PPM-5203 TJ/LJ FRONT CAGE KIT Version 1.1

Similar documents
5231 YJ FRONT CAGE KIT Version 1.1

PPM-5224-A JK 4 DOOR REAR CAGE KIT Version 1.1

PPM-5011 JK FRONT COIL OVER/AIR BUMP STOP BRACKET KIT INSTALLATION Version 1

PPM-8055/8089 JK FRONT TRACK BAR RELOCATION BRACKET Version 1.2

InstalL Instructions. jeep yj roll cage kit. kit contents

PPM-8007 JK STEERING STABILIZER RELOCATION BRACKET Version 1

PPM-8032 JEEP JK 2 DR STRETCH KIT Version 1

InstalL Instructions. rock defense jeep yj roll cage kit. kit contents ins

INSTALLATION INSTRUCTIONS PPM-8086 JK REAR LONG TRAVEL UPPER SHOCK MOUNT

Convertible MM Roll Bar (MMRB-10.1 to -10.7)

5021 JK FRONT LOWER CONTROL ARM FRAME BRACKETS

Detroit Speed, Inc. 4-Point Roll Cage Camaro/Firebird P/N:

2005+ Roll Bar (Mm5RB-20.1 to -20.6) Recommended Center punch 1/8" pilot drill 1-3/4" Hole saw 2" Hole saw

5713 / 5714 JK HEAVY DUTY GAS TANK SKID PLATE Version 1.1

5003 TJ/LJ REAR COILOVER BRACKET KIT

Roll Bar (MMRB-1.1 to 1.7)

5019 JK FRONT AIR BUMP KIT (THRU COIL)

2005+ Drag Race Roll Bar (Mm5RB-20)

PPM 8069 JK FRONT TRACKBAR BRACE / SECTOR SHAFT BRACE INSTALLATION INSTRUCTIONS

PARTS LIST. (1) Main Hoop (1) Cage Leg (Left) (1) Main Hoop Crossbar (1) Cage Leg (Right) (1) Windshield Crossbar (2) 39 Hoop Diagonals

Drag Race Roll Bar (MMRB-6, -7)

PPM JK F911 Hardware Kit Installation Version 2

PPM-8022 / PPM-8042 JEEP JK STAGE 2 SYNERGY SUSPENSION SYSTEM Version 1

Make sure all tubes are installed to your satisfaction BEFORE finish welding!!

PPM-5013 JK REAR C/O KIT Version 2

PARTS LIST: 8581 DODGE LONG ARM BRACKETS 03-13

Roll Bar (MMRB-6.1 to -6.7)

Detroit Speed, Inc Chevy II Mini-Tubs P/N:

PPM-8023 / PPM-8043 JEEP JK SYNERGY STAGE 3 SUSPENSION SYSTEM Version 1

Detroit Speed, Inc. Mustang Mini-Tub Kit Mustang P/N:

RPM Rollbar Installation Instructions Ford Mustang 05-11

K9-F17 INSTALLATION INSTRUCTIONS K9 Kit for FORD INTERCEPTOR SEDAN

5102 JK Hood Louver Panel

Jeep JK Dana 44 and 30 Front Axle Truss Axle Truss Installation Instructions

INSTALLATION INSTRUCTIONS 97 FORD EXPEDITION

Body Preparation. Stretching the Frame. Stretch Kit CHAPTER 4

Detroit Speed, Inc. Rear QUADRAlink Conversion Kit Camaro/Firebird P/N:

S&W Race Cars and Components, Inc.

05+ Toyota Tacoma Rear Shock Hoop Install Notes Part# 86460

Wildcat System Instructions

FITTING FRONT SEAT BELTS TO THE MG Y TYPE SALOON

CLAYTON OFF ROAD COR JEEP GRAND CHEROKEE PRO SERIES 3 LINK FRONT LONG ARM UPGRADE KIT ( , ZJ)

Installation Guide 50342/ Kargo Master Safari Rancho Cordova, CA

FULL LENGTH HEADERS/ CATTED HEAD PIPES

ZODIAC 601 XL. Trim the outboard corner of the front flange of the center spar 6W4-1. Corner should not touch the side of the cabin floor skin 6B10-1.

Part# C3132/C Up Ford Mustang 8-Point Roll Bar

INSTALLATION INSTRUCTIONS PPM-8516 DODGE ADD-A-LEAF PACK

cfr angle kit INSTALLATION INSTRUCTIONS: 2009-present nissan 370z z infiniti g37 v36 Part Numbers: VOO-akns-0400

SYNERGY SUSPENSION UNIVERSAL FRONT 3-LINK KIT Version 1.0

Detroit Speed, Inc Mustang Mini-Tubs P/N:

General Front Windshield

CLAYTON OFF ROAD COR JEEP GRAND CHEROKEE LONG ARM UPGRADE KIT ( WJ)

READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS PRIOR TO INSTALLATION OF SYSTEM AND OPERATION OF VEHICLE.

Chevrolet 3100 IFS Kit

PPM-D44538RJK JK Rear 5.38 Ring and Pinion Installation Instructions Version 1

Read and understand all instructions and warnings prior to installation of product and operation of vehicle.

7333 INSTRUCTIONS FOR MILD STEEL A-ARM AVENGER CHASSIS MUSTANG

Detroit Speed, Inc. QUADRA Link Rear Suspension Mustang P/N:

7256 INSTRUCTIONS FOR ELIMINATOR II A-ARM FRONT, 4-LINK REAR, MILD STEEL, INTERMEDIATE, SERIES CHASSIS

INSTALLATION INSTRUCTIONS CHEVROLET NOVA (NVR-301) INDEPENDENT REAR SUSPENSION

3651 N Highway 89 Chino Valley, AZ (928)

60-65 Falcon, Comet & Ranchero Coil Spring IFS

Prepare to install kit

Tusk UTV Horn & Signal Kit Installation Instructions

INSTALLATION INSTRUCTIONS

PRP Seats 570/800/900 RZR 4 Doors

7260 INSTRUCTIONS FOR ELIMINATOR II STRUT FRONT, 4-LINK REAR, MILD STEEL, FULL SIZE, SERIES CHASSIS

Detroit Speed, Inc. Second Generation Camaro/Firebird Mini-Tub Kit Camaro/Firebird P/N: ,

7316 INSTRUCTIONS FOR MILD STEEL STRUT AVENGER CHASSIS CHEVY FULL SIZE WITH 3" TOP CHOP

Section 10 Mini Stocks

Detroit Speed, Inc. Mini-Tub Kit Chevy Nova, Oldsmobile Omega, Pontiac Ventura P/N: &

Over The Knuckle Steering PART #: RS-SC300-UV APPLICATION: XJ,TJ,ZJ

TOYOTA TUNDRA 2 & 4WD 3 BODY LIFT KIT INSTALLATION INSTRUCTIONS 2006 KIT# 5623

FUSELAGE CABIN ASSEMBLY

IFS Eliminator Kit,

INSTRUCTIONS FOR MILD STEEL STRUT AVENGER CHASSIS 1937 CHEVY, SCALED DOWN BODY

WGAS Motorsports Demolition Derby Pickup Truck Rules WE ARE PRIVELIGED TO USE THESE FACILITIES! PLEASE TAKE EXTRA CARE IN STRIPPING YOUR TRUCK!

INSTALLATION & OWNER S MANUAL

Roll Cage Installation Notes

2013-UP 3500 Dodge 5 Lift Kit SRW

AEV30229AD Last Updated: 06/17/14 REAR VISION SYSTEM INSTALLATION GUIDE

All engine installations with this front end will require a rear sump oil pan.

INSTALLATION & OWNER S MANUAL

Detroit Speed, Inc. QUADRA Link Rear Suspension Chevy II P/N:

Detroit Speed, Inc. Subframe Connectors Camaro/Firebird P/N:

DODGE DAKOTA 3 KIT INSTALLATION INSTRUCTIONS KIT# 60043

FORD RANGER/SPLASH MAZDA B-SERIES (2&4WD, STANDARD & EXT. CAB) 3 BODY LIFT KIT INSTALLATION INSTRUCTIONS KIT# 853

Installation Instructions

Raxiom Factory GPS Rear Back-up Camera Kit (07-17 Wrangler)

73-87 C-10 Coilover System

Rusty's WJ Steering and Brake Conversion

INSTRUCTIONS FOR STRUT FRONT, 4-LINK REAR, ROADSTER CHASSIS

Global West Suspension 655 South Lincoln Ave San Bernardino Ca Phone Fax Web address globalwest.

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

WPS-104 Heater Installation Instructions For 500EFI, 700 XP, & Crew Applications

7311 INSTRUCTIONS FOR 4130 STRUT AVENGER CHASSIS CAMARO/FIREBIRD

INSTALLATION INSTRUCTIONS 98 NISSAN FRONTIER 2 WD KIT # 4073

WIDE RIDE IFS (STOP --- READ ALL THE DIRECTIONS FIRST!)

Detroit Speed, Inc. QUADRA Link Rear Suspension Camaro/Firebird P/N:

7211 A-ARM FRONT, 4-LINK, 3 X 2 FRAME, INTERMEDIATE, ELIMINATOR CHASSIS ITEM QTY SIZE/PART NO. TUBE CODE DESCRIPTION

Transcription:

POLY PERFORMANCE MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397 PPM-5203 TJ/LJ FRONT CAGE KIT Version 1.1 GENERAL NOTES: These instructions are also available on our website; www.synergysuspension.com. Check the website before you begin for any updated instructions and additional photos for your reference. This is a weld in roll cage kit, all welding should be performed by an experienced welder with proper welding equipment Use in conjunction with PPM-5204 or PPM-5210; TJ/LJ front rear cage kit This kit works with either a soft top or hard top Use extreme care when welding and grinding in the interior of your Jeep, remove or cover any components you do not want welding spatter or grinding sparks to damage. Note, if you want to retain the factory roll bar padding you will have to cut holes where the tubes attach, position the tubes through the padding, slide the padding over the tubes and weld. Thus, if roll bar padding is retained, plan ahead and notch the padding as tubes are installed. 1. Remove the hard top or soft top, if using a soft top, remove the door surrounds. 2. Remove the sound bar, upper seat belt mounts, roll bar padding and B-pillar padding and trim. 3. Remove the stock tubes over the side doors, unbolt them from the windshield and from the B-pillar hoop. 4. Notch the dash using the templates provided. The template is made for the drive side with the words up, use the opposite side for the passenger side.

5. Pull up the front foot area carpet to mount the floor plates, position the foot plates as shown, the outer edge goes up against the side of the kick panel, the back edge of the floor plate is approximately 1.5 from the front edge of the drain hole. Wait to drill

and bolt the floor plates until you position the A-pillar tubes and center the floor plate on the A-pillar tubes. 6. Remove the paint on the factory cage around the areas to be welded. The will be between the holes that mounted the side bars to the B-pillar and the middle of the B- pillar where the A-pillar spreader tubes go. 7. It is recommended to position all the tubes and square them before you do any welding on the tubes. 8. Position the new A-pillar upright and over the door tubes, the tube is in two pieces, the splice is above the dash. Use the provided 1 ½ diameter short tube slugs at the splice. Drill a few ½ holes in the A-pillar tubes so you can rosette weld the tubes to the inner slug. Leave a 1/8-1/4 gap between the tubes so the weld will weld the ends of the two tubes to the inner tube slug. The upper end of the door tube should be located in the middle of the two bolt holes that the original door bars attached to the B-pillar. Tack weld the door tube to the B-pillar.

9. Position the dash bar. This tube intersects at the splice in the A-pillar tube. It is helpful to wrap a ratchet strap around the A-pillars to clamp this tube in place.

10. Rotate the lower A-pillar tube to align to the center the floor plate, drill the floor and attach the floor plate using the supplied 3/8 hardware. You will need to cut access hole in the panel underneath the floor panel to install the nuts and washers underneath. If you are using the frame tie-in kit, cut out the whole section of the bottom panel to install the bushing plate. 11. Position the upper windshield cross tube and spreader tubes. The spreaders tube center spacing is up to you but 8 center spacing will match the rear cage diagonal tubes. The bend in the spreader tubes goes to the front. Use a ratchet strap front to back to around the B-pillar and windshield tube to hold these tubes in place.

12. Mount the A-pillar windshield brackets to the windshield using the stock bolts, if the brackets do not touch the A-pillar; use the supplied shims between the bracket and windshield.

13. Make sure all the tubes are aligned and square or level. Tack weld all of the joints in this order: 1. Lower A-pillar to floor plate 2. A-pillar splice over dash 3. Windshield cross tube to A-pillar 4. Spreader tubes to windshield and B-pillar tubes 5. Windshield brackets to A-pillar 6. DO NOT tack weld the dash bar until you completely weld the A- pillar splice 14. Weld the A-pillar splice completely, then tack weld the dash bar into place, make sure the tube is level 15. Weld the rest of the joints of the cage and weld the windshield bracket to the A-pillar. 16. Position the grab handles as shown below and weld into place

17. If you are adding the optional PPM-5205 frame tie in kit, assemble and weld as shown below: