CITY OF ESTHERVILLE, IOWA MISCELLANEOUS FEES & CHARGES. At Sewer Main.. $

Similar documents
Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Borough of Quakertown 2018 Fee Schedule

TOWN OF LAGRANGE FY RATE SCHEDULE

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

Town of Winterville Utility Rates

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

SALEM CITY FEE SCHEDULE AS OF

SALEM CITY FEE SCHEDULE AS OF

DELETE first sentence of first paragraph that reads: REPLACE with the following:

RESOLUTION NO A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF

2018 Fee Schedule MISCELLANEOUS

FEMA's Schedule of Equipment Rates

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Application for Service Residential Subdivision / Development

City of St. Anthony Village Silver Lake Road St. Anthony, Minnesota FEE SCHEDULE

MASTER FEE SCHEDULE. SECTION 1: Refuse/Garbage and Recycling Fees (C of O Sec )

BRISTOL WATER DEPARTMENT

LACEY FEE SCHEDULE Effective July 1, Flea Market/Swap Meet/Sellers Permit Notary $3. NSF Check or Returned Check $20

CLACKAMAS RIVER WATER FEES AND CHARGES

Schedule of Equipment Rates

CODE OF ORDINANCES OF THE CITY OF BOONE, IOWA, 2003 SUPPLEMENT RECORD

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY

CLACKAMAS RIVER WATER FEES AND CHARGES

BRISTOL WATER DEPARTMENT

MASTER FEE SCHEDULE. $50 initial minimum charge plus $20 per hour if minimum is exceeded COMMERCIAL RATES. Once per week collection

FEMA's Schedule of Equipment Rates

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Western Virginia Water Authority Schedule of Monthly Water Rates Botetourt County Customers

City of Grand Island Tuesday, June 26, 2018 Council Session

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

Resolution #105 A RESOLUTION OF THE CITY OF PRESTON, IDAHO, COMPILING A LICENSE AND FEE SCHEDULE AND WATER, SEWER, GARBAGE RATE SCHEDULE

Western Virginia Water Authority Schedule of Monthly Water Rates Franklin County Customers

Western Virginia Water Authority Schedule of Monthly Water Rates Roanoke City and Roanoke County Customers

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

Western Virginia Water Authority Schedule of Monthly Water Rates Franklin County Customers

BUILDING PERMIT FEES

CITY OF MOUNT AIRY FY FEE SCHEDULES

CITY OF GRAND ISLAND UTILITIES DEPARTMENT ELECTRIC RATE SCHEDULE Effective October 1, Ordinance No. 9133

Please Refer to Attached Sample Form

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

Fee Schedule July 1, June 30, 2018

$ homes in a subdivision. The Fee includes an S-1 Pedestal. $ homes in a subdivision. The Fee includes an S-2 Pedestal.

Charter Township of Plymouth ~ Comprehensive Fee Schedule ~ Effective July 24, 2018 WATER AND SEWER SYSTEM

CITY OF SWARTZ CREEK RATES, FEES PERMITS & CHARGES FOR SERVICES. 1. Chapter 1: Municipal Ordinance Violations Bureau (Parking Fines)

Patton Hill Road (Four Inch Main), Project No

Municipal Water Utility of the City of Cedar Falls, Iowa Water Rates Schedules Table of Contents 2019

RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering

TOWN OF GRAND ISLAND ADOPTED FEE SCHEDULE Adopted 1/2/2018 Amended 5/21/2018. NSF Fee: Insufficient Funds Fee $ 20.00

GUIDELINES FOR RESIDENTIAL ELECTRIC SERVICE HOOKUP

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

RESOLUTION WHEREAS, certain rates and fees now need to be adjusted or added to the Master Fee Schedule; and

CITY OF LAURINBURG SCHEDULE OF FEES

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

City of Fountain Inn Fee Schedule

Show Name: Anaheim Home & Garden Show 2018 ELECTRICAL

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

Fleet Replacement Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010

EXHIBIT SUMMARY. Exhibit Summary. Effective: 10/1/2016 Customer Class

CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS

GUIDELINES FOR RESIDENTIAL ELECTRIC SERVICE HOOKUP

Installing or Rebuilding Your Electric Service

Exhibit A BUILDING AND CONSTRUCTION

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD,

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

COMPREHENSIVE SCHEDULE OF FEES

CITY OF THE DALLES - CITY FEE SCHEDULE Effective June 1, 2016

Project Book Worksheet for Cost Estimation

Oaks Commerce Center

Commercial Electric Service Handbook

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

2005 Land Development Review/ State of Public Works

Steese Rd - Curb & Sidewalk Improvement

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

TEMPORARY ELECTRICAL SERVICE

Town of Winterville Fee Schedule Fiscal Year

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

PARKING GENERALLY OBSTRUCTIONAL PARKING; DOUBLE PARKING

Exhibit A. FY19 Schedule of Fees and Charges

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group

TOWN OF TARBORO PROPOSED FEE SCHEDULE

REGULATIONS GOVERNING WATER SERVICE

Please Refer to Attached Sample Form

ELECTRIC WATER SEWER STORMWATER 3 Industrial Loop Drive PO Box 1589 Hannibal, MO (573)

MASTER FEE SCHEDULE. MONTHLY FEE 2X/Week Collection

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

Comprehensive Schedule of Fees Animal Control Dog License Spayed or Neutered $10.00 Unaltered $20.00 Replacement tag $5.00

Effective July 1, Consolidated Fee Schedule

Regular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY FOLLOW-UP ITEM. 1. Citizen Comments

City of Newaygo RESOLUTION Council Member Walerczyk, supported by Council Member Palmiter, moved to adopt the following resolution:

Lake County Building Department

STANDARD DRAWING INDEX

TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION CHAPTER TWO - TEMPORARY OVERHEAD SERVICE

Utilities Kingston Report to Council Report Number

BY-LAW NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE TOWN OF MARKHAM HEREBY ENACTS AS FOLLOWS:

Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) 48" Pallet Fork

Whatcom County Invitation to Bid Bid #17-09

CITY OF LOVELAND, COLORADO

Transcription:

CITY OF ESTHERVILLE, IOWA MISCELLANEOUS FEES & CHARGES Revised 4-6-09 UTILITY FEES Sanitary Sewer Taps: At Manhole... $ 400.00... At Sewer Main.. $ 500.00... All excavation, labor and materials by property owner. Backfill w/gravel only. Sewer main tapping saddle furnished by city. Water Tap Charges: ¾ Taps... $ 500.00... 1 Taps... $ 600.00... All excavation by property owner. All labor and materials on private property by property owner. Backfill w/gravel only within R.O.W. 1½ Taps... $ 1,200.00... 2 Taps... $ 1,300.00... Water meter furnished and maintained by city, except if damaged by property owner. 4 Taps... $ 1,700.00... 6 Taps... $ 1,900.00... NOTE: City will make all taps on water mains. Taps will be made wet using tapping valves. Cut in tees and valves will not be used unless approved by City Administrator. 8 Taps... $ 2,500.00... 10 Taps... $ 3,300.00... Water tap fee includes tapping of main, service pipe to curb stop (valve) & valve box. jm C:\Users\barb\Desktop\Downloads\For Web Page\Miscellaneous FEES & CHARGES.docx Page 1/4

Temporary hydrant meter charge... $50.00/Mo. + Water Temporary water service... 20.00/Mo. (construction site) Remote water meter readout installation. No Charge... Except for system update or benefit to the city and approved by City Administrator. Repair frozen water meter... Service Call + $20.00 for parts Electric Service Charges: Meter Hubs... $ 5.00... Meter Sockets (Single Phase): 150 AMP... 30.00... 200 AMP. 35.00... Property owner buys installs and maintains meter sockets. Electric meter furnished and maintained by city, except if damaged by property owner. Three phase meter sockets will be priced at the time of installation. (Costumers responsibility) Temporary Service... $50.00 Installation Fee + $25/Mo. Minimum Permanent Service Installation... 25.00 Buried Service. 6.00/Ft.... (Single Phase up to 400 Amp First 75 feet N/C) Three Phase: Owner to bring secondary wire to City s transformer Except for system update or benefit to the city and approved by City Administrator. Security Lights: Installation.. $80.00 Pole Setting (if required) 150.00 Overhead Wire (at City s option)...40/ft... Buried Wire... 6.00/Ft.... Monthly Rental Charge: 53 Watt LED..8.50 /Mo... 103 Watt LED.. 15.00 /Mo.... Fiberglass pole: +$5.00/mo. or purchase for $400.00 City owns and maintains all security light equipment including poles. Poles will not be installed on private property. C:\Users\barb\Desktop\Downloads\For Web Page\Miscellaneous FEES & CHARGES.docx Page 2/4

Miscellaneous Utility Charges (Sewer, Water or Electrical): Revised 12-18-13 Connection or Reconnection... $25.00/Utility... Transfer of Service... No Charge Meter Accuracy Test... 20.00... Service Calls... 25.00/Trip... 50.00/Trip... Delinquent Hanger Posting Fee... $20.00 Returned check charge... $30.00 Recycling container not returned upon final billing... 10.00 Water and Sewer Default Termination... $600.00 STREET DEPARTMENT FEES Handicapped Parking Signs... $10.00 Barricade Rental: During working hours by 4 PM 50.00/Utility... On overtime (or after 4 PM if O.T is required) Refunded if meter is more than 2% fast During working hours On overtime Wooden... $ 1.00/day/unit... ($5.00 minimum) Flashers... 2.00/day/unit... ($10.00 minimum) Pavement Restoration... 4.00/SF... If contractor saws pavement ($100.00 minimum) 5.00/SF... If city saws pavement ($150.00 minimum) Default Sidewalk Snow Removal... $ 35.00 or current bid price per frontage (4 wide, up to 66 feet) + $35.00 Administrative Fee Default Mowing... Actual cost + $35.00 Administrative Fee Nuisance Abatements... Actual cost + $35.00 Administrative Fee BUILDING & CONSTRUCTION FEES Excavation Permit... No Charge Driveway Permit... $10.00 Building/Zoning Permit... See Separate Schedule (Approved 3-17-97) Moving Permit... 25.00 + Publication Cost Sign Permit... 25.00 or $100.00 if sign installed prior to permit Board of Adjustment Reviews, Special Exceptions and No charge if electric meter is moved from inside to outside of building. C:\Users\barb\Desktop\Downloads\For Web Page\Miscellaneous FEES & CHARGES.docx Page 3/4

Variance Applications... 25.00 + Publication Cost Preliminary Plat Review Fee... 50.00 Final Plat Review Fee... 50.00 Zoning Reclassification Fee... 25.00 + Publication Cost POLICE SERVICES For non-public safety functions at the discretion of the Chief of Police... $65.00 /hour... 40.00/hour... With police car For police officer only MISCELLANEOUS Copies & Publication Copies Public Agencies... $ 0.10/copy Others... 0.25/copy Code of Ordinances Volume I (General)... $75.00... Supplement pages @ $1.00/ Volume II (Zoning & Subdivision side of printed page. Regulations)... 25.00... ($5.00 Minimum) Both... $100.00... Comprehensive Plan... 25.00 City Map Plotting Prices: With Subdivisions (3 x 4 )... 35.00 Zoning Map (3 x 4 multi-colored)... 35.00 (one color $20) Base Map (shows streets only)... 20.00 Small Map... No Charge Mini Map... No Charge Miscellaneous Plotting... $20.00/Hr. Approved by City Council April 6, 2015 C:\Users\barb\Desktop\Downloads\For Web Page\Miscellaneous FEES & CHARGES.docx Page 4/4

CITY OF ESTHERVILLE, IOWA EQUIPMENT RENTAL CHARGES City Equipment shall not be used for private purposes or on private property without the approval of an administrative supervisor. The following charges do not include operator s wages at 1 hour minimum and no piece of equipment will be used without a qualified operator: Heavy Equipment... $75.00... 1 hour minimum Front-end Loaders, Backhoe, Sweeper, Grader, Sewer Machine, Aerial Trucks, Auger Truck, etc. Light Equipment... $50.00... 1 hour minimum Dump Trucks, Air Hammer, Concrete Saw, Sander, Tractor/Mower, Trencher, etc. Special Equipment Loader/Snow Blower... $100.00 Backhoe/Pavement Breaker... 75.00 Pickup or car... 25.00 plus service call (if applicable) Welder/Truck... 60.00 Water Dept. backhoe 95.00 Approved by City Council April 6, 2015 Miscellaneous Fees & Charges