PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG LEBUHRAYA DUKE 2, LAMAN RIMBUNAN KEPONG DAN JALAN IPOH

Similar documents
PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG DAN JALAN IPOH 13 JUN 2018

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG & JALAN KUCHING 08 JUN 2018

MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR, JALAN KEPONG DAN JALAN JINJANG PERMAI 2 21 JUN 2018

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR DAN JALAN IPOH 15 JANUARI 2019

1. PENUTUPAN JALAN JANGKA PANJANG DI LEBUHRAYA KL-SEREMBAN (ARAH KL)

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG 30 DISEMBER 2018

1. SAMBUNGAN PENUTUPAN PENUH JALAN JANGKA PENDEK SECARA DUA PERINGKAT DI JALAN RAYA SATU (MALAM)

1. SAMBUNGAN PENUTUPAN JALAN BERKALA DI LEBUHRAYA KL-SEREMBAN, KM310.5 ARAH SELATAN

TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT SSP CONSTRUCTION ALONG JALAN SULTAN AZLAN SHAH AND JALAN KUCHING 17 OCTOBER 2017

TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT SSP CONSTRUCTION JALAN RAYA SATU, JALAN RAYA TIGA & JALAN UTAMA 30 MARCH 2018

EAL 574/4 Perancangan & Dasar Pengangkutan

Book your flight for the upcoming election and your flight could be on us. 100 lucky winners will receive a cashback up to RM300.

Get rewarded, download the Touch n Go e-wallet. Get standard or preferred TGV seats for RM7 before 7pm on 7 July.

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

REKOD PENGALAMAN KERJA

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD. QUOTATION NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD

Frequently Asked Questions (FAQ)

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

JA606: VEHICLE DYNAMICS. INSTRUCTION: This section consists of SIX (6) structured questions. Answer FOUR (4) questions only.

MALAYSIA AIRPORTS HOLDINGS BERHAD TENDER NOTICE

MALAYSIA AIRPORTS HOLDINGS BERHAD

INVOICE. Go Ads Creation Sdn Bhd (S8 86 K)

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

Free ebook. Cara penggunaan product

MALAYSIA AIRPORTS HOLDINGS BERHAD

EAL 573/4 Kejuruteraan Lalu Lintas

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

COMMERCIAL AND RESIDENTIAL SALE REPORT 2016

KAEDAH-KAEDAH LALU LINTAS JALAN (LARANGAN PEMANDUAN KENDERAAN BARANGAN) (NO. 2) 2017

Line detector robot / Robot garisan

UNIVERSITI SAINS MALAYSIA EEM 253 REKABENTUK MEKATRONIK I

Item Bil Description of Works Remarks Main Switch Board

PEPERIKSAAN JULAI 2010

Seminar Penyedia Latihan ezskill Bersama JPK Wilayah Sarawak

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

DINDING / WALL SAIZ PANJANG BIL TIANG PINTU/ DOOR POSTS 2 x x TULANG DINDING / WALL FRAME

LIVING CARE. Critical Illness Insurance

INSTRUCTION: This section consists of SIX (6) structures questions. Answer FOUR (4) questions only.

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

PENGENALAN MISI SYARIKAT INI ADALAH PENGLIBATAN SECARA AKTIF DALAM ARUS PEMBANGUNAN DAN EKONOMI NEGARA.

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD. QUOTATION NOTICE (Via eprocurement)

Section 9 Residual Impacts

1. Mechanics Make a minimum payment of RM 5 with Pay function using the Touch n Go ewallet to receive random cashback up to RM 888.

$'11,n n, Lffi MALAYSIA. PEPERIKSAAI\ AKHIR SEMESTER II sesr PERALATAN BINAAN BPD BPC APRIL 2OO9 2 JAM 30 MINIT

NPM 04/2018 MSN 04/2018

INSTRUCTION: This section consists of SIX (6) structure questions. Answer FOUR (4) questions only.

SISTEM BEKALAN AIR TAJUK PROJEK BARU

NOTIS PERKAPALAN MALAYSIA MALAYSIAN SHIPPING NOTICE

MALAYSIA AIRPORTS HOLDINGS BERHAD

TABLE OF CONTENT 1.0 VISION, MISSION 2.0 COMPANY PROFILE. 2.1 Company Address and Contact Details 2.2 Other Company Details 3.0 CORPORATE INFORMATION

PB604 : BUSINESS FINANCE

CONTROL OF INVERTED PENDULUM-CART SYSTEM BASED ON FUZZY LOGIC APPROACH HASRULNIZAM BIN HASHIM

STRUCTURE : 100 MARKS STRUKTUR : 100 MARKAH. INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL questions.

CALENDAR PROGRAM 2016 CONTINUING PROFESSIONAL DEVELOPMENT (CPD)

PROSES KELULUSAN PERMIT UNTUK KERJA PENGOREKAN JALAN DI WILAYAH PERSEKUTUAN KUALA LUMPUR (WPKL) JABATAN KEJURUTERAAN AWAM & SALIRAN 13 MEI 2015

INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL questions.

CURICULUM VITAE. MOHD ARIFF BIN ABAS No 87, Jalan Adang U8\17, Bukit Jelutong, Shah Alam, Selangor

BUILDING. CIVIL ENGINEERING COMPANY PROFILE

MyBot Bridge. 2 pasukan 4 peserta (2 wakil politeknik, 2 wakil sekolah) TEAM PELAJAR MyBot Operator Mentor 2

Enjoy 30% off when you book a Touch 'n Go ewallet-branded SOCAR at selected special zones!

FINITE ELEMENT (FE) MODEL OF BRAKE INSULATOR IN REDUCING BRAKE SQUEAL NOISE FOR MOTORCYCLES MUNDHER FADHIL ABDULRIDHA UNIVERSITI TEKNOLOGI MALAYSIA

KUCHING. MEKANlKAL SULIT POLITEKNIK SULIT 8.30PG PG (2 JAM) TARIKH: 08 NOVEMBER 2010 (ISNIN) Jangan buka kertas soalan ini sehingga diberitahu.

OPTIMIZATION ON FUEL GAS OPERATION FOR COMBINED CYCLE POWER PLANT MOHD IZAMUDDIN BIN MAHMUD

COMPANY PROFILE YOUR ONE-STOP OFFICE FURNITURE SOLUTION

MODELLING OF THROUGH-THE-ROAD HYBRID ELECTRIC VEHICLE OKE PAUL OMEIZA

KEMENTERIAN KEWANGAN MALAYSIA

OPTIMAL ANTI LOCK BRAKING SYSTEM WITH REGENERATIVE BRAKING IN HYBRID ELECTRIC VEHICLE DANA DEHGHANI UNIVERSITI TEKNOLOGI MALAYSIA

DIRECTORY OF WINDSCREEN REPAIRS / REPLACEMENT CENTER (WRC) WITH EFFECT FROM 01/07/2017

GARNIER MALAYSIA Peraduan Menangi BMW Ice Watch bernilai RM500 setiap satu untuk. 20 pemenang bersama Watsons Malaysia

MANUAL PENGGUNA (USER MANUAL) PROSES PINJAMAN PERALATAN (ASSET BOOKING)

PANDUAN ASAS METATRADER 4

TERMA DAN SYARAT PERKHIDMATAN DIRECT DEBIT

Hop On Media Rate Card 2018 ADVERTISING PROPOSAL HOP ON MEDIA ADVERTISING PROPOSAL

SECTION A : 100 MARKS BAHAGIAN A : 100 MARKAH INSTRUCTION: This section consists of SIX (6) essay questions. Answer FOUR (4) questions only.

LATAR News release TOLL-FREE CONGESTION-FREE AT LATAR EXPRESSWAY THIS HARI RAYA FOR THOSE HEADING NORTH VIA WEST COAST ROUTE

INQUIRIES. :

EFFECT OF TRANSVERSE RUMBLE STRIPS ON TRAFFIC FLOW FUNDAMENTAL DIAGRAM ALI TORKZADEH

DESIGN OPTIMIZATION OF THIRD BRAKE LIGHT AND SIGNAL SYSTEM ON MOTORCYCLE HELMET LOGESWARAN A/L KANASIN UNIVERSITI TEKNIKAL MALAYSIA MELAKA

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

VERTEX SUPERIEUR SDN BHD COMPANY PROFILE. Real Estate Management Project Management Consultant Developer

OPTIMAL LOCATION OF FACTS FOR ATC ENHANCEMENT BY USING SENSITIVITY ANALYSIS RAIMON OMAR AL SHAIKH SALEM

Euromoney Real Estate Survey 2016

INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL questions.

Central Region I - Kuala Lumpur & Selangor. Address: General Line: Fax:

SKR 3102: ROMBAK RAWAT SISTEM KLAC

HAZILA BINTI NAYAN. A project report submitted in partial fulfillment of the requirement for the award of the Degree of Master of Manufacturing

INSTRUCTION: This section consists of SIX (6) essay questions. Answer FOUR (4) questions only.

TERMA & SYARAT KREDIT KAD UOB

: Holiday Villa Alor Setar Property Address : Lot 162 & 163, Jalan Tunku Ibrahim, Alor Setar, Kedah Darul Aman.

Transcription:

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG LEBUHRAYA DUKE 2, LAMAN RIMBUNAN KEPONG DAN JALAN IPOH 23 APRIL 2018 1. SAMBUNGAN PENUTUPAN LORONG SECARA BERKALA DI SUSUR MASUK KE LEBUHRAYA DUKE 2 (ARAH KUALA LUMPUR) Tarikh 25 April 2018-15 Mei 2018 Masa 10:00 malam 6:00 pagi Jangka masa 22 hari Sebab Menjalankan kerja-kerja gantry advancing dan sebarang kerja berkaitan Harap maklum sambungan penutupan lorong secara berkala bagi jarak 100 meter di susur masuk ke Lebuhraya DUKE 2 (Arah Kuala Lumpur) akan bermula dari 25 April 2018 15 Mei 2018, dari 10:00 malam 6:00 pagi. Pelan pengurusan lalu lintas adalah seperti di bawah: Penutupan A: Lorong kiri akan ditutup dan kenderaan yang menuju ke Kuala Lumpur melalui Lebuhraya DUKE 2 akan dilencongkan ke lorong kanan. Penutupan B: Lorong kanan akan ditutup dan kenderaan yang menuju ke Kuala Lumpur melalui Lebuhraya DUKE 2 akan dilencongkan ke lorong kiri. Penutupan A & B adalah secara berkala dan satu (1) lorong akan dibuka pada setiap masa untuk pengguna Lebuhraya DUKE 2. Untuk maklumat lanjut, sila rujuk peta di bawah.... 1. CONTINUATION OF LANE CLOSURE INTERMITTENTLY AT THE SLIP ROAD OF DUKE 2 HIGHWAY (KUALA LUMPUR-BOUND) Date 25 April 2018-15 May 2018 Time 10:00pm 6:00am Duration 22 days Reason To facilitate gantry launching and any other related works for MRT construction There will be a continuation of lane closures for a stretch of 100 metres at the slip road of DUKE 2 (Kuala Lumpur-bound) starting from 25 April 2018 15 May 2018, 10:00pm 6:00am intermittently. The traffic management plan is as below: Closure A: The left lane will be closed and during this closure, motorists heading to Kuala Lumpur via DUKE 2 highway will be diverted to the right lane. Closure B: The right lane will be closed and during the closure, motorists heading to Kuala Lumpur via DUKE 2 highway will be diverted to the left lane. Closure A & B will be implemented intermittently and at any one (1) time there will be one lane available for motorists on Duke 2 Highway. Page 1 of 13

MAP 1 : CONTINUATION OF LANE CLOSURE INTERMITTENTLY AT THE SLIP ROAD OF DUKE 2 HIGHWAY (KUALA LUMPUR-BOUND) Page 2 of 13

2. PENUTUPAN SEBAHAGIAN JALAN 2/17, LAMAN RIMBUNAN KEPONG (ARAH FADASON DAN ARAH JINJANG) Tarikh 25 April 2018-25 Mei 2018 Masa 10:00 malam 5:00 pagi Jangka masa 1 bulan Sebab Untuk kerja-kerja pemasangan Kekotak Segmen (SBG) dan sebarang kerja berkaitan Harap maklum, penutupan berkala sebahagian Jalan 2/17, Laman Rimbunana Kepong (Arah Taman Fadason dan Jinjang) akan bermula dari 25 April 2018 hingga 25 Mei 2018, bermula jam 10.00 malam hingga 5.00 pagi. Pelan pengurusan trafik adalah seperti berikut : Arah Taman Fadason: Penutupan sebahagian Jalan 2/17 sejauh 150 meter bermula dari susur lampu isyarat Jalan Kepong hingga ke persimpangan lampu isyarat menuju Laman Rimbunan. Pengguna dari Jalan Kepong menuju Taman Fadason dikehendaki menggunakan susur masuk Jalan Metro Perdana Timur 4 (Arah Jinjang), belok kanan ke Jalan Rimbunan Raya dan seterusnya belok ke kiri di persimpangan lampu isyarat untuk menuju Taman Fadason. (Sila rujuk Laluan Alternatif 1 - anak panah bewarna BIRU). Arah Jinjang: Penutupan sejauh 150 meter bermula dari persimpangan lampu isyarat menuju lot kedai Laman Rimbunan hingga ke susur Jalan Kepong. Bagi pengguna dari Taman Fadason menuju Jinjang/Kuala Lumpur, pengguna perlu belok kiri di persimpangan lampu isyarat Jalan 2/17, menuju Jalan Rimbunan Raya seterusnya belok kiri bersebelahan Public Bank Kepong Baru dan menggunakan susur keluar ke Jalan Kepong (Arah Jinjang). (Sila rujuk Laluan Alternatif 2 - anak panah bewarna HIJAU). Untuk maklumat lanjut, sila rujuk peta di bawah.. 2. PARTIAL BOUND CLOSURE ALONG JALAN 2/17, LAMAN RIMBUNAN KEPONG (TAMAN FADASON- BOUND AND KL-BOUND) Date 25 April 2018-25 May 2018 Time 10:00pm 5:00am Duration 1 month Reason To facilitate SBG launching and any other related works for MRT construction There will be partial bound closure along Jalan 2/17, Laman Rimbunan Keponh (Taman Fadason-bound and Kuala Lumpur-bound) starting from 25 April 2018 until 25 May 2018 from 10.00 pm until 5.00 am daily, intermittently. The traffic management plan involves the following closures : Taman Fadason-bound: Closure for a stretch of 150 metres starting from traffic light at the junction of Jalan Kepong (heading to Taman Fadason) until the traffic light junction of Laman Rimbunan shop lots. Motorists from Jalan Kepong heading to Taman Fadason are advised to turn left at Jalan Metro Perdana Timur 4, take the right turn onto Jalan Rimbunan Raya before turning left at the traffic light junction of Jalan 2/17. (Please refer to Alternative Route 1 - as indicated by BLUE arrow in the appended map). Jinjang-bound: Closure for a stretch of 150 meters starting from the traffic light at the junction to Laman Rimbunan until the slip road to Jalan Kepong (Jinjang-bound). Motorist from Taman Page 3 of 13

Fadason heading to Jinjang are advised to turn right at the traffic light junction of Jalan 2/17 onto Jalan Rimbunan Raya, take the left turn at the parking lot before turning left again nearby Public Bank Kepong Baru to join Jalan Kepong (Jinjang-bound). (Please refer to Alternative Route 2 - as indicated by GREEN arrow in the appended map). MAP 2 : PARTIAL BOUND CLOSURE ALONG JALAN 2/17, LAMAN RIMBUNAN KEPONG (TAMAN FADASON-BOUND AND KL-BOUND) Page 4 of 13

3. SAMBUNGAN PENUTUPAN LORONG SECARA BERKALA WAKTU MALAM DI JALAN IPOH BERDEKATAN PEJABAT POS MALAYSIA (ARAH KL DAN ARAH KEPONG) Tarikh 25 April 2018 18 Jun 2018 Masa 9:00 malam 6:00 pagi; 9:00 malam 10:00 pagi Jangka masa Sebab 1 bulan, 25 hari Untuk kerja- kerja pemunggahan barang, pengesanan awal, pemindahan utiliti, perobohan kerb jalan, pelebaran jalan dan kerja- kerja perparitan dan sebarang kerja yang berkaitan Harap maklum penutupan lorong secara berkala di Jalan Ipoh (berdekatan Pejabat Pos Malaysia) akan bermula dari 25 April 2018 sehingga 18 Jun 2018, 9:00malam 6:00pagi (hari minggu) dan 9:00malam 10:00pagi (malam Sabtu). Pelan pengurusan lalu lintas melibatkan penutupan seperti berikut: Penutupan 1 Jalan Ipoh (Arah Kepong): Penutupan lorong kiri dan tengah dari Sri Muniswarar Temple ke Winsin Stationery. Jalan Ipoh (Arah KL): Penutupan lorong kiri dan tengah dari Perodua ke Restoran Uma Rani. Penutupan 2 Jalan Ipoh (Arah Kepong): Penutupan lorong kanan dan tengah dari Sri Muniswarar Temple ke Winsin Stationery. Jalan Ipoh (Arah KL): Penutupan lorong kanan dan tengah dari Perodua ke Restoran Uma Rani. Penutupan lorong akan dilaksanakan secara berkala dan satu (1) lorong boleh diguna oleh pemandu dari kedua-dua hala pada setiap masa. Untuk maklumat lanjut, sila rujuk peta di bawah.. 3. CONTINUATION OF NIGHT LANE CLOSURES ALONG JALAN IPOH - NEAR POS MALAYSIA (KL-BOUND AND KEPONG-BOUND) Date 25 April 2018 18 June 2018 Time 9pm-6am; 9pm-10am Duration Reason 1 month 26 days To facilitate loading/unloading material, piloting, soil investigation, utilities relocation, drainage works, retaining wall, road curb demolition, road widening and box culvert works for MRT construction works. There will be continuation of night lane closures by stages along Jalan Ipoh (near Pos Malaysia) from 25 April 2018 to 18 June 2018, 9:00pm 6:00am (weekdays) and 9:00pm 10:00am (Saturday night), intermittently. The traffic management plan involves the following closures: Closure 1 Jalan Sultan Azlan Shah (Kepong-bound) - Slow and middle lane closures from Sri Muniswarar Temple to Winsin Stationery. Page 5 of 13

Jalan Sultan Azlan Shah (Kuala Lumpur-bound) - Slow and middle lane closures from Perodua to Restoran Uma Rani. MAP 3(a) : CONTINUATION OF NIGHT LANE CLOSURES ALONG JALAN IPOH - NEAR POS MALAYSIA (KL-BOUND AND KEPONG-BOUND) Page 6 of 13

Closure 2 Jalan Ipoh (Kepong-bound) - Fast and middle lane closures from Sri Muniswarar Temple to Winsin Stationery. Jalan Ipoh (KL-bound) - Fast and middle lane closures from Perodua to Restoran Uma Rani. MAP 3(b) : CONTINUATION OF NIGHT LANE CLOSURES ALONG JALAN IPOH - NEAR POS MALAYSIA (KL-BOUND AND KEPONG-BOUND) The closures will be implemented intermittently and at any one time there will be one (1) lane made available for motorists on both bounds. Page 7 of 13

4. SAMBUNGAN PENUTUPAN LORONG DI JALAN IPOH BERDEKATAN BATU COMPLEX BUSINESS CENTRE (ARAH KEPONG) Tarikh 25 April 2018 18 Jun 2018 Masa 24 jam Jangka masa Sebab 1 bulan, 25 hari Untuk kerja- kerja pemunggahan barang, pemindahan utiliti, kerja- kerja perparitan dan sebarang kerja yang berkaitan Harap maklum penutupan lorong kiri di Jalan Ipoh (Arah Kepong), berdekatan Batu Complex Business Centre akan bermula dari 25 April 2018 sehingga 18 Jun 2018, 24 jam setiap hari. Penutupan ini dilaksanakan sepanjang 150 meter, bermula dari Batu Complex Business Centre ke Mercedes-Benz. Pemandu yang ingin menuju ke Jalan Ipoh (Arah Kepong) dari Jalan Murai 2 perlu membelok kiri ke Jalan Murai 2, menghala terus melalui Batu Complex Business Centre, belok kiri ke Jalan Murai 1 dan belok kiri untuk meghala ke Jalan Ipoh (Arah Kepong). Semasa penutupan lorong dilaksanakan, tiga (3) lorong boleh diguna oleh pemandu di Jalan Kepong (Arah Kepong). Pengawal bendera akan berada di pintu masuk bilik pameran Mercedes - Benz untuk mengawal kereta masuk dan keluar. Untuk maklumat lanjut, sila rujuk peta di bawah.. 4. CONTINUATION OF LEFT-MOST LANE CLOSURE ALONG JALAN IPOH NEAR BATU COMPLEX BUSINESS CENTRE (KEPONG-BOUND) Date 25 April 2018 18 June 2018 Time 24 hours Duration 1 month 25 days Reason To facilitate loading/unloading material, utilities relocation, drainage works and any other related works for MRT construction There will be a continuation of left-most lane closure along Jalan Ipoh (Kepong-bound), near Batu Complex Business Centre from 25 April 2018 to 18 June 2018, 24 hours, daily. The closure is for a stretch of 150 metres starting from Batu Complex Business Centre to Mercedes- Benz. Motorist heading to Jalan Ipoh (Kepong-bound) from Jalan Murai 2 will have to turn left to Jalan Murai 2, pass by Batu Complex Business Centre, make a left turn to Jalan Murai 1 and turn left to connect to Jalan Ipoh (Kepong-bound). During the closure, there will be three (3) lanes made available for motorists on Jalan Ipoh (Kepong- Bound). A flagman will be stationed at the Mercedes - Benz Showroom entrance to guide cars going in and out of the showroom. Please refer to the map for further reference on the closures mentioned above: Page 8 of 13

MAP 4 : CONTINUATION OF LEFT-MOST LANE CLOSURE ALONG JALAN IPOH NEAR BATU COMPLEX BUSINESS CENTRE (KEPONG-BOUND) Page 9 of 13

5. SAMBUNGAN PENUTUPAN LORONG DI TAMAN MILLION (JALAN IPOH) Tarikh 25 April 2018 08 Ogos 2018 Masa 9:00 malam 6:00 pagi Jangka masa 4 bulan Sebab Untuk kerja- kerja pemunggahan barang, pembersihan & penyediaan tapak, pemindahan utiliti, penyelidikan tanah, pemasangan alat penghalang bunyi, kerjakerja pembinaan cerucuk, "concrete cut & cover" dan sebarang kerja yang berkaitan. Harap maklum penutupan lorong secara berkala di Lorong Balam, Jalan Pipit & Jalan Tiong, Taman Million akan bermula dari 25 April 2018 sehingga 08 Ogos 2018. Pelan Pengurusan lalu lintas melibatkan penutupan seperti berikut: Penutupan A: Lorong Balam - Penutupan lorong untuk jarak 30 meter, 24-jam, setiap hari. Penutupan B: Jalan Tiong - Penutupan lot parkir berkala untuk jarak 100 meter dari 9 malam sehingga 6 pagi. Jalan Pipit - Penutupan lorong berkala untuk jarak 60 meter dari 9 malam sehingga 6 pagi. Semasa penutupan jalan dilaksanakan, pemandu yang menghala ke Jalan Pipit dari Jalan Ipoh (Hala KL) perlu belok kiri ke Jalan Merak dan belok kiri selepas 1 Stop Cafe. Seterusnya melalui Jalan Balam sebelum membelok kiri selepas Syarikat Brightlite (M) Sdn. Bhd. seperti yang ditunjukkan dalam anak panah HIJAU di dalam peta. Pemandu yang menghala ke Jalan Ipoh (Hala KL) dari Jalan Pipit perlu melalui kawasan perumahan Taman Million, seterusnya belok kanan ke Jalan Merak dan menghala terus ke simpang Jalan Ipoh (Hala KL), seperti yang ditunjukkan dalam anak panah UNGU di dalam peta. Untuk maklumat lanjut, sila rujuk peta di bawah.. 5. CONTINUATION OF ROAD CLOSURES ALONG TAMAN MILLION (JALAN IPOH) Date 25 April 2018 08 August 2018 Time 9:00pm 6:00am Duration 4 months Reason To facilitate loading/unloading material, utilities relocation, soil investigation, installation of noise barrier, pier works, concrete cut & cover and any other related works for MRT construction works There will be continuation of internal road closure by stages at Taman Million along Lorong Balam, Jalan Pipit & Jalan Tiong from 25 April 2018 until 08 August 2018. The traffic management plan involves the following closures: Closure A: Lorong Balam - Internal road closure for a stretch of 30 metres for 24-hours, daily. Closure B: Jalan Tiong - Parking bays closure for a stretch of 100 metres by stages from 9pm to 6am. Jalan Pipit - Internal lane closure for a stretch of 60 metres by stages from 9pm to 6am. Page 10 of 13

During the closure, motorists heading to Jalan Pipit from Jalan Sultan Azlan Shah (KLbound) will have to turn left into Jalan Merak and turn left again after 1 Stop Cafe, continue straight along Jalan Balam before turning left after Syarikat Brightlite (M) Sdn. Bhd. to join Jalan Pipit, as indicated in GREEN arrows in the map. Motorists heading to Jalan Sultan Azlan Shah (KL-bound) from Jalan Pipit will have to pass by Taman Million housing area, turn right into Jalan Merak and continue straight to join Jalan Sultan Azlan Shah (KL-bound), as indicated in PURPLE arrows in the map. Please refer to the map for further reference on the construction works as mentioned above: MAP 5 : CONTINUATION OF ROAD CLOSURES ALONG TAMAN MILLION (JALAN IPOH) Page 11 of 13

6. SAMBUNGAN PENUTUPAN LORONG DAN LOT PARKIR DI JALAN IPOH (ARAH KL & ARAH KEPONG) Tarikh 25 April 2018 18 Jun 2018 Masa 9:00 malam 6:00 pagi; 8:00 pagi 5:00 petang Jangka masa 1 bulan 25 hari Sebab Untuk kerja-kerja pemindahan utiliti dan sebarang kerja yang berkaitan Harap maklum untuk menjalankan kerja- kerja yang tertera di atas, penutupan lorong dan lot parkir secara berkala akan dilaksanakan dari 25 April 2018 sehingga 18 Jun 2018, 9:00malam 6:00pagi (hari minggu) dan 8:00pagi 5:00petang (hanya pada hari Ahad). Sementara itu, kerb jalan akan ditutup selama 24-jam. Pelan pengurusan lalu lintas melibatkan penutupan seperti berikut: Penutupan A: Jalan Ipoh (Arah KL): Penutupan bahu jalan, lorong dalam, lot parkir bermula dari CIMB ke Papparich (sebelum Jalan Gunung Semanggol). Penutupan B: Jalan Ipoh (Arah KL): Penutupan bahu jalan, lorong dalam, lot parkir bermula dari Pos Malaysia (selepas Jalan Gunung Semanggol) ke Chai & Chai Trading (sebelum Jalan Batu Kentonmen). Penutupan lorong kiri dari Caltex ke Chai & Chai Trading (sebelum Jalan Batu Kentonmen). Penutupan C: Jalan Ipoh (Arah Kepong): Penutupan bahu jalan, lorong dalam, lot parkir dan lorong kiri bermula dari Jalan Cenderuh ke sebelum Universal Studio. Penutupan bahu jalan, lorong dalam, lot parkir dan lorong kiri bermula dari Universal Studio ke Fo Sin Aluminium. Untuk maklumat lanjut, sila rujuk peta dibawah.. 6. CONTINUATION OF LANE AND PARKING BAYS CLOSURE ALONG JALAN IPOH (KL-BOUND & KEPONG-BOUND) Date 25 April 2018 18 June 2018 Time 9:00pm 6:00am; 8:00am 5:00pm Duration 1 month 25 days Reason To facilitate utilities relocation and any other related works for MRT construction works To facilitate the above mentioned works, there will be a continuation of lane closures and parking bay closure by stages intermittently starting from 25 April 2018 until 18 June 2018, 9pm 6am (on weekdays) and from 8am 5pm (only on SUNDAY). Meanwhile, the road curb will be closed 24- hours during this period. The traffic management plan involves the following closures: Closure A: Jalan Ipoh (KL-bound): Road shoulder, the internal road & parking bays closure starting from CIMB bank until Papparich (before Jalan Gunung Semanggol). Closure B: Jalan Ipoh (KL-bound): Road shoulder, internal road & parking bays closure starting from Pos Malaysia (after Jalan Gunung Semanggol) to Chai & Chai Trading (before Jalan Batu Kentonmen). Slow lane closure from Caltex to Chai & Chai Trading (before Jalan Batu Kentonmen). Closure C: Jalan Ipoh (Kepong-bound): Road shoulder, internal road, parking bays and slow lane closure starting from Jalan Cenderuh until before Universal Studio. Road shoulder, internal road, parking bays and slow lane closure starting from Universal Studio until Fo Sin Aluminium. Page 12 of 13

Below is the map for further reference on the closures mentioned above: MAP 6 : CONTINUATION OF LANE AND PARKING BAYS CLOSURE ALONG JALAN IPOH (KL-BOUND & KEPONG-BOUND) For media enquiries, please contact: Mohd Sofie Hassan (Item 1) Tel: +6019 228 3004 sofie@sunway.com.my Zaini Ghazali (Item 2) Tel: +6012 328 1821 zainighazali@azrb.com Juliet Choong Wai Gaik (Item 3-6) Tel: +6012 601 0318 julietchoong@ijm.com Leanne Ann Susau (Item 1-6) Tel: +603 7493 3832 leanne@mgjv-kvmrt.com.my MMC GAMUDA KVMRT (PDP SSP) SDN BHD (1117100-V) Block A, Level 17, Menara Mustapha Kamal, PJ Trade Centre No 8, Jalan PJU 8/8A, Bandar Damansara Perdana, 47820 Petaling Jaya Selangor Darul Ehsan, Malaysia T: +603-7494 2222 F: +603-7727 0222 www.kvmrt.com.my Page 13 of 13