Servicing Hawker Vehicle Batteries with Standard Battery Charging and Test Equipment

Similar documents
TARDEC Technology Integration

UNCLASSIFIED: Dist A. Approved for public release. GVPM Track & Suspension Overview Mr. Jason Alef & Mr. Geoff Bossio 11 Aug 2011

Robot Drive Motor Characterization Test Plan

UNCLASSIFIED: Dist A. Approved for public release. GVPM Energy Storage Overview Mr. David Skalny & Dr. Laurence Toomey 10 August 2011

TARDEC Robotics. Dr. Greg Hudas UNCLASSIFIED: Dist A. Approved for public release

UNCLASSIFIED: Dist A. Approved for public release. GVPM Non-primary Power Systems Overview Kevin Centeck and Darin Kowalski 10 Aug 2011

Tank Automotive Research, Development and Engineering Command (TARDEC) Overview

TARDEC --- TECHNICAL REPORT ---

UNCLASSIFIED: Distribution A. Approved for Public Release TACOM Case # 21906, 26 May Vehicle Electronics and Architecture

GM-TARDEC Autonomous Safety Collaboration Meeting

Alternative Fuels: FT SPK and HRJ for Military Use

Energy Storage Requirements & Challenges For Ground Vehicles

TARDEC OVERVIEW. Tank Automotive Research, Development and Engineering Center. APTAC Spring Conference Detroit 27 March, 2007

2011 NDIA GROUND VEHICLE SYSTEMS ENGINEERING AND TECHNOLOGY SYMPOSIUM POWER AND MOBILITY (P&M) MINI-SYMPOSIUM AUGUST 9-11 DEARBORN, MICHIGAN

DSCC Annual Tire Conference CATL UPDATE. March 24, 2011 UNCLASSIFIED: Dist A. Approved for public release

Feeding the Fleet. GreenGov Washington D.C. October 31, 2011

An Advanced Fuel Filter

UNCLASSIFIED: DIST A. APPROVED FOR PUBLIC RELEASE. ARMY GREATEST INVENTIONS CY 2009 PROGRAM MRAP Overhead Wire Mitigation (OWM) Kit

INTELLIGENT ENERGY MANAGEMENT IN A TWO POWER-BUS VEHICLE SYSTEM. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Transparent Armor Cost Benefit Study

Energy Storage Commonality Military vs. Commercial Trucks

U.S. Army s Ground Vehicle Energy Storage R&D Programs & Goals

US ARMY POWER OVERVIEW

Transparent Armor Cost Benefit Study

AFRL-RX-TY-TM

High efficiency variable speed versatile power air conditioning system for military vehicles

Automatic Air Collision Avoidance System. Auto-ACAS. Mark A. Skoog Dryden Flight Research Center - NASA. AutoACAS. Dryden Flight Research Center

Vehicle Systems Engineering and Integration Activities - Phase 4

U.S. Army/CERDEC's Portable Fuel Cell Evaluation and Field Testing 2011 Fuel Cell Seminar & Expo Orlando, FL 31 Oct 2011

Joint Light Tactical Vehicle Power Requirements

Evaluation of SpectroVisc Q3000 for Viscosity Determination

Vehicle Systems Engineering and Integration Activities - Phase 3

REMOTE MINE AREA CLEARANCE EQUIPMENT (MACE) C-130 LOAD CELL TEST DATA

FTTS Utility Vehicle UV2 Concept Review FTTS UV2 Support Variant

FINAL REPORT FOR THE C-130 RAMP TEST #3 OF A HYDREMA MINE CLEARING VEHICLE

Evaluation of Single Common Powertrain Lubricant (SCPL) Candidates for Fuel Consumption Benefits in Military Equipment

EXPLORATORY DISCUSSIONS - PRE DECISIONAL

TARDEC Hybrid Electric Program Last Decade

EVALUATING VOLTAGE REGULATION COMPLIANCE OF MIL-PRF-GCS600A(ARMY) FOR VEHICLE ON-BOARD GENERATORS AND ASSESSING OVERALL VEHICLE BUS COMPLIANCE

Cadmium Repair Alternatives on High-Strength Steel January 25, 2006 Hilton San Diego Resort 1775 East Mission Bay Drive San Diego, CA 92109

Presented by Mr. Greg Kilchenstein OSD, Maintenance. 29August 2012

Helicopter Dynamic Components Project. Presented at: HCAT Meeting January 2006

Up-Coming Diesel Fuel and Exhaust Emissions Regulations For Mobile Sources. Parminder Khabra RDECOM-TARDEC TACOM LCMC March 22, 2006 JSEM

Does V50 Depend on Armor Mass?

Open & Evolutive UAV Architecture

Dual Use Ground Vehicle Condition-Based Maintenance Project B

HIGH REPETITION RATE CHARGING A MARX TYPE GENERATOR *

Navy Coalescence Test on Petroleum F-76 Fuel with Infineum R655 Lubricity Improver at 300 ppm

Development of Man Portable Auxiliary Power Unit using Advanced Large Format Lithium-Ion Cells

US Army Non - Human Factor Helicopter Mishap Findings and Recommendations. Major Robert Kent, USAF, MC, SFS

LESSONS LEARNED WHILE MEASURING FUEL SYSTEM DIFFERENTIAL PRESSURE MARK HEATON AIR FORCE FLIGHT TEST CENTER EDWARDS AFB, CA 10 MAY 2011

Monolithically Integrated Micro Flapping Vehicles

REPORT DOCUMENTATION PAGE

Multilevel Vehicle Design: Fuel Economy, Mobility and Safety Considerations, Part B

SIO Shipyard Representative Bi-Weekly Progress Report

Robust Fault Diagnosis in Electric Drives Using Machine Learning

Evaluation of Digital Refractometers for Field Determination of FSII Concentration in JP-5 Fuel

F100 ENGINE NACELLE FIRE FIGHTING TEST MOCKUP DRAWINGS

BALANCE OF PERFORMANCE PARAMETERS FOR SURVIVABILITY AND MOBILITY IN THE DEMONSTRATOR FOR NOVEL DESIGN (DFND) VEHICLE CONCEPTS

Navy Coalescence Test on Camelina HRJ5 Fuel

Predator B: The Multi-Role UAV

Predator Program Office

DESULFURIZATION OF LOGISTIC FUELS FOR FUEL CELL APUs

Center for Ground Vehicle Development and Integration

Program Overview. Chris Mocnik Robotic Vehicle Control Architecture for FCS ATO Manager U.S. Army RDECOM TARDEC

Application of Airbag Technology for Vehicle Protection

DEVELOPMENT OF COMPACT VARIABLE- VOLTAGE, BI-DIRECTIONAL 100KW DC-DC CONVERTER

Hydro-Piezoelectricity: A Renewable Energy Source For Autonomous Underwater Vehicles

TRANSIENT MAGNETIC FLUX DENSITY MEASUREMENT RESULTS ON A FUSELAGE-LIKE TEST SETUP AND INVESTIGATION OF THE EFFECTS OF APERTURES

INLINE MONITORING OF FREE WATER AND PARTICULATE CONTAMINATION OF JET A FUEL

Portable Fluid Analyzer

Joint Oil Analysis Program Spectrometer Standards VHG Labs Inc. Qualification Report For D19-0, D3-100 and D12-XXX Series Standards

Additives to Increase Fuel Heat Sink Capacity

NDCEE National Defense Center for Energy and Environment

Membrane Wing Aerodynamics for µav Applications

Fuel Efficient ground vehicle Demonstrator (FED) Vision

U.S. Army s Ground Vehicle Energy Storage R&D Programs & Goals

Research Development and Engineering Command TARDEC/NAC

GVSET Power & Energy Preview Mr. Chuck Coutteau Associate Director (Acting) Ground Vehicle Power & Mobility 19 August 2009

Power Technology Branch Army Power Division US Army RDECOM CERDEC C2D Fort Belvoir, Virginia

Hybrid Components: Motors and Power Electronics

REPORT DOCUMENTATION PAGE

ITC-Germany Visit. Chuck Coutteau, Associate Director Ground Vehicle Power and Mobility Overview 10 November 2011

Power Distribution System for a Small Unmanned Rotorcraft

IMPACT OF FRICTION REDUCTION TECHNOLOGIES ON FUEL ECONOMY FOR GROUND VEHICLES G. R. Fenske, R. A. Erck, O. O. Ajayi, A. Masoner, and A. S.

Additional Transit Bus Life Cycle Cost Scenarios Based on Current and Future Fuel Prices

Joint Oil Analysis Program Spectrometer Standards SCP Science (Conostan) Qualification Report For D19-0, D3-100, and D12-XXX Series Standards

NoFoam Unit Installation, Evaluation and Operations Manual

Quarterly Progress Report

Blast Pendulum Testing of Milliken Tegris Panels

Linear Algebraic Modeling of Power Flow in the HMPT500-3 Transmission

Impact of 200 ppm HiTEC 4898C Lubricity Improver Additive (LIA) on F-76 Fuel Coalescence

Developing a Methodology for the Evaluation of Hybrid Vehicle Thermal Management Systems

A GENERAL PURPOSE VEHICLE POWERTRAIN MODELING AND SIMULATION SOFTWARE - VPSET

ANALYSIS OF NON-TACTICAL VEHICLE UTILIZATION AT FORT CARSON COLORADO

Methylene Chloride Alternative HAP-Free Chemical Paint Strippers at Anniston Army Depot

2012 E2S2 CARB s New Mobile Equipment Regulations

Battery Research & Development Need for Military Vehicle Application

Endurance Testing of Redesigned Tab Spring for MI-RAMS System

EXPERIMENTAL VALIDATION AND COMBUSTION MODELING OF A JP-8 SURROGATE IN A SINGLE CYLINDER DIESEL ENGINE

Transcription:

Servicing Hawker Vehicle Batteries with Standard Battery Charging and Test Equipment Mr. Fred Krestik TARDEC 2007 Joint Service Power Expo

Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 25 APR 2007 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE Servicing Hawker Vehicle Batteries with Standard Battery Charging and Test Equipment 6. AUTHOR(S) Krestik, Fred 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) USA TACOM 6501 E. 11 Mile Road Warren, MI 48397-5000 8. PERFORMING ORGANIZATION REPORT NUMBER 17040 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR S ACRONYM(S) TACOM TARDEC 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release, distribution unlimited 13. SUPPLEMENTARY NOTES The original document contains color images. 14. ABSTRACT 15. SUBJECT TERMS 11. SPONSOR/MONITOR S REPORT NUMBER(S) 17040 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT SAR a. REPORT unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified 18. NUMBER OF PAGES 18 19a. NAME OF RESPONSIBLE PERSON Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

The Hawker Battery Hawker Armasafe Plus Battery NSN 6140-01-485-1472 Absorbent Glass Mat (AGM) technology

Recoverability Hawker batteries have proven to be highly recoverable using standard charging equipment: Ft. Drum March 2006: >90% of Hawkers sent to DOL shop were successfully recovered using standard battery shop buss bar charging equipment. Ft. Hood May 2006, 2 pallets of Hawker batteries from DRMO were sent to TACOM for analysis: 90% were recovered using std. chargers/methods.

TB 9-6140-252-13 The technical information presented is taken from Technical Bulletin TB 0-6140-252-13 titled: Field and Sustainment Maintenance and Recovery Procedures For Automotive HAWKER ARMASAFE Plus Battery NSN 6140-01-485-1472

Required Equipment Test Equipment: 1. Multimeter or voltmeter: any type that reads in 1/10 th volt increments. (Clamp-on ammeter function a plus.) 2. Battery analyzer (e.g. Midtronics or PulseTech) or heavy duty Load Tester.

Required Equipment Charging Equipment: - Any charger with constant voltage output (rated at 12VDC or 12/24VDC) that can apply a charge to one or more batteries at a time using alligator clamps or NATO slave connector. - Most modern chargers have settings/capabilities for AGM batteries. - If in doubt, test charge voltage. - Constant current chargers are not recommended.

Charge Voltage Test To Verify Charger Output Voltage: 1. Attach charger to any fully charged (6TMF or Hawker) battery. 2. Apply power and wait a few minutes until ammeter reads 1 amp, and measure voltage across battery. 3. If voltage reading is > 15 VDC (> 30 VDC across series pair/nato connector) do not use on Hawker batteries.

Pre-Charge Inspection 1. Check top, sides, and bottom for damage. (i.e. cracks, dents, leaks, or swelling) 2. Check that the battery case and lid are sealed. 3. Make sure terminals aren t melted, bent or damaged. 4. Check for missing vent caps. Mark and immediately dispose of batteries damaged as listed above.

Pre-Charge Inspection Cell Vent Caps Check that all vent caps are in place (flush) and do not appear to be elevated. Gently tap any elevated vent caps back into place and mark them with an R with a permanent marker. If a marked vent cap elevates again during charging or operation, dispose of the battery.

Pre-Charge Testing 1. Clean corrosion from battery terminals with a wire brush. 2. Using a voltmeter set to the lowest voltage range above 15 VDC, test the Open Circuit Voltage (OCV) and mark the OCV in pencil or chalk on the top of the battery. 3. If a battery analyzer is available, use it to determine if any internal damage exists. Many analyzers will not operate if the battery voltage is very low. If no reading is given or no internal damage is indicated, charge the battery for 24 hours and retest.

Charging Procedures Charging Procedures Overviews: Buss Bar Charging Multiple Batteries Single Battery or Roll Around Chargers WARNING: The Charging Procedure Overviews that follow are overviews only. They do not include safety related information. Refer to TB 9-6140-252-13 for more detailed information and procedures.

Overview: Buss Bar Charging Procedures Checklist summary: 1. Never mix battery types on a buss bar. 2. Group batteries by OCV ranges: 0 5.9V, 6.0 9.9V, 10V and up. 3. Set buss bar voltage between 14.7V and 15.2V. 4. Allow at least 10 Amps per battery, e.g. 100 Amp buss bar charger can support 10 batteries max.

Overview: Buss Bar Charging Procedures 1. Connect the batteries to the buss bars 2. Charge the batteries at least 24 to 48 hours 3. Check daily (recommend more frequently) for excessive heating, gassing, leaking, and proper voltage applied. 4. Immediately remove any battery that shows signs of excessive heat, gassing, leaking, or swelling during charging. Battery should be marked with date and Charged Tested Bad, and disposed of. 5. Batteries are finished when charge current drops to approximately 1 Amp per battery.

Overview: Single Battery & Roll Around Chargers 1. Use only chargers that are compatible with AGM batteries. (Refer to charger instructions and the Charger Output Voltage test) 2. Set charger to appropriate settings for battery type and voltage. (Refer to charger instructions and instructions in the TB) 3. Connect charger to battery posts or NATO slave receptacle. 4. Turn on charger and monitor batteries for excessive heat and gassing during the charge cycle.

Overview: Single Battery & Roll Around Chargers 5. Some chargers automatically turn off at end of charge cycle. Some of these chargers require multiple cycles to fully charge batteries. 6. Batteries are finished when charge current drops to approximately 1 Amp. 7. Rest the batteries for 8 hours and test using a battery analyzer or load tester. 8. OCV of rested battery may also be used as an indicator of battery state of charge.

Rested OCV and State of Charge (SOC) > 12.9 Volts OCV: 95% - 100% SOC 12.7 Volts OCV: about 80% SOC 12.5 Volts OCV: about 60% SOC 12.3 Volts OCV: about 50% SOC 12.1 Volts OCV: about 35% SOC 11.9 Volts OCV: about 20% SOC 11.7 Volts OCV: about 10% SOC 11.5 Volts OCV: about 5% SOC < 11.4 Volts OCV: 0% SOC If the battery hasn t rested sufficiently after charging, the voltage reading will be a bit higher than normal. If it hasn t rested sufficiently after discharging, the voltage reading may be a bit lower than normal.

Servicing Hawker Vehicle Batteries with Standard Battery Charging and Test Equipment 2007 Joint Service Power Expo

Thank-you! For further information refer to TB 9-6140-252-13 Or contact: Boyd Dial or Fred Krestik DSN 786-2629 DSN 786-8000 586-753-2629 586-574-8000 dialb@tacom.army.mil krestikf@tacom.army.mil