WEST CAMPUS Transportation Impact Assessment

Similar documents
Address Land Use Approximate GSF

Parking Management Strategies

TRANSPORTATION REVIEW

APPENDIX VMT Evaluation

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

METRO Orange Line BRT American Boulevard Station Options

Parking Management Element

The Engineering Department recommends Council receive this report for information.

CORE AREA SPECIFIC PLAN

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Transportation Demand Management Element

appendix 4: Parking Management Study, Phase II

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

2.0 Development Driveways. Movin Out June 2017

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Segment Update April 19, 2017

Denver Car Share Program 2017 Program Summary

1 Downtown LRT Connector: Draft Concept

Metra Milwaukee District West Line Transit-Friendly Development Plan

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

West Broadway Transit Study. Community Advisory Committee September 17, 2015

Mississauga Bus Rapid Transit Preliminary Design Project

Mercer Island Center for the Arts Parking Management Plan

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

Click to edit Master title style

Green Line Long-Term Investments

Appendix C. Parking Strategies

TORONTO TRANSIT COMMISSION REPORT NO.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Transportation & Traffic Engineering

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

LEED v4 Building Design and Construction Quiz #3 LT

Transportation Sustainability Program

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

THE WAY WE MOVE LRT FOR EVERYONE

August 2, 2010 Public Meeting

Car Sharing at a. with great results.

Fresno County. Sustainable Communities Strategy (SCS) Public Workshop

Draft Marrickville Car Share Policy 2014

Otay Ranch Station 2020 MOBILITY SERVICES MAP REGIONAL MOBILITY HUB IMPLEMENTATION STRATEGY

The City of Toronto s Transportation Strategy July 2007

2.4 TRANSIT VISION 2040 FROM VISION TO ACTION. Support the revitalization of urban cores STRATEGIC DIRECTION

EXECUTIVE SUMMARY. Introduction

Attachment 5. High Speed Transit Planning Study REPORT SUMMARY. Prepared by: City of Edmonton Transportation Planning Branch. Stantec Consulting Ltd.

TRAVEL DEMAND FORECASTS

Lacey Gateway Residential Phase 1

Chapter 4 : THEME 2. Transportation

GTA West Corridor Planning and EA Study Stage 1

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

CEDAR AVENUE TRANSITWAY Implementation Plan Update

M E M O R A N D U M INTRODUCTION. POTENTIAL TDM STRATEGIES Marketing & Management. Residents & Employees. Exhibit 6

5. OPPORTUNITIES AND NEXT STEPS

4. Transportation Plan

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Newmarket GO Station Mobility Hub Study. Open House #1 MAY 18, 2017

Public Meeting. March 21, 2013 Mimosa Elementary School

ANDERSON PROPERTY SITE ANALYSIS

U N I V E R S I T Y O F B R I T I S H C O L U M B I A. Fall 2008 Transportation Status Report

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

4 Circulation & Transportation

What We Heard Report - Metro Line NW LRT

Welcome. Green Line in Your Community

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Alpine Highway to North County Boulevard Connector Study

TRAFFIC IMPACT ANALYSIS

2030 Multimodal Transportation Study

4.0 TIER 2 ALTERNATIVES

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

Downtown Lee s Summit Parking Study

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

Chapter 740, Street Vending One Year Review

Best Route. Best Care. The Milwaukee Regional Medical Center s Alternative Transportation Program

Parks and Transportation System Development Charge Methodology

APPENDIX E. Traffic Analysis Report

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY

Executive Summary EXECUTIVE SUMMARY Parking Issues Trenton Downtown Parking Policy and Sidewalk Design Standards E.S. Page 1 Final Report 2008

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

The South Waterfront District and the Portland Aerial Tram

IMPROVEMENT CONCEPTS

FREQUENTLY ASKED QUESTIONS

Breakout Session. The Mobility Challenges of Our Growing & Sprawling Upstate

TRANSPORTATION MASTER PLAN AND TRANSPORTATION IMPACT ASSESSMENT FOR THREE SISTERS MOUNTAIN VILLAGE RESORT CENTRE ASP

Transcription:

WEST CAMPUS Transportation Impact Assessment #310, 3016 5th Avenue NE Calgary, AB T2A 6K4 Phone: (403) 273-9001 Fax: (403) 273-3440 wattconsultinggroup.com

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE OF CONTENTS EXECUTIVE SUMMARY 1.0 INTRODUCTION... 1 1.1 Site Location... 1 1.2 Scope of Work... 2 2.0 PROPOSED DEVELOPMENT... 4 2.1 Vision... 4 2.2 Alignment with the Calgary Transportation Plan... 5 2.3 Proposed Land Uses... 6 2.4 Proposed Cross-Sections... 7 3.0 TDM PROGRAM... 8 3.1 Approach to Transportation Demand Management... 8 3.2 Proximity to Major Employment Centres... 9 3.3 Control Parking Supply and Parking Pricing... 10 3.4 Other Parking Strategies for Residential Developments... 10 3.5 Other Parking Strategies for Office Developments... 11 3.6 Pedestrian and Cycling Facilities... 11 3.7 Transit Service... 12 3.8 Other TDM Measures... 13 4.0 EXISTING CONDITIONS... 14 4.1 Existing Road Network and Daily Volumes... 14 4.2 Traffic Associated with the Alberta Children s Hospital... 15 5.0 FUTURE CONDITIONS... 17 5.1 Trip Generation... 17 5.2 Comparison of Trip Generation Estimates... 19 5.3 Future External Road Network... 20 5.4 Review of RTM Land Use Assumptions... 20 5.5 Mode Split... 23 5.6 Future Modal Split... 24 6.0 POST-DEVELOPMENT CONDITIONS... 26 6.1 Post Development Traffic Volumes... 26 6.2 Post Development Pedestrian Volumes... 26 6.3 Post Development Bicycle Volumes... 28 6.4 Post Development Transit Volumes... 31 6.5 Post-Development Operating Conditions... 31 6.6 Discussion of Results and Intersection Improvement Options... 34 West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 6.7 Potential for Roundabouts... 38 6.8 Intersection Capacity Analysis Summary... 39 6.9 Impact on Other Intersections... 40 6.10 Daily Volume Analysis... 41 6.11 Phasing... 43 7.0 ACTIVE MODES REVIEW... 48 7.1 Site Description... 48 7.2 Existing Pedestrian and Cyclist Facilities... 48 7.3 Future Pedestrian and Cyclist Facilities... 49 8.0 TRANSIT SERVICE... 52 8.1 Existing Transit Service... 52 8.2 Future Transit Service... 53 9.0 SUMMARY AND CONCLUSION... 56 APPENDIX A: SCOPE OF WORK APPENDIX B: LAND USE PLANS APPENDIX C: TRIP GENERATION METHODOLOGY APPENDIX D: SELECT ZONE PLOTS SPECIAL WEST CAMPUS MODEL RUN APPENDIX E: PROPOSED CROSS SECTIONS APPENDIX F: EXISTING TRAFFIC COUNTS APPENDIX G: FUTURE INTERSECTION VOLUMES AND ADJUSTMENTS APPENDIX H: POST DEVELOPMENT INTERSECTION OPERATIONS APPENDIX I: SYNCHRO ANALYSIS RESULTS APPENDIX J: SIDRA ANALYSIS RESULTS APPENDIX K: MODEL OUTPUT REGIONAL TRANSPORTATION MODEL FORECAST TRIP GENERATION West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning LIST OF FIGURES FIGURE 1: SITE LOCATION... 2 FIGURE 2: STUDY AREA AND INTERSECTIONS... 3 FIGURE 3: CONCEPT RENDERING OF THE WEST CAMPUS DEVELOPMENT... 4 FIGURE 4: SUSTAINABILITY TRIANGLE... 5 FIGURE 5: INTERNAL TRIP POTENTIAL FROM MAJOR EMPLOYMENT CENTRES... 9 FIGURE 6: POST-DEVELOPMENT TRAFFIC VOLUMES... 27 FIGURE 7: POST-DEVELOPMENT PEDESTRIAN AND BICYCLE VOLUMES... 30 FIGURE 8: WEST CAMPUS STREET NETWORK LANING AND SIGNAGE 2039 BASE SCENARIO... 32 FIGURE 9: WEST CAMPUS STREET NETWORK LANING AND SIGNAGE 2039 IMPROVED SCENARIO... 37 FIGURE 10: INFRASTRUCTURE IMPROVEMENTS... 38 FIGURE 11: LEVEL OF SERVICE SUMMARY IN STUDY AREA... 40 FIGURE 12: 2039 DAILY VOLUME ESTIMATES... 42 FIGURE 13: WEST CAMPUS PHASING PLAN... 44 FIGURE 14: TRAVEL DESTINATIONS AND PEDESTRIAN AND CYCLIST FACILITIES... 49 FIGURE 15: INTERNAL PEDESTRIAN AND CYCLIST FACILITIES... 50 FIGURE 16: EXISTING TRANSIT SERVICE... 53 FIGURE 17: FUTURE TRANSIT NETWORK... 54 LIST OF TABLES TABLE 1: PROPOSED LAND USE INTENSITIES (AUGUST 2013)... 7 TABLE 2: REGIONAL TRANSPORTATION MODEL WEST CAMPUS TRIP GENERATION... 17 TABLE 3: WEST CAMPUS TRIP GENERATION ESTIMATES... 19 TABLE 4: WEST CAMPUS TRIP GENERATION COMPARISON... 19 TABLE 5: RTM EMPLOYMENT AND POPULATIONS FORECASTS... 21 TABLE 6: RTM EMPLOYMENT AND POPULATIONS FORECASTS SPECIAL WEST CAMPUS MODEL RUN...... 22 TABLE 7: EXISTING MODAL SPLIT... 23 TABLE 8: RTM MODAL SPLIT ESTIMATES FOR WEST CAMPUS 2039... 24 TABLE 9: CURRENT PEAK HOUR PEDESTRIAN VOLUMES IN CALGARY... 28 TABLE 10: LEVEL OF SERVICE CRITERIA... 33 TABLE 11: LEVEL OF SERVICE CRITERIA FOR ROUNDABOUTS... 34 TABLE 12: WEST CAMPUS IMPACT ON NEARBY INTERSECTIONS... 41 TABLE 13: ROADWAY CLASSIFICATION SUMMARY... 43 TABLE 14: RECOMMENDED IMPROVEMENT PHASING... 45 TABLE 15: EXISTING TRANSIT SCHEDULE AND CONNECTIONS... 52 TABLE 16: FORECAST FUTURE TRANSIT SERVICES... 55 West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning EXECUTIVE SUMMARY West Campus Development Trust is planning to develop the 207 acre parcel of land located immediately west of the University of Calgary Campus. The vision for the West Campus lands is to be a complete, vibrant and sustainable community that enhances the University experience, while harmonizing with surrounding communities. The Plan vision and proposed land use designations reflect a built form framework that supports a diverse, mixed-use pedestrian oriented community, providing an opportunity for all demographics to live, work and play in a compact, walkable and accessible environment. A rendering of the proposed development concept is provided in Figure ES-1. FIGURE ES-1: WEST CAMPUS CONCEPT PLAN West Campus Transportation Impact Assessment ES-1

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning The transportation network was generally laid out in a grid format to maximize pedestrian connectivity. The street cross-sections for West Campus were developed with the goal of enhancing the pedestrian environment, accommodating cyclists and meeting the needs of transit, emergency vehicles and other auto/truck traffic. Wherever possible, the specific elements of the cross-sections align with the City s Complete Streets Guidelines and provide ample space for all modes of transportation within the road right-of-way. Alignment with the Calgary Transportation Plan The West Campus Plan aligns very closely with a number of City policies including the Calgary Transportation Plan (CTP). The overarching goal of the CTP is: To develop an integrated, multi-modal transportation system that supports land use, provides increased mobility choices for citizens, promotes vibrant, connected communities, protects the natural environment, and supports a prosperous and competitive economy. A number of policies were established as part of the CTP that support more sustainable modes of transportation such as walking, cycling and transit. Once of the concepts highlighted in the CTP is the transportation sustainability triangle which ranks each mode of transportation based on their overall sustainability. The West Campus Plan was designed with the transportation sustainability triangle in mind. The design of the streets, sidewalks and pathway system as well as the layout of the road network reflect a strong desire by the planning team to create a walkable, Figure ES2 Sustainability Triangle pedestrian-friendly environment that promotes more sustainable modes of transportation. Given the proximity to major employment centres as well as the University, the West Campus Project Team believes that the development can achieve mode splits that surpass the goals established in the CTP. West Campus Transportation Impact Assessment ES-2

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning Transportation Demand Management (TDM) A transportation demand management (TDM) program is a series of measures and strategies to promote the use of alternative modes of transportation and reduce the reliance on private passenger vehicles. By nature of its proximity to major activity centres, West Campus is well situated to reduce the reliance on the automobile and promote more walking and cycling trips. Increased transit service to the area as planned by the City of Calgary will also help to achieve the goals of TDM. The West Campus Development Trust supports the provision of TDM strategies to promote sustainable modes of transportation including: Controlled or restricted parking supply Car-sharing programs for individual residential buildings in combination with a reduced parking supply Designated carpool parking stalls Parking Cash-Out for office developments Unbundling Parking for residential and office developments Support for city-wide car-sharing program such as Car2Go Universal transit pass program for major employers Active Modes Assessment The site is ideally situated in close proximity to several major travel destinations including the U of C, Foothills Medical Centre and Alberta Children s Hospital. By nature of its location, many of the trips are expected to use active modes including walking and cycling. The proposed road network within West Campus will provide pedestrians with a variety of route options to nearby travel destinations. The sidewalks and pathways in the area also provide good connectivity to local amenities and transit stops. The proposed cycling and walking infrastructure within the West Campus development area is shown in Figure ES-3. As shown, sidewalks and pathways are proposed along major roadways within the development to enhance pedestrian mobility and provide a multitude of different route options. The sidewalks will be constructed as per the City of Calgary s Complete Streets Guidelines and will range in width from 1.5m to 3.0m based on anticipated levels of pedestrian traffic and to maximize safety and comfort. In addition to the multi-use pathways, on-street bike lanes and separate bike paths will further enhance connectivity and provide route options for cyclists travelling around West Campus and to external access points such as 37 Street NW to the north, 24 Avenue NW to the east, and West Campus Boulevard and 16 Avenue NW to the south and west, West Campus Transportation Impact Assessment ES-3

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning respectively. A regional pathway will loop around much of the perimeter of West Campus to facilitate commuter and recreational cycling around the development. The sidewalk and pathway network will also provide direct connections to the nearby transit facilities and bus stops located within and in close proximity to the site. FIGURE ES-3: PROPOSED PEDESTRIAN AND CYCLING FACILITIES West Campus Transportation Impact Assessment ES-4

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning The proposed active modes network within and in the vicinity of West Campus has been designed to accommodate and encourage a high level of pedestrian and cyclist activity. Transit Service West Campus is currently served by four transit routes with stops located primarily on West Campus Drive. The City of Calgary is currently assessing transit services in an area that includes West Campus, the University of Calgary, Brentwood, Market Mall and the Foothills Medical Centre. The NW-HUB Transit Enhancement Study is anticipated to be completed in 2014. The study will assess the need and feasibility of potential mobility improvement options, including new bus routes, bus rapid transit (BRT) services, cycling and pedestrian routes, and alternative improvement possibilities such as trams and urban gondolas. It is expected that upon completion of the study, the City of Calgary will begin introducing enhanced transit service and improved transit infrastructure in the West Campus area. The vision for the West Campus development includes the provision of high quality transit stations and convenient pedestrian connectivity to and from all of the transit stops. Based on the current development plans, all of the residents and employment areas are expected to be within 400m of a transit stop. Existing Traffic Conditions The existing road network in the West Campus area is partially developed and was mostly built in 2005 and 2006 as part of the Alberta Children s Hospital project. The ACH project also included the construction of three new accesses into the West Campus area including the new interchange at 16 Avenue NW at West Campus Boulevard, a new right-turn only ramp off of northbound Shaganappi Trail into the ACH site and a new signalized access off 32 Avenue NW at 39 Street NW (West Campus Gate NW). Daily traffic volumes on the streets in and around West Campus are within the acceptable ranges identified in the City s Environmental Design Guidelines and have spare capacity to accommodate the West Campus development. Alberta Children s Hospital is a large employment centre within West Campus and generates an estimated 700 vehicular trips during each of the AM and PM peak periods. Based on discussions with Alberta Health Services, ACH typically receives one inbound ambulance trip to the hospital per day. West Campus Transportation Impact Assessment ES-5

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning Future Traffic Conditions Traffic volumes for all of the study intersections were projected for the year 2039 based on information provided by the City s Regional Transportation Model. The 2039 traffic projections included the current land use plan for West Campus as well as the following network improvements: Enhanced Transit Service to West Campus including higher frequency on the current routes as well as new routes such as the South Shaganappi BRT 16 Avenue NW widened to 6 lanes through 29 Street NW intersection NW LRT Extended to Tuscany Rocky Ridge Interchange at 16 Avenue NW / Bowfort Road The Stadium Shopping Centre redevelopment was not included in the City s model and therefore manual adjustments were made to the traffic projections to account for the fullbuild out of the Stadium Shopping Centre at the approved land use density. Capacity analysis was carried out for the study intersections with the projected 2039 volumes. The key issues/results are summarized below: The proposed new signalized access at Shaganappi Trail and West Campus Way is a key intersection for the development and will also improve emergency access to the Alberta Children s Hospital. The intersection of 32 Avenue NW and Shaganappi Trail is expected to be congested during the peak periods with the current geometric configuration. The analysis suggests that Shaganappi Trail will need to be widened to three travel lanes in each direction by 2039 to accommodate the anticipated traffic volumes. The widening of Shaganappi Trail as well as the addition of an eastbound right-turn lane are expected to address the identified operational issues at this intersection. Traffic signals are recommended along West Campus Way at West Campus Drive and 39 Street NW (West Campus Gate NW) to accommodate full development of West Campus. An eastbound right-turn lane could be considered at the intersection of 32 Avenue NW and 39 Street NW (West Campus Gate NW) to alleviate anticipated congestion on this leg. The benefits to traffic flow would have to be weighed against the potential impacts to the pedestrian and cyclist environment on the south side of 32 Avenue NW. West Campus Transportation Impact Assessment ES-6

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning The intersection of 24 Avenue NW/Children s Way and West Campus Blvd can be stop controlled for the northbound movement. The north and south interchange terminals at 16 Avenue NW / West Campus Blvd. will need to be upgraded in the future to accommodate the anticipated 2039 traffic volumes. Although either signals or roundabouts will address the identified operational issues, through further investigation, a roundabout is recommended at the north terminal and a signal is recommended at the south terminal. A summary of the improvements requirements and the anticipated traffic controls is provided in Figure ES-4. FIGURE ES-4: PROPOSED INFRASTRUCTURE West Campus Transportation Impact Assessment ES-7

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning Summary and Conclusion The Vision for West Campus includes many of the sustainability principles outlined in the Calgary Transportation Plan. The population and employment density is expected to exceed the minimum requirements for a Major Activity Centre and will generate enough critical mass to support frequent transit service. The mixed-use nature of the development, together with the proximity to major employment centres will generate a large number of internal trips and will also encourage other forms of sustainable transportation including walking and cycling. The sustainability principles that have been incorporated into the plan will reduce the proportion of trips made by automobile and will reduce the impact on the adjacent transportation network. With the recommended improvements outlined in this report, the transportation network will be able to support full development of West Campus. West Campus Transportation Impact Assessment ES-8

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 1.0 INTRODUCTION West Campus Development Trust (WCDT) is planning to develop the 207-acre (83.8 hectare) parcel of land that lies immediately west of the University of Calgary s Main Campus in Northwest Calgary. The vision for the land is a vibrant, mixed-use community, with a highquality public realm, a diversity of housing choices; a place where residents can walk to work while enjoying the richness of a green environment as they travel along pedestrian-friendly, tree-lined streets. The vision for the development includes a strong Transportation Demand Management (TDM) program that will reduce the number of auto trips generated by the site. To support the Outline Plan and Land Use Application to the City of Calgary, WCDT retained Watt Consulting Group (Watt) to prepare a Transportation Impact Assessment (TIA). 1.1 Site Location West Campus is located immediately west of the University of Calgary Main Campus in the northwest quadrant of the City of Calgary. The site offers many benefits for development and is a prime location for a new inner city neighbourhood with proximity to major employers such as the University, Foothills Medical Centre and the Alberta Children s Hospital. The site is currently served by several bus routes and it is located within walking distance of the NWLRT line. The quality and frequency of transit service to the area is expected to increase in the future after the City completes the NW-HUB Transit Enhancement Study and begins to implement some of the recommendations. West Campus is bound by 32 Avenue NW to the north, Shaganappi Trail to the west, and 16 Avenue NW to the south, making up approximately 207 acres (83.8 hectares) of developable land. The site location is provided in Figure 1. According to the Municipal Development Plan (MDP), West Campus is classified as a Major Activity Centre (MAC). Other MACs in the vicinity include the University of Calgary, McMahon Stadium and the Foothills Medical Centre (FMC). According to the MDP, a MAC is defined as: Major Activity Centres (MACs) provide for the highest concentration of jobs and population outside of the Centre City area. In addition to achieving higher concentrations of jobs and population, the design and character of the MACs must also create a high-quality environment that features amenities for a comfortable street environment. West Campus Transportation Impact Assessment 1

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning From a transportation perspective, the importance of the MAC designation is that the emphasis is on more sustainable modes of transportation, primarily walking, cycling and transit. FIGURE 1: SITE LOCATION 1.2 Scope of Work A scope of work for this study was determined in consultation with the City of Calgary s Transportation Development Services Division. A summary of the major tasks is provided below with the more detailed scope included in Appendix A. Review current and future (2039) conditions for pedestrians, cyclists, transit users and West Campus Transportation Impact Assessment 2

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning vehicular traffic for the peak a.m. and p.m. weekday periods for the key internal and external intersections, a graphic of the study intersections (in red) for detailed capacity analysis is shown in Figure 2; Provide a discussion on TDM measures that could be applied to the site; Review the anticipated modal split information from the model and provide commentary on the results versus expected results based on other developments; Use the City s Regional Transportation Model to estimate the traffic generation and distribution of the site traffic based on anticipated land uses and densities; Identify geometric road improvements that are required to support the development. FIGURE 2: STUDY AREA AND INTERSECTIONS West Campus Transportation Impact Assessment 3

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 2.0 PROPOSED DEVELOPMENT 2.1 Vision The vision for the West Campus lands is to be a complete, vibrant and sustainable community that enhances the University experience, while harmonizing with surrounding communities. The Plan vision and proposed land use designations reflect a built form framework that supports a diverse, mixed-use pedestrian oriented community, providing an opportunity for all demographics to live, work and play in a compact, walkable and accessible environment. A concept rendering of the West Campus development is provided in Figure 3. FIGURE 3: CONCEPT RENDERING OF THE WEST CAMPUS DEVELOPMENT West Campus Transportation Impact Assessment 4

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 2.2 Alignment with the Calgary Transportation Plan City Council approved and adopted the Calgary Transportation Plan (CTP) in September 2009. The overarching goal of the CTP is: To develop an integrated, multi-modal transportation system that supports land use, provides increased mobility choices for citizens, promotes vibrant, connected communities, protects the natural environment, and supports a prosperous and competitive economy. (CTP, pg 1-6, 2009) 1 Sustainability is a common theme that is reflected in the CTP. A number of policies were established as part of the CTP that support more sustainable modes of transportation such as walking, cycling and transit. These modes of transportation are considered more sustainable because they are less impactful on the environment, are accessible to most Calgarians and the infrastructure needed to support these modes of transportation are typically less costly to build. The concept of comparing the sustainability aspect of all modes of transportation is summarized in the transportation sustainability triangle shown in Figure 4. The CTP also builds on a number of Key Directions for Land Use and Mobility that were adopted by Council in November 2008. The West Campus Plan aligns closely with many of these Key Directions as described below: FIGURE 4: SUSTAINABILITY TRIANGLE 1) Achieve a balance of growth between established and greenfield communities o West Campus is one of the largest development areas available in an established area and this development will help to balance the City s growth pattern between established areas and greenfield communities. 1 Calgary Transportation Plan, City of Calgary, September 2009 Available at: http://www.calgary.ca/transportation/tp/documents/ctp2009/calgary_transportation_plan_2009.pdf?noredirect=1 West Campus Transportation Impact Assessment 5

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 2) Provide more choice within complete communities o The mixed-use aspect of the development will provide opportunities for people to live, work and play within an area that is walkable. The range of housing choices will accommodate citizens of all demographics. 3) Direct land use change within a framework of nodes and corridors o West Campus is considered a major activity centre in the MDP. The density proposed within the West Campus plan is consistent with this key direction. 4) Increase mobility choices o The West Campus plan provides an extensive network of walking and cycling paths that will encourage more of its residents and employees to use these modes of transportation. 5) Create Complete Streets o Although many of the streets within West Campus are already constructed, complete street guidelines were used wherever possible to ensure that the street design is consistent with this key direction. 6) Optimize infrastructure o The West Campus plan supports this key direction by utilizing available capacity that exists along some of the primary transportation corridors in the area. As shown above, the plan for West Campus aligns closely with many of the key directions that have been adopted by City Council to create a more sustainable City. 2.3 Proposed Land Uses The proposed development of West Campus will incorporate a diverse range of land uses, which include several retail and commercial centres, office space, a variety of residential housing developments, community facilities as well as parks and green space. The developments will be constructed in a combination of stand-alone and mixed-use facilities, such as shared office and commercial buildings, as well as mixed retail-residential towers. The proposed intensities of each land use are summarized in Table 1. West Campus Transportation Impact Assessment 6

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE 1: PROPOSED LAND USE INTENSITIES (AUGUST 2013) LAND USE INTENSITY Multi-Family Residential 6,358 units Office 1,562,000 ft 2 Retail & Community Facilities 221,700 ft 2 The above land use development scenario is consistent with the current application in circulation at the City of Calgary. A previous version of the land use plan was submitted to the City s Geo-demographics Department in April 2013 to use as the basis for updating the City s Regional Transportation Model (RTM) and estimating future traffic volumes and mode split. Between April and the time of submission, the boundary of the West Campus development was changed and the area of development was reduced. Since the changes reflect a decrease in the density of development, it was decided to proceed with the results of the previous land use data with the understanding that the data being analyzed would be conservative (overstating the potential impacts). The April 2013 and the current land use plan are provided in Appendix B. 2.4 Proposed Cross-Sections The West Campus Project Team has developed cross-sections for all of the internal streets that support the City s Key Directions for Mobility and Land Use. In general, the proposed cross-sections follow the City s Complete Streets Guidelines by accommodating all modes of transportation. Since many of the roads in West Campus are already built, the proposed cross-sections attempted to maximize the use of the existing infrastructure. A detailed discussion of the proposed internal roads is included in the Outline Plan and Land Use Submission report (pages 91-97). A copy of the latest version of the proposed crosssections (January 20, 2014) is included in Appendix E. West Campus Transportation Impact Assessment 7

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 3.0 TDM PROGRAM 3.1 Approach to Transportation Demand Management Transportation Demand Management (TDM) was a key consideration throughout the planning process for the West Campus Development. The design of the streets, sidewalks and pathway system as well as the layout of the road network reflects a strong desire by the planning team to create a walkable, pedestrian-friendly environment. The purpose of this section is to provide information related to the TDM program that was prepared for this development. A transportation demand management (TDM) program is a series of measures and strategies to promote the use of more sustainable modes of transportation and reduce the reliance on private passenger vehicles (see transportation sustainability triangle). TDM supports efforts to create a more balanced transportation system. It does so by: accommodating all modes (private vehicle, transit, cycling, walking etc.) offering transportation choices; and encouraging non-automobile modes It is worth noting that the primary goal of a TDM program is to reduce automobile (especially SOV) use, but not to eliminate the car completely. A TDM program should recognize that most people need to drive occasionally. If that occasional requirement isn t addressed by the TDM program, then drivers won t switch to non-automobile modes. The measures and strategies that are applied to achieve TDM goals vary depending on the specific context and land uses. In 2012, the University of Calgary developed a TDM plan for implementation on the main campus. Some elements of this plan are applicable to the West Campus context, while others are not appropriate to the proposed land uses for the West Campus development. West Campus Transportation Impact Assessment 8

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning The following sections identify various TDM programs or strategies that are applicable to the West Campus development and highlight shared components or differences from the U of C TDM plan. 3.2 Proximity to Major Employment Centres Although not a TDM program per se, the proximity of West Campus to major employment centres such as the Alberta Children s Hospital, the U of C main campus and the Foothills Medical Centre will significantly increase the potential number of walking and cycling trips to/from the development. In particular, the proximity to these large employment centres is expected to have a significant impact on the residential land uses as more people living in West Campus will be able to walk or cycle to work as illustrated in Figure 5. Information gathered from UBC s South Campus (a complete community located within walking distance of UBC campus) suggests that more than 50 percent of the 6,300 nonmarket and market households have at least one person that works or studies on campus. Based on this potential, it will be important to ensure the walking and cycling connections to the adjacent employment centres are direct and of high quality. FIGURE 5: INTERNAL TRIP POTENTIAL FROM MAJOR EMPLOYMENT CENTRES West Campus Transportation Impact Assessment 9

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 3.3 Control Parking Supply and Parking Pricing One of the most effective means of encouraging alternate transportation modes is to control the available parking in an area, and set appropriate pricing levels for the available parking. In the West Campus context the approach will vary according to land use: Office uses are the best candidates for restricted parking supply due to available transit service and active mode facilities. The University of Calgary will be constraining its parking supply relative to anticipated population growth, setting prices to exceed the cost of transit service (two-way) and with a premium on monthly parking (which tends to encourage all-in car driving rather than driving only when necessary). For the West Campus area, restricted parking supply for office users (combined with other TDM elements as outlined below), will support the use of active modes while still allowing the flexibility for employees to park on site when required. The potential for restricted office parking would however need to be considered in context of current market demand. Street-level retail will need to be supported by on-street parking and/or short-stay parking within nearby parking structures. Such parking should be time limited and priced to discourage longer stays (free or low-cost for first 30 minutes or 1 hour period, but significantly higher pricing beyond that). Residential uses typically need to provide at or near bylaw amounts of parking to be marketable. Other TDM programs that provide cost- and time- comparable alternatives will tend to result in cars being left at home for peak hour commuter trips. 3.4 Other Parking Strategies for Residential Developments Given the proximity of the site to major employment centres, it is likely that some of the residents in the area would not own a car. Therefore, one strategy to reduce auto travel in the area could be to build some of the residential developments with significantly less parking stalls than required by the City s land use bylaw. This would have the impact of reducing the cost of the residential development, passing on the savings to the purchasers that choose not to buy a parking stall. In order for this strategy to work, the parking stalls would need to be unbundled from the condo title. Another strategy for residential developments that could be considered is for the developer to provide a car-sharing program for use exclusively by residents. This would allow the developer to potentially replace a number of dedicated parking stalls on-site with parking West Campus Transportation Impact Assessment 10

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning stalls that would be used by the car-sharing program. This type of program has been successful in other North American cities and is currently being considered by some residential developers in Calgary. 3.5 Other Parking Strategies for Office Developments There are a number of TDM strategies that could be applied to the office developments within West Campus to reduce the overall reliance on passenger cars. A summary of these strategies is provided below: Parking Cash-Out: A parking cash-out program for office developments is one in which employees are offered the opportunity to choose either a parking space or the cash equivalent of the space, based on the out-of-pocket costs to the employer. The employee can determine whether to use the cash for alternative modes of transportation or keep the funds. Offering the option of cashing out their subsidized parking space can incentivize employees to ride transit, bike, walk, or carpool to work, thereby reducing vehicle commute trips and emissions. Unbundling Parking: This strategy involves the separation of the cost of parking from office space leases to help tenants understand the true cost of parking. By consciously needing to pay for a block of parking stalls every month, tenants are more likely to reconsider how many parking spaces are required to operate their business. This strategy can be effective in reducing the overall parking demand for office buildings. This could be considered in tandem with the parking cash-out strategy. 3.6 Pedestrian and Cycling Facilities Section 7 of this report details recommendations with respect to pedestrian and cycling facilities in the West Campus area. As detailed, these facilities are intended to connect to other regional attractors in the area as well as the main U of C campus. For office and commercial uses, the provision of both short stay and secured bicycle parking is necessary to support TDM. Short stay parking is typically provided by bike racks which are located very close to the main entrance of retail and office developments to encourage shoppers, couriers, and other site visitors. Secured bicycle parking supports commuter cycling. Where structured parking is being considered for a specific office development, or to support multiple adjacent office and retail locations, bike cages (as opposed to individual bicycle lockers) are a cost effective way to add significant secured bike parking capacity. West Campus Transportation Impact Assessment 11

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning The University of Calgary provides both types of bicycle parking and will continue to grow the capacity of each as the population expands. The University of Calgary makes use of existing recreation facilities to provide on-site shower facilities for commuter cyclists. For West Campus, the fragmented nature of the site (multiple buildings with their own populations) will require a different approach with each building or cluster of buildings providing a shower/locker room facility. Residential development in West Campus will be ideally located for cyclist commuting to the University of Calgary (for faculty or students) and other major employment centres in the City, so efforts to ensure a continuous and high quality bicycle network through the area are likely to be very beneficial from a TDM perspective. 3.7 Transit Service Section 8 of this report details recommendations with respect to transit service and facilities in the West Campus area. As detailed, these facilities will connect to major pedestrian routes on the main U of C campus, as well as providing connections to other regional attractors. The University of Calgary, West Campus, and the Foothills Medical Centre are currently working in partnership with Calgary Transit to review transit service to and through the area. Part of that review will be to assess the feasibility of a U of C circulator route which will likely extend into the West Campus area (potentially connecting West Campus to the transit hub and the University LRT station). The future size and location of the west transit hub (currently located next to the Children s Hospital) will also be assessed. The ultimate goal will be to ensure the area is well served by regular, reliable transit service, connecting to a broad area. To further incentivize transit use over private vehicle travel, the University of Calgary currently provides a universal transit pass for the student population. Transit passes or discounts on passes can be readily applied to office developments such as those proposed within the West Campus area, usually in conjunction with restricted or priced parking, but are not as easily applicable to residential development due to fragmented ownership. West Campus Transportation Impact Assessment 12

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 3.8 Other TDM Measures Other TDM measures that may be applicable to the West Campus development include the provision of preferentially located carpool parking stalls within structured parking areas. The University of Calgary provides discounted parking prices for car-pool drivers as well, though this program is not currently extensive enough to have a significant impact on travel mode. Carshare programs such as Car2Go can be encouraged in West Campus by working with the providers to ensure the area is within a coverage zone, and subsidizing registrations or giving out free trips to promote the program. The University of Calgary is currently considering implementing a Guaranteed Ride Home program which provides taxi vouchers for staff that use transit or car-pools if they need to go home for an emergency or stay late past their usual travel time. This may be feasible for larger employers within the West Campus development area, but may be difficult to implement at the current level of planning detail. Finally, all TDM programs need a designated representative with the mandate to monitor and support the programs over time. At the University of Calgary, a TDM coordinator position will be developed to monitor the program. For the West Campus development, individual developments may be required to identify a TDM coordinator (frequently managed by the condo board in residential developments or the building manager in office/retail developments) on a site-by-site basis. It may be worth exploring the idea of creating a collaborative arrangement between multiple developments to unify TDM efforts across the West Campus project over the lifetime of the development. West Campus Transportation Impact Assessment 13

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 4.0 EXISTING CONDITIONS 4.1 Existing Road Network and Daily Volumes The existing road network in the West Campus area is partially developed and was mostly built in the early 2000 s as part of the Alberta Children s Hospital project. The ACH project also included the construction of three new accesses into the West Campus area including the new interchange at 16 Avenue NW at West Campus Boulevard, a new right-turn only ramp off of northbound Shaganappi Trail into the ACH site and a new signalized access off 32 Avenue NW at 39 Street NW (West Campus Gate NW). A brief description of each of the primary streets that form the transportation network that will serve West Campus is provided below. The most recent traffic volumes provided by the City of Calgary are provided in Appendix F. Shaganappi Trail Shaganappi Trail currently provides two travel lanes in each direction in the vicinity of the site with a posted speed limit of 70 km/hr. Current average annual daily traffic (AADT) volumes along Shaganappi Trail are approximately 25,000 vehicles per day just south of 32 Avenue NW. It is noted that Shaganappi Trail was recently downgraded from a skeletal road to an arterial road. This reclassification of the roadway allows for more access points and better accommodates transit and active transportation modes. The City is currently undertaking a functional study of the Shaganappi Trail corridor and this study is anticipated to be completed by Spring 2014. The long term vision for Shaganappi Trail includes three travel lanes in each direction as well as separate cycle lanes and sidewalks. One of the travel lanes in each direction is planned to accommodate High Occupancy Vehicles (HOV). 32 Avenue NW 32 Avenue NW is classified as an urban boulevard within the City s Calgary Transportation Plan (CTP). The current configuration includes two travel lanes in each direction, a median and separate left-turn lanes at the major junctions. A regional pathway exists on the south side of the roadway for most of the length between Shaganappi Trail and Crowchild Trail. The posted speed limit is 60 km/hr. Existing AADT volumes along 32 Avenue NW are approximately 17,000 vehicles per day just east of Shaganappi Trail. No major changes to this roadway are planned in the next 30 years. West Campus Transportation Impact Assessment 14

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 24 Avenue NW 24 Avenue NW is classified as an arterial street within the CTP (east of West Campus Drive). The current configuration includes two travel lanes in each direction, a wide median, separate left-turn lanes at the major junctions, and sidewalks on both sides of the street. The posted speed limit is 50 km/hr and the existing AADT volumes along 24 Avenue NW are approximately 11,000 vehicles per day between University Drive and West Campus Drive. No major changes to this roadway are planned in the next 30 years. West Campus Boulevard As previously mentioned, this roadway was built as part of the Alberta Children s Hospital project in 2005. It connects the West Campus area to 16 Avenue NW and the Foothills Hospital via an interchange. It is currently marked as one wide travel lane in each direction with a posted speed limit of 40 km/hr. There is a regional pathway on the west side of the roadway but it only starts approximately midway between the ACH and 16 Avenue NW and then continues south across the 16 Avenue NW interchange. Current daily volumes along West Campus Boulevard are in the range of 5,700 vehicles per day. West Campus Drive West Campus Drive connects 24 Avenue NW to West Campus Way and provides the primary access into ACH. It currently provides one wide travel lane in each direction, a median and a wide pathway on the west side. The posted speed limit is 40 km/hr. Current daily volumes along West Campus Drive were not available from the City but are estimated at approximately 6,500 vehicles per day based on an intersection counts conducted at 24 Avenue NW, Oki Drive and West Campus Drive. In the future, this roadway is envisioned as a four-lane divided roadway. 4.2 Traffic Associated with the Alberta Children s Hospital A meeting was held with Alberta Health Services EMS staff on August 16, 2013 to document the current emergency vehicle operations associated with the site as well as to gain an understanding of the typical volume of staff and visitors that are travelling to/from the site during the street peak hours. The purpose of this section is to document the results of this review. West Campus Transportation Impact Assessment 15

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning EMS staff were interviewed to understand the current travel patterns of ambulances that are accessing ACH. Based on this discussion, the following points were made: EMS generally responds to approximately 300-350 calls per year where a patient will need to be transported to ACH in an emergency situation. A number of transfers are made as well but these are typically not done under emergency situations. EMS drivers currently use all routes to access ACH including Shaganappi Trail, 32 Avenue NW, 24 Avenue NW and West Campus Blvd. EMS drivers generally do not cut through the U of C campus to access the hospital due to the circuitous nature of the internal road network. There is no current policy or guidelines telling drivers which routes to use to access the hospital. It is up to the individual EMS drivers to select the route that they believe is quickest. Since there are generally no ambulances stationed at the ACH, there are no outbound emergency vehicle trips from ACH. Typically the ambulances will be dispatched from EMS stations nearest the incident and therefore the inbound trips come from all quadrants of the City depending on where the emergency is. Drivers will typically try and avoid routes with lots of curves or a rough pavement surface to avoid causing patient discomfort. Therefore, based on the information gathered from Alberta Health Services, the ACH generates on average approximately one inbound emergency vehicle trip per day. The drivers make use of all routes to the ACH and the addition of the new access on Shaganappi Trail is expected to improve the overall accessibility of the hospital. West Campus Transportation Impact Assessment 16

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 5.0 FUTURE CONDITIONS 5.1 Trip Generation Regional Transportation Model (RTM) Forecast Trip Generation The City s RTM was used to estimate the trip generation of the West Campus Development and the intersection turning movement volumes at the study intersections. Details of the adjustments that were made to the model output to reflect the most current land use plans in the area are provided in Appendix K. The estimated trip generation for the West Campus development based on the City s RTM is summarized in Table 2. TABLE 2: REGIONAL TRANSPORTATION MODEL WEST CAMPUS TRIP GENERATION ZONE TRIPS GENERATED AM IB AM OB PM IB PM OB TOTAL TZ 2402 - West Campus Trips 1,012 176 421 876 2,485 TZ 2403 1,541 1,022 1,373 1,732 5,668 TZ 2405 314 989 1,070 530 2,903 Total 2,867 2,187 2,864 3,138 5,054 6,002 Total West Campus Trips 11,056 Traditional Trip Generation Methods As a method of checking the total trip generation from the RTM, the total trip generation for the West Campus development was also calculated based on traditional trip generation methods using City-approved trip generation rates and multiplying them by the associated land use intensity. A summary of the calculations is provided below with details provided in Appendix C. In assessing the trip generating potential of the proposed mixed-use development, the following trip rates were used for the various land uses: The residential component of the site was assessed using the City of Calgary approved trip generation rate for TOD Multi-family Residential land uses o a.m. peak hour: 0.35 / unit (25% inbound / 75% outbound) o p.m. peak hour: 0.45 / unit (65% inbound / 35% outbound) West Campus Transportation Impact Assessment 17

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning The office component of the site was assessed using the City of Calgary approved trip generation rate for TOD Offices o a.m. peak hour: 1.39 / 1000 ft 2 (88% inbound / 1 outbound) o p.m. peak hour: 1.57 / 1000 ft 2 (17% inbound / 8 outbound) The retail and community facilities components of the site were assessed using the City of Calgary approved Retail trip generation rate o a.m. peak hour: 2.00 / 1000 ft 2 (60% inbound / 40% outbound) o p.m. peak hour: 6.00 / 1000 ft 2 (50% inbound / 50% outbound) The hospital component of the site was assessed using the ITE Hospital (Land Use #610) trip generation rate o a.m. peak hour: 0.95 / 1000 ft 2 (6 inbound / 37% outbound) o p.m. peak hour: 0.93 / 1000 ft 2 (38% inbound / 6 outbound) With the exception of the hospital rates, the trip rates take into account the TOD nature of the area and the high availability of transit services and active mode connections that will be provided for the site. For the retail land use component, a 15% reduction in a.m. and p.m. peak hour trips was applied to account for pass-by trip capture, as agreed upon in the scope of the study. Internal trips are trips that have an origin and destination within the site. Although it is anticipated that most internal trips will be made by walking, cycling or transit, it is expected that some of the internal trips will be made by vehicles. Therefore, to account for this, a 10 percent reduction in the overall trip rates was applied. The trip generation for the proposed development using the application of trip rates to the proposed land uses and adding in traffic estimates for the ACH resulted in a total of 5,000 trips during the a.m. peak hour and 6,500 trips in the p.m. peak hour, as summarized in Table 3. West Campus Transportation Impact Assessment 18

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE 3: WEST CAMPUS TRIP GENERATION ESTIMATES LAND USE TRIPS GENERATED - AM PEAK HOUR TRIPS GENERATED - PM PEAK HOUR TOTAL INBOUND OUTBOUND TOTAL INBOUND OUTBOUND Multi-family Residential 2,192 548 1,644 2,818 1,832 986 Office 2,172 1,911 261 2,453 417 2,036 Alberta Children's Hospital 713 449 264 698 265 433 Retail + Community Facilities 488 293 195 1,466 733 733 - Passby Reduction (Retail Only) -73-44 -29-220 -110-110 - Internal Trip Reduction @ 10% -549-316 -233-722 -314-408 Total West Campus Trips 4,943 2,841 2,102 6,493 2,823 3,670 5.2 Comparison of Trip Generation Estimates To ensure that the use of the City of Calgary RTM Forecast traffic volumes for site generated traffic associated with the development will provide an accurate representation of future traffic in the area, a comparison of these volumes was made to the trip generation estimates arising from application of the approved trip rates. The results of the comparison are summarized in Table 4. TABLE 4: WEST CAMPUS TRIP GENERATION COMPARISON METHOD TRIPS GENERATED AM IB AM OB PM IB PM OB TOTAL RTM Forecast Model 2,867 2,187 2,864 3,138 11,056 Trip Generation Rates 2,841 2,102 2,823 3,670 11,436 Difference (Rates - Model) -26-85 -41 532 380 % Difference 3. The results indicate that the traditional trip generation rate technique provided values for the West Campus development that were approximately 3 percent higher than the RTM estimates. Given the scale of the development and the uncertainties regarding the potential internal capture and pass-by rates, this difference in estimates is considered reasonable. Therefore, it is concluded that the RTM trip generation estimates can be used to assess the operational performance of the study intersections. West Campus Transportation Impact Assessment 19

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 5.3 Future External Road Network There are a few changes that are planned to the surrounding road network between 2013 and the 2039 horizon year. The City s Regional Transportation Model (RTM) which is used to estimate future traffic volumes assumes a number of improvements to the network. The projects that are assumed to be complete by 2039 that are relevant to this study include: Enhanced Transit Service to West Campus including higher frequency on the current routes as well as new routes such as the South Shaganappi BRT 16 Avenue NW widened to 6 lanes through 29 Street NW intersection NW LRT Extended to Tuscany / Rocky Ridge Interchange at 16 Avenue NW / Bowfort Road In addition to the above improvements, the City Forecasting Division updated the RTM to include the internal road network for West Campus based on the current plans. This included the new all-turns access onto Shaganappi Trail from West Campus Way / 28 Street NW. 5.4 Review of RTM Land Use Assumptions The City s RTM was used to estimate the future traffic volumes in West Campus. Therefore to ensure that the model is based on the most accurate information, all of the adjacent transportation zones adjacent to West Campus were reviewed to ensure that the most up to date land use projections for employment and population were included in the model. Traffic adjustments were made to account for population or employment increases that may not be reflected in the model. A summary of the assumptions that were included in the model for adjacent transportation zones as well as some commentary as to whether adjustments to the traffic volumes were justified are included in Table 5. The year 2006 is used as the current / base scenario in the jobs and populations that are assumed in the City s Regional Transportation Model (RTM). Since this base period, ACH has become fully operational. After consultations with Alberta Health Services staff, it was determined that the number of staff currently employed at ACH is 1,320 of which approximately 1,030 work the day shift. West Campus Transportation Impact Assessment 20

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE 5: RTM EMPLOYMENT AND POPULATIONS FORECASTS Employment / Population Forecast 2006 2039 (Forecast) % Change Comments TZ 2035 Stadium Shopping Centre and University Heights Employment 748 853 + 1 The City s RTM did not account for Population 2919 3195 + 9% redevelopment of Stadium Shopping Centre. Traffic volumes were manually adjusted to account for anticipated traffic volumes. TZ 2304 Foothills Medical Centre Employment 11,246 17,816 58% Assumes significant growth of site Population 0 0 0% including Cancer Care Centre. Growth included in the model is higher than what is assumed in the 2006 FMC master plan. No changes recommended. TZ 2732 Market Mall Employment 3760 3500-7% Anticipates the conversion of some Population 0 299 n/a retail to residential. Since this would reduce overall traffic it was decided not to adjust volumes. TZ 2404 - McMahon Stadium and Foothills Athletic Centre Employment 291 291 0% Minor growth expected at FAC with Population 0 0 0% negligible impact on West Campus. No adjustments recommended. McMahon discussed below. McMahon Stadium Although some future redevelopment is anticipated at McMahon Stadium, no further information was available at the time of this study. TDS staff indicated that the impact of any future development at McMahon stadium will be evaluated under a separate study Stadium Shopping Center The RTM assumes some minor growth but does not include Stadium Shopping Centre redevelopment. Based on the Stadium Shopping Centre Transportation Impact Assessment, West Campus Transportation Impact Assessment 21

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning the forecast traffic volumes for West Campus were adjusted to account for the redevelopment. This primarily involved the addition of trips along 24 Avenue NW, West Campus Drive and 39 Street NW (West Campus Gate NW). The employment and population forecasts included in the standard forecast series of the RTM for the transportation zones that encompass West Campus were out of date. Therefore, the City s Forecasting Department updated the model to reflect the current plans for West Campus including population and employment projections. A summary of the land use assumptions for West Campus that are based on the most up to land uses is shown in Table 6. TABLE 6: RTM EMPLOYMENT AND POPULATIONS FORECASTS SPECIAL WEST CAMPUS MODEL RUN Employment / Population Forecast 2006 2039 (Forecast) % Change Comments TZ 2402 University of Calgary (Includes part of the West Campus Development) Employment 8,957 13,725 5 The majority of this growth is attributed Population 2,137 10,873 409% to West Campus. TZ 2403 West Campus and Alberta Children s Hospital Employment 219 6,597 2,91 Most of this growth is attributed to Population 0 7,720 n/a West Campus while some of the growth is attributed to Alberta Children s Hospital. TZ 2405 West Campus Employment 0 1,039 n/a All of this growth is attributed to West Population 0 9,012 n/a Campus. In summary, inputting the latest land use plans for West Campus into the RTM ensures that the forecast traffic volumes are based on the best available data. This combined with the minor adjustments that were made to account for the Stadium Shopping Centre redevelopment provides confidence that the forecast volumes are reflective of full development of West Campus and the surrounding area. West Campus Transportation Impact Assessment 22

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 5.5 Mode Split Travel mode split measures the proportion of all person trips generated by a site or region (coming to or departing from an area) being carried out by each of the following transportation modes: As a driver in a vehicle As a cyclist As a passenger in a vehicle As a transit rider As a pedestrian Very little existing modal split data is available for the West Campus area. Statistics Canada did collect information regarding how people commute to work as part of the 2006 census. This data can provide some insight regarding the potential modal split that could be achieved with residential land uses in the area. A summary of the travel to work survey completed as part of the 2006 census (the most recent year available) is provided in Table 7 for University Heights. For comparison purposes, two typical suburban neighborhoods (Coventry Hills and Glamorgan) along with city wide data are also included in the table. TABLE 7: EXISTING MODAL SPLIT UNIVERSITY HEIGHTS RESIDENTS COMMUTE TO WORK* MODE UNIVERSITY COVENTRY CITY OF GLAMORGAN HEIGHTS HILLS CALGARY Auto Driver 47% 79% 66% 68% Auto Passenger 7% 6% 8% Walk and Cycle 26% 7% 7% Transit 2 1 20% 17% Other TOTAL 100% 100% 100% 100% * Based on 2006 Federal Census Data Numbers may add up to more than 100% because of rounding This data is relevant to this study since the future residents of West Campus would likely exhibit a similar mode split for peak hour travel. With the planned improvements to transit, walking and cycling, it is likely that the modal split could improve with less auto travel. West Campus Transportation Impact Assessment 23

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 5.6 Future Modal Split Future modal split information for the West Campus area was provided by the City s Regional Transportation Model and is summarized in Table 8 for the transportation zones that encompass the West Campus area. The modal split data is an output of the RTM based on the proposed land uses, proximity to other major employment centres, quality of transit and many other variables that influence travel behavior. The data from the RTM includes single occupant vehicles (SOV), high occupancy vehicles (HOV) as well as transit, walk and bike percentages. It is noted that the HOV percentage includes both the driver and passengers. It is further noted that zone 2405 includes the U of C main campus so the numbers below are reflective of the entire West Campus of U of C development. Some of the percentages do not add to 100 due to rounding. The model data suggests that the West Campus area modal split upon full build-out would be approximately 45 percent and 36 percent non-auto trips during the AM and PM peak periods, respectively. Over a 24-hour period, 36 percent of the trips are expected to be by non-auto modes. This mode split estimate is at the lower end of the City s 60-year target of 35-45 percent non-auto trips over a 24-hour period city-wide. Considering that West Campus is an inner city development, its proximity to major employment centres, the planned transit improvements in the area and current mode split data from nearby residents, the estimated percentage of non-auto trips appears to be underestimated. With a more comprehensive transit network and increased frequency of transit service, it is estimated that the West Campus development could achieve mode splits that exceed that City-wide 60-year target. Based on what is currently being achieved by the residential land uses in University Heights and what is currently being achieved at UBC in Vancouver, it is estimated that the modal split for West Campus could be in the range of 50-60 percent nonauto trips. TABLE 8: RTM MODAL SPLIT ESTIMATES FOR WEST CAMPUS 2039 AM Peak Percentages SOV HOV Transit Walk Bike TOTAL Study Area Inbound 4 1 38% 100% Outbound 4 2 2 1 100% (2402, 2403, Internal 26% 1 5% 5 100% 2405) TOTAL 40% 16% 3 1 100% West Campus Transportation Impact Assessment 24

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning PM Peak Percentages SOV HOV Transit Walk Bike TOTAL Study Area Inbound 48% 27% 17% 6% 100% Outbound 4 18% 3 5% 100% (2402, 2403, Internal 28% 18% 5% 48% 100% 2405) TOTAL 4 2 2 1 100% 24 Hour Percentages SOV HOV Transit Walk Bike TOTAL Study Area Inbound 4 2 2 7% 100% (2402, 2403, 2405) Outbound 4 2 25% 7% 100% Internal 26% 19% 5 100% TOTAL 40% 2 2 1 100% West Campus Transportation Impact Assessment 25

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 6.0 POST-DEVELOPMENT CONDITIONS 6.1 Post Development Traffic Volumes The future traffic volumes at the study intersections were estimated by the City s Forecasting Division. A number of adjustments were made to the forecast volumes to account for some of the inherent problems associated with developing detailed traffic volume estimate from a macro model. In addition to the adjustments, some of the intersection turning movement volumes needed to be estimated based on adjacent forecast data as well as knowledge regarding the West Campus and U of C Master Plans. The original future intersection volumes as well as the adjustments and the resulting volumes are provided in Appendix G. The resulting turning movement traffic volumes for each of the study intersections are summarized in Figure 6 for the 2039 horizon. The aforementioned graphic s volumes were rounded to the nearest 10 vehicles for clarity and the distance to the horizon year (2039). 6.2 Post Development Pedestrian Volumes According to the City s RTM, the entire West Campus development and the University of Calgary main campus are expected to generate approximately 4,600 pedestrian trips in the AM peak period, and 4,900 trips in the PM peak period. In addition to these primary pedestrian trips, there are expected to be thousands of secondary pedestrian trips including those people that will walk to/from a transit station or walk to/from their car parked in an off-site or on-street location. On a scale such as this, it is too difficult to assign the individual pedestrian trips to the intersections because there would be too much variability in terms of where the pedestrian trips are generated from, where they are destined to, and the routes taken. Therefore, to estimate the pedestrian volumes at the study intersections, it was decided to use current pedestrian volume information from other well used pedestrian corridors in Calgary outside of downtown and the beltline as the basis for estimating pedestrian volumes in West Campus. The current peak hour pedestrian volumes along 4 Street SW in Mission, 33 Avenue SW in Marda Loop and along Kensington Road are summarized in Table 9. The information is divided into those pedestrians walking along the main retail street, versus those that are crossing the main street. West Campus Transportation Impact Assessment 26

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning FIGURE 6: POST-DEVELOPMENT TRAFFIC VOLUMES West Campus Transportation Impact Assessment 27

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE 9: CURRENT PEAK HOUR PEDESTRIAN VOLUMES IN CALGARY Street Average Pedestrians Crossing Minor Street Average Pedestrians Crossing Major Street AM PM AM PM 4 th Street @ 20 th and 21 st Avenues (Mission) 82 111 21 39 33 rd Avenue @ 20 th and 22 nd Streets in Marda Loop 7 20 9 21 Kensington Road @ 12 th Street, 10A Street and 13 th Street 48 125 31 49 AVERAGE 45 85 20 36 MAX 82 125 30 50 Using the pedestrian volumes from the table, together with engineering judgment, the future pedestrian volumes crossing each leg of the West Campus study intersections were estimated. The crossing volumes ranged between 25 and 80 during the AM peak period and between 25 and 125 during the PM peak period. The highest pedestrian volumes were estimated to be along West Campus Way which is the primary retail area for the development. For sensitivity analysis purposes, a significantly high value of 500 pedestrians per hour per crossing was modeled along West Campus Way using the improved scenario infrastructure (per Figure 9). The results of the capacity analysis (provided in Appendix H.) show the number of pedestrians modelled on each intersection leg does not have a significant impact on the capacity analysis results. The intersections along West Campus Way still operate with respectable levels of service for a mixed-use, pedestrian friendly urban area. 6.3 Post Development Bicycle Volumes West Campus and U of C main campus are expected to generate approximately 600 bicycle trips during both the morning and afternoon peak periods. Due to the overlapping boundaries of the transportation zones in the RTM, it is unknown how many of these trips are associated with the West Campus development versus the U of C main campus. Given the uncertainty regarding the volume and the size of the development area, it was deemed to be too difficult to assign the individual bicycle trips to the West Campus road network. Therefore, to estimate the bicycle trips for the intersections, a different approach was taken that involved reviewing current bicycle volumes along higher density inner-city streets. Based on this review, it was concluded that most intersections along these types of streets experience between 5-10 bicycle movements per direction. Based on the vision for West West Campus Transportation Impact Assessment 28

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning Campus as a sustainable community and given the robust cycling network that is planned for the site, higher cycling volumes are anticipated. Therefore, it was decided to group the study intersections into three level of cycling activity including: High= 50 cycle movements per hour per direction Medium = 25 cycle movements per hour per direction Low = 10 cycle movements per hour per direction Based on the cycling infrastructure that is planned for West Campus as well as the density of the land uses, cycle volumes were estimated for each leg of the study intersections. These volumes were incorporated into the capacity analysis. The post-development walk and bicycle volumes for the study intersections are summarized Figure 7. West Campus Transportation Impact Assessment 29

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning FIGURE 7: POST-DEVELOPMENT PEDESTRIAN AND BICYCLE VOLUMES West Campus Transportation Impact Assessment 30

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 6.4 Post Development Transit Volumes The City s Forecasting Division provided information related to future transit service in the area. As discussed in Section 8 the City is planning to add some new routes in the area and substantially increase the frequency of some of the existing routes that serve West Campus. Based on the routing and frequency of the future transit service, the number of bus movements through the intersections was estimated and incorporated into the capacity analysis. The number of bus blockages for each intersection approach ranged between 0 and 32 blockages per hour. 6.5 Post-Development Operating Conditions As per the study scope, capacity analysis was conducted for the following study intersections: 32 Avenue NW / Shaganappi Trail 32 Avenue NW / 39 Street NW (West Campus Gate NW) 32 Avenue NW / Collegiate Blvd. West Campus Way (28 Avenue NW) / Shaganappi Trail (proposed new site access point) West Campus Way / West Campus Drive West Campus Way / 39 Street NW (West Campus Gate NW) West Campus Way (Collegiate Drive) / Collegiate Blvd. ACH access onto West Campus Blvd. 24 Avenue NW / West Campus Drive 24 Avenue NW / West Campus Blvd. West Campus Blvd (Hospital Drive) / 16 Avenue NW (interchange terminals) The base network laning and signage for the 2039 post development period is shown in Figure 8. The initial road network that was assumed for the future conditions was based on the existing infrastructure and the proposed cross-sections included in the Outline Plan and Land Use Submission. The results represent the base case in terms of travel lanes and turning lanes at each of the study intersections. West Campus Transportation Impact Assessment 31

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning FIGURE 8: WEST CAMPUS STREET NETWORK LANING AND SIGNAGE 2039 BASE SCENARIO West Campus Transportation Impact Assessment 32

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning The future operating conditions for the intersections within the study area were evaluated using the Synchro 7.0 software package (which is based on the methodology outlined in the Highway Capacity Manual 2 ). For unsignalized (stop-controlled) intersections, the level-ofservice (LOS) is based on the computed delays on each of the critical movements. LOS A represents minimal delays for minor street traffic movements, and LOS F represents a scenario with an insufficient number of gaps on the major street for minor street motorists to complete their movements without significant delays. For signalized intersections, the methodology considers the intersection geometry, traffic volumes, the traffic signal phasing/timing plan, and also pedestrian volumes. The average delay for each lane group is calculated, as well as the delay for the overall intersection. The operating conditions can also be expressed in terms of volume-to-capacity (v/c) ratio. The LOS criteria for signalized and unsignalized intersections, as summarized in the Highway Capacity Manual, in presented in Table 10. TABLE 10: LEVEL OF SERVICE CRITERIA Level of Service (LOS) Average Delay for Unsignalized Intersection Movements Average Delay for Signalized Intersection Movements A 0 10 seconds per vehicle 0 10 seconds per vehicle B > 10 15 seconds per vehicle > 10 20 seconds per vehicle C > 15 25 seconds per vehicle > 20 35 seconds per vehicle D > 25 35 seconds per vehicle > 35 55 seconds per vehicle E > 35 50 seconds per vehicle > 55 80 seconds per vehicle F > 50 seconds per vehicle > 80 seconds per vehicle All roundabouts reviewed in this study were evaluated using the SIDRA Intersection 5.1 software package. For roundabout approaches, the level-of-service is based on the computed delays on each of the approaches. LOS A represents minimal delays, and LOS F represents a scenario with an insufficient number of gaps on the circulating flow for motorists to enter to the roundabout without significant delays. The LOS criteria for roundabouts are shown in Table 11. 2 Transportation Research Board, National Research Council. Highway Capacity Manual 2000. Washington, D.C. 2000. West Campus Transportation Impact Assessment 33

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE 11: LEVEL OF SERVICE CRITERIA FOR ROUNDABOUTS Level of Service (LOS) A B C D E F Average Delay for Roundabout Movements 0 10 seconds per vehicle > 10 20 seconds per vehicle > 20 35 seconds per vehicle > 35 55 seconds per vehicle > 55 80 seconds per vehicle > 80 seconds per vehicle Applying the future vehicle, pedestrian and bicycle traffic volumes summarized in Figures 6 and 7 and the intersection geometry from Figure 8, the level of service results of the intersection capacity analysis for each of the study intersections are summarized in Appendix H. Detailed capacity analysis Synchro reports for the signalized and stopcontrolled intersections are included in Appendix I, while detailed capacity analysis SIDRA reports for the roundabouts are included in Appendix J. A discussion of the intersections where capacity issues were present including potential solutions is provided in the following section. 6.6 Discussion of Results and Intersection Improvement Options 32 Avenue NW & Shaganappi Trail: Based on the traffic projections provided by the RTM, this intersection is expected to operate at or over capacity during the peak periods upon full build-out of West Campus. In both the morning and afternoon peak periods, several of the movements are expected to operate at level of service (LOS) F with volume-to-capacity (v/c) ratios over 1.00. New phasing or signal timing plans were tested but could not alleviate the anticipated congestion. Therefore, geometric improvements are warranted for this intersection to address the anticipated congestion. The improvement that was tested was the expansion of Shaganappi Trail to three travel lanes in each direction, dual northbound and southbound left turn lanes and the addition of an eastbound right-turn lane. With these improvements in place, the intersection is expected to improve from an overall LOS F in both peak periods to LOS D and LOS E in the AM and PM peak periods, respectively. Even with the additional lanes, some of the individual movements are still expected to operate at LOS F. It is noted that the City is currently looking at improving the access to Market Mall which may have the impact of reducing the traffic volumes at the 32 Avenue NW and Shaganappi West Campus Transportation Impact Assessment 34

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning Trail intersection. If this improvement is implemented, the need for expanding Shaganappi Trail to three lanes in each direction could be delayed. West Campus Way & Shaganappi Trail: In the base case scenario, this new access onto Shaganappi Trail was assumed to provide two travel lanes in each direction along Shaganappi Trail with a dual southbound left-turn lane into West Campus and a separate northbound right-turn lane. The westbound approach was assumed to have a dual left-turn lane and a separate right-turn lane. With this configuration, the intersection is expected to have operational issues in 2039 during the peak period with some of the movements operating at LOS F with v/c ratios in the range of 0.90-1.04. The expansion of Shaganappi Trail to three travel lanes in each direction as discussed in the previous section will alleviate the identified operational issues. In the future an add-lane merge operation may be required for the eastbound right turning vehicles, due to the p.m. peak volumes. However, the need for this improvement would need to be balanced against the potential impacts on the pedestrian and cycling traffic that crosses the east leg of this intersection. No other improvements are required at this location. The capacity analysis that was conducted for the intersection of West Campus Way and Shaganappi Trail assumed that pedestrians would only be allowed to cross Shaganappi Trail on the north side. This is primarily to avoid potential conflicts between the westbound dual left-turn movement and pedestrian traffic on the south side, and to maximize the efficiency of the overall intersection operation. 32 Avenue NW & 39 Street NW (West Campus Gate NW): This intersection is anticipated to operate within acceptable limits during the PM peak period. In the AM peak, there are a few movements that are expected to operate slightly above the City s acceptable limits. One potential improvement that could address these operational issues is to provide a separate eastbound right-turn lane. However, the need for this improvement would need to be balanced against the potential impacts on the pedestrian and cycling traffic that crosses the south leg of this intersection on the regional path. West Campus Way & 39 Street NW (West Campus Gate NW): This internal intersection was assumed to be controlled by a stop sign on the southbound approach in the base case scenario. The capacity analysis suggests that this type of traffic control will not work in the peak periods. Therefore, a traffic signal was tested at this intersection and the operations improve to within acceptable standards. West Campus Transportation Impact Assessment 35

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 24 Avenue NW & West Campus Drive: This internal intersection is anticipated to operate within acceptable limits during the AM peak period. In the PM peak, there are a few movements that are expected to operate slightly above the City s acceptable limits. One potential improvement that could address these operational issues is to provide a separate westbound right-turn lane. The recommended approach for this intersection is to build the intersection without the westbound right-turn lane and then monitor traffic operations at each development phase. There is sufficient right-of-way to add the turn lane in the future if deemed necessary. All other intersections are expected to operate satisfactorily with the base case network assumptions. The results of the analysis for the improved traffic control options are presented in Appendix H and the resulting improved network is shown in Figure 9. A summary of the infrastructure improvements to the final road network is provided in Figure 10. West Campus Transportation Impact Assessment 36

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning FIGURE 9: WEST CAMPUS STREET NETWORK LANING AND SIGNAGE 2039 IMPROVED SCENARIO West Campus Transportation Impact Assessment 37

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning FIGURE 10: INFRASTRUCTURE IMPROVEMENTS 6.7 Potential for Roundabouts Three of the study intersections were tested as roundabouts. A discussion of each of these intersections is provided below. West Campus Boulevard / 24 Avenue NW: In the base case, this intersection was tested as a northbound stop controlled intersection. The results of this analysis suggest that the West Campus Transportation Impact Assessment 38

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning intersection could work with this type of traffic control. A roundabout at this location was reviewed however there are too many constraints to make it a viable alternative for traffic control at this location. West Campus Boulevard / 16 Avenue NW (north and south terminals): Both of these intersections were tested as a signalized intersection in the base case and as a roundabout. The analysis suggests that under both traffic control options, the intersections would perform at a very good LOS B or better during both peak periods. Roundabouts are expected to perform better in the off-peak period and are also considered to be safer and more sustainable as compared to signalized intersections. It is recommended that a more detailed assessment of the intersection geometry and right-of-way be conducted at both of these locations at further stages of the planning process to determine the appropriate form of traffic control at these intersections. The result of the analysis for a single-lane roundabout option for the north terminal is presented in Appendix H. 6.8 Intersection Capacity Analysis Summary The post development operating conditions of the study intersections in the vicinity of West Campus with the improved geometry and roundabouts are summarized in Figure 11. As shown, most intersections are expected to operate with a good level of service (LOS A or B) during the a.m. and p.m. peak periods. Some intersections are anticipated to operate with a moderate level of service (LOS C or D) and no intersections in the study area are expected to operate with a poor level of service (LOS E or F). West Campus Transportation Impact Assessment 39

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning FIGURE 11: LEVEL OF SERVICE SUMMARY IN STUDY AREA 6.9 Impact on Other Intersections The Select Zone outputs from the model were used to estimate the percentage increase in peak hour traffic volumes as a result of the West Campus Development at the following intersections: 32 Avenue NW / 33 Street NW 32 Avenue NW / 31 Street NW (Campus Drive) 32 Avenue NW / Crowchild Trail (interchange terminals) West Campus Transportation Impact Assessment 40

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 24 Avenue NW / Crowchild Trail 24 Avenue NW / University Drive The results of this review are provided in Table 12. TABLE 12: WEST CAMPUS IMPACT ON NEARBY INTERSECTIONS Entering Volumes Intersection AM Peak PM Peak Existing Addition from WC (2039) Increase % Existing Addition from WC (2039) Increase % 32 Avenue NW / 33 Street NW 1436 396 28% 2508 452 18% 32 Avenue NW / 31 Street NW (Campus Drive) 1873 374 20% 2292 392 17% 32 Avenue NW / Crowchild Trail (East interchange terminal) 1440 302 2 1661 331 20% 32 Avenue NW / Crowchild Trail (West interchange terminal) 2301 330 1 2299 363 16% 24 Avenue / Crowchild Trail 6682 189 7694 94 24 Avenue / University Drive 1878 579 3 1969 657 3 Based on the projected traffic volumes, the West Campus development is expected to increase volumes at intersections outside the immediate area by between 3-33 percent. 6.10 Daily Volume Analysis The daily traffic volumes on the internal and external streets surrounding West Campus were estimated for the year 2039. The daily volumes were estimated at ten times the PM peak entering volumes (shown in Figure 6) at the adjacent intersections. As a comparison, the estimated daily vehicle volumes for external and internal streets adjacent to the development are shown in Figure 12 along with the existing daily volumes of the external roads. These daily volumes were considered along with the context and function of various roadways and the current usage to develop a road classification scheme for the road network. It is noted that many of the streets within West Campus are already built, therefore where possible the existing infrastructure was incorporated into the proposed classifications. West Campus Transportation Impact Assessment 41

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning FIGURE 12: 2039 DAILY VOLUME ESTIMATES Shown in Table 13 are the five classifications of roadways to be used in West Campus with their respective Right-of-Way (ROW) widths and estimated daily traffic volumes in vehicles per day (vpd). Detailed cross sections of these planned roadways can be found in Appendix E. West Campus Transportation Impact Assessment 42

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE 13: ROADWAY CLASSIFICATION SUMMARY Roadway West Campus Gate (39 Street NW) West Campus Way East of West Campus Drive West Campus Way West of West Campus Drive West Campus Drive Next to Hospital West Campus Crescent 24 Avenue NW South of Hospital West Campus Blvd. South of 24 Avenue NW West Campus Blvd. South of West Campus Drive West Campus Drive South of 24 Avenue NW Recommended Road Classification Primary Collector Activity Centre Street ROW Width (m) As Per Existing (~35.4) Estimated Future Volume (vpd) Daily Volume Ranges (2013 Complete Streets) 14,300 8,000 15,000 28.1 14,400 3,000 15,000 Local Arterial 32.8 22,100 15,000 20,000 Local Arterial 34.6 21,700 15,000 20,000 Collector 25.0 4,100 2,000 8,000 Primary Collector Primary Collector 33.5 9,300 8,000 15,000 30.0 9,000 8,000 15,000 Local Arterial 30.0 17,000 15,000 20,000 Collector 19.9 5,600 2,000 8,000- Collegiate Road Collector 21.0 8,000 2,000 8,000 6.11 Phasing The West Campus Development Trust has prepared a preliminary phasing plan for the development of West Campus as shown in Figure 13. Based on this phasing plan, the first phase is expected to be the mixed-use portion of West Campus Way (the High Street). Based on the transportation analysis conducted as part of this study, the transportation infrastructure required to support this phase includes the addition of the new access onto Shaganappi Trail at West Campus Way and the construction of West Campus Way to its ultimate cross-section. Other phases in the development are only expected to require local West Campus Transportation Impact Assessment 43

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning improvements/upgrades to the road network. Table 14 outlines the recommended phase each improvement should be included in. FIGURE 13: WEST CAMPUS PHASING PLAN West Campus Transportation Impact Assessment 44

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE 14: RECOMMENDED IMPROVEMENT PHASING No. Improvement Description Estimated Time Required 1 New Intersection of Shaganappi Trail and West Phase 1 Campus Way 2 Construction of West Campus Way from Shaganappi Phase 1 Trail to Collegiate Blvd. 3 Reconstruction of West Campus Boulevard from 24 Phase 2 Avenue NW to South Boundary of site 4 Reconstruction of intersection of West Campus Phase 2 Boulevard and 24 Avenue NW 5 Reconstruction of 24 Avenue NW from West Campus Phase 2 Blvd. to West Campus Drive. 6 Reconstruction of West Campus Drive from 24 Avenue Phase 2 NW to West Campus Way 7 Traffic Signals at West Campus Way and West Campus Phase 3 Drive 8 Traffic Signals at West Campus Way and West Campus Gate 9 Traffic Signals at West Campus Way and Collegiate Blvd. 10 Construction of Roundabouts or Signals at 16 Avenue NW Interchange Terminals (to be confirmed through discussions with AHS and City) 11 Widening Shaganappi Trail from 32 Avenue NW to 16 Avenue NW and the addition of dual SBLT lanes @ West Campus Way / Shaganappi Trail. 12 Intersection Improvements to Shaganappi Trail and 32 Avenue NW Responsibility for Funding Developer Developer Developer Developer Developer Developer Developer When Developer Warranted When Developer Warranted TBD Developer / City / AHS TBD Developer / City TBD Developer / City Shaganappi Trail Improvements: The construction of the new signalized access at Shaganappi Trail and West Campus Way is expected to be completed as part of the initial phase of the West Campus Development. The provision of a dual southbound left-turn lane and the widening of Shaganappi Trail between West Campus Way and 32 Avenue NW could West Campus Transportation Impact Assessment 45

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning be phased as development proceeds and the need arises. A potential phasing strategy for these improvements is provided below: Stage 1 (Opening Day) Construct Shaganappi Trail / West Campus Way signalized intersection Maintain existing two through lanes northbound/southbound Revise median to add a single southbound left-turn lane Construct dual westbound left-turn lanes and a tapered westbound right-turn lane Stage 2 Add northbound through lane that extends from south of West Campus Way through 32 Avenue NW. This improvement would be accommodated by widening to the east while holding the median and west curb line. Stage 3 Add an additional southbound left-turn lane (dual lefts) Add southbound through lane that extends from north of 32 Avenue NW to south of West Campus Way (tapering back to existing two lanes). This improvement would require modifications to the median as well as widening to the west. It is recommended that the timing for the above improvements be tied to specific traffic operational triggers to ensure that the infrastructure is constructed only when needed. The specific triggers could be related to delays for individual intersection movements, queue lengths or level of service for the overall intersection. More discussion with the City is needed to determine appropriate triggers for these improvements. 16 Avenue NW / West Campus Boulevard Intersection Improvements: The north terminal of the interchange of West Campus Boulevard and 16 Avenue NW is currently operating satisfactorily as a stop controlled intersection with the right of way given to traffic headed northbound and southbound on West Campus Boulevard. To support full development of West Campus, the traffic control for this intersection will need to be upgraded to either a single lane roundabout or a traffic signal. Through discussions with WCDT, the preference for this intersection is a roundabout. This is subject to discussions with Alberta Health Services and the feasibility would need to be confirmed through detailed design. The upgrade of this intersection should be constructed only when needed. Rather than tie the upgrade to a specific phase of development, the preferred approach is to tie the upgrade to a specific trigger related to traffic operations at the intersection. The trigger West Campus Transportation Impact Assessment 46

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning could be level of service for the intersection, delays to the stop-controlled traffic or queues along the off-ramp. More discussion with the City is needed to determine the appropriate trigger for this improvement. Whichever trigger is decided, regular monitoring of the traffic volumes at this intersection and capacity analysis is required on at least an annual basis. West Campus Transportation Impact Assessment 47

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 7.0 ACTIVE MODES REVIEW 7.1 Site Description The proposed West Campus development site is situated in the northwest quadrant of the City in an area within close proximity to several major travel destinations. A diverse range of land uses are proposed within West Campus and within walking distance of the development, which include offices, commercial and institutional destinations, residential areas, medical facilities, sports and recreation facilities, cultural amenities, open spaces, as well as transit stops and other active mode travel destinations. The site is also located within walking distance of Market Mall, the communities of Varsity Village, Montgomery, University Heights, and Parkdale, and is close to the extensive Bow River pathway system. 7.2 Existing Pedestrian and Cyclist Facilities The proposed road network within West Campus and in the vicinity of the site will provide pedestrians with a variety of alternative route options to nearby travel destinations. The sidewalks and pathways in the area also provide good connectivity to several local amenities and transit stops. Major pedestrian and cyclist destinations located close to the site are illustrated in Figure 14. Also shown is the existing pedestrian and bicycle pathway system within a 1 km radius and a 3 km radius from the site. The existing regional pathways and on-street bicycle routes bordering the proposed development provide connections from West Campus throughout the City, including routes leading south to the extensive Bow River pathway system. The regional pathway along the Bow River provides a direct and well-maintained connection to major beltline and downtown destinations, which are located at an approximate distance of 7 km from the site. The number of pedestrians that travel across Shaganappi Trail between Montgomery and the south end of the Alberta Children s Hospital was not quantified as part of this study. Aerial photographs showing a worn path connecting 22 Avenue NW on the west side to 24 Avenue NW on the east side suggest that the crossings do occur with some regularity. Due to the high operating speeds in the area and the steep grades on Shaganappi Trail, the preferred solution is to encourage pedestrians to use the new signalized at-grade crossing being provided at West Campus Way. As shown in Figure 15, strong pedestrian connections on the east side of Shaganappi Trail are being provided to help encourage pedestrians to cross at the new at-grade crossing. West Campus Transportation Impact Assessment 48

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning FIGURE 14: TRAVEL DESTINATIONS AND PEDESTRIAN AND CYCLIST FACILITIES 7.3 Future Pedestrian and Cyclist Facilities In addition to the existing pedestrian and cyclist facilities in the vicinity of West Campus, the proposed development is anticipated to incorporate an extensive system within the site to accommodate active transportation modes and provide a safe and walkable environment aligning with the West Campus vision. Figure 15 from the West Campus Land Use Plan and Outline Plan report illustrates the proposed pedestrian and cyclist infrastructure internal to the West Campus development. West Campus Transportation Impact Assessment 49

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning FIGURE 15: INTERNAL PEDESTRIAN AND CYCLIST FACILITIES West Campus Transportation Impact Assessment 50

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning As shown, sidewalks and pathways are proposed along major roadways within the development to enhance pedestrian mobility and provide a multitude of different route options. The sidewalks will be constructed as per the City of Calgary s Complete Streets Guidelines and will range in width from 1.5 m to 3.0 m based on anticipated levels of pedestrian traffic and to maximize safety and comfort. In addition to the multi-use pathways, on-street bike lanes and separate bike paths will further enhance connectivity and provide route options for cyclists travelling around West Campus and to external access points such as 37 Street NW to the north, 24 Avenue NW to the east, and West Campus Boulevard and 16 Avenue NW to the south and west, respectively. A regional pathway will loop around much of the perimeter of West Campus to facilitate commuter and recreational cycling around the development. The sidewalk and pathway network will also provide direct connections to the nearby transit facilities and bus stops located within and in close proximity to the site. As per the Outline Plan report, additional infrastructure will be constructed to improve the quality of the active modes facilities in the area, including raised pedestrian crosswalks, median refuge islands, curb extensions and curb cut ramps to accommodate wheel chair and stroller use. Bike parking, bike lockers and shower facilities will be provided as per City of Calgary bylaw requirements. As such, the proposed layout and planned active modes network within and in the vicinity of West Campus has been designed to accommodate and encourage a high level of pedestrian and cyclist activity upon construction of the proposed development. West Campus Transportation Impact Assessment 51

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 8.0 TRANSIT SERVICE 8.1 Existing Transit Service The West Campus area is currently serviced by bus routes 9, 72, 73, and 91. The approximate service headways and possible connections for each route are summarized in Table 15. TABLE 15: EXISTING TRANSIT SCHEDULE AND CONNECTIONS Route 9 Varsity Acres / Bridgeland 72 Circle Route 73 Circle Route 91 Lions Park / Brentwood Connections Brentwood terminal, University of Calgary, Children s Hospital Brentwood terminal, University LRT, Shaganappi Point LRT, Children s Hospital, Westbrook terminal Brentwood terminal, University LRT, Shaganappi Point LRT, Children s Hospital, Westbrook terminal Brentwood LRT, Children s Hospital, Foothills, Lions Park LRT AM Peak Frequency (minutes) Mid PM Sat Sun Eve Peak Peak Day Eve Day 20 30 20 30 30 30 30 10 30 15 30 30 30 30 10 30 15 30 30 30 30 16 25 16 25 25 25 25 Additional routes provide transit services to the area along 32 Street and on 16 Avenue. The existing transit facilities and routes servicing West Campus and the surrounding areas are shown in Figure 16 provided by Calgary Transit. The sidewalk network in the area provides a direct route to these transit stops. West Campus Transportation Impact Assessment 52

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning FIGURE 16: EXISTING TRANSIT SERVICE 8.2 Future Transit Service The City of Calgary is currently in the process of evaluating transit services in an area that includes West Campus, the University of Calgary, Brentwood, Market Mall and the Foothills Medical Centre. The study, titled the NW-HUB Transit Enhancement Study, is anticipated to be completed in 2014. The study is aimed at assessing the need and feasibility of potential mobility improvement options, including bus lines and operations, bus rapid transit (BRT) services, cycling and pedestrian routes, and alternative improvement possibilities such as trams and urban gondolas. It is expected that upon completion of the study, the City of Calgary may introduce upgrades to transit services and infrastructure in the West Campus area. West Campus Transportation Impact Assessment 53

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning As detailed in the West Campus Outline Plan and Land Use report, the proposed development is planned to incorporate several new bus stops within the site, such that all areas within West Campus are located within 400 m of a transit stop. In addition, the area is expected to be serviced by several new routes, as illustrated in Figure 17 from the Outline Plan report. FIGURE 17: FUTURE TRANSIT NETWORK West Campus Transportation Impact Assessment 54

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning Although the anticipated routes and schedules may be subject to change in the future upon further discussions with Calgary Transit and based on the findings of the NW-HUB Transit Enhancement Study, Table 16 details the anticipated future transit routes and associated service headways expected. This data was provided by the City of Calgary Forecasting division as transit model assumptions used in the 2039 Regional Transportation Model forecast. TABLE 16: FORECAST FUTURE TRANSIT SERVICES Route Frequency (minutes) AM Peak Hour PM Peak Hour Off Peak Hour 8 - North Pointe / Brentwood 5 5 10 9 - Varsity Acres / Bridgeland 10 10 20 10 - Dalhousie / Southcentre 10 10 20 19-16 Avenue North 10 10 20 20 - Heritage / Northmount 5 5 10 22 - Dalhousie 15 15 30 40 - Crowfoot / North Hill 15 15 30 72 - Circle Route 5 5 10 73 - Circle Route 5 5 10 91 - Lions Park / Brentwood 10 10 20 119-16 Avenue North 10 10 20 122 - Varsity 15 15 30 137 - Northwest Loop 15 15 30 143 - Northwest Loop 15 15 30 181 - MRC N Express 4 4 N/A 201 - Rocky Ridge/552X LRT 3 3 6 309 - BRT 5 5 10 320 - North Crosstown BRT 10 10 20 405 - Hillhurst Shuttle 15 15 30 407 - Greenwood Lions Park 15 15 30 414-14 Street Crosstown 15 15 30 419 - Foothills / Parkhill 10 10 20 Based on the above information, Calgary Transit is planning to increase the frequency of existing transit service to the area significantly. In most cases, the frequency of transit service has doubled during the peak periods and more than doubled in the off-peak periods. Routes #309 and #320 are new BRT routes planned to service the area. West Campus Transportation Impact Assessment 55

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning 9.0 SUMMARY AND CONCLUSION The Vision for West Campus includes many of the sustainability principles outlined in the Calgary Transportation Plan. The population and employment density is expected to exceed the minimum requirements for a Major Activity Centre and will generate enough critical mass to support frequent transit service. The mixed-use nature of the development, together with the proximity to major employment centres will generate a large number of internal trips and will also encourage other forms of sustainable transportation including walking and cycling. It is expected that the quality and accessibility of the future proposed transit infrastructure will align with the vision of providing users with safe, efficient and reliable transit service to encourage active and sustainable transportation modes in and around the West Campus development. The sustainability principles that have been incorporated into the plan will reduce the proportion of trips made by automobile thereby reducing the impact on the adjacent transportation network. With the recommended improvements outlined in this report, the transportation network will be able to support full development of West Campus. West Campus Transportation Impact Assessment 56

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX A: SCOPE OF WORK West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX B: LAND USE PLANS West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX C: TRIP GENERATION METHODOLOGY West Campus Transportation Impact Assessment

services 57575.2932 hospital 116712.9959 Gross Land Area (GLA) 830,032 sqm ronald hou 8628.8134 new total 1012949.381 ER 101,630 sqm Net land area (minus ER) 728,402 sqm Land Use NLA (sqm) Height % of GLA Coverage (%) (Storey) FAR GFA (sqm) Units Population residential SITE TOTALS 728,402 100% 2.3 847,942 6,263 18,814 % GLA % NLA NLA GFA units 154,992 143,370 956 DEVELOPABLE SMARTPLAN ID 400,430 55% 847,942 6,263 18,814 100,396 223,463 1,862 26,747 100,096 1,251 Residential 303,144 37% 3.1 566,984 5,320 11,149 13,411 21,009 100,054 1,251 154,992 19% 1.1 143,370 956 2,676 565 Low Density Residential LDR 35% 3 18.7% 21. 566,984 Medium Density Residential MDR 100,396 1 60% 4 2.4 223,463 1,862 4,469 12. 13.8% 4,838 130355.5509 37,120.76 113,131 942.76 High Density Residential HDR 26,747 55% 8 4.0 100,096 1,251 2,002 3. 3.7% 697,340 Residential Towers RTOWER 21,009 55% 10 4.8 100,054 1,251 2,001 2.5% 2.9% total 340,265 680,115 6,263 335,000 800,000 8,000 Commercial / Mixed Use MU RES RETAIL 43,452 5% 60% 6 4.2 133,095 943 2,762 5. 6.0% 6,518 19,964 499 Retail 15% Residential 85% 36,934 113,131 943 2,263 Assumptions: retail Commercial / Office MU COMM RETAIL 29,892 65% 6 3.1 87,451 2,893 3.6% 4. Unit Sizes (sqm) 6,518 19,964 Retail 897 2,624 66 1,083 2,730 Office 97% 28,996 84,827 2,828 Townhouse 150 7,601 22,694 Office OFFICE 23,755 65% 4 2.6 60,306 2,010 2.9% 3. Midrise Apartment 120 6,700 26,000 Highrise Apartment 80 Community Facilities CFACILITY 187 0% 55% 1 0.7 106.18 - - Hotel 70 office Community Facility (Retail) 100% 187 106 NLA GFA Residential 0% - - - - POPULATION (per unit) 28,996 84,827 23,755 60,306 Townhouse 2.8 52,750 145,133 NON-DEVELOPABLE 327,972 45% Midrise Apartment 2.4 56,000 150,000 Highrise Apartment 1.6 Open Space 125,262 17. Office 30 m2 / employee TOTALS Retail 40 m2 / employee 400,616 847,942 S-SPR S-SPR MR 78,682 10.8% 9.5% 10.8% 397,700 976,000 S-UN S-UN ER - 0% 12. 0.0% Institutional 30 m2 / employee S-CRI S-CRI PUL 46,580 6. 5.6% 6. NLA GFA easements 361,019 Infrastructure 202,711 27.8% - FAR Roads 202,711 28% GFA/NLA PARCEL BY PARCEL 2.35 1.16 FAR GFA/NLA PARCEL BY PARCEL WITHOUT EASEMENTS 1.16 2.35 previous #'s SUMMARY TOTALS precise in Board of Governors PPT GROSS FLOOR AREA 847,942 sqm 884,838 850,000 GROSS DEVELOPABLE LAND AREA 830,032 sqm 841,222 841,222 NET DEVELOPABLE LAND AREA 728,402 sqm 739,592 739,592 FAR ON GROSS DEVELOPABLE AREA 1.02 1.05 1.0 FAR ON NET DEVEOPABLE AREA 1.16 1.20 1.2 RESIDENTIAL GFA 680,115 sqm 711,727 650,000 RETAIL GFA 22,694 sqm 20,988 20,000 OFFICE GFA 145,133 sqm 152,122 150,000 RESIDENTIAL UNITS 6,263 6,755 6,500 TOTAL PEOPLE + JOBS 18,814 19,618 n/a

Determination of TZ 2402 Traffic Associated with West Campus, and with U of C Forecast with Regular Model Run for 2039 AM IB AM OB PM IB PM OB TOTAL TZ 2402 5285 673 1805 4317 12080 TZ 2403 834 358 584 882 2658 TZ 2405 100 715 693 260 1768 TOTAL 6219 1746 3082 5459 July 26 2013 Forecast for 2039 with West Campus Landuse Assumptions AM IB AM OB PM IB PM OB TOTAL TZ 2402 5933 1029 2470 5133 14565 TZ 2403 1541 1022 1373 1732 5668 TZ 2405 314 989 1070 530 2903 TOTAL 7788 3040 4913 7395 Trips Added by including West Campus Land Use Assumptions (West Campus Run - Regular Run) AM IB AM OB PM IB PM OB TOTAL TZ 2402 648 356 665 816 2485 17% TZ 2403 707 664 789 850 3010 TZ 2405 214 274 377 270 1135 TOTAL 1569 1294 1831 1936 6630 17% Percent of TZ 2402 trips (U of C zone) that are WC trips {(West Campus Run - Regular Run)/West Campus Run} - this assumed increase is attributed to West Campus

17% Trips of TZ 2402 assumed to be to/from West Campus Forecast for 2039 with West Campus Landuse Assumptions - with 17% of TZ 2402 AM IB AM OB PM IB PM OB TOTAL TZ 2402 1012 176 421 876 2485 TZ 2403 1541 1022 1373 1732 5668 TZ 2405 314 989 1070 530 2903 TOTAL 2867 2187 2864 3138 11056 West Campus Trip Generation based on City of Calgary Trip Rates AM IB AM OB PM IB PM OB 2708 2071 2872 3645 TOTAL 11296 Difference (Trip Gen - Forecast) -159-116 8 507 240 % Difference = (Trip Gen-Forecast)/Trip Gen 2.

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX D: SELECT ZONE PLOTS SPECIAL WEST CAMPUS MODEL RUN West Campus Transportation Impact Assessment

R1523c1: West Campus TIA Select Zone Distributions Request Number: R1523c1 Location: West Campus Forecast Requested by: Zoran Carkic Company: Development Services Date Requested: July 24, 2013 Forecast Prepared by: Xiaolin Qin Date Completed: July 26, 2013 Cost: N/A Notes: Database: 39P899_05_Target_WestCampus If you have any questions regarding this forecast, please e-mail: TranPlanForecast@calgary.ca ADVISORY: Prior to application in any study, all model inputs and outputs require interpretation and adjustment. DISCLAIMER: The City of Calgary provides this information in good faith but provides no warranty, nor accepts any liability arising from any incorrect, incomplete or misleading information or its improper use. If you have questions, require clarification or would like more details on this data please contact TranPlanForecast@calgary.ca. ISC: Protected

16% Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: AM Peak Hour Select Zone: TZ2402 - IB 19% 6% 19% Note: Values less than are suppressed for clarity. TRAIL 19% 1 19% 20% 8% N LAURIE 1 25% 1 1 1 10% 10% 10% BL 16% 17% 1 7% 7% 7% 7% 7% 16% 16% 17% 17% 1 6% 10% SHAGANAPPI 1 1 32 AVENUE NW 1 1 1 8% 2 2 2121 5% 30% 16% 19% 16% UNIVERSITY 6% 6% 6% 6% 6% 1337 2402 2130 5% 5% 345 DRIVE 24 AVENUE NW 36% 3 OW 3 7% RIVER MEMORIAL DRIVE 25% 7% 25% 2 5% 5% 26% 2013-07-25 Scenario #: 31 Plotted by XQIN BOW TRAIL 33 ST SW 25% 5% 20% KENSINGTO ROAD 20% 5% 20% 1 1 5% 5%

% Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: AM Peak Hour Select Zone: TZ2402 - OB 7% Note: Values less than are suppressed for clarity. 7% 8% 6% 7% 6% 8% TRAIL 6% 6% 5% 5% 5% N LAURIE 9% 25% BL 6% 10% 8% 8%1 7% 7% 7% 7% 7% 8% 8% 6% 5% 10% 8% 6% 9% 7% 32 AVENUE NW 1 2 SHAGANAPPI 7% 7% UNIVERSITY DRIVE 24 AVENUE NW OW RIVER 10% 10% MEMORIAL DRIVE BOW TRAIL KENSINGTO ROAD 33 ST 1 1 1 2 1 138 168 2402 264 459 10% 1 1 4 10% 4 9% 5% 5% 1 28% 5% 5% 28% 27% 28% 25% 2013-07-25 Scenario #: 32 Plotted by XQIN 5% 19% 19% 5% 5% 20% SW 16% 1 % 2

1 Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: PM Peak Hour Select Zone: TZ2402 - IB 1 5% RIVER 1 Note: Values less than are suppressed for clarity. 7% 7% 1 TRAIL 7% 7% 6% 6 N LAURIE 1 7% 7%19% 1 7% 7% 7% 7% 6% 6% 6% BL 7% 19% 10% 19% 2 1 10% 3 5% 7% SHAGANAPPI 32 AVENUE NW 8% 8% 1 1 1 1 1 938 35% 2 1 2 5% 366 UNIVERSITY 264 2402 902 24 AVENUE NW 37% 5% 5% 5% 9% 9% DRIVE 36% OW 5% 3 1 2 8% 8% 2 2 MEMORIAL DRIVE 2 2013-07-25 Scenario #: 33 Plotted by XQIN BOW TRAIL 6%7% 1 7% 7% 9% KENSINGTO 5% 1 ROAD 5% 5% 1 33 ST SW 10% 10%

Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: PM Peak Hour Select Zone: TZ2402 - OB 1 15% Note: Values less than are suppressed for clarity. 10% 10% 10% 10% 15% TRAIL 10% 10% 10% 10% 10 15% 16% N LAURIE % 2 BL 10% 15% 10% 6% 1 6% 5% 5% 10% 10% 10% 9% 9% 9% 6% 1 5% 6% 7% 6% 1 SHAGANAPPI 1 32 AVENUE NW 1 10% 10% 20% 9% 8% 19% OW 7% UNIVERSITY DRIVE 24 AVENUE NW RIVER 5% MEMORIAL DRIVE BOW TRAIL KENSINGTO ROAD 33 ST 29% 10% 20% 6% 6% 5% 5% 5% 1704 684 2402 1 1 16% 16% 1106 1639 30% 30% 6% 6% 6% 6% 7% 1 7% 7% 7% 10% 10% 10% 2 6% 6% 2 2 2 2013-07-25 Scenario #: 34 Plotted by XQIN 2 19% 19% 19% 17% SW 1 2

1 Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: AM Peak Hour Select Zone: TZ2403+2405 - IB 1 1 Note: Values less than are suppressed for clarity. 6% 6% 6% 26% 26% 1 26% 26% 1 TRAIL 2 1 1 13 1 N LAURIE 7% 7% 7% 7% 7% 7% 7% 7% BL 7% 8% 26% 26% 26% SHAGANAPPI 26% 8% 9% 8% 5%3 3 32 AVENUE NW 1 1 10% 8% 9% 15% 1 1 1 1 2 56% 1212 5% 329 2403 18% 6% 7% 8% 1 1 UNIVERSITY DRIVE 7% 24 AVENUE NW 5% 1 2 OW 1 8% 7% 2405 1 2 314 314 16% 1 1 1 1 1 1 8% 8% 6% 6% 6% RIVER 1 10% 8% 8% 25% 1 BOW TRAIL MEMORIAL DRIVE 6% 1 1 6%6% 6% 6% 6% 2013-07-25 Scenario #: 41 Plotted by XQIN 6% 1 1 33 ST 1 SW 1 1 1 1 8% 7% 7% 7% 6% KENSINGTO ROAD 6% 1 6% 1 10% 10% 7% 7%

% Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: AM Peak Hour Select Zone: TZ2403+2405 - OB Note: Values less than are suppressed for clarity. 1 1 16% 1 TRAIL 1 1 7% 6% 6% 5% 5% 1 9% 9% N LAURIE 8% BL 1 1 1 1 SHAGANAPPI 1 16% 32 AVENUE NW 5% UNIVERSITY 24 AVENUE NW DRIVE OW RIVER 9% 9% MEMORIAL DRIVE BOW TRAIL KENSINGTO ROAD 33 ST 6% 5% 29% 6% 5% 555 7% 6% 1 9% 2 2403 467 20% 3 3 15% 10% 6% 6% 6% 20% 989 989 2405 9% 1 1 3 29% 2 2 2 9% 9% 1 1 5% 7% 5% 5% 9% 1 9% 9% 1 1 1 9% 9% 10% 9% 10% 9% 19% 19% 19% 19% 8% 7% 7% 2013-07-25 Scenario #: 42 Plotted by XQIN 6% 8% 6% 8% 1 1 1 SW 1 10%

7% Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: PM Peak Hour Select Zone: TZ2403+2405 - IB 8% 8% 8% Note: Values less than are suppressed for clarity. 16% 17% 8% 16% 16% 8% TRAIL 1 8% 8% 7% 7 N LAURIE 1 BL 17% 17% 2 SHAGANAPPI 17% 5% 1 32 AVENUE NW 7% 7% 5% 5% 5% 7% % 5% 2 2 1 3 792 6% 8% 9% 8% 581 2403 2 1 17% 5% 7% 7% 25% 25% 7% UNIVERSITY 1 24 AVENUE NW 1 OW 5% 5% 5% 5% 17% 1 2405 1070 3 9% 2 2 DRIVE 2 2 17% 17% 1 8% 9% 5% 7% 8% 10% 10% RIVER 5% 1 1 5% 1 1 8% MEMORIAL DRIVE 7% 6% 6% 6% 6% 1 2013-07-25 Scenario #: 43 Plotted by XQIN BOW TRAIL 33 ST 6% SW 9% 9% 1 1 1 8% KENSINGTO ROAD 5% 1 5% 1 9% 9% 9% 8% 8%

0% Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: PM Peak Hour Select Zone: TZ2403+2405 - OB 10% 1 Note: Values less than are suppressed for clarity. 2 2 30% 10% 2 TRAIL 27% 2 1 1 1 1 12 16% N LAURIE BL 25% 26% 26% 5% 26% 5% 6% 6% 5% 32 AVENUE NW 8% 7% 6% 7% SHAGANAPPI 26% 30% 1 UNIVERSITY DRIVE 24 AVENUE NW OW RIVER 5% 5% MEMORIAL DRIVE BOW TRAIL KENSINGTO ROAD 33 ST 8% 7% 7% 7% 7% 7% 2 5 9% 1315 6% 1 8% 18% 2403 417 1 18% 18% 10% 7% 6% 6%6% 1 530 530 2405 7% 2 7% 8% 8% 5% 5% 5% 2 1 7% 7% 7% 7% 5% 7% 27% 17% 16% 16% 15% 2013-07-25 Scenario #: 44 Plotted by XQIN 15% 15% 15% 15% 15% 5% 10% 10% 1 10% 6% 6% SW 8%

15% Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: AM Peak Hour Select Zone: TZ2402+2403+2405 - IB 18% 5% 18% Note: Values less than are suppressed for clarity. 7% 7% 7% 7% 7% 5% TRAIL 15% 16% 7% 5% 5% 15% 4 6% N LAURIE 1 20% 1 1 1 9% 9% 9% BL 7% 7% 1 15% 1 7% 7% 7% 7% 6% 6% 6% 6% 6% 1 1 15% 15% 1 7% 5% 9% 5% SHAGANAPPI 9% 10% 7% 7% 7% 7% 7% 9% 32 AVENUE NW 1 1212 9% 329 2403 10% 6% 16% 19% 1337 UNIVERSITY 345 2402 2121 2130 5% 25% 1 17% 1 24 AVENUE NW 27% 25% OW RIVER 7% 7% 7% 2405 314 314 MEMORIAL DRIVE DRIVE 25% 5% 20% 7% 2 20% 5% 5% 2 2013-07-25 Scenario #: 51 Plotted by XQIN BOW TRAIL 33 ST SW 20% 16% KENSINGTO ROAD 18% 18% 1 1 5% 5%

% Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: AM Peak Hour Select Zone: TZ2402+2403+2405 - OB 5% Note: Values less than are suppressed for clarity. 5% 6% 10% 10% 10% 10% TRAIL 10% 10% 7% 6% 5% 5% 7% 7% N LAURIE 1 BL 10% 1 1 1 32 AVENUE NW 9% SHAGANAPPI 1 10% UNIVERSITY 24 AVENUE NW DRIVE OW RIVER 10% 10% MEMORIAL DRIVE BOW TRAIL KENSINGTO ROAD 33 ST 9%9% 9% 138 264 9% 20% 555 5% 168 2402 459 9% 7% 15% 2403 467 6% 1 5% 20% 5% 20% 10% 2 5% 5% 5% 9% 1 6% 989 989 2405 20% 9% 2 20% 1 1 1 7% 7% 8% 8% 5% 7% 1 16% 10% 7% 15% 8% 7% 7% 7% 7% 15% 7% 6% 7% 7% 6% 1 1 1 1 1 2013-07-25 Scenario #: 52 Plotted by XQIN 1 8% 5% 1 5% 10% 10% 16% SW 1 1 % 1

9% Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: PM Peak Hour Select Zone: TZ2402+2403+2405 - IB 10% 10% Note: Values less than are suppressed for clarity. 8% 8% 1 8% 8% 6% TRAIL 6% 8% 7% 6% 7% 7 N LAURIE 5% 1 5% 5% 5% BL 8% 10% 5% 5% 5% 5% 8% 10% 7% 8% 9% 1 8% 9% 10% 1 8% 9% 7% 2 5% SHAGANAPPI 5% 5% 1 6% 6% 6% 32 AVENUE NW 18% 792 6% 6% 5% 5% 581 2403 1 8% 8% 5% 1 5% 7% 1 5% 10% 366 UNIVERSITY 264 DRIVE 2402938 6% 902 20% 9% 1 1 24 AVENUE NW 18% 2 OW 5% 8% 2405 2 6% 6% 1070 17% 6% 1 1 1 1 8% 8% 5% 8% 15% 9% 9% RIVER 19% 18% 6% MEMORIAL DRIVE 18% 2013-07-25 Scenario #: 53 Plotted by XQIN BOW TRAIL 33 ST SW 5% 5% 9% 1 9% 9% 8% KENSINGTO ROAD 5% 1 1 10% 10% 6% 6%

Project Title: R1523c1-W est Campus TIA Horizon: 2039 Target W est Campus Time of Day: PM Peak Hour Select Zone: TZ2402+2403+2405 - OB 1 1 Note: Values less than are suppressed for clarity. 1 1 15% 9% 1 1 TRAIL 9% 1 1 6% 1 10% 10 1 1 N LAURIE % 15% BL 15% 15% 15% 1 8% 9% 5% 5% 5% 15% 7% 7% 7% 8% 9% 5% 9% 9% 9% 32 AVENUE NW 9% 7% 8% 1 15% 7% SHAGANAPPI UNIVERSITY DRIVE 24 AVENUE NW OW RIVER 5% 5% MEMORIAL DRIVE BOW TRAIL KENSINGTO ROAD 33 ST 8% 20% 8% 8% 9% 16% 7% 7% 1704 684 8% 8% 17% 1315 6% 2403 417 10% 1 6% 1 6% 1106 2402 6% 1639 2 5% 5% 8% 10% 530 530 2405 2 7% 7% 7% 6% 8% 8% 1 9% 9% 9% 17% 6% 6% 18% 9% 17% 6% 5% 5% 5% 17% 5% 5% 2013-07-25 Scenario #: 54 Plotted by XQIN 5% 5% 5% 5% 5% 5% 15% 1 1 16% 15% SW 1 2

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX E: PROPOSED CROSS SECTIONS West Campus Transportation Impact Assessment

Revised Sections Figures A1-2 to A1-21 In Reference to Transportation Comments Date of Issue: January 20, 2014 Appendices Prepared by: A1-1

C D D Key Plan for Sections C1 C1 A A B B G G B1 B1 C D1 legend D1 west campus gate west campus way (east of west campus drive) E E F F west campus way (west of west campus drive) west campus drive - east of the hospital west campus crescent - extension of west campus drive 24th avenue - east of west campus drive E1 E1 24th avenue - south of the hospital west campus Boulevard - north of west campus drive west campus Boulevard - south of west campus drive west campus drive - south of 24th avenue collegiate road nw. residential streets (18.4m north end; 16m south end) Dec. 11, 2013 STREET SECTIONS KEY PLAN Appendices A1-2

Section A-A : West Campus Gate Appendices A1-3

Section B-B (1): West Campus Way, East of West Campus Drive Off-Peak, On-street Parking Period - Two Vehicular Travel Lanes) Appendices A1-4

Plan B-B (1): West Campus Way, East of West Campus Drive Off-Peak, On-street Parking Period - Two Vehicular Travel Lanes) Appendices A1-5

Section B-B (2): West Campus Way, East of West Campus Drive Peak Traffic Period - Four Vehicular Travel Lanes) Appendices A1-6

Plan B-B (2): West Campus Way, East of West Campus Drive Peak Traffic Period - Four Vehicular Travel Lanes) Appendices A1-7

Section B1-B1 : West Campus Way, West of West Campus Drive Appendices A1-8

Plan B1-B1 : West Campus Way, West of West Campus Drive Appendices A1-9

Section C-C : West Campus Drive, East of the Hospital Appendices A1-10

Section C1-C1 : West Campus Crescent, West Portion of Crescent Appendices A1-11

Section D-D : 24th Avenue, East of West Campus Drive Appendices A1-12

Section D1-D1 : 24th Avenue, South of the Hospital Appendices A1-13

Section E-E : West Campus Boulevard NW - North of West Campus Drive Appendices A1-14

Plan E-E : West Campus Boulevard NW - North of West Campus Drive to be updated Appendices A1-15

Section E1-E1 : West Campus Boulevard NW - South of West Campus Drive Appendices A1-16

Section F-F : West Campus Drive - South of 24th Avenue Appendices A1-17

Section G-G : Collegiate Road NW Appendices A1-18

Residential Section: TYP. 18.4m R.O.W. Appendices A1-19

Residential Section: TYP. 16m R.O.W. Appendices A1-20

Section TYP: 7.0m Laneway Section TYP: 6.1m Laneway (Residential) (Commercial) Section TYP: 10.0m Laneway (Residential) Appendices A1-21

legend lane residential street activity street collector primary collector arterial Dec. 11, 2013 road classification STREET HIERARCHY planplan Comment Number: 69 Appendices Date of Issue: January 20, 2014 Prepared by: A1-22

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX F: EXISTING TRAFFIC COUNTS West Campus Transportation Impact Assessment

Location: S of the Intersection SHAGANAPPI TR NW & 32 AV NW Verified: Yes Study Date: Monday, Sep 12, 2011 To Friday, Sep 16, 2011 Comments: Direction: NORTH BOUND Count Date: Thursday, Sep 15, 2011 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 18 12 7 11 48 0.4 01:00 6 4 3 4 17 0.1 02:00 3 5 3 2 13 0.1 03:00 1 5 1 1 8 0.1 04:00 6 2 4 7 19 0.1 05:00 5 11 18 14 48 0.4 06:00 28 32 41 39 140 1.1 07:00 62 63 96 97 318 2.5 08:00 90 102 136 148 476 3.7 09:00 127 137 123 133 520 4 10:00 130 144 155 161 590 4.6 11:00 169 166 193 210 738 5.7 12:00 203 213 244 206 866 6.7 13:00 207 185 188 235 815 6.3 14:00 237 236 241 244 958 7.4 15:00 321 346 359 389 1415 10.9 16:00 402 423 423 382 1630 12.6 17:00 400 395 341 335 1471 11.4 18:00 300 244 210 200 954 7.4 19:00 162 171 167 133 633 4.9 20:00 175 147 149 93 564 4.4 21:00 103 83 67 74 327 2.5 22:00 48 69 43 36 196 1.5 23:00 48 44 46 29 167 1.3 A.M. Peak Hour 11:15:00 AM - 12:15:00 PM Flow 772 5.97% P.M. Peak Hour 3:45:00 PM - 4:45:00 PM Flow 1637 12.66% TOTAL 24 Hour Flow 12931 12 Hour Summary (7 AM to 7 PM) Flow 10751 16 Hour Summary (7 AM to 11 PM) Flow 12471 6 Hour Summary (7-9, 11-1, 4-6) Flow 5499

Direction: SOUTH BOUND Count Date: Thursday, Sep 15, 2011 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 7 6 3 1 17 0.1 01:00 6 4 2 3 15 0.1 02:00 0 4 1 2 7 0.1 03:00 3 3 7 8 21 0.2 04:00 8 7 14 13 42 0.4 05:00 14 13 25 33 85 0.7 06:00 56 101 192 296 645 5.6 07:00 295 400 434 432 1561 13.5 08:00 368 399 337 259 1363 11.7 09:00 196 153 155 130 634 5.5 10:00 126 119 123 122 490 4.2 11:00 152 163 163 131 609 5.2 12:00 160 143 193 156 652 5.6 13:00 155 168 193 171 687 5.9 14:00 165 179 185 202 731 6.3 15:00 166 155 157 161 639 5.5 16:00 168 167 146 150 631 5.4 17:00 155 163 153 133 604 5.2 18:00 172 184 152 173 681 5.9 19:00 142 175 131 109 557 4.8 20:00 113 99 101 90 403 3.5 21:00 106 87 73 40 306 2.6 22:00 33 49 43 34 159 1.4 23:00 19 22 11 11 63 0.5 A.M. Peak Hour 7:15:00 AM - 8:15:00 AM Flow 1634 14.08% P.M. Peak Hour 2:15:00 PM - 3:15:00 PM Flow 732 6.3 TOTAL 24 Hour Flow 11602 12 Hour Summary (7 AM to 7 PM) Flow 9282 16 Hour Summary (7 AM to 11 PM) Flow 10707 6 Hour Summary (7-9, 11-1, 4-6) Flow 5420

Direction: TOTAL Count Date: Thursday, Sep 15, 2011 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 25 18 10 12 65 0.3 01:00 12 8 5 7 32 0.1 02:00 3 9 4 4 20 0.1 03:00 4 8 8 9 29 0.1 04:00 14 9 18 20 61 0.2 05:00 19 24 43 47 133 0.5 06:00 84 133 233 335 785 3.2 07:00 357 463 530 529 1879 7.7 08:00 458 501 473 407 1839 7.5 09:00 323 290 278 263 1154 4.7 10:00 256 263 278 283 1080 4.4 11:00 321 329 356 341 1347 5.5 12:00 363 356 437 362 1518 6.2 13:00 362 353 381 406 1502 6.1 14:00 402 415 426 446 1689 6.9 15:00 487 501 516 550 2054 8.4 16:00 570 590 569 532 2261 9.2 17:00 555 558 494 468 2075 8.5 18:00 472 428 362 373 1635 6.7 19:00 304 346 298 242 1190 4.9 20:00 288 246 250 183 967 3.9 21:00 209 170 140 114 633 2.6 22:00 81 118 86 70 355 1.4 23:00 67 66 57 40 230 0.9 A.M. Peak Hour 7:30:00 AM - 8:30:00 AM Flow 2018 8.2 P.M. Peak Hour 3:45:00 PM - 4:45:00 PM Flow 2279 9.29% TOTAL 24 Hour Flow 24533 12 Hour Summary (7 AM to 7 PM) Flow 20033 16 Hour Summary (7 AM to 11 PM) Flow 23178 6 Hour Summary (7-9, 11-1, 4-6) Flow 10919 Daily Expansion Factor: 2.25

Location: E of the Intersection SHAGANAPPI TR NW and 32 AV NW Verified: Yes Study Date:Tuesday, Apr 9, 2013 To Wednesday, Apr 10, 2013 Comments: Direction: EAST BOUND Count Date: Wednesday, Apr 10, 2013 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 11 4 12 6 33 0.4 01:00 10 4 4 1 19 0.2 02:00 1 0 5 1 7 0.1 03:00 2 1 2 4 9 0.1 04:00 0 0 2 7 9 0.1 05:00 10 12 20 40 82 0.9 06:00 52 62 120 172 406 4.7 07:00 133 254 275 295 957 11 08:00 276 254 289 250 1069 12.3 09:00 148 121 144 124 537 6.2 10:00 84 110 102 126 422 4.9 11:00 102 104 115 126 447 5.2 12:00 116 119 134 158 527 6.1 13:00 130 112 137 109 488 5.6 14:00 95 128 120 127 470 5.4 15:00 148 151 122 150 571 6.6 16:00 145 140 138 154 577 6.7 17:00 140 126 133 134 533 6.1 18:00 136 140 138 108 522 6 19:00 85 89 70 77 321 3.7 20:00 77 71 63 64 275 3.2 21:00 74 58 56 41 229 2.6 22:00 34 28 28 20 110 1.3 23:00 23 10 12 10 55 0.6 A.M. Peak Hour 7:45:00 AM - 8:45:00 AM Flow 1114 12.8 P.M. Peak Hour 4:00:00 PM - 5:00:00 PM Flow 577 6.65% TOTAL 24 Hour Flow 8675 12 Hour Summary (7 AM to 7 PM) Flow 7120 16 Hour Summary (7 AM to 11 PM) Flow 8055 6 Hour Summary (7-9, 11-1, 4-6) Flow 4110

Direction: WEST BOUND Count Date: Wednesday, Apr 10, 2013 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 11 16 11 3 41 0.5 01:00 4 9 4 5 22 0.3 02:00 3 4 4 8 19 0.2 03:00 1 4 3 4 12 0.1 04:00 2 1 4 3 10 0.1 05:00 2 6 5 10 23 0.3 06:00 16 19 30 36 101 1.2 07:00 40 60 80 84 264 3.2 08:00 74 72 94 90 330 4 09:00 90 79 96 95 360 4.4 10:00 90 76 72 112 350 4.3 11:00 113 122 126 135 496 6 12:00 163 147 144 118 572 7 13:00 96 107 128 140 471 5.7 14:00 160 130 124 142 556 6.8 15:00 164 234 215 241 854 10.4 16:00 252 240 292 272 1056 12.8 17:00 256 222 204 174 856 10.4 18:00 136 176 139 139 590 7.2 19:00 152 104 106 105 467 5.7 20:00 102 60 82 63 307 3.7 21:00 76 70 52 43 241 2.9 22:00 54 30 27 31 142 1.7 23:00 28 18 26 12 84 1 A.M. Peak Hour 11:15:00 AM - 12:15:00 PM Flow 546 6.6 P.M. Peak Hour 4:15:00 PM - 5:15:00 PM Flow 1060 12.89% TOTAL 24 Hour Flow 8224 12 Hour Summary (7 AM to 7 PM) Flow 6755 16 Hour Summary (7 AM to 11 PM) Flow 7912 6 Hour Summary (7-9, 11-1, 4-6) Flow 3574

Direction: TOTAL Count Date: Wednesday, Apr 10, 2013 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 22 20 23 9 74 0.4 01:00 14 13 8 6 41 0.2 02:00 4 4 9 9 26 0.2 03:00 3 5 5 8 21 0.1 04:00 2 1 6 10 19 0.1 05:00 12 18 25 50 105 0.6 06:00 68 81 150 208 507 3 07:00 173 314 355 379 1221 7.2 08:00 350 326 383 340 1399 8.3 09:00 238 200 240 219 897 5.3 10:00 174 186 174 238 772 4.6 11:00 215 226 241 261 943 5.6 12:00 279 266 278 276 1099 6.5 13:00 226 219 265 249 959 5.7 14:00 255 258 244 269 1026 6.1 15:00 312 385 337 391 1425 8.4 16:00 397 380 430 426 1633 9.7 17:00 396 348 337 308 1389 8.2 18:00 272 316 277 247 1112 6.6 19:00 237 193 176 182 788 4.7 20:00 179 131 145 127 582 3.4 21:00 150 128 108 84 470 2.8 22:00 88 58 55 51 252 1.5 23:00 51 28 38 22 139 0.8 A.M. Peak Hour 7:45:00 AM - 8:45:00 AM Flow 1438 8.5 P.M. Peak Hour 4:00:00 PM - 5:00:00 PM Flow 1633 9.66% TOTAL 24 Hour Flow 16899 12 Hour Summary (7 AM to 7 PM) Flow 13875 16 Hour Summary (7 AM to 11 PM) Flow 15967 6 Hour Summary (7-9, 11-1, 4-6) Flow 7684 Daily Expansion Factor: 2.2

Location: E of the Intersection 37 ST NW & 32 AV NW Verified: Yes Study Date: Monday, Sep 12, 2011 To Tuesday, Sep 13, 2011 Comments: Direction: EAST BOUND Count Date: Tuesday, Sep 13, 2011 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 8 4 8 1 21 0.3 01:00 2 2 5 3 12 0.2 02:00 2 1 2 3 8 0.1 03:00 1 2 4 3 10 0.1 04:00 1 2 3 3 9 0.1 05:00 6 16 25 24 71 0.9 06:00 31 65 47 83 226 2.9 07:00 94 119 188 220 621 7.9 08:00 171 209 224 228 832 10.6 09:00 234 204 121 88 647 8.3 10:00 83 114 146 104 447 5.7 11:00 99 107 105 125 436 5.6 12:00 115 103 144 138 500 6.4 13:00 109 109 98 107 423 5.4 14:00 108 101 114 125 448 5.7 15:00 146 134 166 164 610 7.8 16:00 142 145 156 155 598 7.6 17:00 134 152 122 131 539 6.9 18:00 123 114 127 93 457 5.8 19:00 72 87 93 75 327 4.2 20:00 71 66 61 54 252 3.2 21:00 69 55 42 35 201 2.6 22:00 31 17 10 17 75 1 23:00 20 15 9 15 59 0.8 A.M. Peak Hour 8:15:00 AM - 9:15:00 AM Flow 895 11.4 P.M. Peak Hour 3:30:00 PM - 4:30:00 PM Flow 617 7.88% TOTAL 24 Hour Flow 7829 12 Hour Summary (7 AM to 7 PM) Flow 6558 16 Hour Summary (7 AM to 11 PM) Flow 7413 6 Hour Summary (7-9, 11-1, 4-6) Flow 3526

Direction: WEST BOUND Count Date: Tuesday, Sep 13, 2011 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 11 8 6 5 30 0.4 01:00 3 3 4 2 12 0.2 02:00 2 2 0 1 5 0.1 03:00 2 3 1 1 7 0.1 04:00 1 1 5 1 8 0.1 05:00 5 1 6 14 26 0.4 06:00 15 24 42 48 129 1.8 07:00 45 69 76 108 298 4.1 08:00 105 153 135 133 526 7.2 09:00 165 162 115 87 529 7.2 10:00 83 99 105 89 376 5.1 11:00 104 73 100 115 392 5.4 12:00 136 119 121 119 495 6.8 13:00 121 107 93 118 439 6 14:00 126 144 132 133 535 7.3 15:00 169 140 150 177 636 8.7 16:00 152 170 200 209 731 10 17:00 191 181 154 127 653 8.9 18:00 129 114 136 111 490 6.7 19:00 89 79 131 107 406 5.6 20:00 60 67 59 48 234 3.2 21:00 51 51 43 43 188 2.6 22:00 37 22 26 19 104 1.4 23:00 20 18 10 9 57 0.8 A.M. Peak Hour 8:30:00 AM - 9:30:00 AM Flow 595 8.1 P.M. Peak Hour 4:30:00 PM - 5:30:00 PM Flow 781 10.69% TOTAL 24 Hour Flow 7306 12 Hour Summary (7 AM to 7 PM) Flow 6100 16 Hour Summary (7 AM to 11 PM) Flow 7032 6 Hour Summary (7-9, 11-1, 4-6) Flow 3095

Direction: TOTAL Count Date: Tuesday, Sep 13, 2011 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 19 12 14 6 51 0.3 01:00 5 5 9 5 24 0.2 02:00 4 3 2 4 13 0.1 03:00 3 5 5 4 17 0.1 04:00 2 3 8 4 17 0.1 05:00 11 17 31 38 97 0.6 06:00 46 89 89 131 355 2.3 07:00 139 188 264 328 919 6.1 08:00 276 362 359 361 1358 9 09:00 399 366 236 175 1176 7.8 10:00 166 213 251 193 823 5.4 11:00 203 180 205 240 828 5.5 12:00 251 222 265 257 995 6.6 13:00 230 216 191 225 862 5.7 14:00 234 245 246 258 983 6.5 15:00 315 274 316 341 1246 8.2 16:00 294 315 356 364 1329 8.8 17:00 325 333 276 258 1192 7.9 18:00 252 228 263 204 947 6.3 19:00 161 166 224 182 733 4.8 20:00 131 133 120 102 486 3.2 21:00 120 106 85 78 389 2.6 22:00 68 39 36 36 179 1.2 23:00 40 33 19 24 116 0.8 A.M. Peak Hour 8:30:00 AM - 9:30:00 AM Flow 1485 9.8 P.M. Peak Hour 4:30:00 PM - 5:30:00 PM Flow 1378 9. TOTAL 24 Hour Flow 15135 12 Hour Summary (7 AM to 7 PM) Flow 12658 16 Hour Summary (7 AM to 11 PM) Flow 14445 6 Hour Summary (7-9, 11-1, 4-6) Flow 6621 Daily Expansion Factor: 2.29

Location: W of the Intersection 24 AV NW & UNIVERSITY DR NW Verified: Yes Study Date: Tuesday, Mar 25, 2003 Comments: Direction: EAST BOUND Count Date: Tuesday, Mar 25, 2003 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 17 12 8 5 42 0.7 01:00 2 5 3 4 14 0.2 02:00 4 1 1 3 9 0.1 03:00 4 1 2 1 8 0.1 04:00 0 2 3 0 5 0.1 05:00 10 11 11 11 43 0.7 06:00 21 25 43 49 138 2.2 07:00 57 93 174 140 464 7.2 08:00 141 198 236 191 766 11.9 09:00 110 166 211 150 637 9.9 10:00 70 89 158 139 456 7.1 11:00 67 99 105 104 375 5.8 12:00 83 98 88 82 351 5.5 13:00 73 89 138 90 390 6.1 14:00 73 76 62 62 273 4.3 15:00 92 93 94 96 375 5.8 16:00 76 98 94 104 372 5.8 17:00 97 82 99 104 382 6 18:00 128 118 103 105 454 7.1 19:00 70 59 53 80 262 4.1 20:00 83 65 53 66 267 4.2 21:00 37 56 42 43 178 2.8 22:00 30 23 18 21 92 1.4 23:00 21 18 11 12 62 1 A.M. Peak Hour 8:00:00 AM - 9:00:00 AM Flow 766 11.9 P.M. Peak Hour 6:00:00 PM - 7:00:00 PM Flow 454 7.08% TOTAL 24 Hour Flow 6415 12 Hour Summary (7 AM to 7 PM) Flow 5295 16 Hour Summary (7 AM to 11 PM) Flow 6094 6 Hour Summary (7-9, 11-1, 4-6) Flow 2710

Direction: WEST BOUND Count Date: Tuesday, Mar 25, 2003 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 12 18 8 3 41 0.9 01:00 5 6 6 5 22 0.5 02:00 5 1 0 2 8 0.2 03:00 3 2 2 3 10 0.2 04:00 3 1 0 3 7 0.1 05:00 1 6 3 7 17 0.4 06:00 7 7 11 37 62 1.3 07:00 30 43 54 56 183 3.9 08:00 46 58 52 54 210 4.5 09:00 38 39 54 56 187 4 10:00 47 37 48 67 199 4.2 11:00 58 61 64 65 248 5.3 12:00 78 87 61 55 281 6 13:00 66 58 82 81 287 6.1 14:00 81 53 73 86 293 6.2 15:00 78 101 106 92 377 8 16:00 105 94 138 98 435 9.2 17:00 124 93 93 80 390 8.3 18:00 91 87 94 95 367 7.8 19:00 84 61 65 69 279 5.9 20:00 82 82 73 66 303 6.4 21:00 81 55 81 55 272 5.8 22:00 55 32 33 33 153 3.2 23:00 39 11 19 8 77 1.6 A.M. Peak Hour 11:15:00 AM - 12:15:00 PM Flow 268 5.69% P.M. Peak Hour 4:15:00 PM - 5:15:00 PM Flow 454 9.6 TOTAL 24 Hour Flow 4708 12 Hour Summary (7 AM to 7 PM) Flow 3457 16 Hour Summary (7 AM to 11 PM) Flow 4464 6 Hour Summary (7-9, 11-1, 4-6) Flow 1747

Direction: WEST BOUND Count Date: Tuesday, Mar 25, 2003 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 12 18 8 3 41 0.9 01:00 5 6 6 5 22 0.5 02:00 5 1 0 2 8 0.2 03:00 3 2 2 3 10 0.2 04:00 3 1 0 3 7 0.1 05:00 1 6 3 7 17 0.4 06:00 7 7 11 37 62 1.3 07:00 30 43 54 56 183 3.9 08:00 46 58 52 54 210 4.5 09:00 38 39 54 56 187 4 10:00 47 37 48 67 199 4.2 11:00 58 61 64 65 248 5.3 12:00 78 87 61 55 281 6 13:00 66 58 82 81 287 6.1 14:00 81 53 73 86 293 6.2 15:00 78 101 106 92 377 8 16:00 105 94 138 98 435 9.2 17:00 124 93 93 80 390 8.3 18:00 91 87 94 95 367 7.8 19:00 84 61 65 69 279 5.9 20:00 82 82 73 66 303 6.4 21:00 81 55 81 55 272 5.8 22:00 55 32 33 33 153 3.2 23:00 39 11 19 8 77 1.6 A.M. Peak Hour 11:15:00 AM - 12:15:00 PM Flow 268 5.69% P.M. Peak Hour 4:15:00 PM - 5:15:00 PM Flow 454 9.6 TOTAL 24 Hour Flow 4708 12 Hour Summary (7 AM to 7 PM) Flow 3457 16 Hour Summary (7 AM to 11 PM) Flow 4464 6 Hour Summary (7-9, 11-1, 4-6) Flow 1747

Location: N of the Intersection WEST CAMPUS BV NW & 16 AV NW Verified: Yes Study Date:Tuesday, Apr 9, 2013 To Wednesday, Apr 10, 2013 Comments: Direction: NORTH BOUND Count Date: Wednesday, Apr 10, 2013 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 3 2 2 4 11 0.4 01:00 3 2 0 4 9 0.4 02:00 2 1 1 0 4 0.2 03:00 1 0 0 0 1 0 04:00 2 2 2 2 8 0.3 05:00 5 7 6 5 23 0.9 06:00 14 31 30 59 134 5.2 07:00 42 45 76 104 267 10.4 08:00 70 96 68 82 316 12.3 09:00 56 50 56 44 206 8 10:00 43 38 41 51 173 6.8 11:00 32 28 38 36 134 5.2 12:00 32 47 42 52 173 6.8 13:00 40 22 42 32 136 5.3 14:00 52 36 42 44 174 6.8 15:00 46 48 46 39 179 7 16:00 52 43 58 33 186 7.3 17:00 40 36 21 28 125 4.9 18:00 25 25 29 32 111 4.3 19:00 15 16 12 20 63 2.5 20:00 12 14 12 7 45 1.8 21:00 10 6 3 5 24 0.9 22:00 13 6 6 11 36 1.4 23:00 9 11 3 1 24 0.9 A.M. Peak Hour 7:30:00 AM - 8:30:00 AM Flow 346 13.5 P.M. Peak Hour 3:45:00 PM - 4:45:00 PM Flow 192 7.49% TOTAL 24 Hour Flow 2562 12 Hour Summary (7 AM to 7 PM) Flow 2180 16 Hour Summary (7 AM to 11 PM) Flow 2348 6 Hour Summary (7-9, 11-1, 4-6) Flow 1201

Direction: SOUTH BOUND Count Date: Wednesday, Apr 10, 2013 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 4 7 6 5 22 0.7 01:00 5 2 4 10 21 0.7 02:00 3 0 2 0 5 0.2 03:00 1 1 1 1 4 0.1 04:00 1 2 0 2 5 0.2 05:00 1 2 6 9 18 0.6 06:00 8 13 32 46 99 3.2 07:00 53 82 89 106 330 10.6 08:00 73 56 62 54 245 7.9 09:00 44 30 36 33 143 4.6 10:00 33 25 30 39 127 4.1 11:00 48 38 33 30 149 4.8 12:00 45 50 38 44 177 5.7 13:00 34 33 26 56 149 4.8 14:00 27 53 44 58 182 5.9 15:00 73 83 85 78 319 10.3 16:00 94 99 93 120 406 13.1 17:00 71 70 46 40 227 7.3 18:00 41 44 35 34 154 5 19:00 20 26 22 26 94 3 20:00 19 20 22 10 71 2.3 21:00 17 17 14 13 61 2 22:00 7 17 14 12 50 1.6 23:00 17 15 9 6 47 1.5 A.M. Peak Hour 7:15:00 AM - 8:15:00 AM Flow 350 11.27% P.M. Peak Hour 4:00:00 PM - 5:00:00 PM Flow 406 13.08% TOTAL 24 Hour Flow 3105 12 Hour Summary (7 AM to 7 PM) Flow 2608 16 Hour Summary (7 AM to 11 PM) Flow 2884 6 Hour Summary (7-9, 11-1, 4-6) Flow 1534

Direction: TOTAL Count Date: Wednesday, Apr 10, 2013 24 Hour Automatic Report Minutes START TIME 00 15 30 45 TOTAL % TOTAL FLOW 00:00 7 9 8 9 33 0.6 01:00 8 4 4 14 30 0.5 02:00 5 1 3 0 9 0.2 03:00 2 1 1 1 5 0.1 04:00 3 4 2 4 13 0.2 05:00 6 9 12 14 41 0.7 06:00 22 44 62 105 233 4.1 07:00 95 127 165 210 597 10.5 08:00 143 152 130 136 561 9.9 09:00 100 80 92 77 349 6.2 10:00 76 63 71 90 300 5.3 11:00 80 66 71 66 283 5 12:00 77 97 80 96 350 6.2 13:00 74 55 68 88 285 5 14:00 79 89 86 102 356 6.3 15:00 119 131 131 117 498 8.8 16:00 146 142 151 153 592 10.4 17:00 111 106 67 68 352 6.2 18:00 66 69 64 66 265 4.7 19:00 35 42 34 46 157 2.8 20:00 31 34 34 17 116 2 21:00 27 23 17 18 85 1.5 22:00 20 23 20 23 86 1.5 23:00 26 26 12 7 71 1.3 A.M. Peak Hour 7:30:00 AM - 8:30:00 AM Flow 670 11.8 P.M. Peak Hour 4:00:00 PM - 5:00:00 PM Flow 592 10.45% TOTAL 24 Hour Flow 5667 12 Hour Summary (7 AM to 7 PM) Flow 4788 16 Hour Summary (7 AM to 11 PM) Flow 5232 6 Hour Summary (7-9, 11-1, 4-6) Flow 2735 Daily Expansion Factor: 2.07

Synchro Data Entry Format Location: Shaganappi Trail NW & 32 Avenue NW Shaganappi Trail NW & 32 Avenue NW Date : Observer(s) : Tuesday June 21, 2011 City of Calgary Job # : 2984.T01 Job Name: West Campus Transportation Management Plan & TDM AM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 179 413 198 60 113 44 93 210 27 422 1108 24 Conflicting Peds (#/hr) 4 -- 0 0 -- 4 15 -- 2 2 -- 15 Conflicting Bikes (#/hr) -- -- 15 -- -- 2 -- -- 0 -- -- 2 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 1 1 1 Midday Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 208 281 205 46 354 146 334 374 28 132 388 125 Conflicting Peds (#/hr) 2 -- 1 1 -- 2 6 -- 1 1 -- 6 Conflicting Bikes (#/hr) -- -- 6 -- -- 1 -- -- 1 -- -- 2 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) PM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 284 326 246 109 464 262 378 1112 88 107 354 108 Conflicting Peds (#/hr) 1 -- 0 0 -- 1 6 -- 15 15 -- 6 Conflicting Bikes (#/hr) -- -- 6 -- -- 15 -- -- 0 -- -- 1 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%)

Location : North Leg : Shaganappi Trail NW East Leg: 32 Avenue NW South Leg : Shaganappi Trail NW West Leg: 32 Avenue NW Date : Observer(s) : Job # : Job Name: Tuesday June 21, 2011 City of Calgary 2984.T01 West Campus Transportation Management Plan & TDM From the North On: Shaganappi Trail NW From the South On: Shaganappi Trail NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 71 0 277 0 0 0 1 13 1 32 2 6 0 0 11 1 16 1 12 1 0 35 1 76 1 50 1 1 600 8 2 608 07:15 86 2 298 6 0 0 1 18 0 61 1 4 0 0 12 1 24 2 7 1 1 36 1 59 1 50 1 0 655 16 2 671 07:30 102 1 299 1 1 0 0 21 0 58 1 4 0 0 18 2 22 3 11 1 0 46 2 98 4 51 2 4 731 17 4 748 07:45 120 2 292 6 10 0 1 29 1 53 2 11 0 0 12 2 26 3 9 1 1 38 2 76 5 41 3 3 717 27 5 744 08:00 100 2 250 5 3 0 2 13 0 48 1 2 0 0 14 1 24 2 12 1 1 48 1 122 3 46 1 6 680 19 9 699 08:15 93 2 249 6 10 0 1 28 1 46 1 10 0 0 9 2 27 6 7 2 0 40 2 100 5 52 2 2 670 30 3 700 08:30 89 2 212 5 11 0 1 26 1 59 2 11 0 0 20 1 33 1 22 1 0 42 3 77 5 35 2 8 637 23 9 660 08:45 91 3 163 5 24 1 4 42 1 74 2 9 0 1 13 1 42 3 19 1 1 44 3 92 6 24 1 3 637 27 9 664 2 Hour Total 752 14 2040 34 59 1 11 190 5 432 11 55 2 1 109 11 213 22 99 9 4 330 14 700 30 348 14 27 5327 167 43 5494 Peak Hour: 7:30-8:30 415 7 1090 18 24 0 4 91 2 206 4 26 1 0 53 7 98 15 39 5 2 171 8 396 17 190 8 15 2798 93 21 2891 Total Veh & % Trucks 422 1108 24 93 210 27 60 1 113 1 44 1 179 413 198 PHF 0.90 Peak Total = 1554 PHF 0.86 Peak Total = 330 PHF 0.95 Peak Total = 217 PHF 0.89 Peak Total = 790 From the North On: Shaganappi Trail NW From the South On: Shaganappi Trail NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 21 0 66 1 7 0 0 62 2 80 2 6 0 0 10 1 60 3 24 1 0 38 4 44 4 36 3 2 453 22 2 475 11:15 22 0 84 1 22 0 0 68 2 63 2 8 0 0 12 1 58 4 34 3 2 50 1 52 1 45 1 0 516 18 2 534 11:30 27 2 87 5 29 2 0 55 2 86 3 9 0 0 13 0 49 2 29 1 1 44 3 52 3 43 3 1 523 26 2 549 11:45 19 1 83 4 33 1 0 70 3 87 4 10 1 0 12 0 84 3 33 1 0 53 2 60 2 43 1 3 587 23 3 610 12:00 25 0 75 1 32 0 1 85 0 93 1 8 0 0 15 0 112 2 57 1 0 44 2 52 3 47 3 1 643 14 2 657 12:15 24 1 84 4 26 1 0 70 2 104 2 10 0 0 10 0 81 4 30 1 0 54 2 44 2 43 2 2 578 23 2 601 12:30 38 1 103 3 23 1 1 91 3 80 3 6 0 0 10 0 67 3 34 2 1 54 2 73 2 48 1 2 628 20 4 648 12:45 43 0 117 1 42 0 0 83 0 91 1 4 0 1 10 1 81 4 20 1 0 49 1 103 2 60 1 1 702 13 2 715 2 Hour Total 218 6 699 20 213 6 2 583 15 683 18 60 2 1 91 4 591 26 261 11 4 386 17 479 20 364 16 12 4630 159 19 4789 Peak Hour: 12:00-1:00 129 3 379 9 122 3 2 328 6 368 6 28 0 1 44 2 340 14 141 5 1 201 7 272 9 198 7 6 2551 70 10 2621 Total Veh & % Trucks 132 388 125 334 374 28 46 354 146 208 281 205 PHF 1.06 Peak Total = 645 PHF 0.99 Peak Total = 736 PHF 0.73 Peak Total = 546 PHF 1.08 Peak Total = 694 From the North On: Shaganappi Trail NW From the South On: Shaganappi Trail NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 20 2 76 6 21 2 0 123 2 258 3 18 0 1 15 0 100 1 74 1 8 55 1 59 1 51 1 1 871 19 10 890 04:15 26 1 77 3 27 1 0 95 0 277 1 16 0 0 10 0 91 3 77 2 1 59 1 65 2 42 1 1 861 16 2 877 04:30 11 0 100 1 20 0 0 94 1 301 2 16 0 0 26 0 109 2 63 1 3 62 2 73 2 62 2 3 937 13 6 950 04:45 25 1 65 1 45 1 1 94 1 242 2 21 0 0 31 0 100 1 62 1 5 80 2 88 2 62 1 0 915 13 6 928 05:00 37 1 86 1 22 0 0 96 1 271 3 24 0 0 29 1 117 2 61 1 3 65 1 78 2 58 1 3 943 15 6 958 05:15 31 1 98 2 20 0 0 90 1 289 2 27 0 0 22 0 131 2 72 1 4 70 2 79 2 59 1 0 987 15 4 1002 05:30 28 0 78 0 15 0 0 74 1 248 2 15 0 0 9 0 120 1 46 1 3 64 2 73 2 57 1 1 827 10 4 837 05:45 33 0 87 1 25 0 0 75 0 218 1 19 0 0 22 1 73 2 34 1 7 69 1 76 1 61 1 2 790 10 9 800 2 Hour Total 212 5 667 15 194 5 1 741 7 2102 18 155 1 1 162 3 841 14 490 8 34 524 12 591 14 451 10 11 7131 111 47 7242 Peak Hour: 4:30-5:30 105 2 349 5 106 2 1 375 3 1102 10 87 1 0 107 2 457 7 258 4 15 277 7 318 8 240 6 6 3782 56 22 3838 Total Veh & % Trucks 107 354 108 378 1112 88 109 464 262 284 326 246 PHF 0.97 Peak Total = 569 PHF 0.95 Peak Total = 1578 PHF 0.99 Peak Total = 835 PHF 0.91 Peak Total = 856 6 Hour Total 1183 24 3406 69 466 12 14 1515 26 3217 47 270 5 3 363 17 1646 61 850 28 42 1240 43 1770 64 1163 40 50 1207 3475 478 1541 3264 275 380 1707 878 1283 1834 1203 5160 5080 2965 4320

BIKES Note: The City of Calgary does not count bicycles by North Leg : Shaganappi Trail NW East Leg : 32 Avenue NW movement, only by direction. All bicycles have South Leg : Shaganappi Trail NW West leg : 32 Avenue NW been allocated to the straight through movement. Date : Observer(s) : Job # : Job Name: Tuesday June 21, 2011 City of Calgary 2984.T01 West Campus Transportation Management Plan & TDM Time Starting From the North On: Shaganappi Trail NW From the South On: Shaganappi Trail NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 07:00 1 0 0 1 2 07:15 1 0 1 0 2 07:30 0 0 0 4 4 07:45 0 0 1 3 4 08:00 1 0 1 6 8 08:15 1 0 0 2 3 08:30 0 0 0 8 8 08:45 0 1 1 3 5 2 Hour Total 0 4 0 0 1 0 0 4 0 0 27 0 36 Peak Hour: 7:30-8:30 0 2 0 0 0 0 0 2 0 0 15 0 19 Time Starting From the North On: Shaganappi Trail NW From the South On: Shaganappi Trail NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 11:00 0 0 0 2 2 11:15 0 0 2 0 2 11:30 0 0 1 1 2 11:45 0 0 0 3 3 12:00 1 0 0 1 2 12:15 0 0 0 2 2 12:30 1 0 1 2 4 12:45 0 1 0 1 2 2 Hour Total 0 2 0 0 1 0 0 4 0 0 12 0 19 Peak Hour: 12:00-1:00 0 2 0 0 1 0 0 1 0 0 6 0 10 Time Starting From the North On: Shaganappi Trail NW From the South On: Shaganappi Trail NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 04:00 0 1 8 1 10 04:15 0 0 1 1 2 04:30 0 0 3 3 6 04:45 1 0 5 0 6 05:00 0 0 3 3 6 05:15 0 0 4 0 4 05:30 0 0 3 1 4 05:45 0 0 7 2 9 2 Hour Total 0 1 0 0 1 0 0 34 0 0 11 0 47 Peak Hour: 4:30-5:30 0 1 0 0 0 0 0 15 0 0 6 0 22 6 Hour Total 0 7 0 0 3 0 0 42 0 0 50 0 7 3 42 50

Synchro Data Entry Format Location: 39 Street NW & 32 Avenue NW 39 Street NW & 32 Avenue NW Date : Observer(s) : Wednesday November 8, 2006 City of Calgary Job # : 2984.T01 Job Name: West Campus Transportation Management Plan & TDM AM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 13 829 444 135 263 12 60 1 62 26 32 22 Conflicting Peds (#/hr) 1 -- 3 3 -- 1 3 -- 1 1 -- 3 Conflicting Bikes (#/hr) -- -- 3 -- -- 1 -- -- 3 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 6% 6% 6% 1 8% 1 Midday Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 18 404 107 53 427 10 159 4 62 10 4 18 Conflicting Peds (#/hr) 1 -- 0 0 -- 1 2 -- 2 2 -- 2 Conflicting Bikes (#/hr) -- -- 2 -- -- 2 -- -- 0 -- -- 1 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 5% 5% 0% 0% 0% PM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 36 432 74 56 756 23 470 15 129 18 5 15 Conflicting Peds (#/hr) 0 -- 4 4 -- 0 1 -- 6 6 -- 1 Conflicting Bikes (#/hr) -- -- 1 -- -- 6 -- -- 4 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%)

Location : North Leg : 39 Street NW East Leg: 32 Avenue NW South Leg : 39 Street NW West Leg: 32 Avenue NW Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2984.T01 West Campus Transportation Management Plan & TDM From the North On: 39 Street NW From the South On: 39 Street NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 4 0 5 0 4 0 4 8 1 0 0 8 1 1 13 2 20 3 2 0 1 0 0 107 2 70 2 4 241 11 10 252 07:15 8 0 5 0 2 0 1 6 1 0 0 12 1 0 18 2 32 4 3 0 2 2 0 123 1 94 0 2 305 9 5 314 07:30 5 0 16 0 5 0 7 12 2 0 0 10 1 0 40 6 39 5 1 0 0 1 0 148 2 135 1 3 412 17 10 429 07:45 4 0 10 1 5 1 0 11 2 0 0 9 1 0 39 2 58 2 3 0 0 2 0 235 3 164 2 1 540 14 1 554 08:00 11 0 6 0 7 0 1 8 3 0 0 12 3 3 25 1 64 4 3 0 0 2 0 181 2 100 1 0 419 14 4 433 08:15 3 0 7 0 1 0 0 9 2 0 0 8 2 0 35 3 73 6 2 0 1 5 0 188 6 93 3 1 424 22 2 446 08:30 8 0 8 0 8 0 0 23 2 1 0 25 2 0 28 2 52 4 4 0 0 4 0 205 9 78 3 1 443 23 1 466 08:45 7 0 6 0 3 0 0 13 3 1 0 26 5 2 39 3 82 6 4 0 0 5 0 222 3 74 1 6 482 21 8 503 2 Hour Total 49 1 63 1 35 1 13 92 14 2 0 109 17 6 238 20 421 33 20 2 4 21 0 1410 27 807 14 18 3266 131 41 3397 Peak Hour: 7:45-8:45 25 1 31 1 21 1 1 52 8 1 0 53 9 3 127 8 247 16 11 1 1 13 0 810 19 435 9 3 1826 73 8 1899 Total Veh & % Trucks 26 32 22 60 1 1 8% 62 1 135 6% 263 6% 12 6% 13 829 444 PHF 0.77 Peak Total = 80 PHF 1.18 Peak Total = 123 PHF 0.99 Peak Total = 410 PHF 0.79 Peak Total = 1286 From the North On: 39 Street NW From the South On: 39 Street NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 3 0 2 0 4 0 0 31 3 3 0 14 1 0 10 0 106 5 11 1 0 4 0 82 5 14 1 0 281 18 0 299 11:15 4 0 0 0 6 0 0 35 1 2 0 19 1 0 14 1 78 3 5 0 0 1 0 85 0 9 0 0 258 6 0 264 11:30 2 0 2 0 1 0 0 22 2 0 0 18 2 0 14 1 81 3 2 0 0 5 0 99 3 24 1 2 270 12 2 282 11:45 3 0 0 0 7 0 0 39 1 3 0 20 1 0 12 1 90 4 2 0 0 3 0 104 3 22 1 0 305 11 0 316 12:00 4 0 2 0 4 0 0 52 1 2 0 24 1 0 14 1 127 6 3 0 0 2 0 65 1 23 0 0 322 10 0 332 12:15 2 0 0 0 3 0 0 36 4 0 0 10 1 0 14 1 102 4 2 0 1 3 0 90 3 15 1 0 277 14 1 291 12:30 2 0 0 0 4 0 0 26 3 1 0 11 1 0 5 0 85 1 4 0 1 6 0 116 4 32 1 0 292 10 1 302 12:45 2 0 2 0 7 0 1 36 1 1 0 14 0 0 17 1 99 3 1 0 0 7 0 124 1 35 0 2 344 7 3 351 2 Hour Total 22 0 8 0 36 0 1 276 17 11 1 130 8 0 102 4 766 31 29 1 2 30 1 764 21 174 5 4 2349 88 7 2437 Peak Hour: 12:00-1:00 10 0 4 0 18 0 1 150 9 4 0 59 3 0 51 2 412 15 10 0 2 18 0 395 9 105 2 2 1235 41 5 1276 Total Veh & % Trucks 10 0% 4 0% 18 0% 159 5% 4 62 5% 53 427 10 18 404 107 PHF 0.80 Peak Total = 32 PHF 0.70 Peak Total = 225 PHF 0.81 Peak Total = 490 PHF 0.99 Peak Total = 529 From the North On: 39 Street NW From the South On: 39 Street NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 3 0 4 0 2 0 0 118 5 0 0 50 2 2 14 0 187 6 6 0 1 5 0 80 4 17 1 0 485 19 3 504 04:15 3 0 2 0 5 1 0 127 3 3 0 38 1 0 13 0 142 4 6 0 1 7 0 86 1 23 0 1 452 12 2 464 04:30 6 0 2 0 3 0 0 113 1 4 0 40 1 1 8 0 195 3 5 0 4 10 0 115 2 13 0 0 514 7 5 521 04:45 5 0 0 0 4 0 0 102 2 5 0 34 1 1 19 0 186 3 8 0 0 7 0 122 2 24 0 0 515 9 1 524 05:00 4 0 1 0 3 0 0 121 1 3 0 14 0 2 16 0 219 4 4 0 1 12 0 101 3 14 0 0 511 9 3 520 05:15 3 0 1 0 6 0 0 90 2 3 0 36 1 1 11 0 169 4 5 0 0 4 0 109 1 16 0 0 453 8 1 461 05:30 2 0 0 0 4 0 0 69 2 2 0 17 0 0 14 0 179 4 10 0 2 4 0 110 2 25 1 0 436 9 2 445 05:45 7 0 2 0 2 0 0 42 2 1 0 12 0 2 14 0 144 3 8 0 1 6 0 102 2 20 0 0 359 8 3 367 2 Hour Total 33 0 12 0 29 1 0 782 18 21 0 241 6 9 107 2 1422 30 51 1 10 54 1 824 18 151 3 1 3725 81 20 3806 Peak Hour: 4:15-5:15 18 0 5 0 15 1 0 462 8 15 0 127 2 4 55 1 742 14 23 0 6 35 1 423 9 73 1 1 1992 37 11 2029 Total Veh & % Trucks 18 5 15 470 15 129 56 756 23 36 432 74 PHF 0.86 Peak Total = 38 PHF 0.88 Peak Total = 614 PHF 0.86 Peak Total = 835 PHF 0.87 Peak Total = 542 6 Hour Total 104 1 82 2 99 2 14 1150 49 34 1 480 31 15 446 27 2609 94 100 4 16 104 3 2998 66 1132 22 23 105 84 101 1199 35 511 473 2703 104 107 3064 1154 290 1745 3280 4325

BIKES Note: The City of Calgary does not count bicycles by North Leg : 39 Street NW East Leg : 32 Avenue NW movement, only by direction. All bicycles have South Leg : 39 Street NW West leg : 32 Avenue NW been allocated to the straight through movement. Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2984.T01 West Campus Transportation Management Plan & TDM Time Starting From the North On: 39 Street NW From the South On: 39 Street NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 07:00 3 1 1 4 9 07:15 5 0 2 2 9 07:30 1 0 0 3 4 07:45 0 0 0 1 1 08:00 0 3 0 0 3 08:15 0 0 1 1 2 08:30 0 0 0 1 1 08:45 2 2 0 6 10 2 Hour Total 0 11 0 0 6 0 0 4 0 0 18 0 39 Peak Hour: 7:45-8:45 0 0 0 0 3 0 0 1 0 0 3 0 7 Time Starting From the North On: 39 Street NW From the South On: 39 Street NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 11:00 0 0 0 0 0 11:15 0 0 0 0 0 11:30 0 0 0 2 2 11:45 0 0 0 0 0 12:00 0 0 0 0 0 12:15 0 0 1 0 1 12:30 0 0 1 0 1 12:45 1 0 0 2 3 2 Hour Total 0 1 0 0 0 0 0 2 0 0 4 0 7 Peak Hour: 12:00-1:00 0 1 0 0 0 0 0 2 0 0 2 0 5 Time Starting From the North On: 39 Street NW From the South On: 39 Street NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 04:00 0 2 1 0 3 04:15 0 0 1 1 2 04:30 0 1 4 0 5 04:45 0 1 0 0 1 05:00 0 2 1 0 3 05:15 0 1 0 0 1 05:30 0 0 2 0 2 05:45 0 2 1 0 3 2 Hour Total 0 0 0 0 9 0 0 10 0 0 1 0 20 Peak Hour: 4:15-5:15 0 0 0 0 4 0 0 6 0 0 1 0 11 6 Hour Total 0 12 0 0 15 0 0 16 0 0 23 0 12 15 16 23

Synchro Data Entry Format Location: & 32 Avenue NW Collegiate Blvd. NW & 32 Avenue NW Date : Wednesday September 10, 2008 Observer(s) : City of Calgary Job # : 2984.T01 Job Name: West Campus Transportation Management Plan & TIA AM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 522 372 542 401 0 46 0 91 0 0 0 Conflicting Peds (#/hr) 0 -- 25 25 -- 0 0 -- 13 13 -- 0 Conflicting Bikes (#/hr) -- -- 59 -- -- 1 -- -- 0 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 5% 5% 0% 0% 0% 0% 0% Midday Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 374 104 172 378 0 115 0 213 0 0 0 Conflicting Peds (#/hr) 0 -- 37 37 -- 0 2 -- 5 5 -- 2 Conflicting Bikes (#/hr) -- -- 14 -- -- 7 -- -- 10 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% PM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 619 61 105 479 0 247 0 442 0 0 0 Conflicting Peds (#/hr) 0 -- 31 31 -- 0 0 -- 7 7 -- 0 Conflicting Bikes (#/hr) -- -- 6 -- -- 10 -- -- 18 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0%

Location : North Leg : East Leg: 32 Avenue NW South Leg : Collegiate Blvd. NW West Leg: 32 Avenue NW Date : Observer(s) : Job # : Job Name: Wednesday September 10, 2008 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA From the North On: From the South On: Collegiate Blvd. NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 0 0 0 0 0 0 0 1 1 0 0 1 0 1 28 3 44 4 0 0 0 0 0 85 3 14 1 0 173 12 1 185 07:15 0 0 0 0 0 0 0 1 0 0 0 11 0 2 67 2 58 1 0 0 2 0 0 128 4 37 1 0 302 8 4 310 07:30 0 0 0 0 0 0 0 4 0 0 0 13 1 4 81 7 66 5 0 0 5 0 0 112 5 61 2 0 337 20 9 357 07:45 0 0 0 0 0 0 0 13 0 0 0 28 1 6 136 3 98 2 0 0 2 0 0 122 3 101 2 0 498 11 8 509 08:00 0 0 0 0 0 0 0 11 0 0 0 25 1 2 102 4 86 4 0 0 1 0 0 115 5 71 3 0 410 17 3 427 08:15 0 0 0 0 0 0 0 4 0 0 0 15 0 8 97 5 89 4 0 0 3 0 0 109 5 75 4 0 389 18 11 407 08:30 0 0 0 0 0 0 0 15 1 0 0 24 1 9 158 4 100 3 0 0 3 0 0 137 6 106 5 0 540 20 12 560 08:45 0 0 0 0 0 0 0 15 0 0 0 25 0 6 168 4 112 3 0 0 6 0 0 138 7 102 6 0 560 20 12 580 2 Hour Total 0 0 0 0 0 0 0 64 2 0 0 142 4 38 838 31 652 27 0 0 22 0 0 946 38 567 24 0 3209 126 60 3335 Peak Hour: 8:00-9:00 0 0 0 0 0 0 0 45 1 0 0 89 2 25 524 18 388 13 0 0 13 0 0 498 24 355 17 0 1899 75 38 1974 Total Veh & % Trucks 0 0% 0 0% 0 0% 46 0 0% 91 542 401 0 0% 0 0% 522 5% 372 5% PHF 0.00 Peak Total = 0 PHF 0.82 Peak Total = 137 PHF 0.99 Peak Total = 943 PHF 0.98 Peak Total = 894 From the North On: From the South On: Collegiate Blvd. NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 0 0 0 0 0 0 0 24 1 0 0 61 1 3 34 2 92 6 0 0 0 0 0 88 3 13 1 0 312 14 3 326 11:15 0 0 0 0 0 0 0 20 0 0 0 40 1 6 22 2 62 4 0 0 2 0 0 75 3 11 0 0 230 10 8 240 11:30 0 0 0 0 0 0 0 22 1 0 0 30 2 2 35 2 85 6 0 0 1 0 0 72 5 21 1 0 265 17 3 282 11:45 0 0 0 0 0 0 0 31 0 0 0 50 0 7 38 2 73 5 0 0 1 0 0 75 1 23 0 0 290 8 8 298 12:00 0 0 0 0 0 0 0 28 1 0 0 67 1 7 31 1 110 5 0 0 2 0 0 76 5 23 1 1 335 14 10 349 12:15 0 0 0 0 0 0 0 30 0 0 0 46 0 14 32 1 94 4 0 0 0 0 0 76 5 23 1 0 301 11 14 312 12:30 0 0 0 0 0 0 0 25 1 0 0 46 2 6 49 2 86 3 0 0 1 0 0 97 2 30 1 1 333 11 8 344 12:45 0 0 0 0 0 0 0 29 1 0 0 50 1 10 55 1 74 2 0 0 2 0 0 111 2 25 0 0 344 7 12 351 2 Hour Total 0 0 0 0 0 0 0 209 5 0 0 390 8 55 295 14 677 34 0 0 9 0 0 671 25 168 6 2 2410 92 66 2502 Peak Hour: 12:00-1:00 0 0 0 0 0 0 0 113 2 0 0 208 5 37 166 6 365 13 0 0 5 0 0 361 13 100 4 2 1313 43 44 1356 Total Veh & % Trucks 0 0% 0 0% 0 0% 115 0 0% 213 172 378 0 0% 0 0% 374 104 PHF 0.00 Peak Total = 0 PHF 0.85 Peak Total = 328 PHF 0.94 Peak Total = 550 PHF 1.14 Peak Total = 478 From the North On: From the South On: Collegiate Blvd. NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 0 0 0 0 0 0 0 69 0 0 0 108 0 7 30 1 111 5 0 0 0 0 0 142 3 15 0 0 475 9 7 484 04:15 0 0 0 0 0 0 0 57 1 0 0 73 1 10 27 2 130 8 0 0 1 0 0 123 4 14 1 0 424 17 11 441 04:30 0 0 0 0 0 0 0 71 0 0 0 104 0 5 34 2 102 4 0 0 3 0 0 152 5 16 0 0 479 11 8 490 04:45 0 0 0 0 0 0 0 64 1 0 0 96 1 8 24 0 114 2 0 0 2 0 0 144 7 15 1 0 457 12 10 469 05:00 0 0 0 0 0 0 0 69 0 0 0 137 0 11 19 1 126 8 0 0 1 0 0 164 5 16 1 0 531 15 12 546 05:15 0 0 0 0 0 0 0 42 0 0 0 103 1 7 24 1 119 4 0 0 1 0 0 138 4 12 0 0 438 10 8 448 05:30 0 0 0 0 0 0 0 27 0 0 0 89 1 7 25 1 104 4 0 0 7 0 0 136 4 18 1 0 399 11 14 410 05:45 0 0 0 0 0 0 0 27 0 0 0 60 0 10 32 1 131 6 0 0 0 0 0 114 5 14 1 0 378 13 10 391 2 Hour Total 0 0 0 0 0 0 0 426 2 0 0 770 4 65 215 9 937 41 0 0 15 0 0 1112 38 121 4 0 3581 98 80 3679 Peak Hour: 4:30-5:30 0 0 0 0 0 0 0 246 1 0 0 440 2 31 101 4 461 18 0 0 7 0 0 598 21 59 2 0 1905 48 38 1953 Total Veh & % Trucks 0 0% 0 0% 0 0% 247 0% 0 0% 442 0% 105 479 0 0% 0 0% 619 61 PHF 0.00 Peak Total = 0 PHF 0.84 Peak Total = 689 PHF 0.87 Peak Total = 584 PHF 0.91 Peak Total = 680 6 Hour Total 0 0 0 0 0 0 0 699 9 0 0 1302 16 158 1347 55 2267 101 0 0 46 0 0 2729 101 856 34 2 0 0 0 708 0 1318 1402 2368 0 0 2830 890 0 2026 3770 3720

BIKES Note: The City of Calgary does not count bicycles by North Leg : 0 East Leg : 32 Avenue NW movement, only by direction. All bicycles have South Leg : Collegiate Blvd. NW West leg : 32 Avenue NW been allocated to the straight through movement. Date : Observer(s) : Job # : Job Name: Wednesday September 10, 2008 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA Time Starting From the North On: 0 From the South On: Collegiate Blvd. NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 07:00 0 2 1 1 4 07:15 0 0 1 5 6 07:30 0 3 1 2 6 07:45 0 1 1 11 13 08:00 0 0 0 9 9 08:15 0 0 0 12 12 08:30 0 0 0 11 11 08:45 0 0 1 27 28 2 Hour Total 0 0 0 0 6 0 0 5 0 0 78 0 89 Peak Hour: 8:00-9:00 0 0 0 0 0 0 0 1 0 0 59 0 60 Time Starting From the North On: 0 From the South On: Collegiate Blvd. NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 11:00 0 1 0 1 2 11:15 0 2 1 5 8 11:30 0 1 0 0 1 11:45 0 4 3 3 10 12:00 0 7 2 1 10 12:15 0 1 1 3 5 12:30 0 1 2 4 7 12:45 0 1 2 6 9 2 Hour Total 0 0 0 0 18 0 0 11 0 0 23 0 52 Peak Hour: 12:00-1:00 0 0 0 0 10 0 0 7 0 0 14 0 31 Time Starting From the North On: 0 From the South On: Collegiate Blvd. NW From the East On: 32 Avenue NW From the West On: 32 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 04:00 0 3 2 1 6 04:15 0 1 2 2 5 04:30 0 7 0 4 11 04:45 0 3 4 0 7 05:00 0 8 5 1 14 05:15 0 0 1 1 2 05:30 0 0 6 0 6 05:45 0 2 6 4 12 2 Hour Total 0 0 0 0 24 0 0 26 0 0 13 0 63 Peak Hour: 4:30-5:30 0 0 0 0 18 0 0 10 0 0 6 0 34 6 Hour Total 0 0 0 0 48 0 0 42 0 0 114 0 0 48 42 114

Synchro Data Entry Format Location: 39 Street NW & West Campus Way NW & West Campus Way NW Date : Observer(s) : Wednesday November 8, 2006 City of Calgary Job # : 2984.T01 Job Name: West Campus Transportation Management Plan & TIA AM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 77 143 0 0 64 2 0 0 0 78 0 636 Conflicting Peds (#/hr) 1 -- 8 8 -- 1 0 -- 11 11 -- 0 Conflicting Bikes (#/hr) -- -- 0 -- -- 2 -- -- 0 -- -- 6 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 1 1 0% 0% 20% 10% 0% 0% 0% 0% Midday Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 180 100 0 0 48 31 0 0 0 13 0 137 Conflicting Peds (#/hr) 0 -- 9 9 -- 0 1 -- 9 9 -- 1 Conflicting Bikes (#/hr) -- -- 2 -- -- 1 -- -- 0 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 9% 9% 0% 0% 1 1 0% 0% 0% 7% 0% 7% PM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 621 97 0 0 82 105 0 0 0 30 0 110 Conflicting Peds (#/hr) 0 -- 7 7 -- 0 0 -- 9 9 -- 0 Conflicting Bikes (#/hr) -- -- 7 -- -- 3 -- -- 0 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 6% 6% 0% 0% 0% 7% 0% 7%

Location : North Leg : 39 Street NW East Leg: West Campus Way NW South Leg : West Leg: West Campus Way NW Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA From the North On: 39 Street NW From the South On: From the East On: West Campus Way NW From the West On: West Campus Way NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 9 0 0 0 73 3 0 0 0 0 0 0 0 0 0 0 5 4 1 0 1 12 2 9 2 0 0 0 109 11 1 120 07:15 17 1 0 0 108 3 0 0 0 0 0 0 0 1 0 0 12 3 2 0 1 8 3 11 4 0 0 0 157 13 2 170 07:30 27 1 0 0 185 5 0 0 0 0 0 0 0 2 0 0 15 5 0 0 2 15 2 26 3 0 0 0 268 16 4 284 07:45 17 0 0 0 188 4 1 0 0 0 0 0 0 2 0 0 13 1 0 0 3 16 1 37 4 0 0 0 271 10 6 281 08:00 14 1 0 0 128 5 0 0 0 0 0 0 0 2 0 0 7 5 0 0 2 20 4 32 5 0 0 0 201 20 4 221 08:15 17 1 0 0 118 3 0 0 0 0 0 0 0 2 0 0 16 2 2 0 4 16 3 31 5 0 0 0 200 14 6 214 08:30 13 0 0 0 87 3 0 0 0 0 0 0 0 3 0 0 2 1 1 0 2 34 2 36 3 0 0 0 173 9 5 182 08:45 22 1 0 0 70 5 0 0 0 0 0 0 0 2 0 0 9 3 1 1 1 25 4 53 8 0 0 0 179 21 3 200 2 Hour Total 136 5 0 0 957 31 1 0 0 0 0 0 0 14 0 0 80 23 6 2 16 145 20 234 33 0 0 0 1558 114 31 1672 Peak Hour: 7:30-8:30 76 2 0 0 618 18 1 0 0 0 0 0 0 8 0 0 51 13 2 0 11 67 10 126 17 0 0 0 940 60 20 1000 Total Veh & % Trucks 78 0 0% 636 0 0% 0 0% 0 0% 0 0% 64 20% 2 10% 77 1 143 1 0 0% PHF 0.82 Peak Total = 714 PHF 0.00 Peak Total = 0 PHF 0.83 Peak Total = 66 PHF 0.90 Peak Total = 220 From the North On: 39 Street NW From the South On: From the East On: West Campus Way NW From the West On: West Campus Way NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 2 0 0 0 22 1 1 0 0 0 0 0 0 1 0 0 11 3 6 1 3 32 4 22 3 0 0 1 95 12 6 107 11:15 4 0 0 0 16 2 0 0 0 0 0 0 0 1 0 0 9 1 6 0 1 44 3 17 1 0 0 0 96 7 2 103 11:30 3 0 0 0 29 1 0 0 0 0 0 0 0 1 0 0 7 3 2 1 3 36 6 17 3 0 0 1 94 14 5 108 11:45 9 2 0 0 24 4 0 0 0 0 0 0 0 4 0 0 8 2 3 0 2 52 3 22 1 0 0 0 118 12 6 130 12:00 3 0 0 0 24 3 0 0 0 0 0 0 0 1 0 0 15 1 15 1 2 54 4 18 1 0 0 0 129 10 3 139 12:15 1 0 0 0 26 2 0 0 0 0 0 0 0 3 0 0 3 1 4 1 5 43 5 20 2 0 0 0 97 11 8 108 12:30 6 0 0 0 29 2 0 0 0 0 0 0 0 2 0 0 13 1 6 1 1 31 4 27 3 0 0 0 112 11 3 123 12:45 3 0 0 0 47 4 0 0 0 0 0 0 0 3 0 0 12 2 2 1 1 36 3 26 3 0 0 1 126 13 5 139 2 Hour Total 30 3 0 0 218 18 1 0 0 0 0 0 0 16 0 0 78 14 44 6 18 328 32 169 17 0 0 3 867 90 38 957 Peak Hour: 12:00-1:00 12 1 0 0 127 10 0 0 0 0 0 0 0 9 0 0 42 6 28 3 9 164 16 91 9 0 0 1 464 45 19 509 Total Veh & % Trucks 13 7% 0 0% 137 7% 0 0% 0 0% 0 0% 0 0% 48 1 31 1 180 9% 100 9% 0 0% PHF 0.96 Peak Total = 150 PHF 0.00 Peak Total = 0 PHF 0.62 Peak Total = 79 PHF 0.90 Peak Total = 280 From the North On: 39 Street NW From the South On: From the East On: West Campus Way NW From the West On: West Campus Way NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 6 0 0 0 29 2 0 0 0 0 0 0 0 1 0 0 18 1 32 2 4 171 6 26 1 0 0 0 282 12 5 294 04:15 10 1 0 0 28 2 0 0 0 0 0 0 0 0 0 0 16 2 21 3 0 159 6 20 1 0 0 0 254 15 0 269 04:30 3 0 0 0 16 3 0 0 0 0 0 0 0 3 0 0 22 1 16 1 2 133 4 24 1 0 0 0 214 10 5 224 04:45 10 1 0 0 29 2 0 0 0 0 0 0 0 3 0 0 21 1 29 1 3 137 5 23 1 0 0 0 248 10 6 258 05:00 0 0 0 0 18 3 1 0 0 0 0 0 0 5 0 0 16 1 20 1 5 162 5 14 0 0 0 0 230 10 11 240 05:15 4 0 0 0 22 0 0 0 0 0 0 0 0 4 0 0 15 2 13 1 6 120 6 9 0 0 0 0 183 9 10 192 05:30 9 1 0 0 27 3 0 0 0 0 0 0 0 1 0 0 13 1 12 1 0 74 5 25 1 0 0 0 160 12 1 172 05:45 7 0 0 0 33 1 0 0 0 0 0 0 0 2 0 0 11 1 11 0 1 62 3 27 1 0 0 0 151 6 3 157 2 Hour Total 48 3 0 0 202 15 1 0 0 0 0 0 0 19 0 0 133 9 153 11 21 1019 39 167 7 0 0 0 1722 84 41 1806 Peak Hour: 4:00-5:00 28 2 0 0 102 8 0 0 0 0 0 0 0 7 0 0 77 5 98 7 9 599 22 94 3 0 0 0 998 47 16 1045 Total Veh & % Trucks 30 7% 0 0% 110 7% 0 0% 0 0% 0 0% 0 0% 82 6% 105 6% 621 97 0 0% PHF 0.85 Peak Total = 140 PHF 0.00 Peak Total = 0 PHF 0.88 Peak Total = 187 PHF 0.88 Peak Total = 718 6 Hour Total 214 11 0 0 1377 64 3 0 0 0 0 0 0 49 0 0 291 46 203 19 55 1492 91 570 57 0 0 3 225 0 1441 0 0 0 0 337 222 1583 627 0 1666 0 559 2210

BIKES Note: The City of Calgary does not count bicycles by North Leg : 39 Street NW East Leg : West Campus Way NW movement, only by direction. All bicycles have South Leg : 0 West leg : West Campus Way NW been allocated to the straight through movement. Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA Time Starting From the North On: 39 Street NW From the South On: 0 From the East On: West Campus Way NW From the West On: West Campus Way NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 07:00 2 0 0 0 2 07:15 4 0 0 1 5 07:30 2 0 1 0 3 07:45 1 0 1 0 2 08:00 1 0 0 0 1 08:15 2 0 0 0 2 08:30 1 0 0 0 1 08:45 1 0 0 2 3 2 Hour Total 0 14 0 0 0 0 0 2 0 0 3 0 19 Peak Hour: 7:30-8:30 0 6 0 0 0 0 0 2 0 0 0 0 8 Time Starting From the North On: 39 Street NW From the South On: 0 From the East On: West Campus Way NW From the West On: West Campus Way NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 11:00 0 0 0 1 1 11:15 0 0 0 1 1 11:30 1 0 0 0 1 11:45 0 0 0 1 1 12:00 0 0 0 1 1 12:15 0 0 1 0 1 12:30 0 0 0 0 0 12:45 0 0 0 1 1 2 Hour Total 0 1 0 0 0 0 0 1 0 0 5 0 7 Peak Hour: 12:00-1:00 0 0 0 0 0 0 0 1 0 0 2 0 3 Time Starting From the North On: 39 Street NW From the South On: 0 From the East On: West Campus Way NW From the West On: West Campus Way NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 04:00 0 0 2 2 4 04:15 0 0 0 2 2 04:30 0 0 0 1 1 04:45 0 0 1 2 3 05:00 0 0 1 1 2 05:15 0 0 2 2 4 05:30 0 0 0 0 0 05:45 0 0 1 1 2 2 Hour Total 0 0 0 0 0 0 0 7 0 0 11 0 18 Peak Hour: 4:00-5:00 0 0 0 0 0 0 0 3 0 0 7 0 10 6 Hour Total 0 15 0 0 0 0 0 10 0 0 19 0 15 0 10 19

Synchro Data Entry Format Location: West Campus Drive NW & West Campus Way NW West Campus Drive NW & West Campus Way NW Date : Observer(s) : Wednesday November 8, 2006 City of Calgary Job # : 2984.T01 Job Name: West Campus Transportation Management Plan & TIA AM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 31 54 733 4 0 0 0 188 0 0 0 Conflicting Peds (#/hr) 0 -- 13 13 -- 0 1 -- 0 0 -- 1 Conflicting Bikes (#/hr) -- -- 0 -- -- 5 -- -- 0 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 10% 9% 0% 0% 0% 1 0% 0% 0% Midday Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 12 23 183 1 0 6 0 266 0 0 0 Conflicting Peds (#/hr) 0 -- 14 14 -- 0 0 -- 0 0 -- 0 Conflicting Bikes (#/hr) -- -- 1 -- -- 0 -- -- 0 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 9% 9% 0% 9% 0% 8% 0% 0% 0% PM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 31 14 189 0 0 8 0 588 0 0 0 Conflicting Peds (#/hr) 0 -- 13 13 -- 0 0 -- 1 1 -- 0 Conflicting Bikes (#/hr) -- -- 5 -- -- 1 -- -- 1 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 0% 1 0% 0% 0% 0% 0% 0%

Location : North Leg : West Campus Drive NW East Leg: West Campus Way NW South Leg : West Campus Drive NW West Leg: West Campus Way NW Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: West Campus Way NW From the West On: West Campus Way NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15 0 0 0 0 0 0 0 1 0 0 0 16 3 1 126 6 1 0 0 0 0 0 0 2 2 6 3 0 152 14 1 166 07:30 0 0 0 0 0 0 0 0 0 0 0 38 3 4 190 10 1 0 0 0 0 0 0 6 1 10 2 0 245 16 4 261 07:45 0 0 0 0 0 0 0 0 0 0 0 43 6 3 228 6 2 0 0 0 0 0 0 8 0 18 0 1 299 12 4 311 08:00 0 0 0 0 0 0 0 0 0 0 0 48 6 3 136 11 0 0 0 0 0 0 0 6 1 12 1 0 202 19 3 221 08:15 0 0 0 0 0 0 0 0 0 0 0 39 5 3 147 5 1 0 0 0 0 0 0 8 1 9 2 0 204 13 3 217 08:30 0 0 0 0 0 0 0 0 0 0 0 70 5 4 101 7 1 0 0 0 0 0 0 9 0 13 1 0 194 13 4 207 08:45 0 0 0 0 0 0 0 2 0 0 0 67 11 1 87 10 1 0 0 0 0 0 0 9 0 11 1 0 177 22 1 199 2 Hour Total 0 0 0 0 0 0 0 3 0 0 0 321 39 19 1015 55 7 0 0 0 0 0 0 47 6 80 9 1 1473 109 20 1582 Peak Hour: 7:30-8:30 0 0 0 0 0 0 0 0 0 0 0 168 20 13 701 32 4 0 0 0 0 0 0 28 3 49 5 1 950 60 14 1010 Total Veh & % Trucks 0 0% 0 0% 0 0% 0 0% 0 0% 188 1 733 4 0 0% 0 0% 31 10% 54 9% PHF 0.00 Peak Total = 0 PHF 0.87 Peak Total = 188 PHF 0.78 Peak Total = 737 PHF 0.82 Peak Total = 85 From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: West Campus Way NW From the West On: West Campus Way NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 0 0 0 0 0 0 0 3 0 0 0 52 7 2 28 4 0 0 0 0 0 0 0 2 0 6 0 0 91 11 2 102 11:15 0 0 0 0 0 0 1 2 0 0 0 53 4 1 28 4 0 0 0 0 0 0 0 7 0 3 0 0 93 8 2 101 11:30 0 0 0 0 0 0 0 2 0 0 0 49 7 1 35 5 0 0 0 0 0 0 0 5 1 3 0 0 94 13 1 107 11:45 0 0 0 0 0 0 1 5 0 0 0 68 2 5 34 6 0 0 0 0 0 0 0 11 2 4 1 0 121 10 6 131 12:00 0 0 0 0 0 0 0 2 0 0 0 69 5 1 42 5 0 0 0 0 0 0 0 4 0 8 1 0 125 11 1 136 12:15 0 0 0 0 0 0 0 1 0 0 0 57 7 2 28 3 1 0 0 0 0 0 0 3 0 3 0 0 93 10 2 103 12:30 0 0 0 0 0 0 0 3 0 0 0 56 7 4 42 3 0 0 0 0 0 0 0 2 0 7 0 0 110 10 4 120 12:45 0 0 0 0 0 0 0 0 0 0 0 61 4 7 55 5 0 0 0 0 0 0 0 3 0 4 0 0 123 9 7 132 2 Hour Total 0 0 0 0 0 0 2 17 1 0 0 466 42 23 292 35 1 0 0 0 0 0 0 37 2 37 2 0 850 82 25 932 Peak Hour: 12:00-1:00 0 0 0 0 0 0 0 5 1 0 0 244 22 14 167 16 1 0 0 0 0 0 0 12 0 22 1 0 451 40 14 491 Total Veh & % Trucks 0 0% 0 0% 0 0% 6 9% 0 0% 266 8% 183 9% 1 9% 0 0% 0 0% 12 23 PHF 0.00 Peak Total = 0 PHF 0.89 Peak Total = 272 PHF 0.98 Peak Total = 184 PHF 0.55 Peak Total = 35 From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: West Campus Way NW From the West On: West Campus Way NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 0 0 0 0 0 0 0 1 0 0 0 159 7 6 43 5 0 0 0 0 0 0 0 8 0 2 0 0 213 12 6 225 04:15 0 0 0 0 0 0 0 3 0 0 0 133 6 0 38 7 0 0 0 0 0 0 0 8 0 3 0 0 185 13 0 198 04:30 0 0 0 0 0 0 0 4 0 0 0 142 6 3 37 5 0 0 0 0 1 0 0 10 0 4 0 0 197 11 4 208 04:45 0 0 0 0 0 0 0 0 0 0 0 130 5 4 50 4 0 0 0 0 0 0 0 5 0 5 0 0 190 9 4 199 05:00 0 0 0 0 0 0 0 1 0 0 0 131 5 4 32 5 0 0 0 0 0 0 0 7 0 2 0 0 173 10 4 183 05:15 0 0 0 0 0 0 0 0 0 0 0 106 6 4 32 3 0 0 0 0 0 0 0 6 1 0 0 0 144 10 4 154 05:30 0 0 0 0 0 0 0 3 0 0 0 90 4 1 34 6 0 0 0 0 0 0 0 5 0 4 0 0 136 10 1 146 05:45 0 0 0 0 0 0 0 2 0 0 0 66 4 2 34 2 2 0 0 0 0 0 0 5 0 6 1 0 115 7 2 122 2 Hour Total 0 0 0 0 0 0 0 13 1 0 0 958 42 24 300 37 2 0 0 0 1 0 0 54 1 26 1 0 1353 82 25 1435 Peak Hour: 4:00-5:00 0 0 0 0 0 0 0 8 0 0 0 564 24 13 168 21 0 0 0 0 1 0 0 31 0 14 0 0 785 45 14 830 Total Veh & % Trucks 0 0% 0 0% 0 0% 8 0 0% 588 189 1 0 0% 0 0% 0 0% 31 0% 14 0% PHF 0.00 Peak Total = 0 PHF 0.89 Peak Total = 596 PHF 0.88 Peak Total = 189 PHF 0.80 Peak Total = 45 6 Hour Total 0 0 0 0 0 0 2 33 2 0 0 1745 123 66 1608 126 9 1 0 0 1 0 0 138 9 143 12 1 0 0 0 35 0 1868 1734 10 0 0 147 155 0 1903 1744 302

BIKES Note: The City of Calgary does not count bicycles by North Leg : West Campus Drive NW East Leg : West Campus Way NW movement, only by direction. All bicycles have South Leg : West Campus Drive NW West leg : West Campus Way NW been allocated to the straight through movement. Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA Time Starting From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: West Campus Way NW From the West On: West Campus Way NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 07:00 0 0 0 0 0 07:15 0 0 0 1 1 07:30 0 0 3 0 3 07:45 0 0 1 0 1 08:00 0 0 1 0 1 08:15 0 0 0 0 0 08:30 0 0 0 0 0 08:45 0 0 0 2 2 2 Hour Total 0 0 0 0 0 0 0 5 0 0 3 0 8 Peak Hour: 7:30-8:30 0 0 0 0 0 0 0 5 0 0 0 0 5 Time Starting From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: West Campus Way NW From the West On: West Campus Way NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 11:00 0 0 0 1 1 11:15 0 0 0 0 0 11:30 0 0 0 0 0 11:45 0 0 0 1 1 12:00 0 0 0 1 1 12:15 0 0 0 0 0 12:30 0 0 0 0 0 12:45 0 0 0 0 0 2 Hour Total 0 0 0 0 0 0 0 0 0 0 3 0 3 Peak Hour: 12:00-1:00 0 0 0 0 0 0 0 0 0 0 1 0 1 Time Starting From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: West Campus Way NW From the West On: West Campus Way NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 04:00 0 0 1 1 2 04:15 0 0 0 1 1 04:30 0 1 0 1 2 04:45 0 0 0 2 2 05:00 0 1 0 0 1 05:15 0 1 1 1 3 05:30 0 0 0 0 0 05:45 0 2 0 0 2 2 Hour Total 0 0 0 0 5 0 0 2 0 0 6 0 13 Peak Hour: 4:00-5:00 0 0 0 0 1 0 0 1 0 0 5 0 7 6 Hour Total 0 0 0 0 5 0 0 7 0 0 12 0 0 5 7 12

Synchro Data Entry Format Location: West Campus Drive & Collegiate Road NW West Campus Drive & Oki Drive NW Date : Observer(s) : Wednesday August 15, 2007 City of Calgary Job # : 2984.T01 Job Name: West Campus Transportation Management Plan & TIA AM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 20 3 38 20 3 19 77 160 16 57 307 59 Conflicting Peds (#/hr) 2 -- 4 4 -- 2 4 -- 0 0 -- 4 Conflicting Bikes (#/hr) -- -- 0 -- -- 1 -- -- 1 -- -- 5 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 5% 1 17% 17% 16% 9% 9% 9% 7% 7% 7% Midday Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 59 3 70 27 4 35 70 135 18 28 122 53 Conflicting Peds (#/hr) 3 -- 24 24 -- 3 13 -- 2 2 -- 13 Conflicting Bikes (#/hr) -- -- 1 -- -- 0 -- -- 0 -- -- 2 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 16% 1 17% 1 10% 10% 1 1 1 PM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 45 1 65 28 0 32 40 274 4 7 227 24 Conflicting Peds (#/hr) 2 -- 14 14 -- 2 1 -- 0 0 -- 1 Conflicting Bikes (#/hr) -- -- 3 -- -- 1 -- -- 2 -- -- 2 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 0% 7% 7% 7% 1 1 1

Location : North Leg : West Campus Drive East Leg: Collegiate Road NW South Leg : West Campus Drive West Leg: Oki Drive NW Date : Observer(s) : Job # : Job Name: Wednesday August 15, 2007 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA From the North On: West Campus Drive From the South On: West Campus Drive From the East On: Collegiate Road NW From the West On: Oki Drive NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 4 1 40 8 3 1 0 11 3 15 4 3 1 1 2 1 0 0 1 0 0 3 0 0 0 4 0 0 88 17 1 105 07:15 3 0 71 7 5 1 0 13 1 23 2 1 0 1 3 0 0 0 3 0 0 1 0 0 0 4 0 3 127 11 4 138 07:30 10 1 73 4 16 1 1 16 2 16 2 3 0 2 1 0 0 0 2 2 0 5 0 0 0 10 0 2 151 13 5 164 07:45 19 1 99 5 14 1 1 15 1 33 3 5 0 0 3 0 0 0 3 1 0 6 0 0 0 13 0 1 209 13 2 222 08:00 7 1 62 7 8 1 0 20 2 29 3 3 0 3 6 1 0 0 2 1 0 6 0 0 0 7 0 3 149 17 6 166 08:15 13 1 67 6 18 1 1 14 1 42 4 5 0 0 2 1 2 0 5 1 0 2 1 1 0 3 2 0 173 19 1 192 08:30 14 1 56 5 15 1 0 22 2 42 4 3 0 1 6 1 1 0 5 1 0 5 0 2 0 13 0 0 184 15 1 199 08:45 7 1 33 6 17 3 0 22 2 32 3 2 0 1 3 1 0 0 4 3 0 6 0 0 0 11 0 1 137 19 2 156 2 Hour Total 77 7 501 48 97 9 3 132 15 232 25 23 3 9 25 6 2 1 26 8 0 34 1 3 0 65 2 10 1218 124 22 1342 Peak Hour: 7:45-8:45 53 4 284 23 55 4 2 70 7 146 14 15 1 4 17 3 2 1 16 3 0 19 1 3 0 36 2 4 715 64 10 779 Total Veh & % Trucks 57 7% 307 7% 59 7% 77 9% 160 9% 16 9% 20 17% 3 17% 19 16% 20 5% 3 1 38 PHF 0.76 Peak Total = 423 PHF 1.11 Peak Total = 253 PHF 1.05 Peak Total = 42 PHF 0.80 Peak Total = 61 From the North On: West Campus Drive From the South On: West Campus Drive From the East On: Collegiate Road NW From the West On: Oki Drive NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 1 0 25 4 4 1 0 17 2 24 3 3 0 3 8 0 1 0 3 0 1 15 0 1 0 18 1 0 120 11 4 131 11:15 3 1 21 8 8 3 1 8 1 27 2 1 0 0 5 1 0 0 8 1 0 6 0 0 0 27 0 0 114 17 1 131 11:30 5 1 29 7 8 2 0 9 3 10 3 3 1 1 10 0 0 0 13 1 0 16 0 0 0 21 1 1 124 19 2 143 11:45 10 3 28 7 3 1 1 14 2 27 4 5 1 2 13 2 1 0 6 1 0 13 0 1 0 17 1 3 138 22 6 160 12:00 4 1 19 5 10 3 0 10 1 32 3 4 0 11 6 1 0 0 10 2 0 16 0 0 0 16 0 3 127 16 14 143 12:15 4 0 23 1 9 1 1 13 2 25 3 4 0 9 9 2 3 0 9 2 1 14 0 1 0 26 1 2 140 12 13 152 12:30 4 1 24 3 16 2 0 17 2 34 4 5 1 3 5 0 1 0 5 0 1 17 0 2 0 13 0 7 142 14 11 156 12:45 13 1 42 5 11 1 2 22 3 30 4 4 0 1 3 1 0 0 5 2 0 12 0 0 0 14 0 1 156 17 4 173 2 Hour Total 44 8 210 41 70 13 5 111 15 209 26 28 4 30 58 8 5 1 59 9 3 107 2 5 0 154 2 17 1061 128 55 1189 Peak Hour: 12:00-1:00 25 3 108 14 46 7 3 63 7 121 14 16 2 24 23 4 3 1 29 6 2 59 0 3 0 69 1 13 565 59 42 624 Total Veh & % Trucks 28 1 122 1 53 1 70 1 135 10% 18 10% 27 16% 4 1 35 17% 59 3 70 PHF 0.98 Peak Total = 203 PHF 1.05 Peak Total = 223 PHF 0.69 Peak Total = 66 PHF 0.87 Peak Total = 132 From the North On: West Campus Drive From the South On: West Campus Drive From the East On: Collegiate Road NW From the West On: Oki Drive NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 3 0 57 7 7 1 0 11 1 55 5 0 0 6 4 0 0 0 5 0 0 18 1 0 0 18 1 1 178 16 7 194 04:15 3 0 56 7 6 1 0 13 1 63 5 3 0 1 9 0 0 0 6 0 0 12 0 0 0 14 0 0 185 14 1 199 04:30 0 0 49 10 4 1 1 6 1 70 5 0 0 5 6 0 0 0 13 0 0 6 0 1 0 16 1 0 171 18 6 189 04:45 1 0 36 5 3 1 1 7 0 67 4 1 0 2 9 0 0 0 8 0 0 8 0 0 0 15 0 0 154 11 3 165 05:00 0 0 37 3 7 1 2 7 1 74 6 2 0 0 3 0 0 0 1 0 1 7 0 0 0 13 0 1 151 11 4 162 05:15 1 0 32 6 6 1 2 7 1 58 4 0 0 0 1 0 0 0 3 0 1 7 0 0 0 7 1 0 122 13 3 135 05:30 0 0 23 7 5 2 0 6 0 46 4 1 0 0 4 0 0 0 1 0 0 6 0 0 0 7 1 0 99 14 0 113 05:45 2 0 30 2 6 0 1 11 0 65 2 4 0 1 1 0 0 0 3 0 1 10 1 0 0 10 1 0 141 5 3 146 2 Hour Total 9 1 320 47 45 7 7 68 5 497 36 10 1 15 37 0 0 0 40 0 3 72 3 1 0 101 3 2 1201 102 27 1303 Peak Hour: 4:00-5:00 6 1 198 29 21 3 2 37 3 254 20 4 0 14 28 0 0 0 32 0 0 44 1 1 0 63 2 1 688 59 17 747 Total Veh & % Trucks 7 1 227 1 24 1 40 7% 274 7% 4 7% 28 0% 0 0% 32 0% 45 1 65 PHF 0.86 Peak Total = 258 PHF 0.88 Peak Total = 318 PHF 0.79 Peak Total = 60 PHF 0.73 Peak Total = 111 6 Hour Total 130 16 1032 135 212 29 15 311 35 938 87 62 7 54 120 14 8 1 126 16 6 214 5 9 0 320 7 29 146 1167 241 346 1025 69 134 9 142 219 9 327 1554 1440 285 555

BIKES Note: The City of Calgary does not count bicycles by North Leg : West Campus Drive East Leg : Collegiate Road NW movement, only by direction. All bicycles have South Leg : West Campus Drive West leg : Oki Drive NW been allocated to the straight through movement. Date : Observer(s) : Job # : Job Name: Wednesday August 15, 2007 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA Time Starting From the North On: West Campus Drive From the South On: West Campus Drive From the East On: Collegiate Road NW From the West On: Oki Drive NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 07:00 0 0 0 0 0 07:15 3 0 0 0 3 07:30 3 2 0 0 5 07:45 2 1 0 0 3 08:00 1 0 0 0 1 08:15 2 0 1 0 3 08:30 0 0 0 0 0 08:45 2 2 0 0 4 2 Hour Total 0 13 0 0 5 0 0 1 0 0 0 0 19 Peak Hour: 7:45-8:45 0 5 0 0 1 0 0 1 0 0 0 0 7 Time Starting From the North On: West Campus Drive From the South On: West Campus Drive From the East On: Collegiate Road NW From the West On: Oki Drive NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 11:00 0 0 0 0 0 11:15 2 0 1 0 3 11:30 0 0 0 0 0 11:45 0 0 0 0 0 12:00 0 0 0 0 0 12:15 0 0 0 1 1 12:30 2 0 0 0 2 12:45 0 0 0 0 0 2 Hour Total 0 4 0 0 0 0 0 1 0 0 1 0 6 Peak Hour: 12:00-1:00 0 2 0 0 0 0 0 0 0 0 1 0 3 Time Starting From the North On: West Campus Drive From the South On: West Campus Drive From the East On: Collegiate Road NW From the West On: Oki Drive NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 04:00 1 1 1 0 3 04:15 0 0 0 0 0 04:30 1 0 0 1 2 04:45 0 1 0 2 3 05:00 1 3 0 0 4 05:15 0 0 0 0 0 05:30 0 0 1 0 1 05:45 1 2 0 1 4 2 Hour Total 0 4 0 0 7 0 0 2 0 0 4 0 17 Peak Hour: 4:00-5:00 0 2 0 0 2 0 0 1 0 0 3 0 8 6 Hour Total 0 21 0 0 12 0 0 4 0 0 5 0 21 12 4 5

Synchro Data Entry Format Location: West Campus Drive NW & 24 Avenue NW West Campus Drive NW & 24 Avenue NW Date : Observer(s) : Wednesday November 8, 2006 City of Calgary Job # : 2984.T01 Job Name: West Campus Transportation Management Plan & TIA AM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 62 31 1 3 97 221 0 0 4 392 5 142 Conflicting Peds (#/hr) 2 -- 6 6 -- 2 6 -- 1 1 -- 6 Conflicting Bikes (#/hr) -- -- 0 -- -- 1 -- -- 0 -- -- 2 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 1 1 1 9% 9% 9% 0% 0% 0% 8% 7% 8% Midday Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 91 34 1 7 39 175 0 2 7 189 3 75 Conflicting Peds (#/hr) 12 -- 4 4 -- 12 8 -- 3 3 -- 8 Conflicting Bikes (#/hr) -- -- 0 -- -- 0 -- -- 0 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 8% 7% 10% 10% 10% 0% 7% 27% 1 1 1 PM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 101 87 3 2 33 292 0 3 6 267 5 85 Conflicting Peds (#/hr) 2 -- 6 6 -- 2 9 -- 2 2 -- 9 Conflicting Bikes (#/hr) -- -- 2 -- -- 2 -- -- 0 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 5% 5% 5% 10% 7% 8% 0% 8% 46% 7% 6% 7%

Location : North Leg : West Campus Drive NW East Leg: 24 Avenue NW South Leg : West Campus Drive NW West Leg: 24 Avenue NW Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: 24 Avenue NW From the West On: 24 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 46 4 6 1 19 2 0 0 0 0 0 0 0 0 9 1 16 1 22 1 0 9 2 8 1 1 0 0 136 13 0 149 07:15 75 4 2 0 13 1 0 0 0 0 0 0 0 0 3 0 22 2 27 3 0 8 2 4 1 1 0 0 155 13 0 168 07:30 89 6 1 0 30 2 1 0 0 0 0 1 0 1 1 0 17 1 40 3 0 6 0 4 0 0 0 1 188 13 3 201 07:45 122 8 3 0 37 2 2 0 0 0 0 1 0 5 1 0 23 3 60 8 0 10 2 2 1 0 0 5 259 24 12 283 08:00 83 12 1 0 32 4 0 0 0 0 0 1 0 0 1 0 28 2 51 5 0 13 2 8 1 1 0 0 219 26 0 245 08:15 90 7 1 0 31 3 0 0 0 0 0 1 0 0 1 0 16 1 45 4 0 15 1 5 1 0 0 0 205 17 0 222 08:30 65 5 0 0 30 3 0 0 0 0 0 1 0 1 0 0 22 2 45 3 1 17 2 12 1 0 0 1 192 16 3 208 08:45 62 6 1 0 25 3 0 0 0 0 0 1 0 0 0 0 18 3 50 8 0 22 3 2 0 0 0 0 181 23 0 204 2 Hour Total 631 53 15 1 218 19 3 0 0 0 0 6 0 7 16 1 161 16 340 35 1 100 14 45 6 3 0 7 1535 145 18 1680 Peak Hour: 7:45-8:45 360 32 5 0 130 12 2 0 0 0 0 4 0 6 3 0 89 8 202 19 1 55 7 28 3 1 0 6 875 83 15 958 Total Veh & % Trucks 392 8% 5 7% 142 8% 0 0% 0 0% 4 0% 3 9% 97 9% 221 9% 62 1 31 1 1 1 PHF 0.78 Peak Total = 539 PHF 1.00 Peak Total = 4 PHF 0.84 Peak Total = 321 PHF 0.94 Peak Total = 94 From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: 24 Avenue NW From the West On: 24 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 29 2 1 0 16 1 0 1 0 0 0 1 0 0 1 0 9 1 37 3 0 11 2 2 0 2 0 0 109 9 0 118 11:15 41 2 1 0 24 1 3 1 0 0 0 1 0 1 0 0 9 1 22 3 0 14 2 7 1 0 0 1 119 11 5 130 11:30 45 4 1 0 15 2 0 1 0 2 0 1 0 0 3 0 5 0 35 3 0 15 2 11 1 0 0 0 133 13 0 146 11:45 44 4 0 0 19 2 3 0 0 1 0 1 0 0 2 0 3 1 32 5 1 17 1 12 1 1 0 2 132 14 6 146 12:00 57 9 1 0 15 3 2 0 0 1 0 5 1 0 3 0 7 1 43 5 1 17 1 9 0 1 0 1 159 20 4 179 12:15 33 3 0 0 17 2 2 0 0 0 0 0 0 2 2 0 12 1 39 4 1 21 3 7 1 0 0 2 130 15 7 145 12:30 36 3 1 0 20 2 4 0 0 0 0 0 1 0 0 0 8 1 37 5 1 21 1 11 1 0 0 2 134 14 7 148 12:45 42 6 1 0 14 2 4 0 0 1 0 0 0 2 2 0 8 1 38 4 0 24 3 5 0 0 0 3 135 16 9 151 2 Hour Total 325 35 5 1 141 14 18 3 0 5 0 9 2 5 12 1 61 7 282 33 4 140 14 63 6 4 0 11 1051 112 38 1163 Peak Hour: 12:00-1:00 167 22 3 0 67 8 12 0 0 2 0 5 2 4 6 1 35 4 157 18 3 84 7 32 2 1 0 8 558 65 27 623 Total Veh & % Trucks 189 1 3 1 75 1 0 0% 2 7% 7 27% 7 10% 39 10% 175 10% 91 8% 34 7% 1 PHF 0.79 Peak Total = 267 PHF 0.32 Peak Total = 9 PHF 0.94 Peak Total = 221 PHF 0.98 Peak Total = 126 From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: 24 Avenue NW From the West On: 24 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 69 4 0 0 26 2 1 0 0 1 0 2 1 1 2 0 5 1 75 8 1 25 1 20 1 1 0 4 225 18 7 243 04:15 67 5 1 0 18 1 1 0 0 0 0 1 2 2 0 0 8 1 52 3 1 33 3 26 2 0 0 2 206 17 6 223 04:30 49 6 0 0 15 2 0 0 0 0 0 0 0 1 0 0 8 1 76 7 0 22 0 20 0 0 0 1 190 16 2 206 04:45 63 4 4 0 20 1 0 0 0 2 0 0 0 2 0 0 10 0 67 4 0 16 1 17 1 2 0 2 201 11 4 212 05:00 24 3 1 0 11 2 0 0 0 0 0 3 0 0 0 0 11 0 60 3 0 16 0 8 0 0 0 1 134 8 1 142 05:15 40 1 0 0 8 0 2 0 1 0 0 0 0 0 0 0 11 0 74 4 0 17 2 6 1 0 0 0 155 8 2 163 05:30 29 3 2 0 8 1 0 1 0 0 0 1 0 0 0 0 2 0 52 5 0 11 1 8 0 0 0 0 114 10 0 124 05:45 42 2 0 0 9 1 1 0 0 1 0 0 0 1 0 0 6 0 53 2 0 14 1 5 0 0 0 1 130 6 3 136 2 Hour Total 383 28 7 1 116 9 5 1 1 4 0 7 3 7 2 0 59 4 510 35 2 154 8 109 5 3 0 11 1355 94 25 1449 Peak Hour: 4:00-5:00 248 19 5 0 79 6 2 0 0 3 0 3 3 6 2 0 31 2 270 22 2 96 5 83 4 3 0 9 822 62 19 884 Total Veh & % Trucks 267 7% 5 6% 85 7% 0 0% 3 8% 6 46% 2 10% 33 7% 292 8% 101 5% 87 5% 3 5% PHF 0.88 Peak Total = 357 PHF 0.56 Peak Total = 9 PHF 0.89 Peak Total = 327 PHF 0.75 Peak Total = 191 6 Hour Total 1339 116 28 2 475 42 26 4 1 9 0 22 5 19 29 3 282 26 1132 103 7 395 35 217 17 9 1 29 1455 30 517 5 9 27 32 308 1235 430 234 10 2002 41 1575 674

BIKES Note: The City of Calgary does not count bicycles by North Leg : West Campus Drive NW East Leg : 24 Avenue NW movement, only by direction. All bicycles have South Leg : West Campus Drive NW West leg : 24 Avenue NW been allocated to the straight through movement. Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA Time Starting From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: 24 Avenue NW From the West On: 24 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 07:00 0 0 0 0 0 07:15 0 0 0 0 0 07:30 1 0 0 0 1 07:45 2 0 1 0 3 08:00 0 0 0 0 0 08:15 0 0 0 0 0 08:30 0 0 0 0 0 08:45 0 0 0 0 0 2 Hour Total 0 3 0 0 0 0 0 1 0 0 0 0 4 Peak Hour: 7:45-8:45 0 2 0 0 0 0 0 1 0 0 0 0 3 Time Starting From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: 24 Avenue NW From the West On: 24 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 11:00 0 0 0 0 0 11:15 0 0 1 0 1 11:30 0 0 0 0 0 11:45 0 0 0 0 0 12:00 0 0 0 0 0 12:15 0 0 0 0 0 12:30 0 0 0 0 0 12:45 0 0 0 0 0 2 Hour Total 0 0 0 0 0 0 0 1 0 0 0 0 1 Peak Hour: 12:00-1:00 0 0 0 0 0 0 0 0 0 0 0 0 0 Time Starting From the North On: West Campus Drive NW From the South On: West Campus Drive NW From the East On: 24 Avenue NW From the West On: 24 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 04:00 0 0 0 0 0 04:15 0 0 0 0 0 04:30 0 0 2 1 3 04:45 0 0 0 1 1 05:00 0 0 0 2 2 05:15 0 0 0 0 0 05:30 0 0 0 1 1 05:45 0 0 0 0 0 2 Hour Total 0 0 0 0 0 0 0 2 0 0 5 0 7 Peak Hour: 4:00-5:00 0 0 0 0 0 0 0 2 0 0 2 0 4 6 Hour Total 0 3 0 0 0 0 0 4 0 0 5 0 3 0 4 5

Synchro Data Entry Format Location: West Campus Blvd. NW & 24 Avenue NW & 24 Avenue NW Date : Observer(s) : Wednesday November 8, 2006 City of Calgary Job # : 2984.T01 Job Name: West Campus Transportation Management Plan & TIA AM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 0 13 77 26 0 38 0 144 0 0 0 Conflicting Peds (#/hr) 0 -- 0 0 -- 0 1 -- 0 0 -- 1 Conflicting Bikes (#/hr) -- -- 2 -- -- 0 -- -- 1 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 15% 2 25% 0% 6% 0% 7% 0% 0% 0% Midday Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 0 24 86 19 0 16 0 79 0 0 0 Conflicting Peds (#/hr) 1 -- 6 6 -- 1 6 -- 1 1 -- 6 Conflicting Bikes (#/hr) -- -- 0 -- -- 0 -- -- 0 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 2 1 15% 0% 8% 0% 10% 0% 0% 0% PM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 0 52 137 12 0 10 0 70 0 0 0 Conflicting Peds (#/hr) 0 -- 0 0 -- 0 1 -- 0 0 -- 1 Conflicting Bikes (#/hr) -- -- 1 -- -- 1 -- -- 2 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 1 1 0% 8% 0% 10% 0% 0% 0%

Location : North Leg : West Campus Blvd. NW East Leg: 24 Avenue NW South Leg : West Leg: 24 Avenue NW Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA From the North On: West Campus Blvd. NW From the South On: From the East On: 24 Avenue NW From the West On: 24 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 0 0 0 0 0 0 0 6 1 0 0 17 2 0 5 1 5 1 0 0 0 0 0 0 0 0 1 0 32 5 0 37 07:15 0 0 0 0 0 0 0 9 1 0 0 20 2 0 7 3 3 2 0 0 1 0 0 1 0 3 2 0 43 10 1 53 07:30 0 0 0 0 0 0 0 12 0 0 0 22 1 0 12 4 5 1 0 0 0 0 0 0 0 4 1 1 55 7 1 62 07:45 0 0 0 0 0 0 0 7 1 0 0 25 3 0 21 3 7 1 0 0 0 0 0 0 0 4 0 0 64 8 0 72 08:00 0 0 0 0 0 0 0 10 1 0 0 31 1 0 14 6 5 2 0 0 0 0 0 0 0 3 1 0 63 11 0 74 08:15 0 0 0 0 0 0 0 6 0 0 0 38 2 0 14 5 3 1 0 0 0 0 0 0 0 2 0 0 63 8 0 71 08:30 0 0 0 0 0 0 0 6 1 0 0 35 4 0 16 2 4 1 0 0 0 0 0 0 0 2 0 1 63 8 1 71 08:45 0 0 0 0 0 0 0 13 1 0 0 31 2 0 15 5 7 3 0 0 0 0 0 0 0 4 1 0 70 12 0 82 2 Hour Total 0 0 0 0 0 0 0 69 5 0 0 218 17 0 103 30 40 11 0 0 1 0 0 1 0 22 6 2 453 69 3 522 Peak Hour: 8:00-9:00 0 0 0 0 0 0 0 36 2 0 0 134 10 0 58 19 20 6 0 0 0 0 0 0 0 11 2 1 259 39 1 298 Total Veh & % Trucks 0 0% 0 0% 0 0% 38 6% 0 0% 144 7% 77 2 26 25% 0 0% 0 0% 0 0% 13 15% PHF 0.00 Peak Total = 0 PHF 1.06 Peak Total = 182 PHF 0.80 Peak Total = 103 PHF 0.54 Peak Total = 13 From the North On: West Campus Blvd. NW From the South On: From the East On: 24 Avenue NW From the West On: 24 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 0 0 0 0 0 0 0 2 0 0 0 15 3 0 19 2 2 0 0 0 0 0 0 0 0 1 3 0 39 8 0 47 11:15 0 0 0 0 0 0 0 3 1 0 0 17 2 0 25 2 6 1 0 0 0 0 0 0 0 2 0 0 53 6 0 59 11:30 0 0 0 0 0 0 0 4 1 0 0 17 2 0 14 4 3 1 0 0 0 0 0 0 0 2 1 0 40 9 0 49 11:45 0 0 0 0 0 0 0 3 1 0 0 15 2 0 18 3 4 1 0 0 0 0 0 0 0 7 1 0 46 7 0 53 12:00 0 0 0 0 0 0 0 3 0 0 0 14 1 0 20 4 3 1 0 0 1 0 0 0 0 2 3 0 42 9 1 51 12:15 0 0 0 0 0 0 0 2 0 0 0 20 4 2 24 2 3 0 0 0 0 0 0 0 0 7 1 2 56 7 4 63 12:30 0 0 0 0 0 0 0 4 0 0 0 20 2 4 15 4 5 1 0 0 0 0 0 0 0 4 1 4 48 8 8 56 12:45 0 0 0 0 0 0 1 6 1 0 0 17 1 0 15 2 5 1 0 0 0 0 0 0 0 6 0 0 49 5 1 54 2 Hour Total 0 0 0 0 0 0 1 28 3 0 0 134 18 6 149 23 31 5 0 0 1 0 0 0 0 31 10 6 373 59 14 432 Peak Hour: 12:00-1:00 0 0 0 0 0 0 1 15 1 0 0 71 8 6 74 12 16 3 0 0 1 0 0 0 0 19 5 6 195 29 14 224 Total Veh & % Trucks 0 0% 0 0% 0 0% 16 8% 0 0% 79 10% 86 1 19 15% 0 0% 0 0% 0 0% 24 2 PHF 0.00 Peak Total = 0 PHF 0.99 Peak Total = 95 PHF 0.77 Peak Total = 105 PHF 0.75 Peak Total = 24 From the North On: West Campus Blvd. NW From the South On: From the East On: 24 Avenue NW From the West On: 24 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 0 0 0 0 0 0 0 4 0 0 0 14 2 0 39 5 1 0 0 0 0 0 0 0 0 7 1 0 65 8 0 73 04:15 0 0 0 0 0 0 0 2 0 0 0 19 4 0 28 3 5 0 0 0 0 0 0 0 0 20 0 1 74 7 1 81 04:30 0 0 0 0 0 0 0 3 0 0 0 11 0 0 19 6 2 0 0 0 0 0 0 0 0 13 0 0 48 6 0 54 04:45 0 0 0 0 0 0 0 1 0 0 0 18 2 0 34 3 4 0 0 0 0 0 0 0 0 10 1 0 67 6 0 73 05:00 0 0 0 0 0 0 0 1 0 0 0 11 0 0 26 3 2 0 0 0 0 0 0 0 0 8 1 1 48 4 1 52 05:15 0 0 0 0 0 0 1 2 0 0 0 9 2 0 26 3 1 0 0 0 0 0 0 0 0 13 0 0 51 5 1 56 05:30 0 0 0 0 0 0 0 1 0 0 0 11 1 0 11 4 2 1 0 0 0 0 0 0 0 10 0 1 34 5 1 39 05:45 0 0 0 0 0 0 0 1 0 0 0 9 1 0 15 1 3 0 0 0 0 0 0 0 0 3 0 0 31 2 0 33 2 Hour Total 0 0 0 0 0 0 1 14 1 0 0 103 11 0 199 26 18 2 0 0 0 0 0 0 0 84 3 3 418 43 4 461 Peak Hour: 4:00-5:00 0 0 0 0 0 0 0 9 1 0 0 63 7 0 121 16 11 1 0 0 0 0 0 0 0 50 2 1 254 27 1 281 Total Veh & % Trucks 0 0% 0 0% 0 0% 10 8% 0 0% 70 10% 137 1 12 1 0 0% 0 0% 0 0% 52 PHF 0.00 Peak Total = 0 PHF 0.80 Peak Total = 80 PHF 0.83 Peak Total = 149 PHF 0.65 Peak Total = 52 6 Hour Total 0 0 0 0 0 0 2 110 10 0 0 456 45 6 452 78 88 19 0 0 2 0 0 1 0 137 19 11 0 0 0 120 0 501 530 107 0 0 1 156 0 621 637 157

BIKES Note: The City of Calgary does not count bicycles by North Leg : West Campus Blvd. NW East Leg : 24 Avenue NW movement, only by direction. All bicycles have South Leg : 0 West leg : 24 Avenue NW been allocated to the straight through movement. Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA Time Starting From the North On: West Campus Blvd. NW From the South On: 0 From the East On: 24 Avenue NW From the West On: 24 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 07:00 0 3 0 0 3 07:15 0 2 0 0 2 07:30 0 0 0 0 0 07:45 0 0 1 0 1 08:00 0 0 0 1 1 08:15 0 1 0 0 1 08:30 0 0 0 1 1 08:45 0 0 0 0 0 2 Hour Total 0 0 0 0 6 0 0 1 0 0 2 0 9 Peak Hour: 8:00-9:00 0 0 0 0 1 0 0 0 0 0 2 0 3 Time Starting From the North On: West Campus Blvd. NW From the South On: 0 From the East On: 24 Avenue NW From the West On: 24 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 11:00 0 0 0 0 0 11:15 0 0 0 0 0 11:30 0 0 0 0 0 11:45 0 0 0 0 0 12:00 0 0 0 0 0 12:15 0 0 0 0 0 12:30 0 0 0 0 0 12:45 0 0 0 0 0 2 Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 Peak Hour: 12:00-1:00 0 0 0 0 0 0 0 0 0 0 0 0 0 Time Starting From the North On: West Campus Blvd. NW From the South On: 0 From the East On: 24 Avenue NW From the West On: 24 Avenue NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 04:00 0 0 0 0 0 04:15 0 1 0 0 1 04:30 0 1 1 0 2 04:45 0 0 0 1 1 05:00 0 0 0 1 1 05:15 0 0 0 1 1 05:30 0 2 0 0 2 05:45 0 0 0 0 0 2 Hour Total 0 0 0 0 4 0 0 1 0 0 3 0 8 Peak Hour: 4:00-5:00 0 0 0 0 2 0 0 1 0 0 1 0 4 6 Hour Total 0 0 0 0 10 0 0 2 0 0 5 0 0 10 2 5

Synchro Data Entry Format Location: West Campus Blvd. NW & 16 Avenue NW Date : Observer(s) : Wednesday November 8, 2006 City of Calgary Job # : 2818.T01 Job Name: Stadium Centre Traffic Engineering AM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 0 0 35 0 70 0 110 11 13 68 0 Conflicting Peds (#/hr) 0 -- 0 0 -- 0 4 -- 0 0 -- 4 Conflicting Bikes (#/hr) -- -- -- -- -- -- -- -- -- -- -- -- Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 0% 1 0% 1 0% 6% 8% 26% 2 0% PM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 0 0 0 9 0 30 0 46 49 78 107 0 Conflicting Peds (#/hr) 0 -- 0 0 -- 0 3 -- 0 0 -- 3 Conflicting Bikes (#/hr) -- -- -- -- -- -- -- -- -- -- -- -- Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 0% 1 0% 1 0% 9% 9% 0%

Location : North Leg : West Campus Blvd. NW East Leg: 16 Avenue NW South Leg : West Campus Blvd. NW West Leg 16 Avenue NW Date : Observer(s) : Job # : Job Name: Wednesday November 8, 2006 City of Calgary 2818.T01 Stadium Centre Traffic Engineering Time Starting From the North On: West Campus Blvd. NW From the South On: West Campus Blvd. NW From the East On: 16 Avenue NW From the West On: 16 Avenue NW Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 0 0 6 3 0 0 1 0 0 12 0 2 0 0 7 1 0 0 12 3 0 0 0 0 0 0 0 1 39 7 2 46 07:15 2 1 5 4 0 0 0 0 0 18 0 3 0 0 9 1 0 0 11 1 0 0 0 0 0 0 0 1 48 7 1 55 07:30 1 0 15 4 0 0 1 0 0 19 0 1 0 0 6 1 0 0 17 1 0 0 0 0 0 0 0 1 59 6 2 65 07:45 4 0 22 2 0 0 0 0 0 21 1 4 0 0 8 1 0 0 8 1 0 0 0 0 0 0 0 0 67 5 0 72 08:00 1 1 15 5 0 0 0 0 0 25 0 0 0 0 6 1 0 0 17 1 0 0 0 0 0 0 0 1 64 8 1 72 08:15 3 1 9 6 0 0 0 0 0 30 3 5 0 0 11 2 0 0 13 2 0 0 0 0 0 0 0 3 71 14 3 85 08:30 2 0 13 2 0 0 0 0 0 28 3 3 0 0 8 1 0 0 10 2 0 0 0 0 0 0 0 0 64 8 0 72 08:45 4 1 14 4 0 0 0 0 0 19 2 3 0 0 5 1 0 0 23 2 0 0 0 0 0 0 0 0 68 10 0 78 2 Hour Total 16 5 100 29 0 0 2 0 0 173 8 20 1 0 61 8 0 0 110 14 0 0 0 0 0 0 0 7 480 65 9 545 Peak Hour: 8:00-9:00 10 3 51 17 0 0 0 0 0 103 7 10 1 0 31 4 0 0 62 8 0 0 0 0 0 0 0 4 267 40 4 307 Total Veh & % Trucks 13 26% 68 2 0 0% 0 0% 110 6% 11 8% 35 1 0 0% 70 1 0 0% 0 0% 0 0% Time Starting From the North On: West Campus Blvd. NW From the South On: West Campus Blvd. NW From the East On: 16 Avenue NW From the West On: 16 Avenue NW Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 4 1 13 3 0 0 0 0 0 5 1 8 2 1 3 1 0 0 10 2 0 0 0 0 0 0 0 0 43 10 1 53 11:15 8 1 21 1 0 0 0 0 0 7 2 2 1 0 8 0 0 0 13 1 0 0 0 0 0 0 0 0 59 6 0 65 11:30 2 1 13 4 0 0 0 0 0 12 0 3 0 0 5 2 0 0 8 3 0 0 0 0 0 0 0 0 43 10 0 53 11:45 6 1 16 2 0 0 0 0 0 4 2 3 2 0 5 1 0 0 12 1 0 0 0 0 0 0 0 1 46 9 1 55 12:00 9 2 15 3 0 0 0 0 0 7 1 4 0 0 3 1 0 0 9 2 0 0 0 0 0 0 0 1 47 9 1 56 12:15 6 1 21 3 0 0 0 0 0 6 3 7 3 0 10 0 0 0 14 1 0 0 0 0 0 0 0 0 64 11 0 75 12:30 2 0 15 4 0 0 0 0 0 11 1 8 0 0 4 1 0 0 11 2 0 0 0 0 0 0 0 1 51 8 1 59 12:45 6 1 15 2 0 0 0 0 0 7 2 6 1 0 9 0 0 0 17 1 0 0 0 0 0 0 0 0 60 7 0 67 2 Hour Total 44 7 128 23 0 0 0 0 0 60 11 40 10 1 47 6 0 0 94 13 0 0 0 0 0 0 0 3 413 70 4 483 Peak Hour: 12:00-1:00 23 4 66 12 0 0 0 0 0 32 6 24 5 0 26 2 0 0 51 6 0 0 0 0 0 0 0 2 222 35 2 257 Total Veh & % Trucks 27 15% 78 15% 0 0% 0 0% 38 15% 29 18% 28 8% 0 0% 57 10% 0 0% 0 0% 0 0% Time Starting From the North On: West Campus Blvd. NW From the South On: West Campus Blvd. NW From the East On: 16 Avenue NW From the West On: 16 Avenue NW Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 17 2 27 3 0 0 0 0 0 9 0 10 0 0 4 1 0 0 7 1 0 0 0 0 0 0 0 0 74 7 0 81 04:15 15 1 29 2 0 0 0 0 0 12 1 7 1 0 1 0 0 0 10 2 0 0 0 0 0 0 0 2 74 7 2 81 04:30 19 3 18 2 0 0 0 0 0 12 0 18 0 0 2 0 0 0 3 0 0 0 0 0 0 0 0 1 72 5 1 77 04:45 19 2 24 2 0 0 0 0 0 12 0 12 1 0 1 0 0 0 6 1 0 0 0 0 0 0 0 0 74 6 0 80 05:00 15 2 18 2 0 0 1 0 0 8 0 13 0 0 1 0 0 0 4 0 0 0 0 0 0 0 0 0 59 4 1 63 05:15 21 2 15 1 0 0 1 0 0 3 0 7 1 0 2 1 0 0 4 2 1 0 0 0 0 0 0 2 52 7 4 59 05:30 7 1 13 3 0 0 1 0 0 6 0 2 0 0 2 0 0 0 8 1 0 0 0 0 0 0 0 2 38 5 3 43 05:45 9 0 9 0 0 0 0 0 0 3 0 4 0 0 1 0 0 0 6 1 0 0 0 0 0 0 0 0 32 1 0 33 2 Hour Total 123 12 152 16 0 0 3 0 0 64 2 74 2 0 14 2 0 0 48 8 1 0 0 0 0 0 0 7 475 42 11 517 Peak Hour: 4:00-5:00 71 7 97 10 0 0 0 0 0 44 2 48 1 0 8 1 0 0 26 4 0 0 0 0 0 0 0 3 294 25 3 319 Total Veh & % Trucks 78 9% 107 9% 0 0% 0 0% 46 49 9 1 0 0% 30 1 0 0% 0 0% 0 0%

Synchro Data Entry Format Location: TCH Ramps & Hospital Drive NW Hospital Drive & West Campus Blvd. NW Date : Observer(s) : Wednesday August 10, 2011 City of Calgary Job # : 2984.T01 Job Name: West Campus Transportation Management Plan & TIA AM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 41 102 70 15 47 11 36 19 2 216 71 143 Conflicting Peds (#/hr) 0 -- 37 37 -- 0 0 -- 0 0 -- 0 Conflicting Bikes (#/hr) -- -- 21 -- -- 0 -- -- 46 -- -- 2 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 7% 6% 6% 1 10% 0% 0% 0% Midday Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 37 30 30 22 72 34 31 34 13 39 22 44 Conflicting Peds (#/hr) 0 -- 39 39 -- 0 0 -- 1 1 -- 0 Conflicting Bikes (#/hr) -- -- 2 -- -- 1 -- -- 22 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 7% 7% 7% 7% 7% 7% 8% 9% 1 PM Peak VOLUME WINDOW EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Volume (vph) 54 19 35 10 381 43 97 16 8 32 17 39 Conflicting Peds (#/hr) 0 -- 39 39 -- 0 1 -- 0 0 -- 1 Conflicting Bikes (#/hr) -- -- 11 -- -- 27 -- -- 17 -- -- 0 Peak Hour Factor -- -- -- -- -- -- -- -- -- -- -- -- Growth Factor -- -- -- -- -- -- -- -- -- -- -- -- Heavy Vehicles (%) 0% 0% 0% 0% 0% 0%

Location : North Leg : TCH Ramps East Leg: Hospital Drive NW South Leg : Hospital Drive West Leg: West Campus Blvd. NW Date : Observer(s) : Job # : Job Name: Wednesday August 10, 2011 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA From the North On: TCH Ramps From the South On: Hospital Drive From the East On: Hospital Drive NW From the West On: West Campus Blvd. NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 41 1 18 0 16 0 0 10 2 3 1 6 1 2 7 0 8 0 1 0 0 5 0 21 1 13 0 0 150 5 2 155 07:15 53 0 27 0 24 0 0 10 0 6 0 2 0 8 1 0 7 0 3 0 0 7 0 22 1 18 1 0 179 3 8 182 07:30 35 0 18 0 24 0 0 6 2 4 1 0 0 7 3 0 13 1 3 0 0 14 1 26 2 19 1 0 165 8 7 173 07:45 76 0 29 0 35 0 0 13 1 5 0 1 0 9 6 0 14 0 1 0 0 7 0 29 1 26 1 0 241 4 9 245 08:00 44 0 10 0 36 0 0 8 2 3 0 0 0 8 2 0 7 0 4 0 0 12 2 18 3 10 2 0 155 8 8 163 08:15 61 0 14 0 48 0 0 4 0 6 0 1 0 13 4 0 11 1 3 0 0 5 0 23 0 11 0 0 190 2 13 192 08:30 51 1 13 0 26 0 0 10 1 3 0 4 0 12 3 0 6 0 4 0 0 6 1 17 3 10 2 0 152 9 12 161 08:45 51 1 7 0 32 0 0 8 1 2 0 2 0 9 4 0 12 1 3 0 0 10 1 18 1 10 1 0 159 6 9 165 2 Hour Total 413 2 136 0 240 1 0 70 8 31 3 15 2 68 29 1 78 3 21 1 0 66 5 175 11 117 8 0 1391 45 68 1436 Peak Hour: 7:30-8:30 216 0 71 0 143 0 0 32 4 17 2 2 0 37 14 1 45 2 11 0 0 38 3 96 6 66 4 0 751 22 37 773 Total Veh & % Trucks 216 0% 71 0% 143 0% 36 1 19 10% 2 15 47 11 41 7% 102 6% 70 6% PHF 0.77 Peak Total = 430 PHF 0.62 Peak Total = 57 PHF 0.87 Peak Total = 73 PHF 0.83 Peak Total = 213 From the North On: TCH Ramps From the South On: Hospital Drive From the East On: Hospital Drive NW From the West On: West Campus Blvd. NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 7 1 3 0 4 0 0 3 1 10 2 5 1 5 5 0 15 2 10 1 0 4 0 7 1 10 1 0 81 10 5 91 11:15 7 0 6 0 5 0 0 13 1 7 0 2 0 5 3 0 9 1 2 0 0 8 1 8 1 6 1 0 76 4 5 80 11:30 10 0 5 0 11 0 0 4 1 9 1 6 1 3 7 1 16 2 7 1 0 8 0 9 0 7 0 0 98 8 3 106 11:45 9 0 2 0 6 0 0 7 1 7 1 3 0 7 6 0 16 1 7 1 0 5 1 5 1 9 1 0 83 6 7 89 12:00 4 0 6 0 7 0 0 11 1 7 0 0 0 14 4 0 14 1 9 1 1 10 1 6 1 8 1 0 86 6 15 92 12:15 16 0 9 0 20 0 0 6 0 9 1 3 0 15 4 0 21 1 8 0 0 11 1 7 1 4 0 0 116 5 15 121 12:30 11 0 4 0 4 0 0 8 0 3 0 6 0 27 9 0 15 1 6 0 0 14 1 12 1 6 1 0 97 4 27 101 12:45 4 1 8 1 11 1 0 7 2 8 2 5 1 24 3 1 12 2 2 0 1 9 0 5 0 9 0 0 83 11 25 94 2 Hour Total 67 2 42 2 66 3 0 60 6 58 8 29 4 100 40 3 117 10 51 4 2 69 5 60 5 59 4 0 720 54 102 774 Peak Hour: 11:30-12:30 38 1 21 1 43 1 0 29 2 31 3 12 1 39 20 2 67 5 32 2 1 34 3 28 2 28 2 0 383 25 40 408 Total Veh & % Trucks 39 22 44 31 8% 34 9% 13 1 22 7% 72 7% 34 7% 37 7% 30 7% 30 7% PHF 1.01 Peak Total = 105 PHF 0.85 Peak Total = 78 PHF 0.94 Peak Total = 128 PHF 0.90 Peak Total = 97 From the North On: TCH Ramps From the South On: Hospital Drive From the East On: Hospital Drive NW From the West On: West Campus Blvd. NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 8 0 2 0 8 0 0 31 0 6 0 4 0 14 2 0 85 0 16 0 0 13 0 5 0 11 0 1 190 1 15 191 04:15 8 0 2 0 10 1 0 20 0 1 0 2 0 8 5 0 124 0 14 0 0 15 1 3 0 4 0 0 208 2 8 210 04:30 9 0 6 0 11 0 0 25 0 7 0 2 0 12 0 0 102 0 6 0 0 12 0 9 0 11 0 0 199 1 12 200 04:45 7 0 7 0 9 0 0 21 0 2 0 0 0 5 3 0 70 0 7 0 0 12 1 2 0 9 0 0 148 2 5 150 05:00 4 1 5 1 6 1 0 13 2 4 0 0 0 3 0 0 49 1 8 0 1 5 1 8 1 7 1 0 111 7 4 118 05:15 4 0 3 0 12 1 0 6 0 4 0 0 0 10 2 0 62 0 4 0 0 3 1 5 1 2 0 0 107 3 10 110 05:30 2 0 1 0 4 0 0 8 0 1 0 0 0 3 0 0 32 0 5 0 0 4 0 5 1 1 0 0 62 1 3 63 05:45 3 0 3 0 7 1 0 9 0 2 0 1 0 4 1 0 37 0 7 0 1 5 1 1 0 3 0 0 79 2 5 81 2 Hour Total 44 2 29 1 68 3 0 133 2 27 0 9 0 59 13 0 561 1 67 0 2 70 4 37 3 46 3 1 1104 19 62 1123 Peak Hour: 4:00-5:00 31 1 17 0 38 1 0 97 0 16 0 8 0 39 10 0 381 0 43 0 0 52 2 18 1 34 1 1 745 6 40 751 Total Veh & % Trucks 32 17 39 97 0% 16 0% 8 0% 10 0% 381 0% 43 0% 54 19 35 PHF 0.85 Peak Total = 88 PHF 0.74 Peak Total = 121 PHF 0.76 Peak Total = 434 PHF 0.84 Peak Total = 108 6 Hour Total 525 5 206 4 375 6 0 264 15 116 11 53 6 227 82 4 756 14 139 5 4 205 14 272 19 222 15 1 530 210 381 279 127 59 86 770 144 219 291 237 1121 465 1000 747

BIKES Note: The City of Calgary does not count bicycles by North Leg : TCH Ramps East Leg : Hospital Drive NW movement, only by direction. All bicycles have South Leg : Hospital Drive West leg : West Campus Blvd. NW been allocated to the straight through movement. Date : Observer(s) : Job # : Job Name: Wednesday August 10, 2011 City of Calgary 2984.T01 West Campus Transportation Management Plan & TIA Time Starting From the North On: TCH Ramps From the South On: Hospital Drive From the East On: Hospital Drive NW From the West On: West Campus Blvd. NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 07:00 0 2 0 7 9 07:15 0 3 0 1 4 07:30 0 9 0 8 17 07:45 0 9 0 6 15 08:00 1 14 0 5 20 08:15 1 14 0 2 17 08:30 0 6 0 0 6 08:45 0 3 0 6 9 2 Hour Total 0 2 0 0 60 0 0 0 0 0 35 0 97 Peak Hour: 7:30-8:30 0 2 0 0 46 0 0 0 0 0 21 0 69 Time Starting From the North On: TCH Ramps From the South On: Hospital Drive From the East On: Hospital Drive NW From the West On: West Campus Blvd. NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 11:00 0 2 0 3 5 11:15 0 2 0 0 2 11:30 0 1 0 2 3 11:45 0 4 0 0 4 12:00 0 0 0 0 0 12:15 0 17 1 0 18 12:30 0 1 3 1 5 12:45 0 1 2 1 4 2 Hour Total 0 0 0 0 28 0 0 6 0 0 7 0 41 Peak Hour: 11:30-12:30 0 0 0 0 22 0 0 1 0 0 2 0 25 Time Starting From the North On: TCH Ramps From the South On: Hospital Drive From the East On: Hospital Drive NW From the West On: West Campus Blvd. NW Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Bikes 04:00 0 3 9 1 13 04:15 0 4 5 5 14 04:30 0 6 8 1 15 04:45 0 4 5 4 13 05:00 0 6 2 3 11 05:15 0 3 8 1 12 05:30 0 1 4 1 6 05:45 0 5 4 4 13 2 Hour Total 0 0 0 0 32 0 0 45 0 0 20 0 97 Peak Hour: 4:00-5:00 0 0 0 0 17 0 0 27 0 0 11 0 55 6 Hour Total 0 2 0 0 120 0 0 51 0 0 62 0 2 120 51 62

Location : North Leg : University Drive NW East Leg: 24 Avenue NW South Leg : University Drive NW West Leg: 24 Avenue NW Date : Observer(s) : Job # : Job Name: Monday September 13, 2012 City of Calgary 2984.T01 West Campus Transportation Management Plan & TDM From the North On: University Drive NW From the South On: University Drive NW From the East On: 24 Avenue NW From the West On: 24 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 07:00 0 0 3 6 0 0 1 44 3 14 1 23 1 0 54 1 14 0 1 0 1 1 0 7 1 21 1 0 182 14 2 196 07:15 5 3 7 4 1 1 3 48 3 40 2 26 1 0 68 0 11 0 8 0 1 4 0 15 1 40 1 0 273 15 4 288 07:30 10 2 19 4 2 0 2 85 2 71 2 60 1 0 60 1 28 1 3 0 0 11 0 17 0 62 1 1 427 15 3 442 07:45 14 2 35 5 4 1 7 96 3 71 2 50 1 1 78 2 31 1 6 0 0 8 0 16 1 57 4 0 467 21 8 488 08:00 16 2 29 3 4 1 2 67 2 61 2 43 1 0 86 1 29 0 2 0 1 18 2 17 2 44 4 0 417 19 3 436 08:15 8 3 12 4 5 1 0 103 4 89 3 42 1 0 88 0 32 0 10 0 1 19 0 34 1 53 1 0 495 18 1 513 08:30 12 1 29 4 7 1 0 94 3 101 4 32 1 2 76 2 32 1 16 1 0 15 1 34 1 34 1 0 482 21 2 503 08:45 26 1 55 2 6 0 2 98 2 120 2 41 1 0 82 1 53 0 17 0 1 9 1 27 2 32 2 0 567 13 3 580 2 Hour Total 92 13 190 31 29 5 17 637 20 568 17 315 10 3 592 8 230 3 63 1 5 85 4 167 8 342 16 1 3310 136 26 3446 Peak Hour: 8:00-9:00 62 7 125 13 22 3 4 363 10 372 10 158 4 2 332 4 145 2 45 1 3 62 3 113 5 163 8 0 1961 71 9 2032 Total Veh & % Trucks 69 10% 138 9% 25 1 373 382 162 336 147 46 65 5% 118 5% 171 5% PHF 0.95 Peak Total = 232 PHF 1.03 Peak Total = 917 PHF 1.12 Peak Total = 529 PHF 0.97 Peak Total = 354 From the North On: University Drive NW From the South On: University Drive NW From the East On: 24 Avenue NW From the West On: 24 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 11:00 28 3 26 3 13 1 0 39 2 42 2 61 3 2 35 0 18 0 3 0 0 5 0 26 0 27 0 0 324 13 2 337 11:15 13 2 21 3 4 0 0 51 3 36 2 40 3 0 42 1 29 1 7 0 0 5 0 21 1 26 1 2 295 17 2 312 11:30 15 2 34 4 5 1 0 58 1 45 1 66 1 0 46 1 24 0 14 0 0 10 0 20 1 35 1 0 374 11 0 385 11:45 27 2 53 3 10 1 0 47 2 64 3 44 2 0 31 0 38 0 7 0 0 6 0 22 1 31 1 1 381 14 1 395 12:00 22 1 58 3 8 0 0 50 1 53 1 50 1 1 37 2 35 2 10 0 0 3 0 29 1 47 2 0 399 17 1 416 12:15 24 2 39 3 6 0 1 43 2 48 2 47 2 0 61 1 44 0 10 0 1 6 0 21 1 37 2 0 386 15 2 401 12:30 21 1 46 2 3 0 1 53 1 60 1 39 1 0 46 0 37 0 10 0 1 6 1 25 2 28 2 0 373 12 2 385 12:45 26 1 42 2 7 0 0 63 1 44 1 33 1 0 38 1 35 1 13 0 0 8 1 31 2 37 2 0 375 14 0 389 2 Hour Total 176 14 319 23 55 4 2 404 13 392 13 382 12 3 337 5 260 4 73 1 2 48 2 195 9 267 12 3 2907 113 10 3020 Peak Hour: 11:30-12:30 88 7 184 13 29 2 1 198 6 210 7 207 6 1 176 3 141 2 40 1 1 24 1 92 4 150 6 1 1540 57 4 1597 Total Veh & % Trucks 95 7% 197 7% 31 7% 204 217 213 179 143 41 25 96 156 PHF 0.84 Peak Total = 323 PHF 0.92 Peak Total = 634 PHF 1.06 Peak Total = 363 PHF 0.84 Peak Total = 277 From the North On: University Drive NW From the South On: University Drive NW From the East On: 24 Avenue NW From the West On: 24 Avenue NW Time Starting Left Turn Straight Right Turn Total Total Left Turn Straight Right Turn Left Turn Straight Right Turn Left Turn Straight Right Turn Peds Peds Peds Peds Vehicles Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Peds 04:00 36 4 55 6 8 1 1 37 2 34 2 59 3 0 80 1 52 1 20 0 1 5 0 31 1 63 1 3 482 20 5 502 04:15 32 2 57 4 15 1 0 43 2 36 2 50 2 1 82 0 38 0 8 0 0 5 0 26 1 52 3 0 443 18 1 461 04:30 34 2 53 3 17 1 1 43 2 34 1 61 3 1 96 1 58 0 13 0 1 2 0 36 0 60 1 4 508 13 7 521 04:45 36 1 64 2 20 1 0 45 2 44 2 45 2 1 63 1 49 0 13 0 0 6 0 31 1 55 2 0 473 12 1 485 05:00 44 4 67 6 7 1 1 43 2 38 2 46 2 0 59 0 40 0 5 0 0 6 0 25 1 40 1 1 421 18 2 439 05:15 40 2 47 2 13 1 2 31 0 46 1 67 1 1 60 1 38 1 3 0 1 3 0 30 1 33 1 0 411 10 4 421 05:30 22 1 30 2 7 1 1 46 1 46 1 55 2 1 61 0 27 0 5 0 1 4 0 23 1 33 1 0 359 10 3 369 05:45 17 2 25 3 8 1 2 51 2 57 2 57 2 0 40 0 23 0 5 0 0 3 0 39 1 39 1 0 364 14 2 378 2 Hour Total 262 17 399 27 96 6 8 339 13 336 12 441 16 5 542 3 325 2 72 0 4 33 1 241 7 376 10 8 3461 115 25 3576 Peak Hour: 4:00-5:00 138 9 230 14 61 3 2 169 7 149 6 216 9 3 322 2 197 1 54 0 2 17 1 124 3 231 6 7 1906 63 14 1969 Total Veh & % Trucks 147 6% 244 6% 64 5% 176 155 225 324 198 54 18 127 237 PHF 0.88 Peak Total = 455 PHF 0.97 Peak Total = 556 PHF 0.86 Peak Total = 576 PHF 0.95 Peak Total = 382 6 Hour Total 530 44 908 81 180 15 27 1380 46 1296 42 1138 38 11 1470 17 814 10 207 3 11 166 7 604 23 984 39 12 574 989 195 1426 1338 1176 1487 824 210 173 627 1023 1758 3940 2521 1823

Traffic Count Reports Land Use & Mobility Department Intersection Id: 8009 Study Name: 6 Hour Intersection Count Study Date: Wednesday, Nov 16, 2011 Verified: Yes Location: 24 AV NW & CROWCHILD TR NW Period Beginning North North Lef t Straight North South East West North North North North South Left Right Truck Pedestrian Bike 07:00:00 20 970 28 1 2 0 07:15:00 26 905 19 1 2 0 07:30:00 36 903 38 8 4 0 07:45:00 22 843 55 6 11 0 08:00:00 36 832 55 10 3 0 08:15:00 39 825 87 14 4 0 08:30:00 38 773 73 9 17 0 08:45:00 50 749 93 13 12 0 South South Straight Right South South South East Left Truck Pedestrian Bike 2 242 17 9 1 0 11 327 31 17 1 0 7 346 47 17 1 0 3 373 48 24 1 0 13 370 36 15 1 0 16 419 58 17 0 0 14 408 53 16 3 0 10 428 54 25 2 0 East East East East East Right West Left Straight Truck Pedestrian Bike 50 43 29 3 1 0 60 55 31 1 2 0 51 68 36 2 3 1 61 65 41 4 4 2 58 76 58 3 4 0 50 65 63 3 1 0 54 61 72 3 4 2 46 50 70 5 3 1 West West Straight Right West West West Vehicle Truck Pedestrian Bike Totals 22 23 7 0 3 1 1453 20 22 2 1 0 1 1509 24 36 9 1 0 2 1601 38 32 7 0 2 0 1588 24 27 11 2 1 0 1596 37 24 5 2 1 0 1688 36 35 9 3 3 0 1626 39 31 9 3 2 0 1629 TOTAL 267 6800 448 62 55 0 PEAK 163 3179 308 46 36 0 PHF 0.96 Peak Total 3650 Total Flow 19.9% Truck Flow 0.8 Total Volume 7515 76 2913 344 140 10 0 53 1625 201 73 6 0 PHF 0.95 Peak Total 1879 Total Flow 8.8% Truck Flow 4. Total Volume 3333 430 483 400 24 22 6 208 252 263 14 12 3 PHF 0.94 Peak Total 723 Total Flow 3.5% Truck Flow 1.8 Total Volume 1313 240 230 59 12 12 4 12690 136 117 34 10 7 0 6539 PHF 0.9 Peak Total 287 Total Flow 1. Truck Flow 2.27% Total Volume 529 11:00:00 37 538 35 14 6 0 11:15:00 45 502 40 9 2 0 11:30:00 51 597 32 16 11 0 11:45:00 27 536 49 23 5 0 12:00:00 36 516 44 13 6 0 12:15:00 34 493 48 14 9 0 12:30:00 35 547 37 10 10 0 12:45:00 42 537 30 15 7 0 6 382 22 20 2 0 6 396 42 18 2 0 4 376 35 16 1 0 6 396 44 13 2 0 4 400 45 25 3 0 11 387 39 13 0 0 10 408 36 19 3 0 14 439 42 12 1 0 34 23 66 3 0 1 39 24 88 5 0 1 46 34 66 3 1 1 38 24 66 2 1 0 44 26 82 2 3 0 29 33 52 1 0 0 34 22 75 3 0 0 29 45 66 2 1 0 70 41 31 2 1 0 1285 37 18 16 3 0 0 1253 53 32 9 3 0 0 1335 53 29 34 2 4 0 1302 76 31 34 5 2 1 1338 80 29 22 4 1 1 1257 63 27 21 7 3 0 1315 65 34 16 3 2 0 1359 TOTAL 307 4266 315 114 56 0 PEAK 147 2093 159 52 32 0 PHF 0.97 Peak Total 2399 Total Flow 12.9% Truck Flow 2.3 Total Volume 4888 61 3184 305 136 14 0 39 1634 162 69 7 0 PHF 0.93 Peak Total 1835 Total Flow 9. Truck Flow 3.8 Total Volume 3550 293 231 561 21 6 3 136 126 275 8 4 0 PHF 0.88 Peak Total 537 Total Flow 2.9% Truck Flow 1.9 Total Volume 1085 497 241 183 29 13 2 10444 284 121 93 19 8 2 5269 PHF 0.88 Peak Total 498 Total Flow 2. Truck Flow 3.15% Total Volume 921 16:00:00 41 510 38 24 10 0 16:15:00 36 527 43 17 5 0 16:30:00 28 499 37 18 9 0 16:45:00 33 508 45 12 2 0 17:00:00 30 467 37 5 5 0 17:15:00 35 499 38 6 8 0 17:30:00 32 511 22 2 4 0 17:45:00 39 516 21 4 7 0 5 827 52 7 3 0 3 863 41 6 1 0 4 853 51 11 0 0 8 813 41 6 0 0 8 818 35 4 3 0 6 803 38 11 2 0 7 770 32 9 2 0 7 757 29 2 3 0 40 34 207 9 1 0 44 28 168 1 4 0 44 34 151 8 5 1 40 28 191 1 5 1 35 23 161 2 6 0 52 34 138 0 3 1 57 31 195 1 6 0 46 42 143 1 1 0 69 56 48 2 4 6 1927 73 49 37 4 1 1 1912 64 51 40 1 0 0 1856 78 62 32 1 0 1 1879 75 59 34 1 2 0 1782 69 59 31 0 2 1 1802 79 47 35 0 2 0 1818 67 38 26 0 3 0 1731 TOTAL 274 4037 281 88 50 0 PEAK 138 2044 163 71 26 0 PHF 0.97 Peak Total 2345 Total Flow 12. Truck Flow 1.9 Total Volume 4592 48 6504 319 56 14 0 20 3356 185 30 4 0 PHF 0.98 Peak Total 3561 Total Flow 18. Truck Flow 0.8 Total Volume 6871 358 254 1354 23 31 3 168 124 717 19 15 2 PHF 0.9 Peak Total 1009 Total Flow 5. Truck Flow 1.17% Total Volume 1966 574 421 283 9 14 9 14707 284 218 157 8 5 8 7574 PHF 0.95 Peak Total 659 Total Flow 3. Truck Flow 0.7% Total Volume 1278 GRAND 848 15103 1044 264 161 0 185 12601 968 332 38 0 1081 968 2315 68 59 12 1311 892 525 50 39 15 37841 4 Hour Total 541 10837 729 Total: 12107 124 9417 663 Total: 10204 788 737 1754 Total: 3279 814 651 342 Total: 1807 27397 Total Hour Summary 848 15103 1044 Total: 16995 185 12601 968 Total: 13754 1081 968 2315 Total: 4364 1311 892 525 Total: 2728 North Bound: 16227-49% South Bound: 16995-5 Total: 33222 South Bound: 16709-55% North Bound: 13754-45% Total: 30463 East Bound: 2708-38% West Bound: 4364-6 Total: 7072 West Bound: 2197-45% East Bound: 2728-55% Total: 4925 Information contained herein is intended, designed, and collected for specific municipal purposes and may not be suitable for other applications. The City of Calgary accepts no responsibility or liability which may arise from any incorrect or incomplete data or results, or for any improper or inappropriate use or interpretation made by any person Print Friendly Version 60 % View Graph

Traffic Count Reports Land Use & Mobility Department Intersection Id: 8008 Study Name: 6 Hour Intersection Count Study Date: Monday, Sep 21, 2009 Verified: Yes Location: CROWCHILD TR NW & 32 AV NW Period Beginning North North Lef t Straight North South East West North North North North South Left Right Truck Pedestrian Bike 07:00:00 0 105 11 5 0 5 07:15:00 0 113 7 3 0 3 07:30:00 0 194 8 5 7 4 07:45:00 0 209 10 5 4 9 08:00:00 0 163 13 10 3 5 08:15:00 0 180 21 8 6 2 08:30:00 0 221 24 8 8 7 08:45:00 0 209 27 6 7 10 South South Straight Right South South South East Left Truck Pedestrian Bike 8 87 0 6 0 1 3 92 0 4 0 2 15 105 0 3 0 0 15 130 0 8 0 1 19 166 0 7 0 2 12 132 0 5 2 1 18 169 0 11 0 0 18 152 0 14 0 2 East East East East East Right West Left Straight Truck Pedestrian Bike 27 6 15 2 5 0 58 2 22 1 5 1 93 6 20 5 16 2 103 7 28 3 21 2 95 4 38 2 5 1 104 10 20 2 24 0 85 7 36 4 24 0 93 8 33 4 42 1 West West Straight Right West West West Vehicle Truck Pedestrian Bike Totals 6 0 5 1 10 0 270 14 0 18 1 4 1 329 37 0 23 1 11 3 501 38 0 29 1 14 2 569 24 0 13 1 11 2 535 25 0 22 2 12 2 526 30 0 17 3 31 1 607 19 0 13 3 33 2 572 TOTAL 0 1394 121 50 35 45 PEAK 0 773 85 32 24 24 PHF 0.88 Peak Total 858 Total Flow 1 Truck Flow 3. Total Volume 1515 108 1033 0 58 2 9 67 619 0 37 2 5 PHF 0.92 Peak Total 686 Total Flow 9.8% Truck Flow 5.08% Total Volume 1141 658 50 212 23 142 7 377 29 127 12 95 2 PHF 0.97 Peak Total 533 Total Flow 7.9% Truck Flow 2.5% Total Volume 920 193 0 140 13 126 13 3909 98 0 65 9 87 7 2240 PHF 0.87 Peak Total 163 Total Flow 2.9% Truck Flow 3.9% Total Volume 333 11:00:00 0 104 16 5 8 6 11:15:00 0 103 23 3 1 4 11:30:00 0 103 22 5 5 3 11:45:00 0 140 25 2 6 4 12:00:00 0 107 29 7 13 2 12:15:00 0 123 22 1 16 0 12:30:00 0 116 18 4 10 3 12:45:00 0 132 22 3 8 1 47 87 0 3 2 1 18 87 0 3 0 0 28 84 0 4 0 3 29 77 0 5 0 5 52 100 0 4 1 6 38 90 0 2 2 4 32 82 0 5 2 2 31 81 0 6 1 0 47 27 47 3 22 1 46 29 28 2 6 0 48 29 31 3 13 0 60 29 43 3 12 2 55 31 34 3 24 0 53 25 31 3 22 0 62 22 35 2 16 0 51 20 36 2 21 0 12 0 31 2 19 1 418 15 0 18 5 2 0 367 15 0 20 4 12 1 380 15 0 22 2 19 0 440 21 0 35 2 19 0 464 21 0 33 2 33 0 436 17 0 28 1 21 0 412 18 0 21 2 27 0 412 TOTAL 0 928 177 30 67 23 PEAK 0 486 94 14 45 9 PHF 0.88 Peak Total 580 Total Flow 9.5% Truck Flow 2.7 Total Volume 1105 275 688 0 32 8 21 151 349 0 16 5 17 PHF 0.82 Peak Total 500 Total Flow 8. Truck Flow 3.3 Total Volume 963 422 212 285 21 136 3 230 107 143 11 74 2 PHF 0.91 Peak Total 480 Total Flow 7.9% Truck Flow 2.29% Total Volume 919 134 0 208 20 152 2 3329 74 0 118 7 92 0 1752 PHF 0.86 Peak Total 192 Total Flow 2.9% Truck Flow 5.85% Total Volume 342 16:00:00 0 110 38 6 16 0 16:15:00 0 130 29 6 3 3 16:30:00 0 114 31 5 6 1 16:45:00 0 127 39 5 14 3 17:00:00 0 136 30 4 6 0 17:15:00 0 120 38 6 14 0 17:30:00 0 139 37 5 9 2 17:45:00 0 153 34 4 11 2 62 179 0 4 9 5 54 183 0 5 1 8 57 200 0 4 0 5 57 198 0 10 1 5 78 174 0 4 0 12 68 192 0 7 6 12 62 165 0 4 0 10 38 125 0 4 0 1 33 18 47 0 20 0 36 21 59 3 12 4 41 14 37 5 17 0 40 19 64 2 30 2 44 25 40 2 27 0 32 23 39 0 29 0 41 15 45 0 23 1 37 23 42 0 30 2 16 0 15 1 30 0 518 17 0 19 0 15 1 548 28 0 22 1 24 0 544 19 0 22 1 21 0 585 29 0 36 2 16 0 592 25 0 22 0 25 0 559 22 0 32 1 14 0 558 26 0 23 1 10 3 501 TOTAL 0 1029 276 41 79 11 PEAK 0 522 144 20 43 5 PHF 0.95 Peak Total 666 Total Flow 11. Truck Flow 3.1 Total Volume 1305 476 1416 0 42 17 58 265 729 0 25 7 39 PHF 0.96 Peak Total 994 Total Flow 16. Truck Flow 2.2 Total Volume 1892 304 158 373 12 188 9 157 82 188 4 109 3 PHF 0.87 Peak Total 427 Total Flow 7. Truck Flow 1.4 Total Volume 835 182 0 191 7 155 4 4405 95 0 112 4 76 0 2294 PHF 0.8 Peak Total 207 Total Flow 3. Truck Flow 1.88% Total Volume 373 GRAND 0 3351 574 121 181 79 859 3137 0 132 27 88 1384 420 870 56 466 19 509 0 539 40 433 19 11643 4 Hour Total 0 2423 397 Total: 2820 584 2449 0 Total: 3033 962 208 585 Total: 1755 375 0 331 Total: 706 8314 Total Hour Summary 0 3351 574 Total: 3925 859 3137 0 Total: 3996 1384 420 870 Total: 2674 509 0 539 Total: 1048 North Bound: 4516-5 South Bound: 3925-46% Total: 8441 South Bound: 5274-57% North Bound: 3996-4 Total: 9270 East Bound: 0-0% West Bound: 2674-100% Total: 2674 West Bound: 1853-6 East Bound: 1048-36% Total: 2901 Crowchild Trail runs E/W. This counts the intersection of Charleswood Dr/32 Av and the WB ramps of Crowchild Tr. See also 8013 & 35094 for complete interchange analy sis. Information contained herein is intended, designed, and collected for specific municipal purposes and may not be suitable for other applications. The City of Calgary accepts no responsibility or liability which may arise from any incorrect or incomplete data or results, or for any improper or inappropriate use or interpretation made by any person Print Friendly Version 60 % View Graph

Traffic Count Reports Land Use & Mobility Department Intersection Id: 35094 Study Name: 6 Hour Intersection Count Study Date: Monday, Sep 21, 2009 Verified: Yes Location: 32 AV NW & CROWCHILD TR SOUTHBOUND RAMP Period Beginning North North Lef t Straight North South East West North North North North South Left Right Truck Pedestrian Bike 07:00:00 36 99 0 5 1 5 07:15:00 42 140 0 6 0 5 07:30:00 58 235 0 8 1 6 07:45:00 70 265 0 5 3 7 08:00:00 49 231 0 8 0 5 08:15:00 58 213 0 7 0 7 08:30:00 63 249 0 9 2 9 08:45:00 54 271 0 10 4 14 South South Straight Right South South South East Left Truck Pedestrian Bike 0 60 20 6 5 0 0 50 28 5 8 0 0 74 38 8 11 0 0 81 30 6 24 0 0 97 25 7 14 0 0 73 24 10 14 1 0 91 43 9 19 0 0 80 37 9 46 1 East East East East East Right West Left Straight Truck Pedestrian Bike 7 0 33 1 4 0 28 0 47 0 3 2 47 0 49 0 9 0 49 0 59 2 24 1 43 0 90 1 9 0 40 0 86 2 20 0 51 0 105 5 16 0 57 0 88 6 30 2 West West Straight Right West West West Vehicle Truck Pedestrian Bike Totals 0 0 0 0 7 0 255 0 0 0 0 6 0 335 0 0 0 0 10 0 501 0 0 0 0 17 0 554 0 0 0 0 12 0 535 0 0 0 0 10 0 494 0 0 0 0 25 0 602 0 0 0 0 47 0 587 TOTAL 430 1703 0 58 11 58 PEAK 224 964 0 34 6 35 PHF 0.91 Peak Total 1188 Total Flow 18.8% Truck Flow 2.7 Total Volume 2133 0 606 245 60 141 2 0 341 129 35 93 2 PHF 0.88 Peak Total 470 Total Flow 7.5% Truck Flow 7.05% Total Volume 851 322 0 557 17 115 5 191 0 369 14 75 2 PHF 0.9 Peak Total 560 Total Flow 7.8% Truck Flow 1.9 Total Volume 879 0 0 0 0 134 0 3863 0 0 0 0 94 0 2218 PHF 0 Peak Total 0 Total Flow 0% Truck Flow 0% Total Volume 0 11:00:00 64 109 0 5 0 7 11:15:00 58 111 0 6 0 4 11:30:00 51 112 0 8 0 3 11:45:00 71 137 0 3 2 6 12:00:00 69 142 0 7 8 1 12:15:00 71 134 0 4 1 0 12:30:00 60 134 0 4 1 3 12:45:00 71 131 0 3 2 4 0 110 61 2 16 0 0 76 60 4 6 1 0 91 65 6 8 2 0 86 53 8 17 3 0 140 78 7 10 3 0 106 56 3 12 3 0 94 51 4 19 0 0 86 74 10 27 0 11 0 21 2 26 1 16 0 29 3 6 0 15 0 18 2 11 0 19 0 28 0 14 7 11 0 15 1 28 1 11 0 26 0 26 2 24 0 18 3 20 1 21 0 24 1 25 3 0 0 0 0 12 0 376 0 0 0 0 8 0 350 0 0 0 0 13 0 352 0 0 0 0 14 0 394 0 0 0 0 17 0 455 0 0 0 0 21 0 404 0 0 0 0 16 0 381 0 0 0 0 24 0 407 TOTAL 515 1010 0 40 14 28 PEAK 271 541 0 18 12 8 PHF 0.96 Peak Total 812 Total Flow 13.5% Truck Flow 2.6 Total Volume 1525 0 789 498 44 115 12 0 426 259 24 68 6 PHF 0.79 Peak Total 685 Total Flow 11. Truck Flow 3.4 Total Volume 1287 128 0 179 12 156 15 67 0 83 5 99 7 PHF 0.83 Peak Total 150 Total Flow 2.7% Truck Flow 3.9 Total Volume 307 0 0 0 0 125 0 3119 0 0 0 0 78 0 1647 PHF 0 Peak Total 0 Total Flow 0% Truck Flow 0% Total Volume 0 16:00:00 46 120 0 4 9 1 16:15:00 53 127 0 4 1 2 16:30:00 54 118 0 4 3 2 16:45:00 45 136 0 6 4 4 17:00:00 64 149 0 5 2 0 17:15:00 60 106 0 5 5 2 17:30:00 84 128 0 5 1 1 17:45:00 60 141 0 3 1 3 0 214 124 7 9 3 0 217 108 7 20 4 0 228 91 5 13 3 0 240 69 9 9 3 0 226 126 5 11 8 0 229 94 5 4 5 0 189 97 6 15 7 0 124 80 5 8 2 16 0 20 1 29 5 21 0 22 0 16 7 20 0 31 1 12 4 17 0 31 2 33 2 19 0 27 0 23 6 22 0 38 2 39 8 19 0 34 0 17 5 22 0 37 0 30 1 0 0 0 0 14 0 540 0 0 0 0 20 0 548 0 0 0 0 10 0 542 0 0 0 0 15 0 538 0 0 0 0 15 0 611 0 0 0 0 16 0 549 0 0 0 0 13 0 551 0 0 0 0 4 0 464 TOTAL 466 1025 0 36 26 15 PEAK 253 519 0 21 12 7 PHF 0.91 Peak Total 772 Total Flow 13. Truck Flow 2.4 Total Volume 1491 0 1667 789 49 89 35 0 884 386 25 39 23 PHF 0.9 Peak Total 1270 Total Flow 21.7% Truck Flow Total Volume 2456 156 0 240 6 199 38 77 0 130 4 112 21 PHF 0.86 Peak Total 207 Total Flow 3.5% Truck Flow 1.5 Total Volume 396 0 0 0 0 107 0 4343 0 0 0 0 59 0 2249 PHF 0 Peak Total 0 Total Flow 0% Truck Flow 0% Total Volume 0 GRAND 1411 3738 0 134 51 101 0 3062 1532 153 345 49 606 0 976 35 470 58 0 0 0 0 366 0 11325 4 Hour Total 896 2728 0 Total: 3624 0 2273 1034 Total: 3307 478 0 797 Total: 1275 0 0 0 Total: 0 8206 Total Hour Summary 1411 3738 0 Total: 5149 0 3062 1532 Total: 4594 606 0 976 Total: 1582 0 0 0 Total: 0 North Bound: 4038-4 South Bound: 5149-56% Total: 9187 South Bound: 4344-49% North Bound: 4594-5 Total: 8938 East Bound: 2943-65% West Bound: 1582-35% Total: 4525 West Bound: 0-0% East Bound: 0-0% Total: 0 Crowchild Trail runs E/W. This counts the intersection of Charleswood Dr/32 Av and the EB ramps of Crowchild Tr. See also 8013 & 8008 for complete interchange analy sis. Information contained herein is intended, designed, and collected for specific municipal purposes and may not be suitable for other applications. The City of Calgary accepts no responsibility or liability which may arise from any incorrect or incomplete data or results, or for any improper or inappropriate use or interpretation made by any person Print Friendly Version 60 % View Graph

Traffic Count Reports Land Use & Mobility Department Intersection Id: 8016 Study Name: 6 Hour Intersection Count Study Date: Thursday, Mar 11, 2004 Verified: Yes Location: 32 AV NW & CAMPUS DR NW Period Beginning North North Lef t Straight North South East West North North North North South Left Right Truck Pedestrian Bike 07:00:00 15 5 4 13 0 1 07:15:00 12 3 4 8 1 0 07:30:00 16 4 6 14 1 0 07:45:00 13 4 5 11 16 0 08:00:00 15 7 6 16 0 0 08:15:00 13 6 9 15 3 0 08:30:00 16 8 6 15 4 0 08:45:00 21 4 9 17 7 0 South South Straight Right South South South East Left Truck Pedestrian Bike 2 4 14 2 0 1 7 6 24 3 3 0 7 4 15 2 3 0 17 6 31 2 5 0 17 6 30 1 10 0 13 11 28 4 3 0 18 5 24 1 8 1 25 12 34 6 8 0 East East East East East Right West Left Straight Truck Pedestrian Bike 19 57 0 0 8 0 41 97 0 5 11 0 48 111 0 3 29 1 70 138 2 3 46 0 74 134 0 3 32 0 79 156 0 5 28 0 85 128 0 2 37 0 73 122 0 2 72 0 West West Straight Right West West West Vehicle Truck Pedestrian Bike Totals 9 44 9 4 3 1 182 15 72 24 3 13 1 305 19 102 23 4 26 0 355 17 73 52 2 50 3 428 6 87 41 1 22 1 423 5 85 53 6 31 6 458 5 81 44 14 32 2 420 11 91 54 8 32 4 456 TOTAL 121 41 49 109 32 1 PEAK 65 25 30 63 14 0 PHF 0.88 Peak Total 120 Total Flow 2. Truck Flow 51.66% Total Volume 211 106 54 200 21 40 2 73 34 116 12 29 1 PHF 0.79 Peak Total 223 Total Flow 3.6% Truck Flow 5.8 Total Volume 360 489 943 2 23 263 1 311 540 0 12 169 0 PHF 0.91 Peak Total 851 Total Flow 14.5% Truck Flow 1.6% Total Volume 1434 87 635 300 42 209 18 3027 27 344 192 29 117 13 1757 PHF 0.9 Peak Total 563 Total Flow 10. Truck Flow 4.1 Total Volume 1022 11:00:00 15 2 8 6 7 0 11:15:00 18 3 9 6 0 1 11:30:00 23 5 8 7 13 0 11:45:00 24 2 15 8 6 0 12:00:00 16 2 14 3 5 0 12:15:00 29 5 5 6 12 0 12:30:00 28 4 4 5 11 0 12:45:00 20 2 5 6 3 0 16 4 37 2 3 0 13 4 14 1 3 0 20 5 20 1 5 0 18 2 25 1 8 0 46 3 46 3 3 2 30 2 55 2 9 0 24 8 34 2 10 1 24 4 16 1 6 1 24 77 0 3 38 1 22 104 0 4 12 1 31 79 1 1 19 0 24 106 0 3 22 0 45 123 0 5 32 1 35 100 0 1 44 1 23 106 1 3 24 0 25 119 0 3 8 0 5 96 18 2 52 0 302 5 100 7 6 15 1 299 5 96 18 4 34 0 311 6 111 24 6 31 2 357 11 135 21 4 68 0 462 9 125 27 2 66 2 422 7 130 22 7 52 1 391 1 115 26 3 38 1 357 TOTAL 173 25 68 47 57 1 PEAK 93 13 28 20 31 0 PHF 0.86 Peak Total 134 Total Flow 2.7% Truck Flow 17.67% Total Volume 266 191 32 247 13 47 4 124 17 151 8 28 4 PHF 0.77 Peak Total 292 Total Flow 4.7% Truck Flow 2.77% Total Volume 470 229 814 2 23 199 4 128 448 1 12 108 2 PHF 0.86 Peak Total 577 Total Flow 10.5% Truck Flow 2. Total Volume 1045 49 908 163 34 356 7 2901 28 505 96 16 224 4 1632 PHF 0.94 Peak Total 629 Total Flow 11. Truck Flow 3.0 Total Volume 1120 16:00:00 27 3 10 9 3 0 16:15:00 38 3 13 12 2 0 16:30:00 54 7 18 14 1 0 16:45:00 35 7 11 12 6 0 17:00:00 53 5 36 14 4 0 17:15:00 44 4 12 7 3 0 17:30:00 51 6 23 13 5 0 17:45:00 32 4 9 13 1 0 42 5 42 3 11 0 31 5 40 3 17 3 53 5 118 4 15 0 78 9 99 3 7 2 54 7 59 2 16 1 38 3 66 3 7 2 42 9 44 6 12 2 29 2 47 2 9 3 21 93 0 1 23 1 36 96 1 2 17 1 38 92 0 0 26 0 42 107 0 1 16 1 36 115 0 0 22 0 27 105 1 1 10 2 23 103 0 0 16 1 31 93 0 0 19 0 2 140 23 3 40 0 408 4 194 19 9 43 0 480 4 179 22 0 49 0 590 6 177 24 4 57 2 595 3 164 17 4 38 3 549 5 170 12 2 43 0 487 5 155 9 1 26 4 470 4 129 24 2 30 1 404 TOTAL 334 39 132 94 25 0 PEAK 186 23 77 47 14 0 PHF 0.76 Peak Total 286 Total Flow 5. Truck Flow 18.6 Total Volume 505 367 45 515 26 94 13 223 24 342 12 45 5 PHF 0.79 Peak Total 589 Total Flow 9. Truck Flow 2.8% Total Volume 927 254 804 2 5 149 6 143 419 1 2 74 3 PHF 0.93 Peak Total 563 Total Flow 10.7% Truck Flow 0.47% Total Volume 1060 33 1308 150 25 326 10 3983 18 690 75 10 187 5 2221 PHF 0.95 Peak Total 783 Total Flow 15% Truck Flow 1.68% Total Volume 1491 GRAND 628 105 249 250 114 2 664 131 962 60 181 19 972 2561 6 51 611 11 169 2851 613 101 891 35 9911 4 Hour Total 455 80 181 Total: 716 473 99 715 Total: 1287 743 1747 4 Total: 2494 120 1943 450 Total: 2513 7010 Total Hour Summary 628 105 249 Total: 982 664 131 962 Total: 1757 972 2561 6 Total: 3539 169 2851 613 Total: 3633 North Bound: 306-2 South Bound: 982-76% Total: 1288 South Bound: 1690-49% North Bound: 1757-5 Total: 3447 East Bound: 4441-56% West Bound: 3539-4 Total: 7980 West Bound: 3474-49% East Bound: 3633-5 Total: 7107 NEIL - 00402012 Information contained herein is intended, designed, and collected for specific municipal purposes and may not be suitable for other applications. The City of Calgary accepts no responsibility or liability which may arise from any incorrect or incomplete data or results, or for any improper or inappropriate use or interpretation made by any person Print Friendly Version 60 % View Graph

Traffic Count Reports Land Use & Mobility Department Intersection Id: 8018 Study Name: 6 Hour Intersection Count Study Date: Thursday, Apr 4, 2002 Verified: Yes Location: 32 AV NW & 33 ST NW Period Beginning North North Lef t Straight North South East West North North North North South Left Right Truck Pedestrian Bike 07:00:00 6 0 1 1 0 1 07:15:00 1 0 0 0 0 0 07:30:00 5 0 2 1 0 0 07:45:00 4 0 1 0 1 0 08:00:00 7 0 3 0 1 0 08:15:00 8 0 8 0 1 0 08:30:00 8 0 3 0 3 0 08:45:00 10 0 7 0 0 2 South South Straight Right South South South East Left Truck Pedestrian Bike 0 0 0 0 2 0 0 0 0 0 3 0 0 0 0 0 14 0 0 0 0 0 27 0 0 0 0 0 18 0 0 0 0 0 12 0 0 0 0 0 9 0 0 0 0 0 9 0 East East East East East Right West Left Straight Truck Pedestrian Bike 0 53 17 7 0 0 0 54 45 7 0 1 0 101 42 3 0 0 0 117 46 6 1 0 0 113 39 3 0 0 0 106 35 2 0 1 0 128 31 4 0 0 0 139 18 5 0 1 West West Straight Right West West West Vehicle Truck Pedestrian Bike Totals 11 94 0 2 0 1 182 6 122 0 2 4 0 228 18 179 0 2 4 1 347 29 185 0 6 4 4 382 21 158 0 6 4 2 341 10 159 0 11 2 0 326 17 150 0 4 3 3 337 19 139 0 3 0 3 332 TOTAL 49 0 25 2 6 3 PEAK 24 0 14 1 3 0 PHF 0.59 Peak Total 38 Total Flow 0.9% Truck Flow 2.7% Total Volume 74 0 0 0 0 94 0 0 0 0 0 71 0 PHF 0 Peak Total 0 Total Flow 0% Truck Flow 0% Total Volume 0 0 811 273 37 1 3 0 437 162 14 1 1 PHF 0.92 Peak Total 599 Total Flow 13. Truck Flow 3.4 Total Volume 1084 131 1186 0 36 21 14 2475 78 681 0 25 14 7 1396 PHF 0.89 Peak Total 759 Total Flow 16. Truck Flow 2.7 Total Volume 1317 11:00:00 17 0 8 0 0 0 11:15:00 25 0 9 1 1 0 11:30:00 18 0 16 1 0 0 11:45:00 34 0 12 0 0 0 12:00:00 30 0 18 0 1 1 12:15:00 24 0 11 1 0 0 12:30:00 18 0 10 0 0 0 12:45:00 19 0 9 0 0 0 0 0 0 0 15 0 0 0 0 0 12 0 0 0 0 0 10 0 0 0 0 0 9 0 0 0 0 0 11 0 0 0 0 0 14 0 0 0 0 0 10 0 0 0 0 0 9 0 0 117 15 4 0 0 0 93 14 2 0 1 0 120 13 2 0 1 0 116 9 4 0 1 0 130 14 5 0 0 0 140 23 2 0 0 0 116 19 5 0 3 0 94 17 5 0 0 7 108 0 7 2 1 272 9 108 0 2 2 1 258 12 94 0 0 0 1 273 8 122 0 4 4 0 301 10 123 0 4 8 1 325 11 135 0 1 11 1 344 15 124 0 5 3 2 302 8 143 0 4 5 0 290 TOTAL 185 0 93 3 2 1 PEAK 106 0 51 1 1 1 PHF 0.82 Peak Total 157 Total Flow 3. Truck Flow 1.08% Total Volume 278 0 0 0 0 90 0 0 0 0 0 44 0 PHF 0 Peak Total 0 Total Flow 0% Truck Flow 0% Total Volume 0 0 926 124 29 0 6 0 502 65 16 0 4 PHF 0.87 Peak Total 567 Total Flow 12.8% Truck Flow 2.76% Total Volume 1050 80 957 0 27 35 7 2365 44 504 0 14 26 4 1272 PHF 0.94 Peak Total 548 Total Flow 12.7% Truck Flow 2.6% Total Volume 1037 16:00:00 42 0 18 0 2 0 16:15:00 44 0 15 0 1 1 16:30:00 38 0 12 0 2 0 16:45:00 25 0 19 0 1 0 17:00:00 41 0 23 1 1 1 17:15:00 42 0 22 0 0 1 17:30:00 24 0 15 0 3 0 17:45:00 22 0 10 0 0 0 0 0 0 0 13 0 0 0 0 0 10 0 0 0 0 0 17 0 0 0 0 0 37 0 0 0 0 0 20 0 0 0 0 0 24 0 0 0 0 0 10 0 0 0 0 0 14 0 0 170 7 2 0 1 0 162 12 4 1 0 0 198 7 3 0 0 0 214 7 4 2 1 0 196 9 5 0 5 0 201 8 3 0 5 0 157 7 3 0 1 0 163 0 4 0 0 6 167 0 2 2 1 410 5 177 0 2 0 0 415 9 189 0 2 2 0 453 5 201 0 0 0 2 471 6 180 0 3 1 0 455 9 158 0 3 4 1 440 10 150 0 1 5 0 363 3 140 0 2 0 2 338 TOTAL 278 0 134 1 10 3 PEAK 146 0 76 1 4 2 PHF 0.87 Peak Total 222 Total Flow 5% Truck Flow 0.2 Total Volume 412 0 0 0 0 145 0 0 0 0 0 98 0 PHF 0 Peak Total 0 Total Flow 0% Truck Flow 0% Total Volume 0 0 1461 57 28 3 13 0 809 31 15 2 11 PHF 0.95 Peak Total 840 Total Flow 18.5% Truck Flow 1.8 Total Volume 1518 53 1362 0 15 14 6 3345 29 728 0 8 7 3 1819 PHF 0.92 Peak Total 757 Total Flow 17. Truck Flow 1.06% Total Volume 1415 GRAND 512 0 252 6 18 7 0 0 0 0 329 0 0 3198 454 94 4 22 264 3505 0 78 70 27 8185 4 Hour Total 327 0 159 Total: 486 0 0 0 Total: 0 0 2272 330 Total: 2602 184 2548 0 Total: 2732 5820 Total Hour Summary 512 0 252 Total: 764 0 0 0 Total: 0 0 3198 454 Total: 3652 264 3505 0 Total: 3769 North Bound: 718-48% South Bound: 764-5 Total: 1482 South Bound: 0-0% North Bound: 0-0% Total: 0 East Bound: 4017-5 West Bound: 3652-48% Total: 7669 West Bound: 3450-48% East Bound: 3769-5 Total: 7219 Information contained herein is intended, designed, and collected for specific municipal purposes and may not be suitable for other applications. The City of Calgary accepts no responsibility or liability which may arise from any incorrect or incomplete data or results, or for any improper or inappropriate use or interpretation made by any person Print Friendly Version 60 % View Graph

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX G: FUTURE INTERSECTION VOLUMES AND ADJUSTMENTS West Campus Transportation Impact Assessment

Summary of adjustments to the City of Calgary 2039 Forecasted volumes and rationale Intersection Movement Peak Forecast Adjustment SBT NBT NBR* AM AM AM 1890 590 60 20 5 5 PM PM PM 910 1670 60 8 16 12 NBL* PM 510 5 32 Avenue NW & Shaganappi AM 440 80 SBL Trail PM 190 100 EBL PM 80 220 NBR* PM 60 30 EBT AM 780 280 EBR AM 420 120 WBT AM 200 50 PM 600 100 NBL* PM 510 110 SBT AM 1810 20 PM 670 8 West Campus Way (28 Avenue AM 450 5 NBT NW) & Shaganappi Trail PM 1520 32 SBL AM 600 80 PM 600 100 32 Avenue NW & 39 Street NW EBL AM 20 5 PM 50 12 SBT AM 130 20 PM 20 7 EBR AM 480 190 PM 300 119 AM 690 273 WBL 32 Avenue NW & Collegiate PM 320 126 Blvd AM 120 47 NBL PM 510 201 NBR AM 180 71 PM 630 249 *Multiple Adjustments on the same approach Rationale Addition for traffic travelling to and from the Stadium Shopping Centre (Post Redevelopment) using the total trips generated by the new site and the selected zone plots for the respective zone Traffic balanced and shifted from SBL at 28 Avenue NW (West Campus Way) due to capacity issues Increase to match existing (284) plus small growth Increase to match existing (88) plus small growth Volumes reduced to be closer to existing volumes since there are no major land use changes in the communities that generate the traffic associates with this movement. Addition for traffic travelling to and from the Stadium Shopping Centre (Post Redevelopment) using the total trips generated by the new site and the selected zone plots for the respective zone Traffic balanced and shifted to SBL at 32 Avenue NW due to capacity issues Addition for traffic travelling to and from the Stadium Shopping Centre (Post Redevelopment) using the total trips generated by the new site and the selected zone plots for the respective zone Reductions based on the University of Calgary Campus Master Plan Report which includes the conversion of the parking lots in the NW quadrant of the campus to buildings and net reduction of parking stalls in the area by 40% or 1,100 stalls

Collegiate Road & Collegiate Blvd Collegiate Blvd (West Campus Way) & 39 Street NW West Campus Way & West Campus Drive EBL EBT WBT WBR SBL SBR SBR SBL SBT SBR EBL EBT EBR NBL NBT NBR WBL* WBT WBR WBL* AM N/A 91 PM N/A 200 AM N/A 399 PM N/A 80 AM N/A 124 PM N/A 380 AM N/A 91 PM N/A 217 AM N/A 282 PM N/A 195 AM N/A 146 PM N/A 180 AM 430 20 PM 210 7 AM 0 40 PM 0 76 AM 0 269 PM 0 172 AM 0 189 PM 0 389 AM 0 144 PM 0 180 AM 270 55 PM 480 13 AM 630 97 PM 260 43 AM 160 79 PM 500 172 AM 0 127 PM 0 200 AM 210 20 PM 560 38 AM 330 42 PM 100 0 AM 360 42 PM 230 30 AM 0 84 PM 0 60 AM 330 20 PM 100 7 No volume data was received from the city for this intersection. Volumes were estimated using volumes from adjacent intersections, information contained in the University of Calgary Campus Master Plan Report and engineering judgement Addition for Stadium Shopping Centre (Post Redevelopment) Adjustments were required at this intersection to assign some of the traffic to the north leg which had no traffic in the original forecast data. The reassignment of traffic to this leg was made based on the proposed land use densities as well as the select zone plots for TZ 2403 and TZ 2405. Addition for Stadium Shopping Centre (Post Redevelopment)

Oki Drive (Alberta Children's Hospital) / Physical Plant Road & West Campus Drive SBL SBT* SBR EBL EBT EBR NBL NBT NBR WBL WBT WBR SBT* *Multiple Adjustments on the same approach AM N/A 80 PM N/A 10 AM N/A 849 PM N/A 552 AM N/A 61 PM N/A 34 AM N/A 33 PM N/A 58 AM N/A 15 PM N/A 10 AM N/A 38 PM N/A 79 AM N/A 83 PM N/A 56 AM N/A 651 PM N/A 914 AM N/A 56 PM N/A 20 AM N/A 33 PM N/A 36 AM N/A 5 PM N/A 5 AM N/A 28 PM N/A 38 AM N/A 20 PM N/A 7 No volume data was received from the City for this intersection. Volumes were estimated using current volumes, engineering judgement and on the TZ 2403 and TZ 2405 select zone plots. Addition for Stadium Shopping Centre (Post Redevelopment)

24 Avenue NW & West Campus Drive / West Campus Place 24 Avenue NW / Children's Way & West Campus Blvd. SBT SBR EBL EBT EBR NBL NBT NBR WBL WBT SBL EBT NBR WBL *Multiple Adjustments on the same approach AM 0 93 PM 0 182 AM 300 93 PM 380 182 AM 360 125 PM 380 155 AM 180 120 PM 190 26 AM 0 13 PM 0 80 AM 0 79 PM 0 12 AM 0 125 PM 0 155 AM 0 120 PM 0 26 AM 0 20 PM 0 99 AM 180 20 PM 350 99 AM 670 20 PM 600 7 AM 0 30 PM 0 20 AM 600 232 PM 440 101 AM 360 34 PM 750 269 Adjustments were required at this intersection to assign some of the traffic to the south leg which had no traffic in the original forecast data. The reassignment of traffic to this leg was made based on the proposed land use densities as well as the select zone plots for TZ 2403 and TZ 2405. Addition for Stadium Shopping Centre (Post Redevelopment) Increased to match opposing volume (WBT) from model Adjustments were required at this intersection to assign some of the traffic to the west leg which had no traffic in the original forecast data. The reassignment of traffic to this leg was made based on current traffic volumes and the select zone plots for TZ 2403 and TZ 2405.

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX H: POST DEVELOPMENT INTERSECTION OPERATIONS West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE H1: 2039 POST DEVELOPMENT OPERATIONS INTERSECTION / MOVEMENT 32 Avenue NW / Shaganappi Trail (Signalized) EB WB NB SB AM PEAK HOUR PM PEAK HOUR v/c Ratio LOS Delay (s) Queue (m) v/c Ratio LOS Delay (s) Queue (m) Left 0.51 D 42 70 1.20 F 159 #167 Through / Right 1.19 F 143 #203 1.14 F 130 #167 Left 0.60 D 49 39 0.66 E 57 #44 Through 0.25 D 51 34 1.10 F 127 #137 Right 0.16 A 0 0 0.49 A 1 0 Left 0.87 F 81 #81 0.92 E 58 #150 Through 0.58 D 46 113 1.08 F 82 #369 Right 0.14 A 9 12 0.18 A 8 17 Left 0.94 D 50 #187 1.22 F 171 #165.9 Through 1.21 F 133 #451 0.71 D 42 #164.1 Right 0.05 B 12 9 0.24 A 9 18 Intersection Summary - F 97 - - F 81 - West Campus Way (28 Ave) / Shaganappi Trail (Signalized) 32 Avenue NW / 39 Street NW (West Campus Gate NW) (Signalized) 32 Avenue NW / Collegiate Blvd (Signalized) WB NB SB Left 0.57 C 32 46 1.04 F 88 #108 Right 0.26 A 0 0 0.54 A 2 0 Through 0.41 C 21 47 0.99 D 47 #226 Right 0.64 A 6 23 0.46 A 5 24 Left 0.71 C 34 63 1.01 F 85 #92 Through 0.90 B 18 172 0.31 A 6 34 Intersection Summary - B 19 - - D 40 - EB WB NB Left Left Left 0.04 0.94 0.49 A E E 9 75 63 5 #109 30 0.19 0.43 0.73 B B D 15 17 43 15 37 84 Through / Right Through / Right Right 0.96 0.21 0.51 D B B 49 15 11 #228 36 37 0.59 0.69 0.55 C C A 29 29 9 85 125 38 SB Left / Through / Right 0.90 E 79 #133.1 0.30 D 39 32 Intersection Summary EB WB NB - D 47 - - C 28 - Through 0.75 C 26 #117 0.63 B 18 58 Right 0.25 A 1 0 0.15 A 0 0 Left 0.78 C 25 #109 0.45 A 9 21 Through 0.21 A 4 24 0.35 A 7 34 Left 0.13 C 30 11 0.45 C 21 26 Right 0.35 A 10 14 0.67 A 9 23 Intersection Summary - B 17 - - B 12 - Collegiate Road / Collegiate Blvd (All-Way Stop- Controlled) West Campus Way / 39 Street NW (West Campus Gate NW) (Stop-Controlled) West Campus Way / West Campus Drive (Signalized) EB Left / Through 0.51 B 14-0.43 B 13 - WB Through / Right 0.24 B 10-0.22 A 9 - SB Left 0.58 C 18-0.38 B 12 - Right 0.26 A 10-0.28 A 9 - EB Left / Through 0.13 A 2 4 0.70 B 15 47 WB Through / Right 0.11 A 0 0 0.21 A 0 0 SB EB WB Left Left Left 0.83 0.30 0.82 F B D 66 13 37 52 24 #88 3.86 0.30 0.82 F B D Error 13 37 Error 24 #88 Right Through / Right Through / Right 0.71 0.84 0.35 C C B 22 24 19 47 #86 41 0.50 0.84 0.35 C C B 21 24 19 22 #86 41 Left 0.28 B 19 19 0.28 B 19 19 NB Through 0.25 C 20 30 0.25 D 50 30 Right 0.35 A 5 14 0.35 A 5 14 SB Left / Through / Right 0.82 C 35 #61 0.82 C 35 #61 Intersection Summary - C 25 - - C 25 - West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning Oki Drive (Physical Plant Road) / West Campus Drive (Signalized) AM PEAK HOUR PM PEAK HOUR v/c Ratio LOS Delay (s) Queue (m) v/c Ratio LOS Delay (s) Queue (m) EB Left 0.08 B 14 8 0.18 B 15 13 Through / Right 0.13 A 8 9 0.20 A 6 9 WB Left / Through / Right 0.09 A 9 6 0.12 A 9 7 NB Left / Through / Right 0.49 A 9 54 0.61 B 11 68 SB Left / Through / Right 0.58 B 11 #77 0.35 A 8 33 INTERSECTION / MOVEMENT Intersection Summary - A 10 - - A 10-24 Avenue NW / West Campus Drive (Signalized) 24 Avenue NW (Children's Way) / West Campus Boulevard (Stop-Controlled) TCH Ramps (North) / West Campus Boulevard (Signalized) TCH Ramps (South) / West Campus Boulevard (Hospital Drive) (Signalized) EB Left 0.91 E 68 #93 0.97 E 77 #91 Through / Right 0.08 C 24 12 0.20 B 11 19 WB Left/ Through / Right 0.91 C 29 #57 1.10 E 79 #161 NB Left /Through / Right 0.79 D 49 #55 0.42 D 40 33 SB Left 0.94 D 43 #235 1.17 F 139 #243 Through / Right 0.33 A 6 33 0.59 C 24 87 Intersection Summary - D 46 - - E 76 - EB Right 0.03 A 0 0 0.04 A 0 0 WB NB WB Left Left Left 0.23 0.23 0.16 A C B 8 25 18 7 7 14 0.34 0.16 0.09 A E D 9 37 37 12 4 11 Through Right Right 0.02 0.45 0.22 A B A 0 12 0 0 18 0 0.01 0.41 0.39 A B A 0 12 0 0 16 0 NB Through / Right 0.56 B 17 #81 0.83 C 27 #238 SB Left 0.43 A 6 31 0.83 C 30 #151 Through 0.31 A 5 38 0.11 A 2 14 Intersection Summary EB WB NB SB - A 8 - - B 17 - Left 0.81 C 23 #62 0.37 A 9 19 Through / Right 0.38 A 6 20 0.18 A 3 10 Left / Through 0.37 C 23 23 0.78 C 31 85 Right 0.12 A 7 6 0.15 A 7 10 Left 0.23 B 16 20 0.40 C 25 36 Through / Right 0.07 B 12 9 0.17 B 18 22 Left 0.59 C 24 #68 0.14 C 20 16 Through 0.27 B 16 33 0.34 C 22 43 Right 0.32 A 4 14 0.36 A 5 16 Intersection Summary - B 16 - - B 18 - The '#' symbol indicates that the 95th percentile volume exceeds capacity after two cycles, and that the queues shown are the maximum queues after two cycles. The actual queue lengths may be longer than the queues shown. West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE H2: 2039 POST DEVELOPMENT OPERATIONS IMPROVED INTERSECTION GEOMETRY INTERSECTION / MOVEMENT 32 Avenue NW / Shaganappi Trail (Signalized) EB WB NB SB AM PEAK HOUR PM PEAK HOUR v/c Ratio LOS Delay (s) Queue (m) v/c Ratio LOS Delay (s) Queue (m) Left 0.51 C 35 59 0.90 E 56 #97 Through 0.87 E 61 #96 0.47 D 37 63 Right 0.79 C 30 #71 0.52 A 8 23 Left 0.45 C 34 33 0.33 C 24 30 Through 0.28 D 43 29 0.67 D 46 82 Right 0.54 B 12 22 1.31 F 179 #220 Left 0.56 E 60 32 0.85 E 66 #77 Through 0.38 C 30 57 1.03 E 68 #204 Right 0.13 A 8 10 0.22 B 14 21 Left 0.81 D 54 86 0.87 E 77 #64 Through 0.91 D 36 190 0.64 D 38 92 Right 0.05 A 6 6 0.27 A 7 14 Intersection Summary - D 39 - - E 64 - West Campus Way (28 Ave) / Shaganappi Trail (Signalized) WB NB SB Left 0.41 C 22 39 0.54 D 36 91 Right 0.56 A 6 21 1.04 E 66 #242 Through 0.42 C 25 34 0.99 E 65 #205 Right 0.72 A 9 28 0.56 A 8 36 Left 0.71 C 32 65 0.92 E 78 #108 Through 0.74 B 14 103 0.27 B 16 45 Intersection Summary - B 17 - - D 50 - West Campus Way / 39 Street NW (West Campus Gate NW) (Signalized) Left / Through 0.53 B 15 36 - - - - EB* Left - - - - 0.81 C 25 #125 Through - - - - 0.22 A 6 24 WB Through / Right 0.26 B 12 21 0.79 C 29 #59 SB Left 0.33 B 11 24 0.20 C 29 20 Right 0.76 B 16 49 0.54 A 9 19 Intersection Summary - B 14 - - C 22 - TCH Ramps (North) / West Campus Boulevard (Roundabout) WB Left / Right 0.39 A 2 20 0.67 A 6 56 Through 0.23 A 2 10 0.39 A 4 19 NB Right 0.14 A 1 6 0.44 A 3 23 SB Left / Through 0.74 A 2 76 0.54 A 2 43 Intersection Summary - A 2 - - A 3 - *EB defacto left in p.m. peak hour The '#' symbol indicates that the 95th percentile volume exceeds capacity after two cycles, and that the queues shown are the maximum queues after two cycles. The actual queue lengths may be longer than the queues shown. West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning TABLE H3: 2039 POST DEVELOPMENT OPERATIONS IMPROVED NETWORK 500 PEDESTRIANS PER MOVEMENT INTERSECTION / MOVEMENT West Campus Way (28 Ave) / Shaganappi Trail (Signalized) WB NB SB AM PEAK HOUR PM PEAK HOUR v/c Ratio LOS Delay (s) Queue (m) v/c Ratio LOS Delay (s) Queue (m) Left 0.35 C 23 40 0.55 D 36 92 Right 0.65 A 9 28 1.36 F 192 #294 Through 0.37 C 26 34 0.97 E 59 #201 Right 0.84 B 16 #69 0.76 B 15 57 Left 0.78 D 41 65 0.92 E 78 #108 Through 0.75 B 17 103 0.27 B 16 44 Intersection Summary - C 21 - - E 70 - West Campus Way / West Campus Drive (Signalized) EB WB Left Left 0.65 0.92 D D 42 54 #53 #97 0.53 0.51 C C 30 31 49 31 Through / Right Through / Right 0.97 0.28 D B 43 12 #107 31 0.96 0.38 E C 63 34 #129 39 Left 0.29 B 20 19 0.89 D 44 #100 NB Through 0.24 C 20 30 0.25 B 16 43 Right 0.46 A 7 16 0.96 D 43 #168 SB Left / Through / Right 0.86 D 40 #69 0.86 C 34 #92 Intersection Summary - C 34 - - D 42 - West Campus Way / 39 Street NW (West Campus Gate NW) (Signalized) Left / Through 0.78 D 41 #69 - - - - EB* Left - - - - 0.87 C 33 #134 Through - - - - 0.23 A 7 26 WB Through / Right 0.36 C 28 35 0.82 C 32 #66 SB Left 0.21 A 7 23 0.17 C 29 20 Right 0.93 D 42 #140 0.62 B 12 23 Intersection Summary - C 34 - - C 26 - Collegiate Road / Collegiate Blvd (All-Way Stop- Controlled) EB Left / Through 0.51 B 14-0.43 B 13 - WB Through / Right 0.24 B 10-0.22 A 9 - SB Left 0.58 C 18-0.38 B 12 - Right 0.26 A 10-0.28 A 9 - *EB defacto left in p.m. peak hour The '#' symbol indicates that the 95th percentile volume exceeds capacity after two cycles, and that the queues shown are the maximum queues after two cycles. The actual queue lengths may be longer than the queues shown. West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX I: SYNCHRO ANALYSIS RESULTS West Campus Transportation Impact Assessment

Lanes, Volumes, Timings 2039 Post Development 24: 32 Ave NW & Shaganappi Trail AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 190 500 300 100 150 190 150 591 60 520 1910 30 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Storage Length (m) 75.0 0.0 75.0 100.0 75.0 100.0 75.0 0.0 Storage Lanes 1 0 1 1 1 1 1 1 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Ped Bike Factor 0.92 0.95 0.97 0.86 0.87 Frt 0.944 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1674 2801 0 1674 3133 1306 1674 3348 1498 1674 3348 1498 Flt Permitted 0.578 0.129 0.083 0.244 Satd. Flow (perm) 935 2801 0 227 3133 1264 146 3348 1291 430 3348 1301 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 77 202 64 16 Link Speed (k/h) 50 60 70 70 Link Distance (m) 234.6 158.7 191.4 170.0 Travel Time (s) 16.9 9.5 9.8 8.7 Confl. Peds. (#/hr) 50 50 50 50 50 50 50 50 Confl. Bikes (#/hr) 25 25 25 25 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 32 32 0 32 32 0 0 0 0 0 0 Adj. Flow (vph) 202 532 319 106 160 202 160 629 64 553 2032 32 Shared Lane Traffic (%) Lane Group Flow (vph) 202 851 0 106 160 202 160 629 64 553 2032 32 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.6 3.6 3.6 3.6 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.04 1.13 1.04 1.04 1.13 1.23 1.04 1.04 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Right Left Thru Right Left Thru Right Leading Detector (m) 8.0 4.0 8.0 4.0 6.0 8.0 4.0 6.0 8.0 4.0 6.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 6.0 2.0 4.0 6.0 2.0 4.0 6.0 2.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt pm+pt Free pm+pt Perm pm+pt Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 Free 2 2 6 6 Detector Phase 7 4 3 8 5 2 2 1 6 6 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 10

Lanes, Volumes, Timings 2039 Post Development 24: 32 Ave NW & Shaganappi Trail AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 20.0 20.0 10.0 20.0 20.0 Minimum Split (s) 15.0 25.0 15.0 25.0 15.0 25.0 25.0 15.0 25.0 25.0 Total Split (s) 19.0 40.0 0.0 15.0 36.0 0.0 15.0 49.0 49.0 46.0 80.0 80.0 Total Split (%) 12.7% 26.7% 0.0% 10.0% 24.0% 0.0% 10.0% 32.7% 32.7% 30.7% 53. 53. Maximum Green (s) 16.0 35.0 12.0 31.0 12.0 44.0 44.0 43.0 75.0 75.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 0.0 2.0 0.0 2.0 2.0 0.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 3.0 5.0 4.0 3.0 5.0 5.0 3.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min Min None Min Min Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 50 50 50 50 50 50 Act Effct Green (s) 51.1 35.0 44.3 31.0 149.3 62.1 48.0 48.0 92.0 75.0 75.0 Actuated g/c Ratio 0.34 0.23 0.30 0.21 1.00 0.42 0.32 0.32 0.62 0.50 0.50 v/c Ratio 0.51 1.19 0.60 0.25 0.16 0.87 0.58 0.14 0.94 1.21 0.05 Control Delay 41.8 142.5 49.4 50.8 0.3 81.3 46.0 9.3 50.1 133.4 11.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 41.8 142.5 49.4 50.8 0.3 81.3 46.0 9.3 50.1 133.4 11.9 LOS D F D D A F D A D F B Approach Delay 123.2 28.7 49.9 114.3 Approach LOS F C D F Queue Length 50th (m) 47.0 ~159.3 23.1 22.3 0.0 35.4 90.5 0.0 115.5 ~408.2 2.5 Queue Length 95th (m) 70.3 #202.9 38.7 33.7 0.0 #80.8 112.6 11.8 #186.5 #450.6 8.7 Internal Link Dist (m) 210.6 134.7 167.4 146.0 Turn Bay Length (m) 75.0 75.0 100.0 75.0 100.0 75.0 Base Capacity (vph) 400 716 185 658 1264 184 1077 459 623 1682 662 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.51 1.19 0.57 0.24 0.16 0.87 0.58 0.14 0.89 1.21 0.05 Intersection Summary Area Type: Other Cycle Length: 150 Actuated Cycle Length: 149.3 Natural Cycle: 150 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.21 Intersection Signal Delay: 97.1 Intersection LOS: F Intersection Capacity Utilization 111.6% ICU Level of Service H Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 11

Lanes, Volumes, Timings 2039 Post Development 24: 32 Ave NW & Shaganappi Trail AM Peak Hour Queue shown is maximum after two cycles. Splits and Phases: 24: 32 Ave NW & Shaganappi Trail West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 12

Lanes, Volumes, Timings 2039 Post Development 28: West Campus Way & Shaganappi Trail AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) 350 350 450 510 500 1830 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.0 3.5 3.6 3.6 3.6 3.6 Storage Length (m) 0.0 50.0 75.0 75.0 Storage Lanes 1 1 1 2 Taper Length (m) 7.5 7.5 7.5 7.5 Lane Util. Factor 0.97 1.00 0.95 1.00 0.97 0.95 Ped Bike Factor 0.96 0.94 0.97 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3031 1481 3348 1498 3247 3348 Flt Permitted 0.950 0.950 Satd. Flow (perm) 3031 1425 3348 1409 3153 3348 Right Turn on Red Yes Yes Satd. Flow (RTOR) 372 543 Link Speed (k/h) 50 70 70 Link Distance (m) 319.3 175.1 148.8 Travel Time (s) 23.0 9.0 7.7 Confl. Peds. (#/hr) 50 25 25 Confl. Bikes (#/hr) 50 25 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Adj. Flow (vph) 372 372 479 543 532 1947 Shared Lane Traffic (%) Lane Group Flow (vph) 372 372 479 543 532 1947 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(m) 9.5 7.2 7.2 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.13 1.05 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 15 25 Number of Detectors 1 1 1 1 1 1 Detector Template Left Right Thru Right Left Thru Leading Detector (m) 8.0 6.0 4.0 6.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 4.0 2.0 4.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Free Perm Prot Protected Phases 8 2 1 6 Permitted Phases Free 2 Detector Phase 8 2 2 1 6 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 16

Lanes, Volumes, Timings 2039 Post Development 28: West Campus Way & Shaganappi Trail AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.0 25.0 25.0 15.0 25.0 Total Split (s) 25.0 0.0 38.0 38.0 27.0 65.0 Total Split (%) 27.8% 0.0% 42. 42. 30.0% 72. Maximum Green (s) 20.0 33.0 33.0 22.0 60.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 4.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min Min None Min Walk Time (s) 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 50 25 25 25 Act Effct Green (s) 16.2 75.9 26.2 26.2 17.6 49.1 Actuated g/c Ratio 0.21 1.00 0.35 0.35 0.23 0.65 v/c Ratio 0.57 0.26 0.41 0.64 0.71 0.90 Control Delay 32.4 0.4 20.7 6.0 34.1 18.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 32.4 0.4 20.7 6.0 34.1 18.4 LOS C A C A C B Approach Delay 16.4 12.9 21.8 Approach LOS B B C Queue Length 50th (m) 29.4 0.0 31.4 0.0 44.8 130.8 Queue Length 95th (m) 45.6 0.0 46.8 22.9 62.8 172.3 Internal Link Dist (m) 295.3 151.1 124.8 Turn Bay Length (m) 50.0 75.0 75.0 Base Capacity (vph) 844 1425 1540 941 994 2667 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.44 0.26 0.31 0.58 0.54 0.73 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 75.9 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 18.7 Intersection Capacity Utilization 75.7% Analysis Period (min) 15 Intersection LOS: B ICU Level of Service D West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 17

Lanes, Volumes, Timings 2039 Post Development 28: West Campus Way & Shaganappi Trail AM Peak Hour Splits and Phases: 28: West Campus Way & Shaganappi Trail West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 18

Lanes, Volumes, Timings 2039 Post Development 35: 32 Ave NW & 39 Street NW AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 20 900 360 250 310 30 130 0 280 90 150 50 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.5 3.7 4.3 3.6 3.7 4.3 4.5 4.5 3.7 4.8 4.8 4.8 Storage Length (m) 70.0 0.0 60.0 0.0 0.0 40.0 0.0 0.0 Storage Lanes 1 0 1 0 2 1 0 0 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.95 0.96 0.99 0.95 0.93 0.97 Frt 0.957 0.987 0.850 0.977 Flt Protected 0.950 0.950 0.950 0.985 Satd. Flow (prot) 1655 2922 0 1674 3098 0 3572 0 1478 0 1898 0 Flt Permitted 0.536 0.069 0.950 0.985 Satd. Flow (perm) 888 2922 0 122 3098 0 3383 0 1380 0 1870 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 62 12 247 7 Link Speed (k/h) 60 60 50 50 Link Distance (m) 341.1 514.0 332.1 117.9 Travel Time (s) 20.5 30.8 23.9 8.5 Confl. Peds. (#/hr) 25 50 50 25 25 25 25 25 Confl. Bikes (#/hr) 50 10 10 10 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 32 32 0 32 32 0 0 6 0 0 0 Adj. Flow (vph) 21 957 383 266 330 32 138 0 298 96 160 53 Shared Lane Traffic (%) Lane Group Flow (vph) 21 1340 0 266 362 0 138 0 298 0 309 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.6 3.6 9.0 9.0 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.05 1.11 0.94 1.04 1.11 0.94 0.91 0.91 1.05 0.88 0.88 0.88 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Left Right Left Thru Leading Detector (m) 8.0 4.0 8.0 4.0 8.0 6.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 6.0 2.0 6.0 4.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt pm+pt Prot custom Perm Protected Phases 5 2 1 6 3 4 Permitted Phases 2 6 8 4 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 19

Lanes, Volumes, Timings 2039 Post Development 35: 32 Ave NW & 39 Street NW AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 3 8 4 4 Switch Phase Minimum Initial (s) 10.0 20.0 10.0 20.0 10.0 10.0 10.0 10.0 Minimum Split (s) 13.0 25.0 13.0 25.0 15.0 25.0 25.0 25.0 Total Split (s) 13.0 66.0 0.0 20.0 73.0 0.0 15.0 0.0 44.0 29.0 29.0 0.0 Total Split (%) 10.0% 50.8% 0.0% 15. 56. 0.0% 11.5% 0.0% 33.8% 22. 22. 0.0% Maximum Green (s) 10.0 61.0 17.0 68.0 10.0 39.0 24.0 24.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 0.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 3.0 5.0 4.0 5.0 4.0 5.0 5.0 5.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min None Min None None None None Walk Time (s) 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 50 25 25 25 25 Act Effct Green (s) 70.6 58.6 80.3 70.8 10.0 37.8 22.8 Actuated g/c Ratio 0.56 0.46 0.64 0.56 0.08 0.30 0.18 v/c Ratio 0.04 0.96 0.94 0.21 0.49 0.51 0.90 Control Delay 9.2 48.8 74.5 14.7 63.1 10.9 79.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.2 48.8 74.5 14.7 63.1 10.9 79.1 LOS A D E B E B E Approach Delay 48.1 40.1 79.1 Approach LOS D D E Queue Length 50th (m) 2.0 173.1 54.0 25.8 18.7 10.0 80.3 Queue Length 95th (m) 5.2 #228.0 #109.2 35.6 30.0 36.8 #133.1 Internal Link Dist (m) 317.1 490.0 308.1 93.9 Turn Bay Length (m) 70.0 60.0 40.0 Base Capacity (vph) 558 1450 288 1743 284 599 363 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.04 0.92 0.92 0.21 0.49 0.50 0.85 Intersection Summary Area Type: Other Cycle Length: 130 Actuated Cycle Length: 126.2 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.96 Intersection Signal Delay: 46.5 Intersection LOS: D Intersection Capacity Utilization 87.9% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 20

Lanes, Volumes, Timings 2039 Post Development 35: 32 Ave NW & 39 Street NW AM Peak Hour Splits and Phases: 35: 32 Ave NW & 39 Street NW West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 21

Lanes, Volumes, Timings 2039 Post Development 37: 32 Ave NW & Collegiate Blvd AM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph) 870 290 420 470 70 110 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Storage Length (m) 45.0 100.0 0.0 90.0 Storage Lanes 1 1 2 1 Taper Length (m) 7.5 7.5 7.5 7.5 Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00 Ped Bike Factor 0.96 0.99 0.94 0.95 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3133 1306 1460 3133 3247 1462 Flt Permitted 0.169 0.950 Satd. Flow (perm) 3133 1254 257 3133 3065 1382 Right Turn on Red Yes Yes Satd. Flow (RTOR) 168 117 Link Speed (k/h) 60 60 50 Link Distance (m) 514.0 253.1 169.0 Travel Time (s) 30.8 15.2 12.2 Confl. Peds. (#/hr) 50 50 25 25 Confl. Bikes (#/hr) 60 10 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 32 32 32 32 0 6 Adj. Flow (vph) 926 309 447 500 74 117 Shared Lane Traffic (%) Lane Group Flow (vph) 926 309 447 500 74 117 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(m) 3.6 3.6 7.2 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.13 1.23 1.23 1.13 1.04 1.07 Turning Speed (k/h) 15 25 25 15 Number of Detectors 1 1 1 1 1 1 Detector Template Thru Right Left Thru Left Right Leading Detector (m) 4.0 6.0 8.0 4.0 8.0 6.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 2.0 4.0 6.0 2.0 6.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Free pm+pt Perm Protected Phases 2 1 6 8 Permitted Phases Free 6 8 Detector Phase 2 1 6 8 8 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 22

Lanes, Volumes, Timings 2039 Post Development 37: 32 Ave NW & Collegiate Blvd AM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Switch Phase Minimum Initial (s) 20.0 10.0 20.0 10.0 10.0 Minimum Split (s) 25.0 13.0 25.0 25.0 25.0 Total Split (s) 36.0 0.0 29.0 65.0 25.0 25.0 Total Split (%) 40.0% 0.0% 32. 72. 27.8% 27.8% Maximum Green (s) 31.0 26.0 60.0 20.0 20.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 0.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 4.0 3.0 5.0 5.0 5.0 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode Min None Min None None Walk Time (s) 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 5 5 5 5 Act Effct Green (s) 28.2 71.4 55.7 55.3 12.5 12.5 Actuated g/c Ratio 0.39 1.00 0.78 0.77 0.18 0.18 v/c Ratio 0.75 0.25 0.78 0.21 0.13 0.35 Control Delay 26.2 0.5 25.4 3.9 29.9 9.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 26.2 0.5 25.4 3.9 29.9 9.6 LOS C A C A C A Approach Delay 19.8 14.1 17.5 Approach LOS B B B Queue Length 50th (m) 66.1 0.0 37.9 9.7 5.3 0.0 Queue Length 95th (m) #116.6 0.0 #109.3 23.5 11.2 13.7 Internal Link Dist (m) 490.0 229.1 145.0 Turn Bay Length (m) 45.0 100.0 90.0 Base Capacity (vph) 1483 1254 678 2535 992 503 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.62 0.25 0.66 0.20 0.07 0.23 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 71.4 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 17.3 Intersection LOS: B Intersection Capacity Utilization 73. ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 23

Lanes, Volumes, Timings 2039 Post Development 37: 32 Ave NW & Collegiate Blvd AM Peak Hour Splits and Phases: 37: 32 Ave NW & Collegiate Blvd West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 24

HCM Unsignalized Intersection Capacity Analysis 2039 Post Development 38: Collegiate Rd & Collegiate Blvd AM Peak Hour Movement EBL EBT WBT WBR SBL SBR Lane Configurations Sign Control Stop Stop Stop Volume (vph) 90 400 120 90 280 150 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Hourly flow rate (vph) 96 426 128 96 298 160 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total (vph) 238 284 85 138 298 160 Volume Left (vph) 96 0 0 0 298 0 Volume Right (vph) 0 0 0 96 0 160 Hadj (s) 0.29 0.09 0.09-0.40 0.58-0.61 Departure Headway (s) 6.6 6.4 6.9 6.4 7.1 5.9 Degree Utilization, x 0.44 0.51 0.16 0.24 0.58 0.26 Capacity (veh/h) 526 546 495 534 489 587 Control Delay (s) 13.4 14.6 10.0 10.2 18.3 9.7 Approach Delay (s) 14.1 10.1 15.3 Approach LOS B B C Intersection Summary Delay 13.8 HCM Level of Service B Intersection Capacity Utilization 53.0% ICU Level of Service A Analysis Period (min) 15 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 3

HCM Unsignalized Intersection Capacity Analysis 2039 Post Development 36: West Campus Way & 39 Street NW AM Peak Hour Movement EBL EBT WBT WBR SBL SBR Lane Configurations Volume (veh/h) 130 300 260 10 190 450 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Hourly flow rate (vph) 138 319 277 11 202 479 Pedestrians 30 30 80 Lane Width (m) 3.5 3.3 3.4 Walking Speed (m/s) 1.2 1.2 1.2 Percent Blockage 2 2 6 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 216 px, platoon unblocked vc, conflicting volume 367 828 254 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 367 828 254 tc, single (s) 4.2 6.9 7.0 tc, 2 stage (s) tf (s) 2.2 3.5 3.3 p0 queue free % 87 17 29 cm capacity (veh/h) 1093 243 674 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total 245 213 184 103 202 479 Volume Left 138 0 0 0 202 0 Volume Right 0 0 0 11 0 479 csh 1093 1700 1700 1700 243 674 Volume to Capacity 0.13 0.13 0.11 0.06 0.83 0.71 Queue Length 95th (m) 3.5 0.0 0.0 0.0 52.3 47.4 Control Delay (s) 5.5 0.0 0.0 0.0 65.7 22.4 Lane LOS A F C Approach Delay (s) 2.9 0.0 35.2 Approach LOS E Intersection Summary Average Delay 17.8 Intersection Capacity Utilization 50.9% ICU Level of Service A Analysis Period (min) 15 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 2

Lanes, Volumes, Timings 2039 Post Development 26: West Campus Way & West Campus Drive AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 140 330 530 310 320 80 80 130 190 40 270 190 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.5 3.3 3.5 3.5 3.3 3.5 3.3 3.3 3.5 3.3 3.3 3.3 Storage Length (m) 40.0 0.0 50.0 0.0 50.0 0.0 0.0 40.0 Storage Lanes 1 0 1 0 1 1 0 1 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 0.95 0.95 0.95 Ped Bike Factor 0.94 0.91 0.97 0.99 0.92 0.96 Frt 0.908 0.970 0.850 0.943 Flt Protected 0.950 0.950 0.950 0.996 Satd. Flow (prot) 1655 2668 0 1655 2975 0 1618 1621 1410 0 2780 0 Flt Permitted 0.504 0.142 0.235 0.916 Satd. Flow (perm) 826 2668 0 247 2975 0 395 1621 1299 0 2549 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 397 37 202 133 Link Speed (k/h) 50 50 50 40 Link Distance (m) 319.3 216.6 313.7 74.2 Travel Time (s) 23.0 15.6 22.6 6.7 Confl. Peds. (#/hr) 80 80 80 80 30 30 30 30 Confl. Bikes (#/hr) 50 50 50 50 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 0 6 0 12 12 0 12 12 0 0 0 Parking (#/hr) 0 0 Adj. Flow (vph) 149 351 564 330 340 85 85 138 202 43 287 202 Shared Lane Traffic (%) Lane Group Flow (vph) 149 915 0 330 425 0 85 138 202 0 532 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.5 3.5 3.3 4.0 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.05 1.08 1.05 1.05 1.12 1.05 1.08 1.15 1.12 1.08 1.15 1.08 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (m) 8.0 4.0 8.0 4.0 8.0 4.0 2.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 0.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 0.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 6.0 2.0 6.0 2.0 2.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt pm+pt pm+pt Perm Perm Protected Phases 5 2 1 6 3 8 4 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 13

Lanes, Volumes, Timings 2039 Post Development 26: West Campus Way & West Campus Drive AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Permitted Phases 2 6 8 8 4 Detector Phase 5 2 1 6 3 8 8 4 4 Switch Phase Minimum Initial (s) 10.0 20.0 10.0 20.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 15.0 25.0 15.0 25.0 15.0 25.0 25.0 25.0 25.0 Total Split (s) 15.0 31.0 0.0 19.0 35.0 0.0 15.0 40.0 40.0 25.0 25.0 0.0 Total Split (%) 16.7% 34. 0.0% 21. 38.9% 0.0% 16.7% 44. 44. 27.8% 27.8% 0.0% Maximum Green (s) 12.0 26.0 16.0 30.0 12.0 35.0 35.0 20.0 20.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 0.0 2.0 0.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 3.0 5.0 4.0 3.0 5.0 5.0 5.0 5.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min None Min None None None None None Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 80 80 30 30 30 30 Act Effct Green (s) 37.2 24.3 44.3 32.1 29.0 26.9 26.9 17.1 Actuated g/c Ratio 0.47 0.31 0.56 0.40 0.36 0.34 0.34 0.22 v/c Ratio 0.30 0.84 0.82 0.35 0.28 0.25 0.35 0.82 Control Delay 12.6 24.0 37.4 19.1 19.2 20.1 4.8 34.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 12.6 24.0 37.4 19.1 19.2 20.1 4.8 34.5 LOS B C D B B C A C Approach Delay 22.4 27.1 12.7 34.5 Approach LOS C C B C Queue Length 50th (m) 12.6 47.1 38.9 26.0 9.4 16.4 0.0 35.3 Queue Length 95th (m) 23.5 #86.1 #88.4 41.3 18.9 30.0 13.6 #60.7 Internal Link Dist (m) 295.3 192.6 289.7 50.2 Turn Bay Length (m) 40.0 50.0 50.0 Base Capacity (vph) 533 1168 432 1245 336 741 704 764 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.28 0.78 0.76 0.34 0.25 0.19 0.29 0.70 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 79.5 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 24.5 Intersection LOS: C Intersection Capacity Utilization 93.7% ICU Level of Service F Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 14

Lanes, Volumes, Timings 2039 Post Development 26: West Campus Way & West Campus Drive AM Peak Hour Queue shown is maximum after two cycles. Splits and Phases: 26: West Campus Way & West Campus Drive West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 15

Lanes, Volumes, Timings 2039 Post Development 51: Oki Drive / ACH & West Campus Drive AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 30 20 40 30 10 30 80 650 60 80 870 60 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Ped Bike Factor 0.98 0.96 0.97 0.99 0.99 Frt 0.899 0.936 0.989 0.991 Flt Protected 0.950 0.979 0.995 0.996 Satd. Flow (prot) 1674 1453 0 0 2996 0 0 3177 0 0 3207 0 Flt Permitted 0.706 0.821 0.766 0.825 Satd. Flow (perm) 1214 1453 0 0 2486 0 0 2443 0 0 2650 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 43 32 20 15 Link Speed (k/h) 40 40 50 50 Link Distance (m) 108.6 54.2 150.1 313.7 Travel Time (s) 9.8 4.9 10.8 22.6 Confl. Peds. (#/hr) 30 30 30 30 80 80 80 80 Confl. Bikes (#/hr) 25 25 25 25 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 12 12 0 0 0 0 12 12 0 12 12 Adj. Flow (vph) 32 21 43 32 11 32 85 691 64 85 926 64 Shared Lane Traffic (%) Lane Group Flow (vph) 32 64 0 0 75 0 0 840 0 0 1075 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.6 3.6 5.9 5.9 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.04 1.10 1.04 1.04 1.04 1.04 1.04 1.07 1.04 1.04 1.07 1.04 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (m) 8.0 4.0 8.0 4.0 8.0 4.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 6.0 2.0 6.0 2.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Perm Perm Perm Perm Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 25

Lanes, Volumes, Timings 2039 Post Development 51: Oki Drive / ACH & West Campus Drive AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Total Split (s) 25.0 25.0 0.0 25.0 25.0 0.0 35.0 35.0 0.0 35.0 35.0 0.0 Total Split (%) 41.7% 41.7% 0.0% 41.7% 41.7% 0.0% 58. 58. 0.0% 58. 58. 0.0% Maximum Green (s) 20.0 20.0 20.0 20.0 30.0 30.0 30.0 30.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 4.0 5.0 5.0 4.0 5.0 5.0 4.0 5.0 5.0 4.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Min Min Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 30 30 30 30 80 80 80 80 Act Effct Green (s) 13.9 13.9 13.9 31.3 31.3 Actuated g/c Ratio 0.31 0.31 0.31 0.70 0.70 v/c Ratio 0.08 0.13 0.09 0.49 0.58 Control Delay 13.9 7.8 9.1 9.0 10.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 13.9 7.8 9.1 9.0 10.6 LOS B A A A B Approach Delay 9.9 9.1 9.0 10.6 Approach LOS A A A B Queue Length 50th (m) 2.0 1.3 1.3 20.3 29.0 Queue Length 95th (m) 7.7 8.6 5.6 53.9 #77.2 Internal Link Dist (m) 84.6 30.2 126.1 289.7 Turn Bay Length (m) Base Capacity (vph) 593 732 1230 1795 1945 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.05 0.09 0.06 0.47 0.55 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 44.5 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 9.9 Intersection LOS: A Intersection Capacity Utilization 78.7% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 26

Lanes, Volumes, Timings 2039 Post Development 51: Oki Drive / ACH & West Campus Drive AM Peak Hour Splits and Phases: 51: Oki Drive / ACH & West Campus Drive West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 27

Lanes, Volumes, Timings 2039 Post Development 13: 24 Ave NW & West Campus Drive AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 240 60 10 20 160 520 80 130 120 690 90 210 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.7 3.3 3.5 3.3 3.3 3.5 3.3 3.5 3.5 3.3 3.5 3.5 Storage Length (m) 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Storage Lanes 1 0 0 0 0 0 1 0 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.96 0.86 0.96 0.97 0.95 Frt 0.978 0.889 0.945 0.895 Flt Protected 0.950 0.999 0.988 0.950 Satd. Flow (prot) 1692 2850 0 0 2470 0 0 2983 0 1618 1479 0 Flt Permitted 0.193 0.945 0.785 0.313 Satd. Flow (perm) 344 2850 0 0 2322 0 0 2351 0 520 1479 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 11 540 81 167 Link Speed (k/h) 50 50 40 50 Link Distance (m) 270.0 730.8 72.5 150.1 Travel Time (s) 19.4 52.6 6.5 10.8 Confl. Peds. (#/hr) 80 80 80 80 30 30 30 30 Confl. Bikes (#/hr) 25 25 25 25 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 6 6 0 6 6 0 0 0 0 0 12 Parking (#/hr) 0 0 Adj. Flow (vph) 255 64 11 21 170 553 85 138 128 734 96 223 Shared Lane Traffic (%) Lane Group Flow (vph) 255 75 0 0 744 0 0 351 0 734 319 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.7 8.0 3.3 5.9 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.02 1.17 1.05 1.08 1.10 1.05 1.08 1.05 1.05 1.08 1.05 1.05 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Left Left Left Left Leading Detector (m) 8.0 4.0 8.0 4.0 8.0 4.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 6.0 2.0 6.0 2.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt Perm Perm pm+pt Protected Phases 5 2 6 8 7 4 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 7

Lanes, Volumes, Timings 2039 Post Development 13: 24 Ave NW & West Campus Drive AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Permitted Phases 2 6 8 4 Detector Phase 5 2 6 6 8 8 7 4 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 15.0 25.0 25.0 25.0 25.0 25.0 15.0 25.0 Total Split (s) 17.0 45.0 0.0 28.0 28.0 0.0 25.0 25.0 0.0 50.0 75.0 0.0 Total Split (%) 14. 37.5% 0.0% 23. 23. 0.0% 20.8% 20.8% 0.0% 41.7% 62.5% 0.0% Maximum Green (s) 14.0 40.0 23.0 23.0 20.0 20.0 47.0 70.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 0.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 5.0 5.0 4.0 5.0 5.0 4.0 3.0 5.0 4.0 Lead/Lag Lead Lag Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min Min Min None None None None Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 80 30 30 80 80 30 Act Effct Green (s) 36.8 34.8 17.7 18.0 70.4 68.4 Actuated g/c Ratio 0.33 0.31 0.16 0.16 0.62 0.60 v/c Ratio 0.91 0.08 0.91 0.79 0.94 0.33 Control Delay 68.4 24.2 28.8 49.4 42.7 6.4 Queue Delay 0.0 0.0 0.0 0.0 32.0 0.5 Total Delay 68.4 24.2 28.8 49.4 74.8 6.9 LOS E C C D E A Approach Delay 58.3 28.8 49.4 54.2 Approach LOS E C D D Queue Length 50th (m) 48.1 5.6 26.4 33.1 138.4 15.5 Queue Length 95th (m) #92.9 11.5 #56.7 #55.2 #234.9 33.4 Internal Link Dist (m) 246.0 706.8 48.5 126.1 Turn Bay Length (m) 100.0 Base Capacity (vph) 280 1020 904 484 782 983 Starvation Cap Reductn 0 0 0 0 95 318 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.91 0.07 0.82 0.73 1.07 0.48 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 113.2 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.94 Intersection Signal Delay: 46.4 Intersection LOS: D Intersection Capacity Utilization 113. ICU Level of Service H Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 8

Lanes, Volumes, Timings 2039 Post Development 13: 24 Ave NW & West Campus Drive AM Peak Hour Queue shown is maximum after two cycles. Splits and Phases: 13: 24 Ave NW & West Campus Drive West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 9

HCM Unsignalized Intersection Capacity Analysis 2039 Post Development 4: Childrens Way & West Campus Blvd AM Peak Hour Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 0 40 326 30 50 368 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Hourly flow rate (vph) 0 43 347 32 53 391 Pedestrians 50 50 50 Lane Width (m) 4.8 3.4 3.3 Walking Speed (m/s) 1.2 1.2 1.2 Percent Blockage 6 4 4 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 270 px, platoon unblocked vc, conflicting volume 50 826 100 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 50 826 100 tc, single (s) 4.1 6.4 6.2 tc, 2 stage (s) tf (s) 2.2 3.5 3.3 p0 queue free % 77 77 55 cm capacity (veh/h) 1479 235 875 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 Volume Total 43 347 32 53 391 Volume Left 0 347 0 53 0 Volume Right 43 0 0 0 391 csh 1700 1479 1700 235 875 Volume to Capacity 0.03 0.23 0.02 0.23 0.45 Queue Length 95th (m) 0.0 7.3 0.0 6.8 18.7 Control Delay (s) 0.0 8.2 0.0 24.7 12.4 Lane LOS A C B Approach Delay (s) 0.0 7.5 13.9 Approach LOS B Intersection Summary Average Delay 10.4 Intersection Capacity Utilization 37. ICU Level of Service A Analysis Period (min) 15 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development 1: TCH Ramp & West Campus Blvd AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) 60 300 240 140 280 680 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.6 3.6 3.6 3.6 3.4 3.0 Storage Length (m) 0.0 0.0 0.0 30.0 Storage Lanes 1 1 0 1 Taper Length (m) 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Ped Bike Factor 1.00 0.99 0.99 1.00 Frt 0.850 0.950 Flt Protected 0.950 0.950 Satd. Flow (prot) 1674 1498 1657 0 1637 3124 Flt Permitted 0.950 0.375 Satd. Flow (perm) 1666 1477 1657 0 644 3124 Right Turn on Red Yes Yes Satd. Flow (RTOR) 319 47 Link Speed (k/h) 40 50 50 Link Distance (m) 96.9 318.3 268.7 Travel Time (s) 8.7 22.9 19.3 Confl. Peds. (#/hr) 5 5 5 5 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Adj. Flow (vph) 64 319 255 149 298 723 Shared Lane Traffic (%) Lane Group Flow (vph) 64 319 404 0 298 723 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(m) 3.6 0.0 3.3 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.04 1.04 1.04 1.04 1.07 1.13 Turning Speed (k/h) 25 15 15 25 Number of Detectors 1 1 1 1 1 Detector Template Left Right Thru Left Thru Leading Detector (m) 8.0 6.0 4.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 4.0 2.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Turn Type Free pm+pt Protected Phases 8 2 1 6 Permitted Phases Free 6 Detector Phase 8 2 1 6 Switch Phase West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development 1: TCH Ramp & West Campus Blvd AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Minimum Initial (s) 10.0 20.0 10.0 20.0 Minimum Split (s) 25.0 25.0 15.0 25.0 Total Split (s) 25.0 0.0 25.0 0.0 15.0 40.0 Total Split (%) 38.5% 0.0% 38.5% 0.0% 23. 61.5% Maximum Green (s) 20.0 20.0 12.0 35.0 Yellow Time (s) 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 0.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 4.0 5.0 4.0 3.0 5.0 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None Min None Min Walk Time (s) 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 Pedestrian Calls (#/hr) 5 5 5 Act Effct Green (s) 12.0 49.5 20.9 37.0 37.5 Actuated g/c Ratio 0.24 1.00 0.42 0.75 0.76 v/c Ratio 0.16 0.22 0.56 0.43 0.31 Control Delay 18.1 0.3 17.0 6.4 5.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 18.1 0.3 17.0 6.4 5.4 LOS B A B A A Approach Delay 3.3 17.0 5.7 Approach LOS A B A Queue Length 50th (m) 5.5 0.0 27.6 9.8 15.4 Queue Length 95th (m) 13.9 0.0 #80.8 31.1 38.1 Internal Link Dist (m) 72.9 294.3 244.7 Turn Bay Length (m) 30.0 Base Capacity (vph) 707 1477 727 733 2309 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.09 0.22 0.56 0.41 0.31 Intersection Summary Area Type: Other Cycle Length: 65 Actuated Cycle Length: 49.5 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay: 7.7 Intersection LOS: A Intersection Capacity Utilization 59. ICU Level of Service B Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 2

Lanes, Volumes, Timings 2039 Post Development 1: TCH Ramp & West Campus Blvd AM Peak Hour Splits and Phases: 1: TCH Ramp & West Campus Blvd West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 3

Lanes, Volumes, Timings 2039 Post Development 9: West Campus Blvd & TCH Ramp AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 460 120 160 30 80 40 90 30 10 270 170 210 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Storage Length (m) 0.0 0.0 0.0 30.0 60.0 0.0 70.0 70.0 Storage Lanes 1 0 0 1 1 0 1 1 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.99 0.98 1.00 0.97 0.99 0.99 0.99 0.97 Frt 0.914 0.850 0.962 0.850 Flt Protected 0.950 0.987 0.950 0.950 Satd. Flow (prot) 1674 1585 0 0 1739 1498 1674 1683 0 1674 1762 1498 Flt Permitted 0.517 0.815 0.643 0.729 Satd. Flow (perm) 905 1585 0 0 1434 1456 1126 1683 0 1275 1762 1456 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 159 43 11 223 Link Speed (k/h) 50 30 30 30 Link Distance (m) 62.1 199.2 185.1 101.6 Travel Time (s) 4.5 23.9 22.2 12.2 Confl. Peds. (#/hr) 5 5 5 5 5 5 5 5 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Adj. Flow (vph) 489 128 170 32 85 43 96 32 11 287 181 223 Shared Lane Traffic (%) Lane Group Flow (vph) 489 298 0 0 117 43 96 43 0 287 181 223 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.6 3.6 3.6 3.6 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Right Left Thru Left Thru Right Leading Detector (m) 8.0 4.0 2.0 4.0 6.0 8.0 4.0 8.0 4.0 6.0 Trailing Detector (m) 2.0 2.0 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 2.0 2.0 4.0 6.0 2.0 6.0 2.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt Perm Perm Perm Perm Perm Protected Phases 7 4 8 2 6 Permitted Phases 4 8 8 2 6 6 Detector Phase 7 4 8 8 8 2 2 6 6 6 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 20.0 20.0 20.0 20.0 20.0 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 4

Lanes, Volumes, Timings 2039 Post Development 9: West Campus Blvd & TCH Ramp AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 15.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 Total Split (s) 15.0 40.0 0.0 25.0 25.0 25.0 25.0 25.0 0.0 25.0 25.0 25.0 Total Split (%) 23. 61.5% 0.0% 38.5% 38.5% 38.5% 38.5% 38.5% 0.0% 38.5% 38.5% 38.5% Maximum Green (s) 12.0 35.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 4.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min Min Min Min Min Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 5 5 5 5 5 5 5 5 5 Act Effct Green (s) 25.5 23.4 12.1 12.1 20.5 20.5 20.5 20.5 20.5 Actuated g/c Ratio 0.47 0.43 0.22 0.22 0.38 0.38 0.38 0.38 0.38 v/c Ratio 0.81 0.38 0.37 0.12 0.23 0.07 0.59 0.27 0.32 Control Delay 23.2 5.9 22.6 7.2 16.2 11.7 23.5 15.7 4.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 23.2 5.9 22.6 7.2 16.2 11.7 23.5 15.7 4.3 LOS C A C A B B C B A Approach Delay 16.6 18.5 14.8 15.3 Approach LOS B B B B Queue Length 50th (m) 33.9 8.1 11.0 0.0 6.8 2.1 23.9 13.0 0.0 Queue Length 95th (m) #62.0 19.6 23.0 6.2 20.3 9.2 #67.5 32.7 13.7 Internal Link Dist (m) 38.1 175.2 161.1 77.6 Turn Bay Length (m) 30.0 60.0 70.0 70.0 Base Capacity (vph) 600 1139 543 578 426 644 483 667 690 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.81 0.26 0.22 0.07 0.23 0.07 0.59 0.27 0.32 Intersection Summary Area Type: Other Cycle Length: 65 Actuated Cycle Length: 54.2 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 16.1 Intersection LOS: B Intersection Capacity Utilization 78.7% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 5

Lanes, Volumes, Timings 2039 Post Development 9: West Campus Blvd & TCH Ramp AM Peak Hour Splits and Phases: 9: West Campus Blvd & TCH Ramp West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 6

Lanes, Volumes, Timings 2039 Post Development 24: 32 Ave NW & Shaganappi Trail PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 300 410 250 110 500 580 400 1690 100 290 920 120 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Storage Length (m) 75.0 0.0 75.0 100.0 75.0 100.0 75.0 0.0 Storage Lanes 1 0 1 1 1 1 1 1 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Ped Bike Factor 0.91 0.95 0.95 0.76 0.76 Frt 0.943 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1674 2675 0 1674 3133 1306 1674 3348 1498 1674 3348 1498 Flt Permitted 0.154 0.174 0.142 0.066 Satd. Flow (perm) 271 2675 0 293 3133 1245 250 3348 1139 116 3348 1136 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 77 294 72 107 Link Speed (k/h) 50 60 70 70 Link Distance (m) 234.6 158.7 191.4 170.0 Travel Time (s) 16.9 9.5 9.8 8.7 Confl. Peds. (#/hr) 100 100 100 100 100 100 100 100 Confl. Bikes (#/hr) 25 25 25 25 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 32 32 0 32 32 0 0 0 0 0 0 Adj. Flow (vph) 316 432 263 116 526 611 421 1779 105 305 968 126 Shared Lane Traffic (%) Lane Group Flow (vph) 316 695 0 116 526 611 421 1779 105 305 968 126 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.6 3.6 3.6 3.6 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.04 1.13 1.04 1.04 1.13 1.23 1.04 1.04 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Right Left Thru Right Left Thru Right Leading Detector (m) 8.0 4.0 8.0 4.0 6.0 8.0 4.0 6.0 8.0 4.0 6.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 6.0 2.0 4.0 6.0 2.0 4.0 6.0 2.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt pm+pt Free pm+pt Perm pm+pt Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 Free 2 2 6 6 Detector Phase 7 4 3 8 5 2 2 1 6 6 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 10

Lanes, Volumes, Timings 2039 Post Development 24: 32 Ave NW & Shaganappi Trail PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 20.0 20.0 10.0 20.0 20.0 Minimum Split (s) 15.0 25.0 15.0 25.0 15.0 25.0 25.0 15.0 25.0 25.0 Total Split (s) 22.0 35.0 0.0 15.0 28.0 0.0 37.0 79.0 79.0 21.0 63.0 63.0 Total Split (%) 14.7% 23. 0.0% 10.0% 18.7% 0.0% 24.7% 52.7% 52.7% 14.0% 42.0% 42.0% Maximum Green (s) 19.0 30.0 12.0 23.0 34.0 74.0 74.0 18.0 58.0 58.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 0.0 2.0 0.0 2.0 2.0 0.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 3.0 5.0 4.0 3.0 5.0 5.0 3.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min Min None Min Min Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 100 100 100 100 100 100 Act Effct Green (s) 47.0 30.6 36.4 23.0 150.0 97.0 74.0 74.0 80.9 60.9 60.9 Actuated g/c Ratio 0.31 0.20 0.24 0.15 1.00 0.65 0.49 0.49 0.54 0.41 0.41 v/c Ratio 1.20 1.14 0.66 1.10 0.49 0.92 1.08 0.18 1.22 0.71 0.24 Control Delay 159.1 129.8 57.1 126.8 1.4 57.9 82.7 8.3 171.2 41.5 8.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 159.1 129.8 57.1 126.8 1.4 57.9 82.7 8.3 171.2 41.5 8.6 LOS F F E F A E F A F D A Approach Delay 138.9 59.2 74.8 66.8 Approach LOS F E E E Queue Length 50th (m) ~103.5 ~125.1 26.9 ~97.6 0.0 90.8 ~325.6 5.3 ~102.8 137.0 3.7 Queue Length 95th (m) #167.3 #167.0 #44.4 #136.5 0.0 #150.2 #369.3 16.6 #165.9 164.1 18.3 Internal Link Dist (m) 210.6 134.7 167.4 146.0 Turn Bay Length (m) 75.0 75.0 100.0 75.0 100.0 75.0 Base Capacity (vph) 263 607 183 480 1245 484 1652 598 249 1359 525 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.20 1.14 0.63 1.10 0.49 0.87 1.08 0.18 1.22 0.71 0.24 Intersection Summary Area Type: Other Cycle Length: 150 Actuated Cycle Length: 150 Natural Cycle: 150 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.22 Intersection Signal Delay: 80.5 Intersection LOS: F Intersection Capacity Utilization 113. ICU Level of Service H Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 11

Lanes, Volumes, Timings 2039 Post Development 24: 32 Ave NW & Shaganappi Trail PM Peak Hour Queue shown is maximum after two cycles. Splits and Phases: 24: 32 Ave NW & Shaganappi Trail West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 12

Lanes, Volumes, Timings 2039 Post Development 28: West Campus Way & Shaganappi Trail PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) 600 730 1550 380 500 680 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.0 3.5 3.6 3.6 3.6 3.6 Storage Length (m) 0.0 50.0 75.0 75.0 Storage Lanes 1 1 1 2 Taper Length (m) 7.5 7.5 7.5 7.5 Lane Util. Factor 0.97 1.00 0.95 1.00 0.97 0.95 Ped Bike Factor 0.96 0.94 0.99 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3031 1481 3348 1498 3247 3348 Flt Permitted 0.950 0.950 Satd. Flow (perm) 3031 1425 3348 1409 3226 3348 Right Turn on Red Yes Yes Satd. Flow (RTOR) 468 341 Link Speed (k/h) 50 70 70 Link Distance (m) 319.3 175.1 115.8 Travel Time (s) 23.0 9.0 6.0 Confl. Peds. (#/hr) 50 25 25 Confl. Bikes (#/hr) 50 25 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Adj. Flow (vph) 632 768 1632 400 526 716 Shared Lane Traffic (%) Lane Group Flow (vph) 632 768 1632 400 526 716 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(m) 9.5 7.2 7.2 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.13 1.05 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 15 25 Number of Detectors 1 1 1 1 1 1 Detector Template Left Right Thru Right Left Thru Leading Detector (m) 8.0 6.0 4.0 6.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 4.0 2.0 4.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Free Perm Prot Protected Phases 8 2 1 6 Permitted Phases Free 2 Detector Phase 8 2 2 1 6 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 16

Lanes, Volumes, Timings 2039 Post Development 28: West Campus Way & Shaganappi Trail PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.0 25.0 25.0 15.0 25.0 Total Split (s) 25.0 0.0 54.0 54.0 21.0 75.0 Total Split (%) 25.0% 0.0% 54.0% 54.0% 21.0% 75.0% Maximum Green (s) 20.0 49.0 49.0 16.0 70.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 4.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min Min None Min Walk Time (s) 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 50 25 25 25 Act Effct Green (s) 20.0 100.0 49.0 49.0 16.0 70.0 Actuated g/c Ratio 0.20 1.00 0.49 0.49 0.16 0.70 v/c Ratio 1.04 0.54 0.99 0.46 1.01 0.31 Control Delay 88.2 1.5 47.2 4.8 85.2 6.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 88.2 1.5 47.2 4.8 85.2 6.1 LOS F A D A F A Approach Delay 40.6 38.9 39.6 Approach LOS D D D Queue Length 50th (m) ~72.3 0.0 167.6 6.2 ~56.9 25.5 Queue Length 95th (m) #107.5 0.0 #226.4 24.4 #91.8 33.6 Internal Link Dist (m) 295.3 151.1 91.8 Turn Bay Length (m) 50.0 75.0 75.0 Base Capacity (vph) 606 1425 1641 864 520 2344 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 1.04 0.54 0.99 0.46 1.01 0.31 Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.04 Intersection Signal Delay: 39.6 Intersection LOS: D Intersection Capacity Utilization 88.7% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 17

Lanes, Volumes, Timings 2039 Post Development 28: West Campus Way & Shaganappi Trail PM Peak Hour Queue shown is maximum after two cycles. Splits and Phases: 28: West Campus Way & Shaganappi Trail West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 18

Lanes, Volumes, Timings 2039 Post Development 35: 32 Ave NW & 39 Street NW PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 60 520 90 170 830 30 510 0 360 30 30 20 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.5 3.7 4.3 3.6 3.7 4.3 4.5 4.5 3.7 4.8 4.8 4.8 Storage Length (m) 50.0 50.0 60.0 0.0 0.0 40.0 0.0 0.0 Storage Lanes 1 0 1 0 2 1 0 0 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 0.97 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 0.99 0.98 0.98 1.00 0.93 0.94 0.97 Frt 0.978 0.995 0.850 0.967 Flt Protected 0.950 0.950 0.950 0.982 Satd. Flow (prot) 1655 3047 0 1674 3141 0 3572 0 1478 0 1864 0 Flt Permitted 0.223 0.275 0.950 0.982 Satd. Flow (perm) 384 3047 0 474 3141 0 3334 0 1388 0 1833 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 18 4 301 12 Link Speed (k/h) 60 60 50 50 Link Distance (m) 341.1 514.0 332.1 117.9 Travel Time (s) 20.5 30.8 23.9 8.5 Confl. Peds. (#/hr) 25 50 50 25 25 25 25 25 Confl. Bikes (#/hr) 25 10 10 10 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 32 32 0 32 32 0 0 6 0 0 0 Adj. Flow (vph) 63 547 95 179 874 32 537 0 379 32 32 21 Shared Lane Traffic (%) Lane Group Flow (vph) 63 642 0 179 906 0 537 0 379 0 85 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.6 3.6 9.0 9.0 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.05 1.11 0.94 1.04 1.11 0.94 0.91 0.91 1.05 0.88 0.88 0.88 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Left Right Left Thru Leading Detector (m) 8.0 4.0 8.0 4.0 8.0 6.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 6.0 2.0 6.0 4.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt pm+pt Prot custom Perm Protected Phases 5 2 1 6 3 4 Permitted Phases 2 6 8 4 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 19

Lanes, Volumes, Timings 2039 Post Development 35: 32 Ave NW & 39 Street NW PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 3 8 4 4 Switch Phase Minimum Initial (s) 10.0 20.0 10.0 20.0 10.0 10.0 10.0 10.0 Minimum Split (s) 13.0 25.0 13.0 25.0 15.0 25.0 25.0 25.0 Total Split (s) 13.0 48.0 0.0 17.0 52.0 0.0 30.0 0.0 55.0 25.0 25.0 0.0 Total Split (%) 10.8% 40.0% 0.0% 14. 43. 0.0% 25.0% 0.0% 45.8% 20.8% 20.8% 0.0% Maximum Green (s) 10.0 43.0 14.0 47.0 25.0 50.0 20.0 20.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 0.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 3.0 5.0 4.0 5.0 4.0 5.0 5.0 5.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min None Min None None None None Walk Time (s) 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 50 25 25 25 25 Act Effct Green (s) 45.5 32.5 49.6 38.6 19.2 33.5 14.0 Actuated g/c Ratio 0.49 0.35 0.54 0.42 0.21 0.36 0.15 v/c Ratio 0.19 0.59 0.43 0.69 0.73 0.55 0.30 Control Delay 15.0 28.6 17.1 29.4 43.1 8.6 38.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 15.0 28.6 17.1 29.4 43.1 8.6 38.7 LOS B C B C D A D Approach Delay 27.4 27.4 38.7 Approach LOS C C D Queue Length 50th (m) 5.5 50.4 16.8 78.1 49.1 9.7 13.3 Queue Length 95th (m) 15.2 85.3 37.2 124.6 84.2 37.7 31.5 Internal Link Dist (m) 317.1 490.0 308.1 93.9 Turn Bay Length (m) 50.0 60.0 40.0 Base Capacity (vph) 338 1545 455 1733 1047 938 439 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.19 0.42 0.39 0.52 0.51 0.40 0.19 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 92.6 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.73 Intersection Signal Delay: 28.2 Intersection Capacity Utilization 69. Analysis Period (min) 15 Intersection LOS: C ICU Level of Service C West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 20

Lanes, Volumes, Timings 2039 Post Development 35: 32 Ave NW & 39 Street NW PM Peak Hour Splits and Phases: 35: 32 Ave NW & 39 Street NW West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 21

Lanes, Volumes, Timings 2039 Post Development 37: 32 Ave NW & Collegiate Blvd PM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph) 680 180 190 620 310 380 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Storage Length (m) 45.0 100.0 0.0 90.0 Storage Lanes 1 1 2 1 Taper Length (m) 7.5 7.5 7.5 7.5 Lane Util. Factor 0.95 1.00 1.00 0.95 0.97 1.00 Ped Bike Factor 0.97 0.99 0.96 0.96 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3133 1306 1460 3133 3247 1462 Flt Permitted 0.260 0.950 Satd. Flow (perm) 3133 1264 394 3133 3115 1399 Right Turn on Red Yes Yes Satd. Flow (RTOR) 184 370 Link Speed (k/h) 60 60 50 Link Distance (m) 514.0 253.1 169.0 Travel Time (s) 30.8 15.2 12.2 Confl. Peds. (#/hr) 50 50 25 25 Confl. Bikes (#/hr) 25 10 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 32 32 32 32 0 6 Adj. Flow (vph) 716 189 200 653 326 400 Shared Lane Traffic (%) Lane Group Flow (vph) 716 189 200 653 326 400 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(m) 3.6 3.6 7.2 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.13 1.23 1.23 1.13 1.04 1.07 Turning Speed (k/h) 15 25 25 15 Number of Detectors 1 1 1 1 1 1 Detector Template Thru Right Left Thru Left Right Leading Detector (m) 4.0 6.0 8.0 4.0 8.0 6.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 2.0 4.0 6.0 2.0 6.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Free pm+pt Perm Protected Phases 2 1 6 8 Permitted Phases Free 6 8 Detector Phase 2 1 6 8 8 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 22

Lanes, Volumes, Timings 2039 Post Development 37: 32 Ave NW & Collegiate Blvd PM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Switch Phase Minimum Initial (s) 20.0 10.0 20.0 10.0 10.0 Minimum Split (s) 25.0 13.0 25.0 25.0 25.0 Total Split (s) 27.0 0.0 13.0 40.0 25.0 25.0 Total Split (%) 41.5% 0.0% 20.0% 61.5% 38.5% 38.5% Maximum Green (s) 22.0 10.0 35.0 20.0 20.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 0.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 4.0 3.0 5.0 5.0 5.0 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode Min None Min None None Walk Time (s) 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 50 25 25 25 Act Effct Green (s) 20.5 56.0 35.5 33.5 12.4 12.4 Actuated g/c Ratio 0.37 1.00 0.63 0.60 0.22 0.22 v/c Ratio 0.63 0.15 0.45 0.35 0.45 0.67 Control Delay 18.2 0.2 8.6 6.9 20.8 9.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 18.2 0.2 8.6 6.9 20.8 9.4 LOS B A A A C A Approach Delay 14.5 7.3 14.5 Approach LOS B A B Queue Length 50th (m) 29.6 0.0 6.4 13.7 15.3 2.5 Queue Length 95th (m) 58.1 0.0 21.3 33.7 25.9 23.0 Internal Link Dist (m) 490.0 229.1 145.0 Turn Bay Length (m) 45.0 100.0 90.0 Base Capacity (vph) 1237 1264 441 1969 1166 739 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.58 0.15 0.45 0.33 0.28 0.54 Intersection Summary Area Type: Other Cycle Length: 65 Actuated Cycle Length: 56 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.67 Intersection Signal Delay: 12.0 Intersection Capacity Utilization 55. Analysis Period (min) 15 Intersection LOS: B ICU Level of Service B West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 23

Lanes, Volumes, Timings 2039 Post Development 37: 32 Ave NW & Collegiate Blvd PM Peak Hour Splits and Phases: 37: 32 Ave NW & Collegiate Blvd West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 24

HCM Unsignalized Intersection Capacity Analysis 2039 Post Development 38: Collegiate Rd & Collegiate Blvd PM Peak Hour Movement EBL EBT WBT WBR SBL SBR Lane Configurations Sign Control Stop Stop Stop Volume (vph) 200 80 120 90 200 180 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Hourly flow rate (vph) 211 84 126 95 211 189 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total (vph) 239 56 84 137 211 189 Volume Left (vph) 211 0 0 0 211 0 Volume Right (vph) 0 0 0 95 0 189 Hadj (s) 0.53 0.09 0.09-0.40 0.58-0.61 Departure Headway (s) 6.5 6.0 6.2 5.7 6.5 5.3 Degree Utilization, x 0.43 0.09 0.14 0.22 0.38 0.28 Capacity (veh/h) 533 566 550 599 532 644 Control Delay (s) 13.1 8.5 9.0 9.1 12.2 9.2 Approach Delay (s) 12.2 9.1 10.8 Approach LOS B A B Intersection Summary Delay 10.8 HCM Level of Service B Intersection Capacity Utilization 47.6% ICU Level of Service A Analysis Period (min) 15 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 3

HCM Unsignalized Intersection Capacity Analysis 2039 Post Development 36: West Campus Way & 39 Street NW PM Peak Hour Movement EBL EBT WBT WBR SBL SBR Lane Configurations Volume (veh/h) 520 220 320 240 60 220 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Hourly flow rate (vph) 547 232 337 253 63 232 Pedestrians 50 50 125 Lane Width (m) 3.5 3.3 3.4 Walking Speed (m/s) 1.2 1.2 1.2 Percent Blockage 4 4 10 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 216 px, platoon unblocked vc, conflicting volume 714 1849 470 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 714 1849 470 tc, single (s) 4.2 6.9 7.0 tc, 2 stage (s) tf (s) 2.2 3.5 3.3 p0 queue free % 30 0 50 cm capacity (veh/h) 777 16 460 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total 625 154 225 365 63 232 Volume Left 547 0 0 0 63 0 Volume Right 0 0 0 253 0 232 csh 777 1700 1700 1700 16 460 Volume to Capacity 0.70 0.09 0.13 0.21 3.86 0.50 Queue Length 95th (m) 47.4 0.0 0.0 0.0 Err 22.1 Control Delay (s) 19.2 0.0 0.0 0.0 Err 20.5 Lane LOS C F C Approach Delay (s) 15.4 0.0 2158.7 Approach LOS F Intersection Summary Average Delay 389.8 Intersection Capacity Utilization 70.9% ICU Level of Service C Analysis Period (min) 15 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 2

Lanes, Volumes, Timings 2039 Post Development 26: West Campus Way & West Campus Drive PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 180 470 220 110 200 60 330 200 520 80 170 390 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.5 3.3 3.5 3.5 3.3 3.5 3.3 3.3 3.5 3.3 3.3 3.3 Storage Length (m) 40.0 0.0 50.0 0.0 50.0 0.0 0.0 40.0 Storage Lanes 1 0 1 0 1 1 0 0 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 0.95 0.95 0.95 Ped Bike Factor 0.85 0.92 0.95 0.94 0.98 0.88 0.91 Frt 0.952 0.966 0.850 0.909 Flt Protected 0.950 0.950 0.950 0.994 Satd. Flow (prot) 1655 2830 0 1655 2872 0 1618 1621 1410 0 2546 0 Flt Permitted 0.548 0.197 0.149 0.869 Satd. Flow (perm) 816 2830 0 327 2872 0 249 1621 1241 0 2207 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 67 34 299 309 Link Speed (k/h) 50 50 50 40 Link Distance (m) 319.3 216.6 313.7 73.9 Travel Time (s) 23.0 15.6 22.6 6.7 Confl. Peds. (#/hr) 125 125 125 125 50 50 50 50 Confl. Bikes (#/hr) 50 50 50 50 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 0 6 0 12 12 0 12 12 0 0 0 Parking (#/hr) 0 0 Adj. Flow (vph) 189 495 232 116 211 63 347 211 547 84 179 411 Shared Lane Traffic (%) Lane Group Flow (vph) 189 727 0 116 274 0 347 211 547 0 674 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.5 3.5 3.3 4.0 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.05 1.08 1.05 1.05 1.12 1.05 1.08 1.15 1.12 1.08 1.15 1.08 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (m) 8.0 4.0 2.0 4.0 8.0 4.0 2.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 0.0 2.0 2.0 2.0 0.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 0.0 2.0 2.0 2.0 0.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt pm+pt pm+pt Perm Perm Protected Phases 5 2 1 6 3 8 4 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 13

Lanes, Volumes, Timings 2039 Post Development 26: West Campus Way & West Campus Drive PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Permitted Phases 2 6 8 8 4 Detector Phase 5 2 1 6 3 8 8 4 4 Switch Phase Minimum Initial (s) 10.0 20.0 10.0 20.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 15.0 25.0 15.0 25.0 15.0 25.0 25.0 25.0 25.0 Total Split (s) 15.0 42.0 0.0 15.0 42.0 0.0 27.0 63.0 63.0 36.0 36.0 0.0 Total Split (%) 12.5% 35.0% 0.0% 12.5% 35.0% 0.0% 22.5% 52.5% 52.5% 30.0% 30.0% 0.0% Maximum Green (s) 12.0 37.0 12.0 37.0 24.0 58.0 58.0 31.0 31.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 0.0 2.0 0.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 3.0 5.0 4.0 3.0 5.0 5.0 5.0 5.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min None Min None None None None None Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 125 125 50 50 50 50 Act Effct Green (s) 43.2 29.5 42.1 28.9 49.5 47.4 47.4 23.9 Actuated g/c Ratio 0.43 0.29 0.41 0.28 0.49 0.47 0.47 0.24 v/c Ratio 0.43 0.84 0.41 0.33 0.87 0.28 0.74 0.89 Control Delay 22.5 41.2 23.3 27.2 48.8 18.2 16.6 36.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 22.5 41.2 23.3 27.2 48.8 18.2 16.6 36.1 LOS C D C C D B B D Approach Delay 37.4 26.1 27.0 36.1 Approach LOS D C C D Queue Length 50th (m) 26.2 72.7 15.4 22.2 53.9 25.8 40.1 42.6 Queue Length 95th (m) 45.4 104.3 29.0 35.7 #117.3 47.3 97.1 #81.2 Internal Link Dist (m) 295.3 192.6 289.7 49.9 Turn Bay Length (m) 40.0 50.0 50.0 Base Capacity (vph) 457 1113 303 1108 458 962 858 911 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.41 0.65 0.38 0.25 0.76 0.22 0.64 0.74 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 101.5 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 32.0 Intersection LOS: C Intersection Capacity Utilization 94.8% ICU Level of Service F Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 14

Lanes, Volumes, Timings 2039 Post Development 26: West Campus Way & West Campus Drive PM Peak Hour Queue shown is maximum after two cycles. Splits and Phases: 26: West Campus Way & West Campus Drive West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 15

Lanes, Volumes, Timings 2039 Post Development 51: Oki Drive / ACH & West Campus Drive PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 60 10 80 40 10 40 60 910 20 10 560 30 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Ped Bike Factor 0.96 0.94 0.95 0.99 0.99 Frt 0.867 0.934 0.997 0.992 Flt Protected 0.950 0.978 0.997 0.999 Satd. Flow (prot) 1674 1362 0 0 2961 0 0 3233 0 0 3216 0 Flt Permitted 0.692 0.817 0.883 0.935 Satd. Flow (perm) 1171 1362 0 0 2431 0 0 2856 0 0 3008 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 84 42 5 13 Link Speed (k/h) 40 40 50 50 Link Distance (m) 108.6 53.2 150.1 313.7 Travel Time (s) 9.8 4.8 10.8 22.6 Confl. Peds. (#/hr) 50 50 50 50 125 125 125 125 Confl. Bikes (#/hr) 25 25 25 25 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 12 12 0 0 0 0 12 12 0 12 12 Adj. Flow (vph) 63 11 84 42 11 42 63 958 21 11 589 32 Shared Lane Traffic (%) Lane Group Flow (vph) 63 95 0 0 95 0 0 1042 0 0 632 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.6 3.6 5.9 5.9 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.04 1.10 1.04 1.04 1.04 1.04 1.04 1.07 1.04 1.04 1.07 1.04 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (m) 8.0 4.0 8.0 4.0 8.0 4.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 6.0 2.0 6.0 2.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Perm Perm Perm Perm Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 25

Lanes, Volumes, Timings 2039 Post Development 51: Oki Drive / ACH & West Campus Drive PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Total Split (s) 25.0 25.0 0.0 25.0 25.0 0.0 35.0 35.0 0.0 35.0 35.0 0.0 Total Split (%) 41.7% 41.7% 0.0% 41.7% 41.7% 0.0% 58. 58. 0.0% 58. 58. 0.0% Maximum Green (s) 20.0 20.0 20.0 20.0 30.0 30.0 30.0 30.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 4.0 5.0 5.0 4.0 5.0 5.0 4.0 5.0 5.0 4.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Min Min Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 50 50 50 50 125 125 125 125 Act Effct Green (s) 13.8 13.8 13.8 27.4 27.4 Actuated g/c Ratio 0.30 0.30 0.30 0.60 0.60 v/c Ratio 0.18 0.20 0.12 0.61 0.35 Control Delay 15.1 6.1 9.0 11.2 8.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 15.1 6.1 9.0 11.2 8.1 LOS B A A B A Approach Delay 9.7 9.0 11.2 8.1 Approach LOS A A B A Queue Length 50th (m) 3.6 0.6 1.5 26.7 12.7 Queue Length 95th (m) 12.8 9.3 6.5 67.5 33.0 Internal Link Dist (m) 84.6 29.2 126.1 289.7 Turn Bay Length (m) Base Capacity (vph) 550 684 1163 2012 2121 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.11 0.14 0.08 0.52 0.30 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 45.8 Natural Cycle: 55 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.61 Intersection Signal Delay: 9.9 Intersection Capacity Utilization 73.8% Analysis Period (min) 15 Intersection LOS: A ICU Level of Service D West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 26

Lanes, Volumes, Timings 2039 Post Development 51: Oki Drive / ACH & West Campus Drive PM Peak Hour Splits and Phases: 51: Oki Drive / ACH & West Campus Drive West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 27

Lanes, Volumes, Timings 2039 Post Development 13: 24 Ave NW & West Campus Drive PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 230 160 80 100 250 790 10 160 30 610 180 200 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.7 3.3 3.5 3.3 3.3 3.5 3.3 3.5 3.5 3.3 3.5 3.5 Storage Length (m) 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Storage Lanes 1 0 0 0 0 0 1 0 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 Ped Bike Factor 0.88 0.83 0.98 0.94 0.95 Frt 0.950 0.896 0.977 0.921 Flt Protected 0.950 0.996 0.997 0.950 Satd. Flow (prot) 1692 2530 0 0 2408 0 0 3166 0 1618 1517 0 Flt Permitted 0.099 0.879 0.923 0.503 Satd. Flow (perm) 176 2530 0 0 2081 0 0 2924 0 809 1517 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 84 560 16 65 Link Speed (k/h) 50 50 40 50 Link Distance (m) 270.0 730.8 72.5 150.1 Travel Time (s) 19.4 52.6 6.5 10.8 Confl. Peds. (#/hr) 125 125 125 125 50 50 50 50 Confl. Bikes (#/hr) 25 25 25 25 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 6 6 0 6 6 0 0 0 0 0 12 Parking (#/hr) 0 0 Adj. Flow (vph) 242 168 84 105 263 832 11 168 32 642 189 211 Shared Lane Traffic (%) Lane Group Flow (vph) 242 252 0 0 1200 0 0 211 0 642 400 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.7 8.0 3.3 5.9 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.02 1.17 1.05 1.08 1.10 1.05 1.08 1.05 1.05 1.08 1.05 1.05 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Left Left Left Left Leading Detector (m) 8.0 4.0 2.0 4.0 8.0 4.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 0.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 0.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 2.0 2.0 6.0 2.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt Perm Perm pm+pt Protected Phases 5 2 6 8 7 4 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 7

Lanes, Volumes, Timings 2039 Post Development 13: 24 Ave NW & West Campus Drive PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Permitted Phases 2 6 8 4 Detector Phase 5 2 6 6 8 8 7 4 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 13.0 25.0 25.0 25.0 25.0 25.0 15.0 25.0 Total Split (s) 14.5 57.0 0.0 42.5 42.5 0.0 25.0 25.0 0.0 28.0 53.0 0.0 Total Split (%) 13. 51.8% 0.0% 38.6% 38.6% 0.0% 22.7% 22.7% 0.0% 25.5% 48. 0.0% Maximum Green (s) 11.5 52.0 37.5 37.5 20.0 20.0 25.0 48.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 0.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 5.0 5.0 4.0 5.0 5.0 4.0 3.0 5.0 4.0 Lead/Lag Lead Lag Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min Min Min None None None None Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 125 125 125 50 50 50 Act Effct Green (s) 54.1 52.1 37.6 17.9 47.9 45.9 Actuated g/c Ratio 0.50 0.48 0.35 0.17 0.44 0.42 v/c Ratio 0.97 0.20 1.10 0.42 1.17 0.59 Control Delay 77.3 11.3 79.1 39.8 123.3 23.5 Queue Delay 0.0 0.0 0.0 0.0 15.3 0.9 Total Delay 77.3 11.3 79.1 39.8 138.5 24.4 LOS E B E D F C Approach Delay 43.7 79.1 39.8 94.7 Approach LOS D E D F Queue Length 50th (m) 38.6 10.9 ~117.0 20.5 ~160.8 55.4 Queue Length 95th (m) #91.1 19.0 #160.6 32.5 #243.3 87.4 Internal Link Dist (m) 246.0 706.8 48.5 126.1 Turn Bay Length (m) 100.0 Base Capacity (vph) 250 1263 1089 556 547 712 Starvation Cap Reductn 0 0 0 0 16 120 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.97 0.20 1.10 0.38 1.21 0.68 Intersection Summary Area Type: Other Cycle Length: 110 Actuated Cycle Length: 108 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.17 Intersection Signal Delay: 75.9 Intersection Capacity Utilization 123.9% Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Intersection LOS: E ICU Level of Service H West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 8

Lanes, Volumes, Timings 2039 Post Development 13: 24 Ave NW & West Campus Drive PM Peak Hour Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 13: 24 Ave NW & West Campus Drive West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 9

HCM Unsignalized Intersection Capacity Analysis 2039 Post Development 4: Childrens Way & West Campus Blvd PM Peak Hour Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 0 60 480 20 20 340 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Hourly flow rate (vph) 0 63 505 21 21 358 Pedestrians 50 50 50 Lane Width (m) 4.8 3.4 3.3 Walking Speed (m/s) 1.2 1.2 1.2 Percent Blockage 6 4 4 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 270 px, platoon unblocked vc, conflicting volume 50 1132 100 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 50 1132 100 tc, single (s) 4.1 6.4 6.2 tc, 2 stage (s) tf (s) 2.2 3.5 3.3 p0 queue free % 66 84 59 cm capacity (veh/h) 1479 133 875 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 Volume Total 63 505 21 21 358 Volume Left 0 505 0 21 0 Volume Right 63 0 0 0 358 csh 1700 1479 1700 133 875 Volume to Capacity 0.04 0.34 0.01 0.16 0.41 Queue Length 95th (m) 0.0 12.3 0.0 4.4 16.1 Control Delay (s) 0.0 8.7 0.0 37.2 11.9 Lane LOS A E B Approach Delay (s) 0.0 8.3 13.3 Approach LOS B Intersection Summary Average Delay 9.8 Intersection Capacity Utilization 46. ICU Level of Service A Analysis Period (min) 15 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development 1: TCH Ramp & West Campus Blvd PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) 20 550 320 410 490 290 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.6 3.6 3.6 3.6 3.4 3.0 Storage Length (m) 0.0 0.0 0.0 30.0 Storage Lanes 1 1 0 1 Taper Length (m) 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 Ped Bike Factor 0.99 0.99 0.98 Frt 0.850 0.924 Flt Protected 0.950 0.950 Satd. Flow (prot) 1674 1498 1597 0 1637 3124 Flt Permitted 0.950 0.162 Satd. Flow (perm) 1660 1477 1597 0 279 3124 Right Turn on Red Yes Yes Satd. Flow (RTOR) 579 76 Link Speed (k/h) 40 50 50 Link Distance (m) 96.9 318.3 268.7 Travel Time (s) 8.7 22.9 19.3 Confl. Peds. (#/hr) 5 5 5 5 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Adj. Flow (vph) 21 579 337 432 516 305 Shared Lane Traffic (%) Lane Group Flow (vph) 21 579 769 0 516 305 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(m) 3.6 0.0 3.3 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.04 1.04 1.04 1.04 1.07 1.13 Turning Speed (k/h) 25 15 15 25 Number of Detectors 1 1 1 1 1 Detector Template Left Right Thru Left Thru Leading Detector (m) 8.0 6.0 4.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 4.0 2.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Turn Type Free pm+pt Protected Phases 8 2 1 6 Permitted Phases Free 6 Detector Phase 8 2 1 6 Switch Phase West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development 1: TCH Ramp & West Campus Blvd PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Minimum Initial (s) 10.0 20.0 10.0 20.0 Minimum Split (s) 25.0 25.0 15.0 25.0 Total Split (s) 29.0 0.0 54.0 0.0 27.0 81.0 Total Split (%) 26. 0.0% 49. 0.0% 24.5% 73.6% Maximum Green (s) 24.0 49.0 24.0 76.0 Yellow Time (s) 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 0.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 4.0 5.0 4.0 3.0 5.0 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 Recall Mode None Min None Min Walk Time (s) 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 Pedestrian Calls (#/hr) 5 5 5 Act Effct Green (s) 11.8 88.7 49.3 78.7 80.0 Actuated g/c Ratio 0.13 1.00 0.56 0.89 0.90 v/c Ratio 0.09 0.39 0.83 0.83 0.11 Control Delay 36.8 0.8 26.9 30.1 2.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 36.8 0.8 26.9 30.1 2.1 LOS D A C C A Approach Delay 2.0 26.9 19.7 Approach LOS A C B Queue Length 50th (m) 3.0 0.0 75.4 35.9 0.0 Queue Length 95th (m) 10.9 0.0 #237.7 #151.3 13.8 Internal Link Dist (m) 72.9 294.3 244.7 Turn Bay Length (m) 30.0 Base Capacity (vph) 459 1477 927 620 2752 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.05 0.39 0.83 0.83 0.11 Intersection Summary Area Type: Other Cycle Length: 110 Actuated Cycle Length: 88.7 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 17.4 Intersection LOS: B Intersection Capacity Utilization 92.6% ICU Level of Service F Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 2

Lanes, Volumes, Timings 2039 Post Development 1: TCH Ramp & West Campus Blvd PM Peak Hour Splits and Phases: 1: TCH Ramp & West Campus Blvd West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 3

Lanes, Volumes, Timings 2039 Post Development 9: West Campus Blvd & TCH Ramp PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 160 30 120 20 390 70 130 70 20 50 180 210 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Storage Length (m) 0.0 0.0 0.0 30.0 60.0 0.0 70.0 70.0 Storage Lanes 1 0 0 1 1 0 1 1 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor 1.00 0.98 1.00 0.97 0.99 0.99 0.99 0.97 Frt 0.880 0.850 0.967 0.850 Flt Protected 0.950 0.998 0.950 0.950 Satd. Flow (prot) 1674 1512 0 0 1758 1498 1674 1692 0 1674 1762 1498 Flt Permitted 0.254 0.982 0.629 0.695 Satd. Flow (perm) 446 1512 0 0 1729 1451 1099 1692 0 1212 1762 1451 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 126 56 16 221 Link Speed (k/h) 50 30 30 30 Link Distance (m) 62.1 199.2 185.1 101.6 Travel Time (s) 4.5 23.9 22.2 12.2 Confl. Peds. (#/hr) 5 5 5 5 5 5 5 5 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Adj. Flow (vph) 168 32 126 21 411 74 137 74 21 53 189 221 Shared Lane Traffic (%) Lane Group Flow (vph) 168 158 0 0 432 74 137 95 0 53 189 221 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.6 3.6 3.6 3.6 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Right Left Thru Left Thru Right Leading Detector (m) 8.0 4.0 2.0 4.0 6.0 8.0 4.0 8.0 4.0 6.0 Trailing Detector (m) 2.0 2.0 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 2.0 2.0 4.0 6.0 2.0 6.0 2.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt Perm Perm Perm Perm Perm Protected Phases 7 4 8 2 6 Permitted Phases 4 8 8 2 6 6 Detector Phase 7 4 8 8 8 2 2 6 6 6 Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 20.0 20.0 20.0 20.0 20.0 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 4

Lanes, Volumes, Timings 2039 Post Development 9: West Campus Blvd & TCH Ramp PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 15.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 Total Split (s) 15.0 58.0 0.0 43.0 43.0 43.0 32.0 32.0 0.0 32.0 32.0 32.0 Total Split (%) 16.7% 64. 0.0% 47.8% 47.8% 47.8% 35.6% 35.6% 0.0% 35.6% 35.6% 35.6% Maximum Green (s) 12.0 53.0 38.0 38.0 38.0 27.0 27.0 27.0 27.0 27.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 4.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min Min Min Min Min Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 5 5 5 5 5 5 5 5 5 Act Effct Green (s) 37.4 35.4 21.2 21.2 20.9 20.9 20.9 20.9 20.9 Actuated g/c Ratio 0.56 0.53 0.32 0.32 0.31 0.31 0.31 0.31 0.31 v/c Ratio 0.37 0.18 0.78 0.15 0.40 0.17 0.14 0.34 0.36 Control Delay 9.2 2.9 31.2 7.3 24.5 17.5 20.3 21.7 5.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.2 2.9 31.2 7.3 24.5 17.5 20.3 21.7 5.4 LOS A A C A C B C C A Approach Delay 6.1 27.7 21.6 13.7 Approach LOS A C C B Queue Length 50th (m) 9.1 1.8 49.0 1.6 13.5 7.2 4.8 18.2 0.0 Queue Length 95th (m) 18.9 9.5 85.3 9.6 35.6 21.5 15.5 43.2 15.9 Internal Link Dist (m) 38.1 175.2 161.1 77.6 Turn Bay Length (m) 30.0 60.0 70.0 70.0 Base Capacity (vph) 477 1249 1005 866 454 708 501 727 729 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.35 0.13 0.43 0.09 0.30 0.13 0.11 0.26 0.30 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 66.5 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 17.9 Intersection Capacity Utilization 82.9% Analysis Period (min) 15 Intersection LOS: B ICU Level of Service E West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 5

Lanes, Volumes, Timings 2039 Post Development 9: West Campus Blvd & TCH Ramp PM Peak Hour Splits and Phases: 9: West Campus Blvd & TCH Ramp West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 6

Lanes, Volumes, Timings 2039 Post Development - Improved 24: 32 Ave NW & Shaganappi Trail AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 190 500 300 100 150 190 150 591 60 520 1910 30 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Storage Length (m) 100.0 100.0 75.0 100.0 125.0 55.0 100.0 100.0 Storage Lanes 1 1 1 1 2 1 2 1 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.97 0.91 1.00 0.97 0.91 1.00 Ped Bike Factor 0.95 0.90 0.98 0.97 0.99 0.88 0.93 0.89 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1674 3133 1306 1674 3133 1306 3247 4810 1498 3247 4810 1498 Flt Permitted 0.633 0.251 0.950 0.950 Satd. Flow (perm) 1055 3133 1176 431 3133 1264 3217 4810 1318 3035 4810 1327 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 223 202 64 31 Link Speed (k/h) 50 50 70 70 Link Distance (m) 234.6 158.7 519.9 170.0 Travel Time (s) 16.9 11.4 26.7 8.7 Confl. Peds. (#/hr) 50 50 50 50 50 50 50 50 Confl. Bikes (#/hr) 25 25 25 25 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 32 32 0 32 32 0 0 0 0 0 0 Adj. Flow (vph) 202 532 319 106 160 202 160 629 64 553 2032 32 Shared Lane Traffic (%) Lane Group Flow (vph) 202 532 319 106 160 202 160 629 64 553 2032 32 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.6 3.6 7.2 7.2 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.04 1.13 1.23 1.04 1.13 1.23 1.04 1.04 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 1 Detector Template Left Thru Right Left Thru Right Left Thru Right Left Thru Right Leading Detector (m) 8.0 4.0 6.0 8.0 4.0 6.0 8.0 4.0 6.0 8.0 4.0 6.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 4.0 6.0 2.0 4.0 6.0 2.0 4.0 6.0 2.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt Perm pm+pt Free Prot Perm Prot Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 4 8 Free 2 6 Detector Phase 7 4 4 3 8 5 2 2 1 6 6 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development - Improved 24: 32 Ave NW & Shaganappi Trail AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 20.0 20.0 10.0 20.0 20.0 Minimum Split (s) 15.0 33.0 33.0 15.0 33.0 15.0 25.0 25.0 15.0 25.0 25.0 Total Split (s) 15.0 33.0 33.0 15.0 33.0 0.0 15.0 42.0 42.0 35.0 62.0 62.0 Total Split (%) 12.0% 26. 26. 12.0% 26. 0.0% 12.0% 33.6% 33.6% 28.0% 49.6% 49.6% Maximum Green (s) 12.0 28.0 28.0 12.0 28.0 10.0 37.0 37.0 30.0 57.0 57.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 2.0 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 5.0 3.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Min Min None Min Min Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 20.0 20.0 20.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 50 50 50 50 50 50 50 Act Effct Green (s) 40.0 26.4 26.4 38.7 25.7 119.9 10.1 39.2 39.2 25.2 54.3 54.3 Actuated g/c Ratio 0.33 0.22 0.22 0.32 0.21 1.00 0.08 0.33 0.33 0.21 0.45 0.45 v/c Ratio 0.49 0.77 0.74 0.42 0.24 0.16 0.59 0.40 0.14 0.81 0.93 0.05 Control Delay 33.9 52.8 25.2 32.7 40.5 0.3 63.9 33.3 8.5 55.6 40.4 6.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 33.9 52.8 25.2 32.7 40.5 0.3 63.9 33.3 8.5 55.6 40.4 6.7 LOS C D C C D A E C A E D A Approach Delay 40.8 21.4 37.2 43.2 Approach LOS D C D D Queue Length 50th (m) 37.8 67.2 22.2 18.6 17.9 0.0 21.0 46.1 0.0 70.7 177.5 0.2 Queue Length 95th (m) 58.7 89.3 60.9 32.6 28.3 0.0 33.0 60.7 11.1 88.5 202.4 6.1 Internal Link Dist (m) 210.6 134.7 495.9 146.0 Turn Bay Length (m) 100.0 100.0 75.0 100.0 125.0 55.0 100.0 100.0 Base Capacity (vph) 419 754 452 268 738 1264 273 1582 476 819 2305 652 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.48 0.71 0.71 0.40 0.22 0.16 0.59 0.40 0.13 0.68 0.88 0.05 Intersection Summary Area Type: Other Cycle Length: 125 Actuated Cycle Length: 119.9 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 39.6 Intersection Capacity Utilization 93. Analysis Period (min) 15 Intersection LOS: D ICU Level of Service F West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 2

Lanes, Volumes, Timings 2039 Post Development - Improved 24: 32 Ave NW & Shaganappi Trail AM Peak Hour Splits and Phases: 24: 32 Ave NW & Shaganappi Trail West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 3

Lanes, Volumes, Timings 2039 Post Development - Improved 28: West Campus Way & Shaganappi Trail AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) 350 350 450 510 500 1830 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.3 3.7 3.6 3.6 3.6 3.6 Storage Length (m) 0.0 55.0 100.0 135.0 Storage Lanes 1 1 1 2 Taper Length (m) 7.5 7.5 7.5 7.5 Lane Util. Factor 0.97 1.00 0.91 1.00 0.97 0.91 Ped Bike Factor 0.96 0.94 0.97 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3139 1514 4810 1498 3247 4810 Flt Permitted 0.950 0.950 Satd. Flow (perm) 3139 1457 4810 1404 3153 4810 Right Turn on Red Yes Yes Satd. Flow (RTOR) 372 543 Link Speed (k/h) 50 70 70 Link Distance (m) 319.3 175.1 519.9 Travel Time (s) 23.0 9.0 26.7 Confl. Peds. (#/hr) 50 25 25 Confl. Bikes (#/hr) 50 25 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Adj. Flow (vph) 372 372 479 543 532 1947 Shared Lane Traffic (%) Lane Group Flow (vph) 372 372 479 543 532 1947 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(m) 10.1 7.2 7.2 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.08 1.02 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 15 25 Number of Detectors 1 1 1 1 1 1 Detector Template Left Right Thru Right Left Thru Leading Detector (m) 8.0 6.0 4.0 6.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 4.0 2.0 4.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Free Perm Prot Protected Phases 8 2 1 6 Permitted Phases Free 2 Detector Phase 8 2 2 1 6 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development - Improved 28: West Campus Way & Shaganappi Trail AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 33.0 25.0 25.0 15.0 25.0 Total Split (s) 33.0 0.0 32.0 32.0 25.0 57.0 Total Split (%) 36.7% 0.0% 35.6% 35.6% 27.8% 63. Maximum Green (s) 28.0 27.0 27.0 20.0 52.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 4.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min Min None Min Walk Time (s) 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 20.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 50 25 25 25 Act Effct Green (s) 19.9 68.4 16.3 16.3 15.9 37.6 Actuated g/c Ratio 0.29 1.00 0.24 0.24 0.23 0.55 v/c Ratio 0.41 0.26 0.42 0.72 0.71 0.74 Control Delay 21.6 0.4 24.5 8.9 32.2 14.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 21.6 0.4 24.5 8.9 32.2 14.4 LOS C A C A C B Approach Delay 11.0 16.2 18.2 Approach LOS B B B Queue Length 50th (m) 20.2 0.0 23.3 0.0 38.6 85.3 Queue Length 95th (m) 39.4 0.0 33.9 27.5 64.6 102.7 Internal Link Dist (m) 295.3 151.1 495.9 Turn Bay Length (m) 55.0 100.0 135.0 Base Capacity (vph) 1394 1457 2059 912 1030 3743 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.27 0.26 0.23 0.60 0.52 0.52 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 68.4 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 16.5 Intersection Capacity Utilization 65.5% Analysis Period (min) 15 Intersection LOS: B ICU Level of Service C West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 2

Lanes, Volumes, Timings 2039 Post Development - Improved 28: West Campus Way & Shaganappi Trail AM Peak Hour Splits and Phases: 28: West Campus Way & Shaganappi Trail West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 3

Lanes, Volumes, Timings 2039 Post Development - Improved 36: West Campus Way & 39 Street NW AM Peak Hour Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Volume (vph) 130 300 260 10 190 450 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.3 3.5 3.3 3.5 3.5 3.3 Lane Util. Factor 0.95 0.95 0.95 0.95 1.00 1.00 Ped Bike Factor 0.99 1.00 0.97 0.94 Frt 0.994 0.850 Flt Protected 0.985 0.950 Satd. Flow (prot) 0 3098 3043 0 1576 1378 Flt Permitted 0.767 0.950 Satd. Flow (perm) 0 2377 3043 0 1533 1296 Right Turn on Red Yes Yes Satd. Flow (RTOR) 7 196 Link Speed (k/h) 50 50 50 Link Distance (m) 216.6 518.1 332.1 Travel Time (s) 15.6 37.3 23.9 Confl. Peds. (#/hr) 80 80 30 30 Confl. Bikes (#/hr) 50 50 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 0 0 6 12 12 Parking (#/hr) 0 0 0 0 Adj. Flow (vph) 138 319 277 11 202 479 Shared Lane Traffic (%) Lane Group Flow (vph) 0 457 288 0 202 479 Enter Blocked Intersection No No No No No No Lane Alignment Left Left Left Right Left Right Median Width(m) 0.0 0.0 3.5 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.08 1.12 1.15 1.05 1.12 1.15 Turning Speed (k/h) 25 15 25 15 Number of Detectors 1 1 1 1 1 Detector Template Left Thru Thru Left Right Leading Detector (m) 2.0 4.0 4.0 8.0 6.0 Trailing Detector (m) 0.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 0.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 2.0 2.0 2.0 6.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Turn Type Perm Perm Protected Phases 4 8 6 Permitted Phases 4 6 Detector Phase 4 4 8 6 6 Switch Phase West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 7

Lanes, Volumes, Timings 2039 Post Development - Improved 36: West Campus Way & 39 Street NW AM Peak Hour Lane Group EBL EBT WBT WBR SBL SBR Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.0 25.0 25.0 25.0 25.0 Total Split (s) 25.0 25.0 25.0 0.0 35.0 35.0 Total Split (%) 41.7% 41.7% 41.7% 0.0% 58. 58. Maximum Green (s) 20.0 20.0 20.0 30.0 30.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode Min Min Min None None Walk Time (s) 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 80 80 80 30 30 Act Effct Green (s) 15.8 15.8 17.3 17.3 Actuated g/c Ratio 0.36 0.36 0.39 0.39 v/c Ratio 0.53 0.26 0.33 0.76 Control Delay 15.1 11.7 11.0 15.7 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 15.1 11.7 11.0 15.7 LOS B B B B Approach Delay 15.1 11.7 14.3 Approach LOS B B B Queue Length 50th (m) 13.6 7.4 12.4 19.8 Queue Length 95th (m) 36.0 20.8 23.6 49.3 Internal Link Dist (m) 192.6 494.1 308.1 Turn Bay Length (m) Base Capacity (vph) 1169 1501 1163 1008 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.39 0.19 0.17 0.48 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 44 Natural Cycle: 50 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 14.0 Intersection Capacity Utilization 55.7% Analysis Period (min) 15 Intersection LOS: B ICU Level of Service B West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 8

Lanes, Volumes, Timings 2039 Post Development - Improved 36: West Campus Way & 39 Street NW AM Peak Hour Splits and Phases: 36: West Campus Way & 39 Street NW West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 9

Lanes, Volumes, Timings 2039 Post Development - Improved 24: 32 Ave NW & Shaganappi Trail PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 300 410 250 110 500 580 400 1690 100 290 920 120 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Storage Length (m) 100.0 100.0 75.0 100.0 125.0 55.0 100.0 100.0 Storage Lanes 1 1 1 1 2 1 2 1 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.97 0.91 1.00 0.97 0.91 1.00 Ped Bike Factor 0.95 0.84 0.94 0.95 0.92 0.80 0.97 0.80 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1674 3133 1306 1674 3133 1306 3247 4810 1498 3247 4810 1498 Flt Permitted 0.241 0.431 0.950 0.950 Satd. Flow (perm) 405 3133 1103 712 3133 1245 2993 4810 1200 3165 4810 1196 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 263 369 61 126 Link Speed (k/h) 50 50 70 70 Link Distance (m) 234.6 158.7 519.9 170.0 Travel Time (s) 16.9 11.4 26.7 8.7 Confl. Peds. (#/hr) 100 100 100 100 100 100 100 100 Confl. Bikes (#/hr) 25 25 25 25 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 32 32 0 32 32 0 0 0 0 0 0 Adj. Flow (vph) 316 432 263 116 526 611 421 1779 105 305 968 126 Shared Lane Traffic (%) Lane Group Flow (vph) 316 432 263 116 526 611 421 1779 105 305 968 126 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.6 3.6 7.2 7.2 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.04 1.13 1.23 1.04 1.13 1.23 1.04 1.04 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 1 Detector Template Left Thru Right Left Thru Right Left Thru Right Left Thru Right Leading Detector (m) 8.0 4.0 6.0 8.0 4.0 6.0 8.0 4.0 6.0 8.0 4.0 6.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 4.0 6.0 2.0 4.0 6.0 2.0 4.0 6.0 2.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt Perm pm+pt Free Prot Perm Prot Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 4 8 Free 2 6 Detector Phase 7 4 4 3 8 5 2 2 1 6 6 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development - Improved 24: 32 Ave NW & Shaganappi Trail PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 20.0 20.0 10.0 20.0 20.0 Minimum Split (s) 15.0 33.0 33.0 15.0 33.0 15.0 25.0 25.0 15.0 25.0 25.0 Total Split (s) 18.0 35.0 35.0 16.0 33.0 0.0 28.0 50.0 50.0 19.0 41.0 41.0 Total Split (%) 15.0% 29. 29. 13. 27.5% 0.0% 23. 41.7% 41.7% 15.8% 34. 34. Maximum Green (s) 15.0 30.0 30.0 13.0 28.0 23.0 45.0 45.0 14.0 36.0 36.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 2.0 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 5.0 3.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Min Min None Min Min Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 20.0 20.0 20.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 100 100 100 100 100 100 100 Act Effct Green (s) 47.8 31.9 31.9 41.2 28.0 119.7 20.0 45.0 45.0 13.7 38.7 38.7 Actuated g/c Ratio 0.40 0.27 0.27 0.34 0.23 1.00 0.17 0.38 0.38 0.11 0.32 0.32 v/c Ratio 0.98 0.52 0.54 0.35 0.72 0.49 0.78 0.98 0.21 0.82 0.62 0.27 Control Delay 77.0 40.4 8.9 26.6 48.6 1.4 57.9 54.8 13.0 70.5 36.9 6.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 77.0 40.4 8.9 26.6 48.6 1.4 57.9 54.8 13.0 70.5 36.9 6.9 LOS E D A C D A E D B E D A Approach Delay 43.6 23.6 53.5 41.5 Approach LOS D C D D Queue Length 50th (m) 57.2 47.8 0.0 18.3 63.5 0.0 51.7 158.6 7.0 38.5 74.5 0.0 Queue Length 95th (m) #111.1 66.5 24.2 31.8 84.1 0.0 68.2 #196.7 20.0 #60.2 93.0 14.5 Internal Link Dist (m) 210.6 134.7 495.9 146.0 Turn Bay Length (m) 100.0 100.0 75.0 100.0 125.0 55.0 100.0 100.0 Base Capacity (vph) 321 834 487 360 733 1245 624 1809 489 380 1554 472 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.98 0.52 0.54 0.32 0.72 0.49 0.67 0.98 0.21 0.80 0.62 0.27 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 119.7 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 42.7 Intersection LOS: D Intersection Capacity Utilization 97.9% ICU Level of Service F Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 2

Lanes, Volumes, Timings 2039 Post Development - Improved 24: 32 Ave NW & Shaganappi Trail PM Peak Hour Splits and Phases: 24: 32 Ave NW & Shaganappi Trail West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 3

Lanes, Volumes, Timings 2039 Post Development - Improved 28: West Campus Way & Shaganappi Trail PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) 600 730 1550 380 500 680 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.3 3.7 3.6 3.6 3.6 3.6 Storage Length (m) 0.0 55.0 100.0 135.0 Storage Lanes 1 1 1 2 Taper Length (m) 7.5 7.5 7.5 7.5 Lane Util. Factor 0.97 1.00 0.91 1.00 0.97 0.91 Ped Bike Factor 0.96 0.92 0.99 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3139 1514 4810 1498 3247 4810 Flt Permitted 0.950 0.950 Satd. Flow (perm) 3139 1457 4810 1383 3219 4810 Right Turn on Red Yes Yes Satd. Flow (RTOR) 495 365 Link Speed (k/h) 50 70 70 Link Distance (m) 319.3 175.1 519.9 Travel Time (s) 23.0 9.0 26.7 Confl. Peds. (#/hr) 50 25 25 Confl. Bikes (#/hr) 50 25 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Adj. Flow (vph) 632 768 1632 400 526 716 Shared Lane Traffic (%) Lane Group Flow (vph) 632 768 1632 400 526 716 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(m) 10.1 7.2 7.2 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.08 1.02 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 15 25 Number of Detectors 1 1 1 1 1 1 Detector Template Left Right Thru Right Left Thru Leading Detector (m) 8.0 6.0 4.0 6.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 4.0 2.0 4.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Free Perm Prot Protected Phases 8 2 1 6 Permitted Phases Free 2 Detector Phase 8 2 2 1 6 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development - Improved 28: West Campus Way & Shaganappi Trail PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 33.0 25.0 25.0 15.0 25.0 Total Split (s) 55.0 0.0 51.0 51.0 29.0 80.0 Total Split (%) 40.7% 0.0% 37.8% 37.8% 21.5% 59. Maximum Green (s) 50.0 46.0 46.0 24.0 75.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 4.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min Min None Min Walk Time (s) 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 20.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 50 25 25 25 Act Effct Green (s) 28.3 111.3 45.5 45.5 22.4 72.9 Actuated g/c Ratio 0.25 1.00 0.41 0.41 0.20 0.65 v/c Ratio 0.79 0.53 0.83 0.51 0.80 0.23 Control Delay 46.9 1.4 34.9 6.3 53.5 8.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 46.9 1.4 34.9 6.3 53.5 8.4 LOS D A C A D A Approach Delay 21.9 29.3 27.5 Approach LOS C C C Queue Length 50th (m) 71.6 0.0 122.8 4.9 59.6 21.9 Queue Length 95th (m) 92.5 0.0 161.2 30.6 #90.5 34.2 Internal Link Dist (m) 295.3 151.1 495.9 Turn Bay Length (m) 55.0 100.0 135.0 Base Capacity (vph) 1419 1457 2001 788 705 3262 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.45 0.53 0.82 0.51 0.75 0.22 Intersection Summary Area Type: Other Cycle Length: 135 Actuated Cycle Length: 111.3 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 26.6 Intersection LOS: C Intersection Capacity Utilization 80. ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 2

Lanes, Volumes, Timings 2039 Post Development - Improved 28: West Campus Way & Shaganappi Trail PM Peak Hour Splits and Phases: 28: West Campus Way & Shaganappi Trail West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 3

Lanes, Volumes, Timings 2039 Post Development - Improved 36: West Campus Way & 39 Street NW PM Peak Hour Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Volume (vph) 520 220 320 240 60 220 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.3 3.5 3.3 3.5 3.5 3.3 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00 Ped Bike Factor 0.95 0.91 0.93 0.88 Frt 0.936 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 1456 1568 2614 0 1576 1378 Flt Permitted 0.215 0.950 Satd. Flow (perm) 313 1568 2614 0 1469 1215 Right Turn on Red Yes Yes Satd. Flow (RTOR) 194 232 Link Speed (k/h) 50 50 50 Link Distance (m) 216.6 518.1 332.1 Travel Time (s) 15.6 37.3 23.9 Confl. Peds. (#/hr) 125 125 50 50 Confl. Bikes (#/hr) 50 50 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 0 0 6 12 12 Parking (#/hr) 0 0 0 0 Adj. Flow (vph) 547 232 337 253 63 232 Shared Lane Traffic (%) Lane Group Flow (vph) 547 232 590 0 63 232 Enter Blocked Intersection No No No No No No Lane Alignment Left Left Left Right Left Right Median Width(m) 3.4 0.0 3.5 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.23 1.20 1.15 1.05 1.12 1.15 Turning Speed (k/h) 25 15 25 15 Number of Detectors 1 1 1 1 1 Detector Template Thru Thru Left Right Leading Detector (m) 8.0 4.0 4.0 8.0 6.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 2.0 6.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt Perm Protected Phases 7 4 8 6 Permitted Phases 4 6 Detector Phase 7 4 8 6 6 Switch Phase West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 7

Lanes, Volumes, Timings 2039 Post Development - Improved 36: West Campus Way & 39 Street NW PM Peak Hour Lane Group EBL EBT WBT WBR SBL SBR Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 15.0 25.0 25.0 25.0 25.0 Total Split (s) 38.0 63.0 25.0 0.0 27.0 27.0 Total Split (%) 42. 70.0% 27.8% 0.0% 30.0% 30.0% Maximum Green (s) 35.0 58.0 20.0 22.0 22.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 5.0 4.0 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min Min None None Walk Time (s) 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 125 125 50 50 Act Effct Green (s) 54.2 52.2 17.8 15.7 15.7 Actuated g/c Ratio 0.69 0.67 0.23 0.20 0.20 v/c Ratio 0.81 0.22 0.79 0.20 0.54 Control Delay 25.3 6.2 28.8 29.4 9.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 25.3 6.2 28.8 29.4 9.4 LOS C A C C A Approach Delay 19.6 28.8 13.7 Approach LOS B C B Queue Length 50th (m) 63.6 14.6 35.4 9.1 0.0 Queue Length 95th (m) #125.0 24.4 #58.6 19.9 19.2 Internal Link Dist (m) 192.6 494.1 308.1 Turn Bay Length (m) Base Capacity (vph) 746 1186 834 459 518 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.73 0.20 0.71 0.14 0.45 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 78.2 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 21.8 Intersection LOS: C Intersection Capacity Utilization 76. ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 8

Lanes, Volumes, Timings 2039 Post Development - Improved 36: West Campus Way & 39 Street NW PM Peak Hour Splits and Phases: 36: West Campus Way & 39 Street NW West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 9

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 28: West Campus Way & Shaganappi Trail AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) 350 350 450 510 500 1830 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.3 3.7 3.6 3.6 3.6 3.6 Storage Length (m) 0.0 55.0 100.0 135.0 Storage Lanes 1 1 1 2 Taper Length (m) 7.5 7.5 7.5 7.5 Lane Util. Factor 0.97 1.00 0.91 1.00 0.97 0.91 Ped Bike Factor 0.64 0.61 0.68 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3139 1514 4810 1498 3247 4810 Flt Permitted 0.950 0.950 Satd. Flow (perm) 3139 973 4810 919 2204 4810 Right Turn on Red Yes Yes Satd. Flow (RTOR) 372 543 Link Speed (k/h) 50 70 70 Link Distance (m) 319.3 175.1 519.9 Travel Time (s) 23.0 9.0 26.7 Confl. Peds. (#/hr) 500 500 500 Confl. Bikes (#/hr) 50 25 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Adj. Flow (vph) 372 372 479 543 532 1947 Shared Lane Traffic (%) Lane Group Flow (vph) 372 372 479 543 532 1947 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(m) 10.1 7.2 7.2 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.08 1.02 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 15 25 Number of Detectors 1 1 1 1 1 1 Detector Template Left Right Thru Right Left Thru Leading Detector (m) 8.0 6.0 4.0 6.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 4.0 2.0 4.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Perm Perm Prot Protected Phases 8 2 1 6 Permitted Phases 8 2 Detector Phase 8 8 2 2 1 6 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 4

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 28: West Campus Way & Shaganappi Trail AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 33.0 33.0 25.0 25.0 15.0 25.0 Total Split (s) 33.0 33.0 32.0 32.0 25.0 57.0 Total Split (%) 36.7% 36.7% 35.6% 35.6% 27.8% 63. Maximum Green (s) 28.0 28.0 27.0 27.0 20.0 52.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s) 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 20.0 20.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 500 500 500 500 500 Act Effct Green (s) 28.1 28.1 22.7 22.7 17.4 45.1 Actuated g/c Ratio 0.34 0.34 0.27 0.27 0.21 0.54 v/c Ratio 0.35 0.65 0.37 0.84 0.78 0.75 Control Delay 22.9 8.8 25.5 16.4 40.6 16.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 22.9 8.8 25.5 16.4 40.6 16.7 LOS C A C B D B Approach Delay 15.9 20.6 21.8 Approach LOS B C C Queue Length 50th (m) 22.8 0.0 23.9 0.0 41.5 85.3 Queue Length 95th (m) 39.5 27.7 33.9 #69.4 64.8 102.6 Internal Link Dist (m) 295.3 151.1 495.9 Turn Bay Length (m) 55.0 100.0 135.0 Base Capacity (vph) 1061 575 1567 666 784 3018 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.35 0.65 0.31 0.82 0.68 0.65 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 83.3 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 20.5 Intersection LOS: C Intersection Capacity Utilization 68.0% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 5

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 28: West Campus Way & Shaganappi Trail AM Peak Hour Splits and Phases: 28: West Campus Way & Shaganappi Trail West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 6

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 26: West Campus Way & West Campus Drive AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 140 330 530 310 320 80 80 130 190 40 270 190 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.5 3.3 3.5 3.5 3.3 3.5 3.3 3.3 3.5 3.3 3.3 3.3 Storage Length (m) 40.0 0.0 50.0 0.0 50.0 0.0 0.0 40.0 Storage Lanes 1 0 1 0 1 1 0 1 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 0.95 0.95 0.95 Ped Bike Factor 0.79 0.76 0.92 0.87 0.61 0.83 Frt 0.908 0.970 0.850 0.943 Flt Protected 0.950 0.950 0.950 0.996 Satd. Flow (prot) 1655 2227 0 1655 2826 0 1618 1621 1410 0 2451 0 Flt Permitted 0.504 0.129 0.254 0.916 Satd. Flow (perm) 696 2227 0 225 2826 0 376 1621 860 0 2198 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 321 20 202 133 Link Speed (k/h) 50 50 50 40 Link Distance (m) 319.3 216.6 313.7 74.2 Travel Time (s) 23.0 15.6 22.6 6.7 Confl. Peds. (#/hr) 500 500 500 500 500 500 500 500 Confl. Bikes (#/hr) 50 50 50 50 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 0 6 0 12 12 0 12 12 0 0 0 Parking (#/hr) 0 0 Adj. Flow (vph) 149 351 564 330 340 85 85 138 202 43 287 202 Shared Lane Traffic (%) Lane Group Flow (vph) 149 915 0 330 425 0 85 138 202 0 532 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.5 3.5 3.3 4.0 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.05 1.08 1.05 1.05 1.12 1.05 1.08 1.15 1.12 1.08 1.15 1.08 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (m) 8.0 4.0 8.0 4.0 8.0 4.0 2.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 0.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 0.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 6.0 2.0 6.0 2.0 2.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Perm pm+pt pm+pt Perm Perm Protected Phases 2 1 6 3 8 4 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 26: West Campus Way & West Campus Drive AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Permitted Phases 2 6 8 8 4 Detector Phase 2 2 1 6 3 8 8 4 4 Switch Phase Minimum Initial (s) 20.0 20.0 10.0 20.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.0 25.0 15.0 25.0 15.0 25.0 25.0 25.0 25.0 Total Split (s) 33.0 33.0 0.0 17.0 50.0 0.0 15.0 40.0 40.0 25.0 25.0 0.0 Total Split (%) 36.7% 36.7% 0.0% 18.9% 55.6% 0.0% 16.7% 44. 44. 27.8% 27.8% 0.0% Maximum Green (s) 28.0 28.0 14.0 45.0 12.0 35.0 35.0 20.0 20.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 0.0 2.0 0.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 4.0 3.0 5.0 4.0 3.0 5.0 5.0 5.0 5.0 4.0 Lead/Lag Lag Lag Lead Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode Min Min None Min None None None None None Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 500 500 500 500 500 500 500 Act Effct Green (s) 28.1 28.1 47.2 45.2 32.4 30.4 30.4 20.1 Actuated g/c Ratio 0.33 0.33 0.55 0.53 0.38 0.36 0.36 0.23 v/c Ratio 0.65 0.97 0.92 0.28 0.29 0.24 0.46 0.86 Control Delay 42.0 42.7 53.6 12.0 19.7 20.3 6.8 40.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 42.0 42.7 53.6 12.0 19.7 20.3 6.8 40.1 LOS D D D B B C A D Approach Delay 42.6 30.2 13.7 40.1 Approach LOS D C B D Queue Length 50th (m) 22.8 59.9 41.7 20.4 9.4 16.4 0.0 36.9 Queue Length 95th (m) #52.9 #107.0 #96.7 31.0 18.9 30.0 15.5 #68.9 Internal Link Dist (m) 295.3 192.6 289.7 50.2 Turn Bay Length (m) 40.0 50.0 50.0 Base Capacity (vph) 228 947 359 1501 317 666 472 617 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.65 0.97 0.92 0.28 0.27 0.21 0.43 0.86 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 85.6 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 34.3 Intersection LOS: C Intersection Capacity Utilization 102.0% ICU Level of Service G Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 2

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 26: West Campus Way & West Campus Drive AM Peak Hour Queue shown is maximum after two cycles. Splits and Phases: 26: West Campus Way & West Campus Drive West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 3

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 36: West Campus Way & 39 Street NW AM Peak Hour Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Volume (vph) 130 300 260 10 190 450 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.3 3.5 3.3 3.5 3.5 3.3 Lane Util. Factor 0.95 0.95 0.95 0.95 1.00 1.00 Ped Bike Factor 0.93 0.98 0.62 0.61 Frt 0.994 0.850 Flt Protected 0.985 0.950 Satd. Flow (prot) 0 3098 3010 0 1576 1378 Flt Permitted 0.753 0.950 Satd. Flow (perm) 0 2194 3010 0 985 846 Right Turn on Red Yes Yes Satd. Flow (RTOR) 4 1 Link Speed (k/h) 50 50 50 Link Distance (m) 216.6 518.1 332.1 Travel Time (s) 15.6 37.3 23.9 Confl. Peds. (#/hr) 500 500 500 500 Confl. Bikes (#/hr) 50 50 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 0 0 6 12 12 Parking (#/hr) 0 0 0 0 Adj. Flow (vph) 138 319 277 11 202 479 Shared Lane Traffic (%) Lane Group Flow (vph) 0 457 288 0 202 479 Enter Blocked Intersection No No No No No No Lane Alignment Left Left Left Right Left Right Median Width(m) 0.0 0.0 3.5 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.08 1.12 1.15 1.05 1.12 1.15 Turning Speed (k/h) 25 15 25 15 Number of Detectors 1 1 1 1 1 Detector Template Left Thru Thru Left Right Leading Detector (m) 2.0 4.0 4.0 8.0 6.0 Trailing Detector (m) 0.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 0.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 2.0 2.0 2.0 6.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Turn Type Perm Perm Protected Phases 4 8 6 Permitted Phases 4 6 Detector Phase 4 4 8 6 6 Switch Phase West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 7

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 36: West Campus Way & 39 Street NW AM Peak Hour Lane Group EBL EBT WBT WBR SBL SBR Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.0 25.0 25.0 25.0 25.0 Total Split (s) 27.0 27.0 27.0 0.0 63.0 63.0 Total Split (%) 30.0% 30.0% 30.0% 0.0% 70.0% 70.0% Maximum Green (s) 22.0 22.0 22.0 58.0 58.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode Min Min Min None None Walk Time (s) 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 500 500 500 500 500 Act Effct Green (s) 21.6 21.6 49.0 49.0 Actuated g/c Ratio 0.27 0.27 0.61 0.61 v/c Ratio 0.78 0.36 0.21 0.93 Control Delay 40.9 27.5 7.4 42.4 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 40.9 27.5 7.4 42.4 LOS D C A D Approach Delay 40.9 27.5 32.0 Approach LOS D C C Queue Length 50th (m) 41.8 22.7 13.4 63.8 Queue Length 95th (m) #69.0 34.8 22.7 #139.6 Internal Link Dist (m) 192.6 494.1 308.1 Turn Bay Length (m) Base Capacity (vph) 612 844 1160 623 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.75 0.34 0.17 0.77 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 80.9 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 33.9 Intersection LOS: C Intersection Capacity Utilization 63.5% ICU Level of Service B Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 8

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 36: West Campus Way & 39 Street NW AM Peak Hour Splits and Phases: 36: West Campus Way & 39 Street NW West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 9

HCM Unsignalized Intersection Capacity Analysis 2039 Post Development - 500 Peds Sens 38: Collegiate Rd & Collegiate Blvd AM Peak Hour Movement EBL EBT WBT WBR SBL SBR Lane Configurations Sign Control Stop Stop Stop Volume (vph) 90 400 120 90 280 150 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Hourly flow rate (vph) 96 426 128 96 298 160 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total (vph) 238 284 85 138 298 160 Volume Left (vph) 96 0 0 0 298 0 Volume Right (vph) 0 0 0 96 0 160 Hadj (s) 0.29 0.09 0.09-0.40 0.58-0.61 Departure Headway (s) 6.6 6.4 6.9 6.4 7.1 5.9 Degree Utilization, x 0.44 0.51 0.16 0.24 0.58 0.26 Capacity (veh/h) 526 546 495 534 489 587 Control Delay (s) 13.4 14.6 10.0 10.2 18.3 9.7 Approach Delay (s) 14.1 10.1 15.3 Approach LOS B B C Intersection Summary Delay 13.8 HCM Level of Service B Intersection Capacity Utilization 53. ICU Level of Service A Analysis Period (min) 15 West Campus Transportation Impact Assessment Synchro 7 - Report Latest Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 28: West Campus Way & Shaganappi Trail PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) 600 730 1550 380 500 680 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.3 3.7 3.6 3.6 3.6 3.6 Storage Length (m) 0.0 55.0 100.0 135.0 Storage Lanes 1 1 1 2 Taper Length (m) 7.5 7.5 7.5 7.5 Lane Util. Factor 0.97 1.00 0.91 1.00 0.97 0.91 Ped Bike Factor 0.60 0.55 0.92 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3139 1514 4810 1498 3247 4810 Flt Permitted 0.950 0.950 Satd. Flow (perm) 3139 909 4810 824 2999 4810 Right Turn on Red Yes Yes Satd. Flow (RTOR) 369 369 Link Speed (k/h) 50 70 70 Link Distance (m) 319.3 175.1 519.9 Travel Time (s) 23.0 9.0 26.7 Confl. Peds. (#/hr) 500 500 500 Confl. Bikes (#/hr) 50 25 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Adj. Flow (vph) 632 768 1632 400 526 716 Shared Lane Traffic (%) Lane Group Flow (vph) 632 768 1632 400 526 716 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(m) 10.1 7.2 7.2 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.08 1.02 1.04 1.04 1.04 1.04 Turning Speed (k/h) 25 15 15 25 Number of Detectors 1 1 1 1 1 1 Detector Template Left Right Thru Right Left Thru Leading Detector (m) 8.0 6.0 4.0 6.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 4.0 2.0 4.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Perm Perm Prot Protected Phases 8 2 1 6 Permitted Phases 8 2 Detector Phase 8 8 2 2 1 6 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 4

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 28: West Campus Way & Shaganappi Trail PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Switch Phase Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 33.0 33.0 25.0 25.0 15.0 25.0 Total Split (s) 54.0 54.0 52.0 52.0 29.0 81.0 Total Split (%) 40.0% 40.0% 38.5% 38.5% 21.5% 60.0% Maximum Green (s) 49.0 49.0 47.0 47.0 24.0 76.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s) 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 20.0 20.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 500 500 500 500 500 Act Effct Green (s) 49.0 49.0 47.0 47.0 23.6 75.6 Actuated g/c Ratio 0.36 0.36 0.35 0.35 0.18 0.56 v/c Ratio 0.55 1.36 0.97 0.76 0.92 0.27 Control Delay 36.4 192.0 59.3 15.4 77.8 15.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 36.4 192.0 59.3 15.4 77.8 15.5 LOS D F E B E B Approach Delay 121.8 50.7 41.9 Approach LOS F D D Queue Length 50th (m) 72.5 ~214.0 164.9 5.9 75.4 36.3 Queue Length 95th (m) 92.1 #293.9 #200.6 56.6 #108.1 44.4 Internal Link Dist (m) 295.3 151.1 495.9 Turn Bay Length (m) 55.0 100.0 135.0 Base Capacity (vph) 1143 566 1680 528 579 2717 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.55 1.36 0.97 0.76 0.91 0.26 Intersection Summary Area Type: Other Cycle Length: 135 Actuated Cycle Length: 134.6 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.36 Intersection Signal Delay: 69.6 Intersection LOS: E Intersection Capacity Utilization 95. ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 5

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 28: West Campus Way & Shaganappi Trail PM Peak Hour Queue shown is maximum after two cycles. Splits and Phases: 28: West Campus Way & Shaganappi Trail West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 6

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 26: West Campus Way & West Campus Drive PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 180 470 220 110 200 60 330 200 520 80 170 390 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.5 3.3 3.5 3.5 3.3 3.5 3.3 3.3 3.5 3.3 3.3 3.3 Storage Length (m) 40.0 0.0 50.0 0.0 50.0 0.0 0.0 40.0 Storage Lanes 1 0 1 0 1 1 0 0 Taper Length (m) 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 0.95 0.95 0.95 Ped Bike Factor 0.74 0.86 0.91 0.90 0.90 0.57 0.71 Frt 0.952 0.966 0.850 0.909 Flt Protected 0.950 0.950 0.950 0.994 Satd. Flow (prot) 1655 2652 0 1655 2745 0 1618 1621 1410 0 2044 0 Flt Permitted 0.516 0.174 0.238 0.870 Satd. Flow (perm) 665 2652 0 277 2745 0 367 1621 804 0 1720 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 63 31 305 258 Link Speed (k/h) 50 50 50 40 Link Distance (m) 319.3 216.6 313.7 73.9 Travel Time (s) 23.0 15.6 22.6 6.7 Confl. Peds. (#/hr) 500 500 500 500 500 500 500 500 Confl. Bikes (#/hr) 50 50 50 50 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 0 6 0 12 12 0 12 12 0 0 0 Parking (#/hr) 0 0 Adj. Flow (vph) 189 495 232 116 211 63 347 211 547 84 179 411 Shared Lane Traffic (%) Lane Group Flow (vph) 189 727 0 116 274 0 347 211 547 0 674 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.5 3.5 3.3 4.0 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.05 1.08 1.05 1.05 1.12 1.05 1.08 1.15 1.12 1.08 1.15 1.08 Turning Speed (k/h) 25 15 25 15 25 15 25 15 Number of Detectors 1 1 1 1 1 1 1 1 1 Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (m) 8.0 4.0 8.0 4.0 8.0 4.0 2.0 8.0 4.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 2.0 0.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 2.0 0.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 6.0 2.0 6.0 2.0 2.0 6.0 2.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt pm+pt pm+pt Perm Perm Protected Phases 5 2 1 6 3 8 4 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 1

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 26: West Campus Way & West Campus Drive PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Permitted Phases 2 6 8 8 4 Detector Phase 5 2 1 6 3 8 8 4 4 Switch Phase Minimum Initial (s) 10.0 20.0 10.0 20.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 15.0 25.0 15.0 25.0 15.0 25.0 25.0 25.0 25.0 Total Split (s) 16.0 37.0 0.0 15.0 36.0 0.0 20.0 68.0 68.0 48.0 48.0 0.0 Total Split (%) 13. 30.8% 0.0% 12.5% 30.0% 0.0% 16.7% 56.7% 56.7% 40.0% 40.0% 0.0% Maximum Green (s) 13.0 32.0 12.0 31.0 17.0 63.0 63.0 43.0 43.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 0.0 2.0 0.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 4.0 3.0 5.0 4.0 3.0 5.0 5.0 5.0 5.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min None Min None None None None None Walk Time (s) 8.0 8.0 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 500 500 500 500 500 500 Act Effct Green (s) 45.1 30.8 42.6 29.6 60.1 58.1 58.1 38.1 Actuated g/c Ratio 0.40 0.27 0.38 0.26 0.53 0.51 0.51 0.34 v/c Ratio 0.51 0.95 0.49 0.37 0.91 0.25 0.98 0.90 Control Delay 28.6 59.8 29.8 33.1 47.2 16.3 45.8 37.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 28.6 59.8 29.8 33.1 47.2 16.3 45.8 37.6 LOS C E C C D B D D Approach Delay 53.4 32.1 40.6 37.6 Approach LOS D C D D Queue Length 50th (m) 30.8 85.6 18.0 25.9 46.8 26.8 70.8 52.7 Queue Length 95th (m) 49.1 #128.7 31.4 39.2 #104.0 43.1 #167.9 #92.5 Internal Link Dist (m) 295.3 192.6 289.7 49.9 Turn Bay Length (m) 40.0 50.0 50.0 Base Capacity (vph) 386 805 255 785 385 915 587 821 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.49 0.90 0.45 0.35 0.90 0.23 0.93 0.82 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 113.1 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 42.7 Intersection LOS: D Intersection Capacity Utilization 105. ICU Level of Service G Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 2

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 26: West Campus Way & West Campus Drive PM Peak Hour Queue shown is maximum after two cycles. Splits and Phases: 26: West Campus Way & West Campus Drive West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 3

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 36: West Campus Way & 39 Street NW PM Peak Hour Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Volume (vph) 520 220 320 240 60 220 Ideal Flow (vphpl) 1850 1850 1850 1850 1850 1850 Lane Width (m) 3.3 3.5 3.3 3.5 3.5 3.3 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00 Ped Bike Factor 0.89 0.83 0.62 0.60 Frt 0.936 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 1456 1568 2387 0 1576 1378 Flt Permitted 0.219 0.950 Satd. Flow (perm) 297 1568 2387 0 985 832 Right Turn on Red Yes Yes Satd. Flow (RTOR) 197 232 Link Speed (k/h) 50 50 50 Link Distance (m) 216.6 518.1 332.1 Travel Time (s) 15.6 37.3 23.9 Confl. Peds. (#/hr) 500 500 500 500 Confl. Bikes (#/hr) 50 50 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% Bus Blockages (#/hr) 0 0 0 6 12 12 Parking (#/hr) 0 0 0 0 Adj. Flow (vph) 547 232 337 253 63 232 Shared Lane Traffic (%) Lane Group Flow (vph) 547 232 590 0 63 232 Enter Blocked Intersection No No No No No No Lane Alignment Left Left Left Right Left Right Median Width(m) 3.4 0.0 3.5 Link Offset(m) 0.0 0.0 0.0 Crosswalk Width(m) 4.8 4.8 4.8 Two way Left Turn Lane Headway Factor 1.23 1.20 1.15 1.05 1.12 1.15 Turning Speed (k/h) 25 15 25 15 Number of Detectors 1 1 1 1 1 Detector Template Thru Thru Left Right Leading Detector (m) 8.0 4.0 4.0 8.0 6.0 Trailing Detector (m) 2.0 2.0 2.0 2.0 2.0 Detector 1 Position(m) 2.0 2.0 2.0 2.0 2.0 Detector 1 Size(m) 6.0 2.0 2.0 6.0 4.0 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt Perm Protected Phases 7 4 8 6 Permitted Phases 4 6 Detector Phase 7 4 8 6 6 Switch Phase West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 7

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 36: West Campus Way & 39 Street NW PM Peak Hour Lane Group EBL EBT WBT WBR SBL SBR Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 15.0 25.0 25.0 25.0 25.0 Total Split (s) 37.0 63.0 26.0 0.0 27.0 27.0 Total Split (%) 41. 70.0% 28.9% 0.0% 30.0% 30.0% Maximum Green (s) 34.0 58.0 21.0 22.0 22.0 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 3.0 5.0 5.0 4.0 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None Min Min None None Walk Time (s) 8.0 8.0 8.0 8.0 Flash Dont Walk (s) 12.0 12.0 12.0 12.0 Pedestrian Calls (#/hr) 500 500 500 500 Act Effct Green (s) 57.6 55.6 20.6 20.4 20.4 Actuated g/c Ratio 0.67 0.65 0.24 0.24 0.24 v/c Ratio 0.87 0.23 0.82 0.17 0.62 Control Delay 32.5 7.0 31.6 28.6 12.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 32.5 7.0 31.6 28.6 12.2 LOS C A C C B Approach Delay 24.9 31.6 15.7 Approach LOS C C B Queue Length 50th (m) 66.1 14.6 35.4 9.1 0.0 Queue Length 95th (m) #133.8 26.2 #65.8 19.7 23.1 Internal Link Dist (m) 192.6 494.1 308.1 Turn Bay Length (m) Base Capacity (vph) 658 1059 733 404 386 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.83 0.22 0.80 0.16 0.60 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 86.1 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.87 Intersection Signal Delay: 25.7 Intersection LOS: C Intersection Capacity Utilization 79. ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 8

Lanes, Volumes, Timings 2039 Post Development - 500 Peds Sens 36: West Campus Way & 39 Street NW PM Peak Hour Splits and Phases: 36: West Campus Way & 39 Street NW West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 9

HCM Unsignalized Intersection Capacity Analysis 2039 Post Development - 500 Peds Sens 38: Collegiate Rd & Collegiate Blvd PM Peak Hour Movement EBL EBT WBT WBR SBL SBR Lane Configurations Sign Control Stop Stop Stop Volume (vph) 200 80 120 90 200 180 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Hourly flow rate (vph) 211 84 126 95 211 189 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total (vph) 239 56 84 137 211 189 Volume Left (vph) 211 0 0 0 211 0 Volume Right (vph) 0 0 0 95 0 189 Hadj (s) 0.53 0.09 0.09-0.40 0.58-0.61 Departure Headway (s) 6.5 6.0 6.2 5.7 6.5 5.3 Degree Utilization, x 0.43 0.09 0.14 0.22 0.38 0.28 Capacity (veh/h) 533 566 550 599 532 644 Control Delay (s) 13.1 8.5 9.0 9.1 12.2 9.2 Approach Delay (s) 12.2 9.1 10.8 Approach LOS B A B Intersection Summary Delay 10.8 HCM Level of Service B Intersection Capacity Utilization 48.0% ICU Level of Service A Analysis Period (min) 15 West Campus Transportation Impact Assessment Synchro 7 - Report Updated Geometry Page 1

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX J: SIDRA ANALYSIS RESULTS West Campus Transportation Impact Assessment

LANE SUMMARY West Campus Blvd and North TCH Interchange Terminal Roundabout Site: AM Peak Hour - Slip Lane Use and Performance Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane SL Cap. Prob. L T R Total HV Cap. Satn Util. Delay Service Vehicles Distance Length Type Adj. Block. veh/h veh/h veh/h veh/h % veh/h v/c % sec veh m m % % South: West Campus Blvd. S Lane 1 0 240 0 240 5.0 1064 0.226 100 1.5 LOS A 1.3 10.1 500 0.0 0.0 Lane 2 0 0 140 140 5.0 1019 1 0.137 100 1.3 LOS A 0.7 5.5 50 Turn Bay 0.0 0.0 Approach 0 240 140 380 5.0 0.226 1.4 LOS A 1.3 10.1 East: TCH Ramp Lane 1 60 0 300 360 5.0 916 0.393 100 2.4 LOS A 2.5 19.6 250 0.0 0.0 Approach 60 0 300 360 5.0 0.393 2.4 LOS A 2.5 19.6 North: West Campus Blvd. N Lane 1 280 680 0 960 5.0 1306 0.735 100 1.5 LOS A 9.6 76.3 500 0.0 0.0 Approach 280 680 0 960 5.0 0.735 1.5 LOS A 9.6 76.3 Intersection 1700 5.0 0.735 1.7 LOS A 9.6 76.3 Level of Service (LOS) Method: Delay (HCM 2000). Roundabout LOS Method: Same as Signalised Intersections. Lane LOS values are based on average delay per lane. Intersection and Approach LOS values are based on average delay for all lanes. Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model used. 1 Reduced capacity due to a short lane effect Processed: Friday, May 02, 2014 12:04:40 PM Copyright 2000-2011 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 5.1.13.2093 www.sidrasolutions.com Project: T:\Projects\Open\2984.T01 - West Campus Transp Mngmt Plan & TIA\Modelling\UPDATED LANING - FOR REPORT\TCH Ramp and West Campus Drive.sip 8000625, D.A. WATT CONSULTING, SINGLE

LANE SUMMARY West Campus Blvd and North TCH Interchange Terminal 2039 Post Development Roundabout Site: PM Peak Hour - Slip Lane Use and Performance Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane SL Cap. Prob. L T R Total HV Cap. Satn Util. Delay Service Vehicles Distance Length Type Adj. Block. veh/h veh/h veh/h veh/h % veh/h v/c % sec veh m m % % South: West Campus Blvd. S Lane 1 0 320 0 320 5.0 815 0.393 100 3.7 LOS A 2.3 18.6 500 0.0 0.0 Lane 2 0 0 410 410 5.0 930 0.441 100 3.4 LOS A 2.8 22.5 50 Turn Bay 0.0 0.0 Approach 0 320 410 730 5.0 0.441 3.5 LOS A 2.8 22.5 East: TCH Ramp Lane 1 20 0 550 570 5.0 845 0.674 100 5.6 LOS A 7.1 55.9 250 0.0 0.0 Approach 20 0 550 570 5.0 0.674 5.6 LOS A 7.1 55.9 North: West Campus Blvd. N Lane 1 490 290 0 780 5.0 1439 0.542 100 1.6 LOS A 5.4 42.5 500 0.0 0.0 Approach 490 290 0 780 5.0 0.542 1.6 LOS A 5.4 42.5 Intersection 2080 5.0 0.674 3.4 LOS A 7.1 55.9 Level of Service (LOS) Method: Delay (HCM 2000). Roundabout LOS Method: Same as Signalised Intersections. Lane LOS values are based on average delay per lane. Intersection and Approach LOS values are based on average delay for all lanes. Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model used. Processed: Friday, May 02, 2014 12:05:35 PM Copyright 2000-2011 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 5.1.13.2093 www.sidrasolutions.com Project: T:\Projects\Open\2984.T01 - West Campus Transp Mngmt Plan & TIA\Modelling\UPDATED LANING - FOR REPORT\TCH Ramp and West Campus Drive.sip 8000625, D.A. WATT CONSULTING, SINGLE

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Transportation Planning APPENDIX K: MODEL OUTPUT REGIONAL TRANSPORTATION MODEL FORECAST TRIP GENERATION West Campus Transportation Impact Assessment

Civil, Municipal and Traffic Engineering Storm Water Management Legal Survey/Geomatics Tr ansportation Planning Regional Transportation Model Forecast Trip Generation The RTM method involved inputting population and employment data into each transportation zone (TZ) that corresponds to the proposed land uses. In addition, the model was updated to reflect the current plans for the transportation network. The model output results provided traffic generation projections for the three TZ s that comprise the West Campus development lands. Two of these three zones have boundaries that coincide with the proposed West Campus site boundaries (TZ 2403 and TZ 2405), however the third zone (TZ 2402) spans across an area that only partially includes West Campus. The majority of TZ 2402 includes the University of Calgary campus and student residences. Figure K1 illustrates the transportation zone boundaries relative to the West Campus lands. FIGURE K1: WEST CAMPUS TRANSPORTATION ZONES