Energy Association of Pennsylvania Meeting. PECO Energy Utility Integrated Concord Microgrid Project. March 21, 2017

Similar documents
BROCHURE. End-to-end microgrid solutions From consulting and advisory services to design and implementation

Impact of Distributed Generation and Storage on Zero Net Energy (ZNE)

Microgrid solutions Delivering resilient power anywhere at any time

Integrating DER. Thomas Bialek, PhD PE Chief Engineer. Smart Grid & Climate Change Summit October 13, 2015

Facilitated Discussion on the Future of the Power Grid

Integrated System Models Graph Trace Analysis Distributed Engineering Workstation

Enabling resilient and cost effective access to power

American Electric Power s Energy Storage Deployments

National Grid New Energy Solutions (NES)

Patrick Lee and Chuck Wells

RESILIENT SOLAR CASE STUDY: SUNY New Paltz NYPA Integrated Grid Pilot

Building a 21 st Century Electric Grid. February 23, 2018

Portland General Electric

Microgrid Controller Requirements

Residential Smart-Grid Distributed Resources

Veridian s Perspectives of Distributed Energy Resources

SERVICES INNOVATION. Montreal Symposium March 29, Jack Simpson Director, Generation & Capacity Planning

Demystifying Distributed Energy Resources and Microgrids Implications for Louisiana

Galapagos San Cristobal Wind Project. VOLT/VAR Optimization Report. Prepared by the General Secretariat

DER Portfolio Optimization and Dispatch, Tertiary Control/Monitoring Strategies

Powering the most advanced energy storage systems

Smart Grids and Mobility

Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic

IFC Workshop on Distributed Generation, 13 February 2013, Moscow, Russia

ENERGY STORAGE AS AN EMERGING TOOL FOR UTILITIES TO RESOLVE GRID CONSTRAINTS. June 18, 2015 E2Tech Presentation

Batteries and Electrification R&D

Utility Distribution Planning 101

IEEE-PES Chicago Chapter Presentation November 11, Smart Grid. Mike Born. Principal Engineer, Capacity Planning

Presentation of the European Electricity Grid Initiative

Control System for a Diesel Generator and UPS

Solar Development in New Jersey, and PV Impacts on the Distribution System Carnegie Mellon Conference on the Electricity Industry - March 9, 2011

EPRI Intelligrid / Smart Grid Demonstration Joint Advisory Meeting March 3, 2010

Copyright 2003 Advanced Power Technologies, Inc.

Ergon Energy s experience in meeting the challenges of increasing peak demand and customer expectation.

Topic Small Projects (< 100 kw) Large Projects (>100 kw)

Small Electrical Systems (Microgrids)

Building the Business Case for Energy Storage

ONCOR ENERGY STORAGE and MICROGRID

State Policies - Distributed Energy Resources

PG&E s Energy Landscape. Gregg Lemler, vice president, electric transmission i-pcgrid Workshop March 28 30, 2018

Transforming the Grid from the Distribution System Out

Solar Microgrid Integrates Solar PV, Energy Storage, Smart Grid Functionality and Advanced Vehicle-to-Grid Capabilities

MILESTONE SUMMARY REPORT Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund

DISTRIBUTED ENERGY RESOURCE MANAGEMENT SYSTEM. ABB Ability DERMS Operational confidence.

Assessment of Smart Grid Applications for the City of Palo Alto. City of Alameda Public Utilities Board September 19, 2011

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Oncor Electric Delivery Distributed Storage and Microgrid Demonstration Projects

Y9. GEH2.3: FREEDM Cost Benefit Analysis based on Detailed Utility Circuit Models

Smart Grid: Characteristics, Opportunities and Challenges

International Approaches for an Integrated Grid

DISTRIBUTED ENERGY RESOURCES

Grid Integration Costs: Impact of The IRP Capacity Mix on System Operations

Presented By: Bob Uluski Electric Power Research Institute. July, 2011

Interconnection System Impact Study Report Request # GI

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016

Demand Optimization. Jason W Black Nov 2, 2010 University of Notre Dame. December 3, 2010

Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources. Power Sector Transformation

Smart Islands Smart Networks European Forum on Clean Energy for Islands Naxos, 9-11 of July 2018

Evaluation and modelling of demand and generation at distribution level for Smart grid implementation

Energy Security Electrical Islanding Approach and Assessment Tools. Dr. Bill Kramer Senior Research Engineer Distributed Energy Systems Integration

Electrical Energy Engineering Program EEE

Battery Energy Storage

Roadmap for high RES penetration in Greek Non Interconnected Islands

Laboratory Scale Microgrid Test-Bed Hardware Implementation

Electric Transportation and Energy Storage

Integrating Solar into a Modernized Grid. Dr. Bryan Hannegan Associate Laboratory Director

The Microgrid Phenomenon. John Caldwell Director of Economics Edison Electric Institute

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

RMEL Generation Conferance. Case Studies: Emerging Technologies, Innovative Practices and Successful Implementations to Meet Energy Priorities

Smart Charging and Vehicle Grid Integration Silicon Valley Leadership Group PEV Forum December 16, 2014

2016 UC Solar Research Symposium

The Role of Electricity Storage on the Grid each location requires different requirements

Transforming the U.S. Electric System: Where State & Federal Initiatives Meet. October 27, 2016 Washington DC

DG system integration in distribution networks. The transition from passive to active grids

Research Needs for Grid Modernization

Opening Address By. Programme Director: Mr Chris Yellend, Dr. Fereidoon Sioshansi, Menlo Energy Economics, USA

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER

PG&E Introduction. Daniel Ohlendorf

Issue 23 draft for Nuvve

Distribution Grid Edge is Expanding Fast. Are You Ready?

Non-network solutions

MICROGRIDS DESIGNING AN IMPROVED GRID

Renewables induce a paradigm shift in power systems, is energy storage the holy grail?

2015 Grid of the Future Symposium

IEEE Workshop Microgrids

California s Energy Storage Summit California Energy Storage Association and Association of California Water Agencies

100 MW Wind Generation Project

State Drivers: Input for Regional Profiling

Enable Utility Industry Transformation

Smart Grid Reliability Research

Advanced Energy Conference DSO/DSP Transition Panel. March 28, 2018

Merger of the generator interconnection processes of Valley Electric and the ISO;

Solar PV and Storage Overview

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

ENABLING DISTRIBUTED ENERGY FOR THE GRID EDGE

SOLAR GRID STABILITY

Measuring the Smartness of the Electricity Grid

15 Nelson-Marlborough Regional Plan

Distribution Capacity Impacts of Plug In Electric Vehicles. Chris Punt, P.E. MIPSYCON 2014

Transcription:

Energy Association of Pennsylvania Meeting PECO Energy Utility Integrated Concord Microgrid Project March 21, 2017

Background 2 In October 2015 PECO introduced it s intention to develop a microgrid as part of it s System 2020 five year plan PECO evaluated many potential projects with a focus on providing critical goods and services to customers during extended outage periods. Projects were evaluated with a selection criteria that focused on; customer mix, reliability need, capacity need, surrounding population density, and area accessibility Conceptual designs of the four highest potential pilot opportunities were further developed and evaluated by performing formal feasibility and business case studies. The final four projects were re-ranked and the Concord Microgrid Project was selected The Concord Microgrid is a clustered microgrid design supporting 30 customer connections with a peak load of 8.6 MW and estimated cost of $35M. PECO filed a petition for allowance with the Pennsylvania PUC to construct the Concord Microgrid Project in May of 2016 In October of 2016, PECO withdrew it s microgrid filing with the PUC based on concerns around utility ownership of generation, business case challenges, project size and cost, and rate structure challenges PECO will enter into collaborative discussions with key stakeholders in an effort to obtain better alignment and move this project forward

Feasibility / Business Case Analysis 3 Feasibility Study Initial conceptual designs were optimized to provide maximum benefit and stakeholder appeal Base case and advanced case designs with additional customer involvement and more advanced technology were developed for each pilot Pocket reliability studies and root cause analysis were performed Post microgrid reliability improvements were estimated Load profile and consumption studies were done to estimate and optimize the generation mix Operational characteristics were identified Business Model Framework, Approach and Analysis Project challenges Base and advanced case functionality and economic performance Key financial and maintenance cost assumptions Business model inputs; cost, revenue, tax credits, and public funding Capital and O&M cost breakdowns Revenue opportunities / market participation Cash flow and NPV Customer reliability savings Interruption Cost Estimator LBNL ICE Model

Types of Microgrids 4 Source: EPRI

Utility Integrated Microgrid Design & Challenges 5 Each utility has it s own unique electrical distribution configuration In the case of the Concord Microgrid, the targeted public purpose customers are connected to five different circuits operating at 34kV and 4kV Each microgrid requires a common point of interconnection (POI) to enable islanding operation Creation of POI will require moderate to extensive distribution system reconfiguraton more costly than a campus style microgrid Customer selection and mix is a key selection criteria that has a huge impact on the electrical reconfiguration cost. Some projects that had a very favorable customer mix were removed from consideration because of the high complexity and cost of the electrical reconfiguration. Who s in and who s out? Aerial facilities within the microgrid footprint need to be hardened against storm damage

Project Approach / Phases 6 Establish firm goals and objectives prior to design Customer mix is a key selection criteria for a public purpose microgrid Systemic thinking achieves optimal operational & functional requirements

Microgrid Site Geographic Overview 7 Complex Green - Microgrid 1 Yellow - Microgrid 2 Privileged & Confidential Prepared at the Request of Counsel Not For Distribution

Concord Microgrid Project 8 NG Engine 1980 kw NG Engine 1980 kw NG Engine 1980 kw Ground Mount PV 500 kw Municipal Building, and Fire Station Microgrid 1 4.6 MW Peak Shopping Center Shopping Center Hotel Hotel C C C C *EV Chargers C C Shopping Centers NG Engine 1980 kw Microgrid 2 4.0 MW Peak NG Engine 1980 kw Retirement Home, Gas Station, Food, ATM, Sewage Plant *Li-Ion BESS 2x100 kw Li-Ion BESS 200 kw Shopping Center Shopping Center *Wind Turbine 160 kw *Roof-Top PV 260 kw Multiple Building Locations *Carport PV 74 kw *Rooftop PV Level 3 EV Chargers 930 kw Level 2 EV Chargers *Sited on Customer Property Customers include; medical and surgery centers, retirement community, township building, fire station, sewage plant, gas stations, supermarkets, convenience stores, restaurants, pharmacies, bank services, home improvement, hotels, shelter, and retail space Slide 8

Microgrid #1 Conceptual Single Line Diagram 9 34kV Circuit X Hotel Wholesale Store Healthcare Healthcare Hotel 266.4 kw Healthcare Shopping Center Shopping Center Large Retailer Home Improvement Store Hotel 129.6 kw SC Trans Grocery Office Supply Restaurant Shelter Slide 9

Microgrid #2 Conceptual Single Line Diagram 10 to MG1 34kV Circuit Y Main Grid 91857 POI RCLC Gas, Food, Wawa ATM 76.5kVA 10kW 1 Microgrid 1 ~700' ~4000' N/O MG Tie Switch RCLC RCLC 52 52 52 Concord Sewage Sewage Plant 385kVA MG2 Generation Station 2*1.98MVA J162 Gas Engine 34kV/4.6kV Maris Grove 3529.8kVA Retirement Home 250kW 1 LEGEND RCLC: Remotely Controllable Load Center POI: Point of Interconnection to Main Grid MG1: Cluster Microgrid 1 Border line of customer properties Aerial cable Underground cable NOTE 1 : Distributed Generation for Advanced Case

Operational & Design Overview 11 Peak generation capacity allows for full islanding without demand response Transition between all modes of operation Environmentally friendly renewable DER BESS to maintain high power quality - renewable smoothing, generator loading, loading shedding, and demand transitions Uninterruptible power supply for fire house, township building, and shelter Remotely controlled load centers to coordinate load block management and fault isolation Coordination with existing utility distribution automation schemes Protection and control coordination with utility for island and parallel operation Economic dispatch of DER during parallel operation Remote DMS control and monitoring from PECO Operations Control Center

Utility Integration of the Microgrid 12 Source: EPRI Integrated Grid

EPRI Microgrid Optimization Study 13 The objective of this study is optimize the current conceptual design One year of historical load profile is being used to optimize DER resource type and size to deliver optimal operational effectiveness and economic dispatch Data integrity and organization has been a challenge Load profile data is being organized in a nodal (load center) format to perform the analysis DER-CAM - Distributed Energy Resources Customer Adoption Model is the primary tool that is being used to perform this analysis Allows users to perform scenario analysis of system to optimize design Economic and environmental model of customer DER adoption Determine the optimal Microgrid configurations as well as operating strategies Developed at Lawrence Berkley National Lab in 2000 Aims to minimize the cost of operating on-site generation Other tools are also being used to provide additional insights

EPRI Microgrid Optimization Study 14 Challenges Extracting one year of Demand Data to develop an aggregate load profile for customers served by the microgrid Interval Mix (15 & 30 min) Variety of meter types Data gaps due to customer relocations and meter upgrades occurring within the sample data set Extracting existing infrastructure information need for power flow modeling. Conductor Type Impedance Lengths Nodes

EPRI Microgrid Optimization Project 15 Current Project Status Report is being finalized EPRI Deliverable DER-CAM scenario report for 4 seasons Power Flow Model (multi-node analysis) Cost/Benefit Analysis Recommended location and sizing of DERs Recommendation on load block size and sectionalizing options Project Objectives Further develop project and prepare for next phases; design, planning, and HIL Support DER-CAM tool development and enhancement for utility use Provide feedback on how to make tool more effective and user friendly Support EPRI s Integrated Grid Vision - process for taking a project from concept to execution

Utility Integrated Microgrid Challenges 16 Design Framework Selection of critical public purpose customers dispersed among disparate feeders and voltages Creation of Point of Common Coupling (PCC) Minimize foundational hardening and reconfiguration cost Contingency Management Demand Data Granularity Traditional utility analysis philosophy may not be adequate Readily available information lacks high resolution Customer-level analysis requires AMI infrastructure with adequate sampling rate Data repository access may be a challenge Island Mode Operational Pillars PA law mandated voltage band must be maintained 120V nominal (+/-5% for residential and +/-10% for commercial/industrial) Generation capacity must support total load for utility application Multi-customer coordination and integration of existing DERs must be considered Safety, Standards, Operating Practices Safe operation and new equipment will require testing, new construction standards, operating practices, and training Microgrid industry standards are under development

Microgrid / Utility Grid Integration Benefits 17 Benefits for Both Grids. The Utility Grid Benefits the Microgrid Enhances microgrid reliability by providing a reliable source of power Provides a low cost alternative to microgrid generation - DERMS platform enables economic dispatch and improves bottom line cost Provides demand (market) for renewable generation / promotes renewable penetration The Microgrid Benefits the Utility Grid Generation can be used to alleviate overloads on utility circuits dependent on electrical configuration and type of microgrid Microgrid generation at point of interconnection can be incorporated into existing utility grid distribution automation scheme (virtual tie circuit) to provide additional contingency and improved reliability

Closing Thoughts 18 Business cases for utility integrated microgrids focused on reliability and resiliency are challenging. Need to improve our ability to quantify savings associated with reliability, resiliency, public safety, and deferred investments. Need to educate key stakeholders on the value of the resiliency insurance policy analogy Regulatory framework needs to change to enable microgrids and DER applications Utility philosophies must adapt to properly conceive, implement, and successfully build & operate effective microgrids Operational approach moves from a reactive mode to a proactive / optimization mode Grid-connected and islanded modes of operation will result in different fault current levels traditional relay protective schemes will not be adequate Next steps for Concord are; preliminary design, planning, and hardware in the loop (HIL) simulation testing to evaluate dynamic system response and protection and control requirements