Meter Installation. -and- Padmount Transformer Guide

Similar documents
Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

METERING REQUIREMENTS

Approved Contractor Construction e-guide Residential Commercial

AMENDMENT ELECTRIC SERVICE MANUAL 2014

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

COMMERCIAL QUICK REFERENCE

Associated equipment As related to metering equipment: such as the current transformers, CT wiring and test switches.

Metering and Service Installation:

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES

10 Commercial, Industrial, Agricultural Services

GENERAL INFORMATION 1.01 PURPOSE

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS

OVERHEAD SERVICE. Items to consider

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION

NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

SECTION 500 METERING AND ASSOCIATED EQUIPMENT

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

Installing or Rebuilding Your Electric Service

ELECTRICAL METERING RESIDENTIAL

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

Commercial Electric Policy

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

New Commercial Service Request-Job Process

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

For Conduit Inspections

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

SECTION VII METERING INSTALLATIONS

TEMPORARY ELECTRICAL SERVICE

Indianapolis Power & Light Company

Approved Meter Sockets and Cabinets

CABINET - INSTRUMENT TRANSFORMER Indoor - Outdoor, 480 Volt Maximum 1200, 1600, 2000 Ampere

10. METERING General Requirements

Section 6 Electric Metering: Residential

Electric Service Standards

Meter Standards COMMERCIAL. Metering Guidelines for Electric Service. March 28, 2014

INTERMOUNTAIN RURAL ELECTRIC ASSOCIATION. Builder/Developer Information

7 Single Family Service

New Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

KIUC Service Installation Manual


2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

CT Metering. CT Metering. Meter Mounting Equipment

Electric & Gas Service Requirements (Greenbook) Overview

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

Table of Contents. Electrical Service Requirements. 1. General Requirements

Requirements for Secondary Voltage Revenue Metering (750 V and less)

Commercial Electric Service Handbook

ELECTRIC SERVICE MANUAL

Customer Requirements Meter Socket Configurations

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

PEU reserves the right to determine all meter locations. Only authorized PEU personnel will determine this location.

Electric Service Requirements

Three-Phase Pole Mounted Recloser

UNDERGROUND SERVICES - SECONDARY

SINGLE PHASE WIRING SPECIFICATIONS

RESIDENTIAL. Metering Guidelines for Electric Service. Meter Standards. October 25, 2017

SECTION PANELBOARDS

THREE PHASE WIRING SPECIFICATIONS

320A Single Phase URD Meter Loop Installations

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

ELECTRICAL ORDER FORM

WPS SERVICE MANUAL. Section Amp and Smaller - Common

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

ELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL

Transmission & Distribution Glossary of Electrical Terms

5. Company's Installation

RIVER FALLS MUNICIPAL UTILITIES ELECTRIC SERVICE MANUAL

SECTION 300 OVERHEAD SERVICE

Interconnection Process for Generation Systems

Customer Metering and Services Guide Revised: May 2017

TELL CITY ELECTRIC DEPARTMENT RATES AND CHARGES

CHAPTER 1 INTRODUCTION

NEW SERVICE HANDBOOK

Electric Service Requirements & Guidelines

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

SmartPole Meter for Service to Pole-Mounted Communication Equipment

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Electric Service Rules

All territory within the incorporated limits of the City and land owned or leased by the City.

Options: PART NUMBER MAIN BREAKER PHASE VOLTAGE

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

ELECTRICAL ORDER FORM

Service Entrance Methods

Customer Requirements Downtown Secondary Network Service

SPECIFICATIONS FOR COMMERCIAL CONSTRUCTION

SPRINGVILLE CITY ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

3.1 Overview of ATCO Electric s URD System Design

WPS SERVICE MANUAL. Section 7 Clearances. 7-1 Basic Electric Clearances - Services Miscellaneous Clearances Antenna Clearances...

COMMERCIAL HANDBOOK 2013 EDITION MATANUSKA ELECTRIC ASSOCIATION, INC. PALMER, ALASKA

Transcription:

Meter Installation -and- Padmount Transformer Guide Feb. 2016

METERING REQUIREMENTS The following information shall be used as a guide for installing metering equipment. A self-contained meter has all load current passing through the meter. CT metering refers to load currents passing through current transformers. If there are any questions or if a change is desired, please contact the Engineering Department or Energy Services at 746-4461 or 800-732-4373. Self-contained Metering (Main Service) Note: Three-phase, 320-amp meter sockets are approved on a case-by-case basis. The metering of 480-volt self-contained services shall be minimized by using Potential Transformers (P.T.) to reduce the voltage seen at the meter to improve safety. A service disconnect can also be used in some instances. Meter located on pole or pedestal Provide a meter socket with lugs, lever bypass and the meter. Provide, install and connect the secondary conductor between meter socket and transformer. If Member wants Nodak to provide a knife-blade double throw disconnect, they shall: New accounts or expansion of existing accounts Reimburse Nodak the cost difference between a meter socket and knife-blade double throw disconnect. Existing accounts (adequate service) Reimburse Nodak the cost of the knife-blade double throw disconnect and pay all labor costs. (Nodak will retain ownership and maintain disconnect.) Meter mounted on Member's building Provide the meter, install and connect the secondary conductor between meter socket and transformer. Provide a meter socket with lever bypass to meet Nodak's specifications. If Member wants Nodak to provide a knife-blade double throw disconnect, he shall: Reimburse Nodak the cost of the disconnect. Have electrician install disconnect. (Nodak will retain ownership and maintain disconnect.) Transformer Rated Metering (Main Service) Provide the current transformers (CTs) and meter socket. Provide the meter. Provide the secondary connectors at the transformer. Install metering circuit conductors from CT to meter socket. Connect the Member's secondary conductor to the transformer. (Nodak will assist with overhead transformer connections.) Arrange for picking up all metering equipment at Nodak's warehouse in Grand Forks. Provide and install the CT cabinet and secondary conductors from the transformer (or transition cabinet) to the service panel. Install a one-inch conduit between CT cabinet and the meter socket (maximum distance of 25 conduit feet with total conduit bends not to exceed 270 from CT to meter socket). Provide and install the secondary connectors at the current transformers. Note: CT cabinet must be minimum size of24" X 36", contain landing pads and accommodate Nodak's padlock. Meter Socket may not be mounted on CT cabinet door. Off-peak (All GS Accounts) (Submetered only) Provide the meter and one load management receiver. Provide a meter socket with lever bypass for direct submetered off-peak loads, or Provide a meter socket with shunt bypass and current transformers. INSTALLATION GUIDELINES All meters must be accessible to Nodak personnel. Main meters shall not be mounted on the back side of residences. Only one conductor per leg may be placed in a 200-amp meter socket or Nodak-owned disconnects. The meter shall be mounted at a height between four feet and six feet from final grade. A minimum clearance of three feet in front of the meter shall be maintained. CTs are not allowed inside a padmount transformer (nothing shall be installed in or mounted on the transformer). The CTs must be located in an area that can be sealed and padlocked by Nodak. Access to any CT cabinet or transition cabinet is prohibited without authorization by Nodak. Nodak's metering personnel will install the current transformer and potential transformer leads for direct metered installations (Figure 2) and install the meter. The contractor shall install wiring between the CTs and meter for submetered installations (Figure 1). The wiring connections will be made by Nodak. If multiple runs of secondary are installed, adequate tagging shall be installed on each run to assure proper installation and assist Nodak personnel in inspecting the final installation. No self-contained meter socket shall be bypassed. The only exception is submetered applications, which may be slugged with Nodaksupplied socket jumpers. If off-peak is installed, it is the responsibility of the Member or electrician to notify Nodak when completed, at which time Nodak will inspect and code the installation. Any usage at the account will be billed on the regular rate until coded, at which time the applicable Off-peak Rate will be applied. The installation must meet the current National Electric Safety Code, National Electric Code, and be certified by the ND State Electrical Board.

PADMOUNT TRANSFORMER REQUIREMENTS Nodak shall provide: Primary conductor, transformer, ground grid, and transformer pad (single phase only). Ground sleeve (basement) under pad. Secondary conductors for metered services that are selfcontained, if requested. Secondary conductor connectors at the transformer. Member shall provide: Secondary conductors and conduit for metered services that are current transformer rated. Transformer pad (three-phase). Pad shall be to Nodak specifications. Member has option of paying Nodak to provide pad. The number and size of conduits and conductors run into the transformer are limited to the following: Maximum of five (5) 4-inch conduits. Maximum of four (4) conductors per phase. Maximum conductor size of 750 MCM. Transformer guard posts, if transformer is exposed to traffic areas. 4" conduit shall be installed under any hard surfaced area for Nodak to install primary cable in. Transition Cabinet Requirements If the service entrance requires more than four conductors per phase, a secondary connection (transition) cabinet must be installed. Provide and install in the Member s conduit, the secondary conductors and terminations between the transformer and transition cabinet. Provide and install the transition cabinet and pad. Provide and install five (5) 4-inch conduits between the transformer and transition cabinet. Connect the Member s secondary to the load side of the transition cabinet. Transition Cabinet Specifications Minimum distance from ground line to the lowest secondary termination shall be 24 inches. Cabinet shall be located adjacent to padmount transformer. If cabinet includes CT provisions, it must be able to be secured with a padlock. CLEARANCE REQUIREMENTS FOR TRANS. PAD Padmount Transformer Transition Cabinet (Consumer supplied) Required if more than 4 conductors per phase Ground Sleeve Protective Guard Posts

Example of a pad mount installation with CT provisions and lockable. (Transition Cabinet) Example of a wall mount CT cabinet with Landing pads to accommodate bar type CT's

METERING SCHEMATICS