AGCO Massey Ferguson Combine Models 8780, 9690, Lincoln Automatic Lubrication System Installation Instructions

Similar documents
Automated Lubrication System

Automated Lubrication System

Automated Lubrication System

Automated Lubrication System

Automated Lubrication System

John Deere R Series Sprayer Lubrication System Installation Guide

John Deere R4045 Sprayer Wet/Dry Lubrication System Installation Guide

Quicklub Lubrication Systems Fittings, Adapters and Accessories

Quicklub Lubrication Systems Fittings, Adapters and Accessories

Quicklub Lubrication Systems

Lincoln Quicklub centralized and automatic lubrication systems

Centralized & Automated Lubrication Systems. I design Quicklub and other systems to satisfy each customer s unique requirements.

9895 Combine Parts Catalog EFF. S/N HSC8101

QUICKLUB CENTRALIZED & AUTOMATED LUBRICATION SYSTEMS

Owner s and Maintenance Manual for: Lincoln QuickLub Systems

Complete Systems & Parts Automatic Oiler & Grease Bank MADE IN THE USA

SOLUTIONS. Airless Spray System. In This Issue: Airless Spray System pg. 2. Improved FlowMaster pg. 5

PARTS SERVICE PARTS GUIDE. All rights reserved.

John Deere. MODEL: 4400 Combine JD-O-OMH86804

Grease Jockey On-Road Lubrication Solutions. Time-tested lubrication equipment with you for the long haul.

Lincoln Quicklub System Installation Manual for: CAT M Loaders

Trouble Shooting Manual Progressive Systems

Centralized Lubrication for Commercial Vehicles Drive Productivity Experience Performance

Capabilities. Solutions. for Commercial Vehicle Applications. Inside: Vol. 2, No. 1 June Lincoln Advantage pg. 2. It s Your Choice pg.

QLS 321 SOLUTIONS. Compact and Rugged Easy to Install and Use Multiple Standard Features. Quicklub Lubrication Systems.

IVTM Installation Manual

People, Capabilities and Systems to Save Money and Increase Productivity

Lubrication Installation Components, Accessories & Fittings Table of Contents

Models CHASSIS LUBE ELECTRIC GREASE PUMP Series "C" - 13C MAY FORM Page. Section - Q3

Model CHASSIS LUBE ELECTRIC GREASE PUMP Series "C"

Models CHASSIS LUBE ELECTRIC GREASE PUMP Series "C" - Q3. MAY FORM Section

Lubrication Systems. Section 26

MF SERVICE PARTS GUIDES

COMBINES 6620, 7720, 8820

\ \ ~, en ~ \ \\ en I- ( \\\ b3~(i 5/27/93. æ Lr PECULIAR HYDRAULICS W LL BELT DRIVE, SLC,

Page 1 of 17. Part# M0200 Rev.11 7/29/2016

A system of lubricant dispensing devices (oil or grease) connected by piping to a central pumping unit that is operated automatically or manually.

FAX

OWNERS MANUAL GM C4500/C5500 DANA MODEL S135 REAR AXLE 2003-NEWER MODELS LINK MFG. PART NO. 8M PROUDLY INSTALLED BY : COMPANY :

CH.4 Basic Components of Hydraulic and Pneumatic System/16 M HAP/17522/AE5G

9500 Series Combines. Massey Ferguson Combines: The Next Generation

Service Manual. MF2135 Industrial

Portable Equipment High-Pressure Heavy-Duty Grease Pumps

OPERATORS MANUAL/INSTRUCTIONS/PARTS & SERVICE FOR MANUAL & ELECTRIC

Troubleshooting of the LubeTech Grease System

OWNERS MANUAL GM C4500/C5500 4X4 DANA MODEL S135 REAR AXLE 2005-NEWER MODELS LINK MFG. PART NO. 8M PROUDLY INSTALLED BY : COMPANY :

Related Parts Selling Manual

550 & 555 Tractor, Loader & Backhoe Volume 1 of 2

If there is additional labor or other costs above the 4 hrs labor you must call VMAC for approved coverage

IS INDEPENDENT SUSPENSION SYSTEM OWNERS MANUAL

PARTS CATALOG FOR. Mud Hog System II & System III 2-Speed Rear Wheel Drive FOR JOHN DEERE 9960, 9965 & 9970 COTTON PICKERS

VALVE AND PLUMBING KIT 2408TL LOADER AGCO & MASSEY FERGUSON TRACTORS

REPAIR MANUAL AFX8010

Operating Instructions & Parts Manual

Automated Steering Hydraulic Installation Kit

PFadvantage JD 3300/4400/6600/7700; 4420

MultiPort II Lubricator

Parts Manual PZ Please read the operator manual carefully and make sure you understand the instructions before using the machine.

C FORD F250 / F L POWERSTROKE DIESEL WITH AUTOMATIC TRANSMISSIONS ONLY

Accessories. Accessories Catalogue

Kysor On/Off Rear Air Fan Drive

SETUP & INSTALLATION MANUAL FOR DOOSAN DL 200 TC TOOL CARRIER BY

C40008 & C40009 EXHAUST BRAKES

Centro-Matic. Automated Lubrication Systems

FAX

OWNERS MANUAL. GMC C K AND 19K GVW CHASSIS CAB 2004-NEWER MODELS (Link Part No. 8M000050) PROUDLY INSTALLED BY : COMPANY : INSTALLER SIGNATURE :

Massey Ferguson Combines: The Next Generation Series Combines

JARVIS. Model 50G Hydraulic Dehorner

215E. Operator and Parts Manual MM158

Lincoln Quicklub centralized and automatic lubrication systems

Kysor On/Off Rear Air Fan Drive

PARTS BOOK CATALOG IMPLEMENT ASSEMBLIES STANDARD BOOM 3PT HITCH MOUNT

PFadvantage MF 6850/6855; Ideal 9080/9090

GRAIN CART RETROFIT J-M 5.5 SPINDLE SCALE SYSTEM

Paint/Solvent/Dump Valve and Flow-Through Valve

Centralized Lubrication Systems for Renewable Energy Production

AIR CONTROL ACCESSORY KIT

PARTS BOOK CATALOG IMPLEMENT ASSEMBLIES STANDARD BOOM 3PT HITCH MOUNT

TrynEx International, LLC, 531 Ajax Drive, Madison Heights, MI , POWER PLOW Snowplow

HP10134 & HP10135 KITS BASIC SIMULTANEOUS AIR SPRING ACTIVATION KIT

Hydraulic Long Jacks

Fluidizing Pickup Tube Kits

JARVIS. Model 30CL-1 AND 30CL-3 Hock Cutter and Dehorner. 30CL-1 Hock Cutter

Part# JL AIR IT UP 4 Tire On Board Air Delivery System. (Requires External Air Source)

INSTRUCTIONS PARTS LIST This manual contains important warnings and information. READ AND RETAIN FOR REFERENCE

Betico SB1 Compressor. Unloader Kit Installation Manual

Fits AGCO, Challenger, & Massey Ferguson Tractor Models:

GRAIN CART RETROFIT BOLT-ON TYPE HITCH SCALE SYSTEM

Quicklub Lubrication Systems

P385B COMMERCIAL PAVER ENGINEERED INNOVATION

Lincoln installation components, accessories and lubrication fittings

PARTS BOOK CATALOG 3PT HITCH MOUNT HEADS SWING FLAIL-HEAVY DUTY MOWERS

SHOP PRO FXP 95 UPGRADE KIT (REGULATED)

Owner s Manual TC-515 with Reversed Hoist, Sub-Frame, Deck, & Hitch Mount

Part Name/Description Part Number Quantity Instruction Kit Metalfor Flow Sensor

BALE KING GT40 Grain Feeder Operator's & Parts Manual Last Update: November 20, 2014 Bridgeview Manufacturing Inc - 1 -

MODEL P Parts List UNIT SERIAL NUMBER MANUAL NUMBER: AB-F EFFECTIVE 06/2016

1090, 1170 & 1175 Volume 1 of 2

INSTALLATION AND OPERATING INSTRUCTIONS

AllCropHarvester.com. New/New Old Stock List as of 03/04/2016

Transcription:

AGCO Massey Ferguson Combine Models 8780, 9690, 9790 Lincoln Automatic Lubrication System Installation Instructions

System Overview Thank you for purchasing the Quicklub On Board Grease System for your AGCO Combine. The system has been designed to increase the component life and overall productivity of your equipment, while reducing labor costs related to the traditional method of point-by-point manual lubrication. The system consists of the Quicklub progressive metering valves that positively displace and meter precise amounts up to N.L.G.I. #2 shop grease down to -13 F temperature. Grease is distributed to each connected point through high-pressure tube and hose. This Quicklub kit is designed to work with your AGCO Combine model 8780. There are subtle differences between models and years and this kit will accommodate all changes. This is a fully automated lubrication system utilizing a 12 volt DC heavy duty electric pump with integrated timer that dispenses lubricant to the progressive metering valves at timed intervals. The lubricant is pumped to the primary metering valve, which distributes it to secondary metering valves in specific zones of service. The secondary metering valves deliver measured amounts of lubricant proportional to each lube point in its zone. The components are connected with lengths of high-pressure hose and tubing that are included in the kit. Contents of the kit are specifically marked to coincide with this instruction manual to achieve a consistent and quality installation. This manual has been included with the system as an easy-to-follow guide for installation and operation. Keep it with the equipment, as it is also a trouble-shooting manual to keep your automated lubrication system working properly. This kit also contains Installation and Operation Instructions for the QLS 301 system supply pump. Please refer to this manual for detailed information on operations, maintenance, trouble shooting and technical data. If missing, please contact Lincoln and request service pace Q3-9, form #402865. Durable and reliable, the Quicklub On Board Grease System has been carefully designed using industry proven products to provide long and trouble-free life under the most severe farming conditions. For further information on this system please contact Lincoln Technical Services at 1-314-679-4200 ext. 4782# or fax 1-314-679-4357. THIS DOCUMENT (INSTALLATION INSTRUCTIONS) IS THE EXCLUSIVE PROPERTY OF LINCOLN INDUSTRIAL CORPORATION ( LINCOLN ). IT CONTAINS PROPRIETARY DATA AND INFORMATION DEVELOPED AT LINCOLN S EXPENSE AND IS FURNISHED UPON THE EXPRESS CONDITION, ACKNOWLEDGED BY THE RECIPIENT, THAT IT S CONTENTS SHALL NOT BE DISCLOSED, COPIED OR DUPLICATED, DISSEMINATED, OR USED, EXCEPT FOR THE PURPOSES ESTABLISHED BY WRITTEN CONTRACT OR OTHERWISE AUTHORIZED BY LINCOLN IN WRITING. LINCOLN RESERVES ALL RIGHTS UNDER PATENT, COPYRIGHT, TRADE SECRET AND OTHER APLICABLE LAWS. Quicklub is a registered trademark of Lincoln.

THE HEART OF THE QUICKLUB SYSTEM: At the heart of every Quicklub System is the metering valve or progressive distributor block, designed to positively meter the input of lubricant (oil up to NLGI #2 greases) out to the connected number of lubrication points irrespective of distance and back pressure. The inlet passageway is connected to all piston chambers at all times with only one piston free to move at any one time. With all pistons at the far right, lubricant from the inlet flows against the right end of piston A (fig. 1). Lubricant flow shifts piston A from right to left, dispensing piston A output through Connecting passages to outlet 2. Piston A shift directs flow against right side of piston B (fig. 2). Lubricant flow shifts piston B from right to left, dispensing piston B output through valve ports of piston A and through outlet 7 (fig. 3). Lubricant flow shifts piston C from right to left dispensing piston C output through valve ports of piston B and through outlet 5. Piston C shift directs lubricant flow against right side of piston D (not illus.)

Lubricant flow shifts piston D from right to left, dispensing piston D output through valve ports of piston C and through outlet 3. Piston D shift directs lubricant through connecting passage to the left side of piston A (fig. 4). Lubricant flow against left side of piston A begins the second half cycle which shifts pistons from left to right, dispensing lubricant through outlets 1, 8, 6 and 4 of the divider valve. Cross-porting (Divider Valve) Installing a closure plug in one or more outlets may combine outputs from adjacent outlets. Lubricant from a plugged outlet is redirected to the next adjacent outlet in descending numerical order. Outlets 1 and 2 must not be plugged since they have no cross-port passage to the next adjacent outlet. In figure 5 outlets 5 and 3 are cross-ported and directed through outlet 1. In this example, outlet 1 will dispense three times as much lubricant as outlet 7. The tube ferrules in outlets 1 and 7 block the cross-port passage so that lubricant flow is directed through the outlets.

QUICKLUB COMPONENT GLOSSARY PART NUMBER and DESCRIPTION 619-26648-2 - Divider valve SSV12k with indicator and 12 port outlets... 619-27122-1 - Divider valve SSV6k with indicator and 6 port outlets... 247023 - Grade 8-1/4" valve mounting bolt... 67448 - Male run tee... 404-22581-2 239857 - Clamping ring (ferrule)... - Valve outlet adapter... 13129-1/8 NPTF 90 Street Elbows... 241110 - Feed Line Bundling Spiral Wrap (10ft.)... P3016121151 - QLS301 With Back Mounted SSV12...

QUICKLUB COMPONENT GLOSSARY PART NUMBER and DESCRIPTION 244883-1/4" tube Quicklinc valve outlet fitting... 303-17499-3 - Valve closure plug for Black divider valves... 243699-90 Swivel quicklinc fitting... 51304 51057-1/4" Nylon locknut for valve mounting... - 5/16" locknut... 242125 - Plastic Grease fitting cap... 246002-1/8" NPT field installable hose coupling... 246416 - Valve mounting bracket... 5400-1/8" PTF Special Short 90 Fitting... 5045 - Straight leak-proof grease fitting...

QUICKLUB COMPONENT GLOSSARY PART NUMBER and DESCRIPTION 241286 241288-1/8" Grease filled high pressure hose (26 ft. coil)... - 1/8" Grease filled high pressure hose (40 ft. coil)... 242025 242050-1/4" grease filled black nylon tubing (25 ft coil)... - 1/4" grease filled black nylon tubing (50 ft coil)... 244054-1/4" -28 Male 90 Fitting... 244055-1/4" -28 Male Straight Fitting... 244047-1/4" Tubing x 1/8" NPT Male Straight... 249913 270931 249853 246363 256206 246990 -.375 P-style clamp for 12mm bolt... -.750 P-style clamp for 12mm bolt... -.812 P-style clamp for 12mm bolt... -.563 P-style clamp for 10mm bolt... - 1.125 P-style clamp for 10mm bolt... - 1.625 P-style clamp for 10mm bolt... 241054 - Nylon Ties (100 count poly bag) 7" Length...

Grease Points Left Side Points not Serviced by the Automatic Lubrication System Front Axle Outer Drive Driveshaft Coupling and Disc Hub (2 fittings) Front Axle, Inner Driveshaft Coupling Rear Wheels - Non-Powered (Standard) Axle Wheel Bearing

Grease Points Right Side Points not Serviced by the Automatic Lubrication System Cleaning Fan Driven Pulley Inner Sliding Sheave Hub Return Elevator Drive Slip Clutch (2 fittings) Return Elevator Conveyor Drive Sheave Front Axle, Outer Driveshaft Couplings and Disc Hub (2 fittings) Front Axle, Inner Driveshaft Coupling Grain Tank Filling Auger U-Joint (2 fittings) Rear Wheels - Non-Powered (Standard) Axle Wheel Bearing

Installation Steps: The following steps will assist the installer with a systematic approach for installing the Quicklub Automated lube system on Lexion Combines. By following the steps outlined, a successful installation will be realized and will increase the service life of all pins and bearings connected to the lube system. Remove all grease fittings from lube points that will be connected to the lube system. Install appropriate adapters and tube fittings in lube points. Position valve mounting brackets to machine. Attach metering valves to previously mounted brackets. Use tubing cutters, cut to length individual tubing feed lines from secondary valves to lube points and make connections. When installing feed line tubing into the Quicklinc fittings, push until firmly seated. Neatly bundle, loom with spiral wrap provided and tie strap feed lines wherever possible to protect from abrasion. Size, cut and attach appropriate hose ends to all supply lines. The high pressure hose is used as supply lines from the pump to the primary, the primary to the secondary. It is recommended that the supply lines be routed and cut only after all valves and the electric pump have been attached to the machine. This assures the supply line is cut to the proper length. Also, allow for unrestricted movement while the machine is in motion. Route supply lines from the pump to primary valve and from the primary valve to the secondary valve and make connections. Secure supply/feed lines with tie straps, so not in harms way. Mount pump and make electrical connections (electrical diagram included with the pump).

THIS DOCUMENT IS THE EXCLUSIVE PROPERTY OF LINCOLN INDUSTRIAL CORPORATION ("LINCOLN"). IT CONTAINS PROPRIETARY DATA AND INFORMATION DEVELOPED AT LINCOLN'S EXPENSE AND IS FURNISHED UPON THE EXPRESS CONDITION, ACKNOWLEDGED BY THE RECIPIENT, THAT IT'S CONTENTS SHALL NOT BE DISCLOSED, COPIED OR DUPLICATED, DISSEMINATED, OR USED,EXCEPT FOR THE PURPOSES ESTABLISHED BY WRITTEN CONTRACT OR OTHERWISE AUTHORIZED BY LINCILN IN WRITING. LINCOLN RESERVES ALL RIGHTS UNDER PATENT, COPYRIGHT,TRADE SECRET AND OTHER APPLICABLE LAWS.

Left Front Valve Mount the Left Front Valve and bracket behind the left front Axle Unloader removable panel. Install one 244054 fitting to replace grease zerk at the right Lateral Tilt Roller. Route/install line from outlet 5 of the Left Front Valve Install one 244054 fitting to replace grease zerk at the left Lateral Tilt Roller. Route/install line from outlet 3 of the Left Front Valve

Install one 244055 fitting replacing the grease zerk at the Center Pivot. Route/install line from outlet 1 on the Left Front Valve. Install one 243699 fitting replacing grease zerk at the Concave Adjusting Lever. Route/install line from outlet 6 of the Left Front Valve. Install one 244055 fitting replacing grease zerk at the Shaker Shoe Shaft Left Bearing. Route/install line from outlet 4 of the Left Front Valve. Install one 244054 fitting replacing grease zerk at the Shaker Shoe Shaft Right Bearing. Route/install line from outlet 2 of the Left Hand Valve.

Left Rear Valve Mount the Left Rear Valve and bracket above the Cleaning Fan between the remote Lube lines.

Install one 243699 fitting replacing grease zerk at the Feeder House Pivot. Route/install line from outlet 11 on the Left Rear Valve. Install one 244047 fitting replacing grease zerk at the Pitman Drive Idler. Route/install line from outlet 10 of Left Right Valve. Install one 243699 fitting replacing the grease zerk at the Grain Idler Pivot. Route/install line from outlet 12 of the Left Rear Valve. Install one 243699 fitting replacing the grease zerk at the Tailshaft Bearing. Route/install line from outlet 9 of the Left Rear Valve.

Install two (2) 244047 fittings replacing the grease zerks at the Unloader Drive Idler and the Front Beater Drive Idler. Route/install line from outlets 5 and 1 of the Left Rear Valve. Install two (2) 244047 fittings replacing the grease zerks at the Countershaft Drive Idler and the Rotor/Propulsion Pump Drive Idler. Route/install lines from outlets 6 and 2 of the Left Rear Valve.

Right Hand Valve Mount the Right Hand Valve and bracket behind the Hydraulic valve and above the white sticker on the right hand side behind the front axle. Install one 243699 fitting replacing the grease zerk at the Feeder Drive Idler Pivot. Route/install line from outlet 5 on the Right Hand Valve

Install one 243699 fitting replacing the. grease zerk at the Feeder House Pivot. Route/install lines from outlet 10 on the Right Hand Valve. Install one 244047 fitting replacing the grease zerk at the Cleaning Fan Drive Idler Pivot. Route/install line from outlet 2 on the Right Hand Valve. Install one 243699 fitting replacing the grease zerk at the Return Elevator Drive Idler Pivot. Route/install line from outlet 6 on the Right Hand Valve. Install one 244054 fitting replacing the grease zerk at the Front Rotor Bearing. Route/install line from outlet 12 of the Right Hand Valve.

Install one 243699 fitting replacing the grease zerk at the Chopper/Spreader Primary Drive Idler Pivot. Route/install line from outlet 1 on the Right Hand Valve. Install one 243699fitting replacing the grease zerk at the Chopper/Spreader Secondary Drive Idler Pivot. Route/install line from outlet 7 on the Right Hand Valve. Install one 13129 and 244047 fitting replacing the grease zerk at the Rotary Screen Adjustment Lever. Route/install line from outlet 9 of Right Hand Valve. Install one 244047 fitting replacing the grease zerk at the Rotary Screen Drive Idler Pivot. Route/install line from outlet 11 on the Right Hand Valve.

Rear Steering Valve Mount the rear steering valve in front of the left rear axle below the hydraulic hoses.

Remove the grease zerk and install one 244054 fitting at the the Left Hand Lower King Pin. Route/Install line from outlet 1 of the Rear Steering Valve. Remove the grease zerk and install one 244054 fitting at the the Left Hand Upper King Pin. Route/Install line from outlet 5 of the Rear Steering Valve. Remove the grease zerk and install one 244054 fitting at the Left Hand Tie Rod End. Route/Install line from outlet 11 of the Rear Steering Valve. Remove the grease zerk and install one 244054 fitting at the the Right Hand Upper King Pin. Route/Install line from outlet 6 of the Rear Steering Valve.

Remove the grease zerk and install one 244054 fitting at the the Right Hand Lower King Pin. Route/Install line from outlet 2 of the Rear Steering Valve. Remove the grease zerk and install one 244054 fitting at the Right Hand Tie Rod End. Route/Install line from outlet 9 of the Rear Steering Valve. Remove the grease zerk and install one 243699 fitting at the Center Pivot. Route/Install line from outlet 10 of the Rear Steering Valve.

Pump Mounting and Power Source Mount the pump on the left side of the engine compartment between the walkway rails. Route the Power cord through engine compartment to the right side of the cab and pick up 12 volt power from the seat compressor circuit. Use an inline fuse in the power cable.

Install hose from outlet 1 of the Primary Valve to the inlet of the Left Front Valve. Install hose from outlet 8 of the Primary Valve to the inlet of the Left Rear Valve. Install hose from outlet 7 of the Primary valve to the inlet of the Right Hand Valve. Install hose from outlet 1 of the Primary Valve to the inlet of the Male Run Tee for the Return Header Line.

Programming the Pump Adjust the pump to run one cycle every 15 min. as follows.!with power to the pump You will adjust P-1 to read 00 and P-2 to read 15. At this setting the pump Will Run four cycles per hour. Complete the programming as follows. Programming options - Pause time: P1 0 99 hours P2 0 59 minutes Min. pause time 20 minutes Max. pause time 99 hours 59 minutes * To access to the programming mode, press both but-tons at the same time ³ 4 seconds. ³ 4 sec ³ 4 sec Setting hours P1 * Settings are made in one direction: 0, 1, 2, 3,... 99 h Button pressed once...increases by 1 hour Button pressed continuously...quick sequence The fields hour and minutes are indicated by a decimal point on the right - hand for the hours and on the left - hand for the minutes. Setting minutes P2 * Settings are made in one direction: 0, 1, 2, 3...59 minutes Button pressed once...increases by 1 minute Button pressed continuously...quick sequence Note: The minimum pause time begins with 20 minutes. When pause times < 20 minutes are programmed, the display automatically shows.20. Completing the programming * Press the button. P- is displayed. * There are two ways to complete the programming: - by pressing the button, or - if the button is not pressed within 30 seconds, programming mode is closed automatically.

System Checkout The following checklist has been developed as an aid in verifying proper installation and operation of the Quicklub Onboard Grease System. By completing the steps outlined below, the operational readiness of the system and resulting extension of the component life of all points connected to the system will be insured. Apply grease gun (manual or pneumatic) to the grease fitting located on the Primary valve and each secondary valve inlet. While pumping grease through the system, cycle the indicator pin on the primary metering valve a minimum of 15 times. NOTE: Grease gun nozzle and grease fitting should be thoroughly cleaned before lubricating to prevent flow of contaminants into the lube system. Inspect primary valve supply and outlets for grease discharge. If leakage is detected, tighten the fittings. Continue to cycle the system until fresh grease appears at each lube point. Inspect each lube point fitting for leaks. Correct any leaks by firmly pushing tube into the fitting until seating occurs, or tighten the threaded fittings for components connected with hose. Operate the equipment through its complete range of motion, inspecting for unrestricted movement of tube and hose. Correct any problems of rubbing, chaffing or kinking. Inspect all hose and tube that is not covered with some type of protective wrap. Wrap any tube or hose that would be susceptible to damage from rubbing or chaffing. Inspect all hose and tube connected to moving components. Insure that adequate hose or tube is provided to allow unrestricted movement to these moving lube points. Verify proper pump operation and verify time setting by activating pump with the green activation button located on the face of the pump control panel. Activate the pump at least three times to insure proper operation. After the Combine is in operation for a period of time (approx. 80 hours), you may find you need to adjust timing to a shorter or longer period based on the operating conditions. Fill the reservoir with selected grease by filling at the grease fitting located on the face of the pump reservoir.

Daily Walk-Around Inspection The Lincoln Industrial Quicklub automated lube system components are designed, engineered, manufactured and assembled to the highest quality standards. This lube system requires little maintenance, however, to ensure maximum reliability and to realize maximum service life of all components, it is highly recommended that a daily walkaround inspection be performed. The daily walk-around inspection should include the following: NOTE: Operator to confirm operation of electric pump while machine is in service. Observe lubricant level in reservoir. Fill reservoir if it is low. Inspect the display for error or low level messages. If panel indicates error, refer to the trouble shooting guide on next page. Inspect all valves and lube point connections to verify that no leaks are occurring. Inspect supply/feed lines to insure that no breaks or leaks have occurred. Inspect lube points so that all lube points have a fresh grease appearance.