Accumulator Charging Valve (Brake) - Test and Adjust

Similar documents
Filling and Flushing the Hydraulic System - Test

Hydrostatic System - Test and Adjust

Transmission Pressures - Test and Adjust

Service Brake Air - Purge

Front Suspension (Cylinder) - Purge and Charge

Installation of the Two-Way Pilot Valve (Control Pattern Change) {5051, 5059}

Air-Assist Service Jack Max. Capacity: 10 Tons

Fuel Injection Pump - Remove. Removal Procedure NOTICE. Table 1 Required Tools. Tool Part Number Part Description Qty

Dethatcher Kit Greensmaster 3000 Series

Fuel System Pressure - Test

Filling and Flushing the Hydrostatic System

Air / Hydraulic Pump

Removal and Installation of Fuel Injection Pumps

OPERATION MANUAL ESX-2

FIS Low Pressure Leak Test March Publication Number / Title Platform Section Title Change. FIS Low Pressure Leak Test- Three-Filter Fuel System

Finding Top Center Position for No. 1 Piston. Set The Top Center Position By Temporary Marks On Type 1 Engines and 9RM Engines

Implement and Steering/Hydraulic System Testing and Adjusting

R070T. Service Repair Manual. Language: Geographic Region: Serial Number Range: English All SN All. This manual is complements of TrackLoaderParts.

BRAKE SYSTEM, HYDRAULICALLY ACTUATED - 631G TRACTOR Cat Tractors with standard shoe/drum brakes

Service Manual. Rubber Track Loader. PT-100 FORESTRY Part Number: Printed (3-09)

VALVE AND PLUMBING KIT 2408TL LOADER AGCO & MASSEY FERGUSON TRACTORS

MBE 900 and MBE 4000 EGR Cooler Leak Tester

Installation, Operation & Maintenance Manual MODEL RJ9A / RJ9S. (Model Series 4-Post only) 9,000 lbs Capacity

Series 111 Accumulator Product Information

ACF Operation Manual

Boring Unit Sitework Systems Attachment

WALKIE HIGH LIFT HYDRAULIC SYSTEM

VALVE AND PLUMBING KIT INSTRUCTIONS SMC 84Q & 2408 LOADERS NEW HOLLAND TRACTORS MODEL 2WD 4WD LESS CAB WITH CAB 1720 X X X 1920 X X X

Service Manual. Compact Track Loader PT-50/60. Part Number: Printed (7-12)

Hose Reel Kit for Multi-Pro 1200 and 1250 Sprayers. Installation Instructions. Form No Model No Serial No.

VALVE AND PLUMBING KIT NEW HOLLAND 7310 LOADER NEW HOLLAND TRACTORS

Models Affected: Certain 2014 Model Year Vision Buses Equipped with Ford 6.8L Propane Engines ISSUE

WALKIE HYDRAULIC SYSTEMS

Installing FRK and FRK Hydraulic Compact Unit (HCU) on Navistar Straight Trucks

Operating Instructions 20 Ton Air/Hydraulic Service Jack

71235 Chaff Spreader Pump Kit

STC Oil Control Valve (Mechanical) ( )

Horton DriveMaster Fan Clutch 20.06

Four Wheel Drive Kit Groundsmaster 580D

BRAKE E

SD Bendix ET-2 Electronic Treadle DESCRIPTION OPERATION

Troubleshooting the Transmission Hydraulic System

OPERATION MANUAL FOR SQUARE DRIVE & LOW PROFILE HYDRAULIC TORQUE WRENCHES NOTICE WARNING

1 To the Purchaser THANK YOU

CAUTION. Fuel Injection Pump, In-Line, Spill Port Timing

SB 160 QUICK REPAIR GUIDE FOR HALE THERMAL RELIEF VALVE TRV 120, TRV 170, TRV L

Installation Guide. Installing the FRK Hydraulic Compact Unit (HCU) on International School Buses TP-0913 Issued 1 Technical Bulletin

Auger Installation, Operation and Service Manual

Installation Guide. Installing the FRK Hydraulic Compact Unit (HCU) with Parking Brake Valve on International School Buses

Hose Reel Kit for Workman 200 Spray Systems. Installation Instructions. Form No Rev A. Model No Serial No.

ASSEMBLY MANUAL. Keep With Operator s Manual

ABSOLUTE EQUIPMENT PTY LTD

MK AUGERS POWER SWING KIT ASSEMBLY & OPERATION MANUAL

7649A FUEL INJECTOR CLEANING SPECIALTY TOOLS USER MANUAL & REPLACEMENT PARTS LIST

MODEL 25-OM-10-C & 25-OA-10-C HYDRAULIC BOOSTER

ABSOLUTE EQUIPMENT PTY LTD

ASSEMBLY MANUAL SMC 2491 LOADER VALVE AND PLUMBING KIT INSTRUCTIONS KUBOTA TRACTORS

32 quarts Transmission Allison HT 740 Automatic Fluid

Brake Bleeding: Service and Repair

Models Affected: Certain 2013 Model Year Propane Vision Buses Equipped with Ford 6.8L Engines CORRECTIVE ACTION ---- PROCEDURE

IMPORTANT NOTE The warranty will be void if the pump has been altered in any way

HYDRAULIC RIDE CONTROL KIT RHINO 4211 AND 4211B FRONT END LOADERS

Operating instructions Form no safety definitions

VALVE AND PLUMBING KIT 4211 LOADER CASE IH JX55, JX65, JX75,JX85, AND JX95 TRACKTORS NON-CAB

VLW18TE, VLW18TI HYDRAULIC VERTICAL LIFTING WEDGES. Operator Instruction Manual INNOVATION IN ITS MOST FUNCTIONAL FORM

NUMBER: S.M. REF.: Listed in Table ENGINE: DD Platform DATE: May 2010

Update Manual. Manufacturing, Inc. 7 & 10 End Wheel No-Till Clutch Linkage. P.O. Box 218 Assaria, Kansas Effective 5/3/ M

Service Bulletin No. 3089

Rugby Manufacturing Hoist Cylinder Bulletin. Preface Technical Service Bulletin

Shock Valve Kit 100 and 200 Series Z Masters

AIR/HYDRAULIC LIFT TABLE CART 770-LB.

RELEASING PRESSURE IN THE HYDRAULIC SYSTEM,

General Information. Assembly Instructions. Dual Marker Option

Post Driver Attachment

ALLDATA Online Saturn L200 L4-2.2L VIN F - Base Brake Bleeding. Base Brake Bleeding

BUCKET SWEEPER OPERATORS & PARTS MANUAL 2852 & 3174 SERIES

VALVE AND PLUMBING KIT 2409 LOADER CUB CADET & KIOTI TRACTORS

CR4 Discrete Valve and Manifold Valve Repair or Replacement Procedure

SERIES OPERATION AND MAINTENANCE MANUAL

ALUMINUM RESERVIOR 10,000 PSI, AIR-HYDRAULIC PUMP

Assembly instructions

1732-M2 Portable C-Frame Punch Driver

Collision Repair Set. Form No No. 1517A 4-Ton Set. No. 1519A 10-Ton Set. Parts List & Operating Instructions for: 1519A. Part No. Item No.

200C II BRAKE SYSTEM

MAINTENANCE INTERVALS

ASSEMBLY MANUAL HOSE KIT 2410 LOADER NEW HOLLAND TN, TNA, TND AND TNDA TRACTORS WITH NEW HOLLAND MID MOUNTED VALVE

WCI-20 Power-Pak Coldwork Hydraulic Power Supply Rev B

Page 1 of 26 Oteco Inc. Houston, Texas

HELPING HAND EXPERT 2000

Trench Filler for Compact Utility Loaders

Section 10. Pressure Adjustments For: L90F-622 LUMBERJACK

PE 20 SERIES ELECTRIC POWER PUMPS

Operating Instructions - Electric Pow'r-Riser Models

Assembly Instructions. General Information

Troubleshooting The Transmission Hydraulic System

QuickServe Online ( ) ISB6.7 CM2350 B101 Service Manual

DeZURIK DR 125 ROTARY DIAPHRAGM ACTUATOR

Tidland D5 Differential Air Shaft. Installation, Operation and Maintenance

High Lift Transmission Jack

ALAMO SMC & RHINO 65A, 75 & 85 BACKHOE MOUNTING KIT KUBOTA L4400DT TRACTORS

Transcription:

Testing and Adjusting 966G Series II Wheel Loader and 972G Series II Wheel Loader Braking System Accumulator Charging Valve (Brake) - Test and Adjust Table 1 Required Tools Part Number Description 1U-5481 Pressure Gauge Group Escaping fluid under pressure, even a pinhole size leak, can penetrate body tissue, causing serious injury, and possible death. If fluid is injected into your skin, it must be treated immediately by a doctor familiar with this type of injury. Always use a board or cardboard when checking for a leak. Personal injury or death can result if two persons are not used in the following procedure.

NOTICE Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop Products Guide" for tools and supplies suitable to collect and contain fluids on Caterpillar products. Dispose of all fluids according to local regulations and mandates. "Procedure 1" is a quick method for checking the cut-out pressure. This procedure also indicates whether the oil pressure switch for the service brakes and the brake oil pressure indicator operate correctly. The procedure provides an estimate of the accumulator precharge pressure and an estimate of the number of brake applications before the brake oil pressure indicator turns on. "Procedure 2" determines whether the cut-in pressure and the cut-out pressure are correct. This procedure also provides the required steps for adjusting the brake accumulator charging valve. Procedure 1 1. Stop the engine. Engage the parking brake. Depress the brake pedal repeatedly until there is no brake oil pressure. Illustration 1 g00497446 Components for the Service Brakes (1) Accumulator charging valve. (2) Oil pressure switch for service brakes. (3) Test port.

2. Connect a 0 to 40000 kpa (0 to 5800 psi) pressure gauge at test port (3) on brake accumulator charging valve (1). The accumulator charging valve is located on the left side of the machine under the operator's platform. The accumulator charging valve is mounted on a steel plate which is located next to the brake accumulators. Observe the pressure gauge. Before you start the engine, the oil pressure3. must be 0 kpa (0 psi). 4. 5. Start the engine. Allow the oil pressure to increase to the cut-out pressure. The correct cut-out pressure should be 14500 ± 345 kpa (2100 ± 50 psi). After the brake accumulators have been completely charged and the correct cut-out pressure has been obtained, stop the engine. Turn the engine key start switch to the ON position, but do not start the 6. engine. 7. Apply the service brakes repeatedly. Pause for two seconds between each of the brake applications and count the number of applications. Observe the pressure gauge as you apply the brakes. Illustration 2 g00905221

(4) Brake oil pressure indicator. 8. 9. 10. 11. When the reading on the pressure gauge decreases to 9000 ± 540 kpa (1300 ± 78 psi), brake oil pressure indicator (4) will turn on. This indicates the operational status of brake oil pressure indicator (4). This also indicates the operational status of the oil pressure switch for the service brakes. Oil pressure switch (2) is located beside accumulator charging valve (1). Continue to apply the service brakes. Pause for one or two seconds between each of the brake applications. When the pressure drops off rapidly, this indicates the approximate nitrogen precharge pressure in the brake accumulators. Determine the number of brake applications that were required before the sudden pressure drop in Step 9. This number should be more than five times. If the cut-out pressure is not within the specification, complete Steps 7 through 12 in "Procedure 2". If the nitrogen precharge pressure is not within the specification, see the following reference. Reference: For additional information on the testing and adjusting of the brake accumulators, refer to Testing And Adjusting, "Brake Accumulator - Test and Charge" for the machine that is being serviced. Procedure 2 Note: Use the same operational conditions that were used in "Procedure 1". Use the same precautions that were used in "Procedure 1". 1. Stop the engine. Engage the parking brake. Depress the brake pedal repeatedly until there is no brake oil pressure. Illustration 3 g00497446 Components for the Service Brakes

(1) Accumulator charging valve. (2) Oil pressure switch for service brakes. (3) Test port. 2. Connect a 0 to 40000 kpa (0 to 5800 psi) pressure gauge at test port (3) on brake accumulator charging valve (1). The accumulator charging valve is located on the left side of the machine under the operator's platform. The accumulator charging valve is mounted on a steel plate which is located next to the brake accumulators. Observe the pressure gauge. Before you start the engine, the oil pressure3. must be 0 kpa (0 psi). 4. 5. 6. Start the engine and immediately raise to high idle. The oil pressure must increase to a maximum. Record this pressure. This is the cut-out pressure of the brake accumulator charging valve. The correct cut-out pressure should be 14500 ± 345 kpa (2100 ± 50 psi). With the engine in operation, slowly apply the service brakes. Apply the service brakes several times in succession. Verify that the pressure drops consistently. At the point of the specified cut -in, the pressure begins to increase quickly. 7. If the cut-in pressure and the cut-out pressures are not within the specification, stop the engine and completely release all the oil pressure from the brake circuit by depressing the brake pedal. Loosen the hydraulic tank filler cap in order to make sure that there is no residual pressure in the hydraulic oil tank.

Illustration 4 g00819498 172-6144 Accumulator Charging Valve (4) Inlet from the brake pump. (5) Outlet to the hydraulic oil tank. (6) Plug. (7) Accumulator port for the front brakes. (8) Outlet to the hydraulic oil filter. (9) Port for the oil pressure switch for the service brakes. (10) Accumulator port for the rear brakes. (11) Pressure relief valve. (12) Adjustment screw cover. 8. Remove the hex cap (12) that covers the adjustment screw. Note: The charging limits will move together. The range between cut-in pressure and the cutout pressure is not adjustable.

9. 10. 11. 12. Turn the adjustment screw by a quarter turn. Turning the adjustment screw clockwise will increase the cut-in pressure and the cut-out pressure. Turning the adjustment screw counterclockwise will decrease the cut-in pressure and the cut-out pressure. Install the hex cap (12) that covers the adjustment screw, and tighten the hydraulic tank filler cap. Start the engine. Make sure that the cut-in pressure and the cut-out pressure are within the specification. If the pressures are not within the specification, repeat Steps 7 through 11. If the cut-in pressure and the cut-out pressure are not within the specification, the brake accumulator charging valve should be repaired or replaced. Reference: For additional information on the testing and adjusting of the brake accumulators, refer to Testing And Adjusting, "Brake Accumulator - Test and Charge" for the machine that is being serviced.