to [STEP 4]) #4-2015 Standard Plan, Simplified icroinverter and Systems

odule anufacturer: odel: odule output power under standard test conditions (STC) = Watts 3.1 odule VOC at STC (from module nameplate): Volts 3.2 odule ISC at STC (from module nameplate): Amps 3.3 Adjusted odule voltage at minimum temperature = [Table 1] [cannot exceed Step 2.4] Table 1. odule VOC at STC Based on Inverter aximum Input Voltage Derived from CEC 690.7 icroinverter ax. Input [STEP 2.4] (Volts) 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 ax. odule VOC @ STC, 1.12 (-1 to -5 C) Correction Factor (Volts) 30.4 33.0 35.7 38.4 41.1 43.8 46.4 49.1 51.8 54.5 57.1 59.8 62.5 65.2 67.9 70.5 ax. odule VOC @ STC, 1.14 (-6 to -10 C) Correction Factor (Volts) 29.8 32.5 35.1 37.7 40.4 43.0 45.6 48.2 50.9 53.5 56.1 58.8 61.4 64.0 66.7 69.3 4. Branch Circuit Output Information Fill in [Table 3] to describe the branch circuit inverter output conductor and OCPD size. Use [Table 2] for determining the OCPD and inimum Conductor size. Table 2. Branch Circuit OCPD and inimum Conductor Size* Circuit Current (Amps) Circuit Power (Watts) OCPD (Amps) inimum Conductor Size (AWG) inimum etal Conduit Size for 6 Current Carrying Conductors 12 2880 15 12 ¾ 16 3840 20 10 ¾ 20 4800 25 8 1 24 5760 30 8 1 *CEC 690.8 and 210.19 (A)(1) factored in Table 2, conductors are copper, insulation must be 90 C wet-rated. Table 2 values are based on maximum ambient temperature of 69 C, which includes 22 C adder, exposed to direct sunlight, mounted > 0.5 inches above rooftop, 6 current carrying conductors (3 circuits) in a circular raceway. Otherwise use Comprehensive Standard Plan. Number of icroinverters or s [Step 1] Selected Conductor Size [Table 2] (AWG) Table 3. Array Configuration Summary Branch 1 Branch 2 Branch 3 Selected Branch and Inverter Output OCPD [Table 2] 5. Solar Load Center (if used) 5.1 Solar Load Center is to have a bus bar rating not less than 100 Amps. Otherwise use Comprehensive Standard Plan. 5.2 Circuit Power see [STEP 1] = Watts 5.3 Circuit Current = (Circuit Power) / ( voltage) = Amps Table 4. Solar Load Center and Total Inverter Output OCPD and Conductor Size** inimum Conductor Size Circuit Current (Amps) Circuit Power (Watts) OCPD (Amps) (AWG) inimum etal Conduit Size 24 5760 30 10 ½ 28 6720 35 8 ¾ 32 7680 40 8 ¾ 36 8640 45 8 ¾ 40 9600 50 8 ¾ 41.6 10000 60 6 ¾ **CEC 690.8 and 210.19 (A)(1) factored in Table 4, conductors are copper, insulation must be 90 C wet-rated. Table 4 values are based on maximum ambient temperature of 47 C (no rooftop temperature adder in this calculation), 3 current carrying conductors in a circular raceway. Otherwise use Comprehensive Standard Plan. #4-2015 Standard Plan, Simplified icroinverter and Systems

6. Point of Connection to Utility: 6.1 Load Side Connection only! Otherwise use the Comprehensive Standard Plan. 6.2 Is the OCPD positioned at the opposite end from input feeder location or main OCPD location? Yes No (If No, then use 100% row in Table 5) 6.3 Per 705.12(D)(2): (Combined inverter output OCPD size + ain OCPD size) [bus bar size (100% or 120%)] Table 5. aximum Combined Inverter Output CIrcuit OCPD Bus Bar Size (Amps) 100 125 125 200 200 200 225 225 225 ain OCPD (Amps) 100 100 125 150 175 200 175 200 225 mbined Inverter OCPD with 120% of bus bar rating (Amps) 20 50 25 60 60 40 60 60 45 mbined Inverter OCPD with 100% of bus bar rating (Amps) 0 25 0 50 25 0 50 25 0 This plan limits the maximum system size to less than 10 kw, therefore the OCPD size is limited to 60 A. Reduction of ain Breaker is not permitted with this plan. 7. Grounding and Bonding Check one of the boxes for whether system is grounded or ungrounded: Grounded Ungrounded For icroinverters with a grounded input, systems must follow the requirements of GEC (CEC 690.47) and EGC (CEC 690.43). For systems and icroinverters with ungrounded a input follow the EGC requirements of (CEC 690.43). 8. arkings Informational note: ANSI Z535.4 provides guidelines for the design of safety signs and labels for application to products. A phenolic plaque with contrasting colors between the text and background would meet the intent of the code for permanency. No type size is specified, but 20 point (3/8 ) should be considered the minimum. WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE CEC 705.12 (D)(7) Optional Disconnect per AHJ WARNING DUAL POWER SOURCES SECOND SOURCE IS PHOTOVOLTAIC SYSTE RATED OUTPUT CURRENT APS NORAL OPERATING VOLTAGE VOLTS CEC 690.54 & CEC 705.12(D)(4) SYSTE DISCONNECT SECOND SOURCE IS PHOTOVOLTAIC SYSTE RATED OUTPUT CURRENT APS NORAL OPERATING VOLTAGE VOLTS CEC 690.54 Optional Solar Load Center... NOTE: CEC 705.10 requires a permanent plaque or directory denoting all electric power sources on or in the premesis. #4-2015 Standard Plan, Simplified icroinverter and Systems

Solar Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings 9. Single-Inverter Line Diagram Equipment Schedule TAG DESCRIPTION: (Provide model # if provided) 1 Solar odule or : 2 icroinverter (if not ): 3 Junction Box (es): 4 Solar Load Center, Yes / No: 5 Performance eter Yes / No: 6 *Utility External Disconnect Switch Yes / No: 7 ain Electrical Service Panel 1 2 3 Single-Line Diagram for icroinverters or s Check a box for dc system grounding: Grounded, Ungrounded For ungrounded dc power systems, EGC is required For grounded dc power systems, GEC & EGC are required Refer to CEC 250.120 for EGC installation & Table 250.122 for sizing * Consult with your local AHJ and /or Utility 4 5 6 7 -> -> G -> Branch Circuit OCPDs (Table 3) Branch 1 OCPD size GEC, Branch 2 OCPD size When Required A Branch 3 OCPD size Solar Load Center Busbar(Section 5) TAG Description and Conductor Type: (Table 3) A B Current-Carrying Conductors: (for each branch circuit) EGC: GEC (when required): Current-Carrying Conductors: EGC: GEC (when required): Conductor, Cable and Conduit Schedule mmb Conductor Size Number of Conductors B ain Service Panel OCPDs ain OCPD size: (table 5) Combined Inverter Output OCPD: (Table 4) ain Service Panel Busbar: (Table 5) Conduit/ Conductor/ Cable Type Conduit Size #4-2015 Standard Plan, Simplified icroinverter and Systems

SOLAR STANDARD PLAN - SIPLIFIED icroinverter and Systems for One- and Two-Family Dwellings ROOF LAYOUT PLAN #4-2015 Standard Plan, Simplified icroinverter and Systems Items required: roof layout of all panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points.