STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC DISTRIBUTION SYSTEM

Similar documents
STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS

UK Power Networks Use of System Charging Methodology

Southern Electric Power Distribution plc. Metering and Data Services Statement. Effective from 1st April Version 1.0

Scottish Hydro Electric Power Distribution plc. Use of System Charging Statement for its. Embedded Distribution Networks FINAL

Scottish Hydro Electric Power Distribution plc. Use of System Charging Statement for its. Embedded Distribution Networks.

Energetics Electricity Ltd. Use of System Charging Statement FINAL NOTICE. Effective from 1st October 2012

UK Power Networks (IDNO) Ltd Use of System Charging Statement FINAL NOTICE Effective from 1 April 2014 Version 2.1

London Power Networks plc Use of System Charging Statement

London Power Networks plc Use of System Charging Statement

Distribution Charging Update

Western Power Distribution. (East Midlands) plc. Use of System Charging Statement NOTICE OF CHARGES. Effective from 1st April Version 0.

CMP294: National Grid Legal Separation changes to CUSC Section 14. CUSC Modification Proposal Form

USE OF SYSTEM CHARGING STATEMENT

London Power Networks plc Use of System Charging Statement

APRIL 2011 FINAL RATES

Northern Powergrid (Yorkshire) plc. Use of System Charging Statement. Notice of Charges. Effective from. Version 1.0

Energetics Electricity Ltd. Use of System Charging Statement FINAL NOTICE OF CHARGES. Effective from. April Version 1.00

INDEPENDENT POWER NETWORKS LIMITED

Western Power Distribution. (East Midlands) plc. Use of System Charging Statement NOTICE OF CHARGES. Effective from 1st April Version 0.

SP MANWEB PLC. Use of System Charging Statement NOTICE OF CHARGES. Effective from 1st April Version 1.1

Statement of Charges for Use of System for The Electricity Network Company Limited s Distribution Network

Statement of Charges for Use of System for Independent Power Networks Limited s Distribution Network

Western Power Distribution. (South Wales) plc. Use of System Charging Statement NOTICE OF CHARGES. Effective from 1st April Version 0.

STATEMENT OF CHARGES FOR USE OF SP MANWEB s ELECTRICITY DISTRIBUTION NETWORK

UK Power Distribution Limited. Use of System Charging Statement FINAL NOTICE. Effective from 1st April Version 1.0

[DNO LOGO] [DNO Name] Use of System Charging Statement SP DISTRIBUTION PLC NOTICE OF CHARGES. Effective from 1st April 2017.

STATEMENT OF CHARGES FOR USE OF SP DISTRIBUTION S ELECTRICITY NETWORK

SP Manweb. Use of System Charging Statement NOTICE OF CHARGES. Effective from 1st April Version 0.1

Eastern Power Networks plc Use of System Charging Statement

Statement of Use of System Charging. Northern Powergrid (Northeast) Ltd. Final Notice. Effective from 1st April Version 1.0

Electricity Transmission network charging

Eastern Power Networks plc Use of System Charging Statement

Statement of Charges for Use of System for The Electricity Network Company Limited s Distribution Network

Potential Transmission Charging Arrangements at Exporting Grid Supply Points (GSPs)

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

This Distribution Charter explains how PLS distributes collective licensing

CUSC Modification Proposal Form CMP270

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

RIDER RTP REAL-TIME PRICING

Indigo Pipelines Limited. Connection Charges For Individual Domestic Properties

A Distribution Network Operator s View of Connecting Microgeneration For RegenSW - South Devon College 07 September 2011

Draft Guidance for generators: Co-location of electricity storage facilities with renewable generation supported under the Renewables Obligation or

STATEMENT OF METHODOLOGY AND CHARGES FOR CONNECTION TO WESTERN POWER DISTRIBUTION (SOUTH WEST) PLC S ELECTRICITY DISTRIBUTION SYSTEM

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

Requirements for Generators European Network Code

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

Transportation Charging Statement

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

Guidance for generators: Co-location of electricity storage facilities with renewable generation supported under the Renewables Obligation or Feed-in

SSEFITAPP 2012_08_07 v2.1. FeeD-In TArIFF APPlICATIon ForM

Revision 34 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 1 st April 2009.

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

Introduction to Charging: Which Parties Pay Which Charges?

All words and phrases with initial capitals have the meanings given to them in clause 13 of these General Terms and Conditions.

GC108: EU Code: Emergency & Restoration: Black start testing requirement

University of Alberta

Key DRAFT OPERATING CODE 2 LEGAL TEXT

Co-location Informal Guidance Note. March 2018 Version 1.1

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

NATIONAL GRID ELECTRICITY TRANSMISSION plc THE CONNECTION & USE OF SYSTEM CODE TABLE OF CONTENTS

CMP266 Removal of Demand TNUoS charging as a barrier to future elective Half Hourly settlement

PEAK LOAD CAPACITY AGREEMENT XXXX/2017. Customer Oy. and. Finextra Oy

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

TERMS AND CONDITIONS

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Page 1 of 5. 1 The Code Administrator will provide the paper reference following submission to National Grid.

Charging Delivery Body. 29 th January 2018

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

GC108: EU Code: Emergency & Restoration: Black start testing requirement

Consolidated Edison Company of New York, Inc.

SSE Guide to the Energy Industry. Guide

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Decision Blaze Energy Ltd. Application for an Exemption under Section 24 of the Hydro and Electric Energy Act.

Addressing ambiguity in how electricity industry legislation applies to secondary networks

WP2 - CFD Private Network Meter Commissioning, Proving and Calibration Tests

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY

Dublin Airport Chauffeur Code of Conduct Dublin Airport Chauffeurs Code of Conduct. Dublin Airport Parking

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Connecting your home or small business generation

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

JEA Distributed Generation Policy Effective April 1, 2018

Basic Connection Services Application and Price Guide

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

Wholesale Developer Services Charges

CMP260: TNUoS Demand charges for 2016/17 during the implementation of P272 following approval of P322 and CMP247 Justification of Urgent Status

DIRECTIONS ISSUED TO LICENSED PROVIDERS PURSUANT TO STANDARD LICENCE CONDITION B1 THE WATER INDUSTRY COMMISSION FOR SCOTLAND.

Transcription:

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC DISTRIBUTION SYSTEM Effective from 1 st April 2013 The methodology set out in this statement was approved on 18 th February 2013 by the Gas and Electricity Markets Authority Scottish Hydro Electric Power Distribution plc Registered office: Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Registered No: SC213460 Document Price 5 Scottish and Southern Energy Power Distribution is a trading name of: Scottish and Southern Energy Power Distribution Limited Registered in Scotland No. SC213459; Scottish Hydro Electric Transmission plc Registered in Scotland No. SC213461; Scottish Hydro Electric Power Distribution plc Registered in Scotland No SC213460; S+S Limited Registered in Scotland 214382 (all having their Registered Offices at Inveralmond House 200 Dunkeld Road Perth PH1 3AQ); and Southern Electric Power Distribution plc Registered in England & Wales No. 4094290 having its Registered Office at 55 Vastern Road, Reading, Berks, RG1 8BU www.sse.com

Contents Page INTRODUCTION... 3 LICENCE OBLIGATIONS... 3 PRICE CONTROL... 3 USE OF SYSTEM... 4 CONNECTION AND USE OF SYSTEM BOUNDARY... 4 THE CONTRACTUAL FRAMEWORK... 5 LINE LOSS FACTOR METHODOLOGY... 6 CONTACT DETAILS... 6 USE OF SYSTEM METHODOLOGY COMMON DISTRIBUTION CHARGING METHODOLOGY (CDCM) FOR DESIGNATED HV AND LV PROPERTIES... 7 USE OF SYSTEM METHODOLOGY EXTRA HIGH VOLTAGE DISTRIBUTION CHARGING METHODOLOGY (EDCM) FOR DESIGNATED EHV PROPERTIES... 8 EXPORT USE OF SYSTEM CHARGES FOR PRE 2005 DISTRIBUTED GENERATION... 9 DISTRIBUTION CHARGING METHODOLOGIES FORUM... 11 DISTRIBUTION GENERATION NETWORK UNAVAILABILITY... 11 OUT OF AREA NETWORKS... 11 WHERE OUR USE OF SYSTEM CHARGES ARE PUBLISHED... 11 GLOSSARY OF TERMS... 12 Page 2 of 15

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC DISTRIBUTION SYSTEM Introduction Scottish Hydro Electric Power Distribution plc ( SHEPD ) is the licensed electricity distribution business which operates networks in the north of Scotland. We also own and operate small, embedded distribution systems in other parts of Scotland. This statement is produced by Scottish Hydro Electric Power Distribution plc, referred to in this statement as SHEPD, in accordance with the requirements of its electricity distribution licence. Scottish and Southern Energy Power Distribution is a trading name of Southern Electric Power Distribution plc, Scottish Hydro Electric Power Distribution plc and Scottish Hydro Electric Transmission plc. All of these companies are part of the SSE plc Group. Licence Obligations This statement describes the Use of System Charging Methodologies under which authorised Users will be charged for use of the SHEPD electricity distribution system. Notwithstanding our obligation to set Use of System charges in line with the special conditions of our Electricity Distribution Licences (as amended from time to time), SHEPD is obliged, under Licence Condition 13, paragraph 13.1(a), of its Licences, to prepare a statement approved by the Authority setting out the methodology upon which charges will be made for the provision of Use of System. We are also obliged to review our Use of System Charging Methodology statement annually. Words and expressions used in this statement have (unless specifically defined herein) the definitions given to them in the Act or the Licence and shall be construed accordingly. Additional copies of this statement can be obtained from our website: www.ssepd.co.uk. Price Control The Licence contains conditions relating to price control of the revenue that SHEPD is allowed to charge for the provision of regulated services including Use of System. In this way, the amount of revenue that SHEPD is allowed to recover from its customer base annually and over the price control period is governed by the detailed terms of its Charge Restriction Licence conditions. Use of System charges may vary from time to time as SHEPD sets its Use of System charges to recover its Allowed Revenue. Page 3 of 15

Use of System SHEPD will levy Use of System charges to Users for use of its Distribution System associated with the supply of electricity to exit points, for the export of electricity from generators from entry points and for the transportation of electricity across its Distribution System. Users entitled to use the SHEPD Distribution System are those who are authorised by licence or by exemption under the Act to supply, distribute or generate electricity. In order to protect all Users of the system, SHEPD may require evidence of authorisation before agreeing terms for use of the Distribution System. Whilst this statement details the methodology that is used by SHEPD to calculate Use of System charges, our Licence Condition 14 Charging Statement details the Use of System charges which will be applied. The Charging Statement can be obtained from our website: www.ssepd.co.uk. Prospective Users seeking use of the Distribution System shall procure that the Meter Operator, Data Collector and Data Aggregator appointed for each metering point supplied in relation to which the supply of electricity is measured by Settlements metering equipment shall provide SHEPD with any data required to be provided to SHEPD, without charge, by the person appointed in that capacity. Terms for payment of use of system charges, any requirement to provide appropriate security to SHEPD in respect of the charges billed but unpaid and/or estimated to arise, and interest payments applicable to late payments shall be in accordance with the relevant terms of the DCUSA. Use of System charges are applied to the electricity measured (or as otherwise determined by SHEPD) at the exit or entry points to or from the SHEPD electricity distribution system. However, Suppliers must demonstrate that at all times the quantity of electricity entering the Distribution System for the purpose of providing a supply equals the metered quantity delivered from that exit point plus the amount of electrical losses appropriate to the voltage at which the supply is delivered and to the source of the supply, as shown in the tables in our Licence Condition 14 Statement. Relevant metering information or being a party to the Balancing and Settlement Code will be considered to be adequate demonstration. Suppliers should refer to the tables to calculate the amount of electricity that they must provide. The same loss adjustment factors are reflected automatically in the settlement system. Connection and Use of System Boundary There is a point at which SHEPD splits the recovery of costs between connection to the distribution network and on-going use of system charges for utilisation of the network. This statement details the charging methodology that is applied for the calculation of use of system charges. The Licence Condition 14 Charging Statement details the actual use of system charges Page 4 of 15

to be applied, whilst the licence Condition 13 Statement details the Connection Charging Methodology that is used for calculation for connection charges. These statements can be obtained from our website: www.ssepd.co.uk. The Contractual Framework The following flowchart shows the contractual framework for a customer trading through either Supplier Volume Allocation (SVA) or Central Volume Allocation (CVA) Settlements. Generator LDNO Connection Agreement DCUSA or Use of System Agreement Connection Agreement DCUSA Distributor Industry Agreements BSC, CUSC, MRA, D Code, Grid Code Connection Agreement DCUSA Customer* Supply Agreement Supplier * demand or generator Users seeking to use the SHEPD Distribution System will be required, prior to using the system, to be a party to the Distribution Connection and Use of System Agreement (DCUSA) or (if appropriate) enter into an alternative agreement with SHEPD setting out the obligations of both parties. The User will be required to: pay all charges due in respect of use of the system as described in this statement, our Licence Condition 14 Charging Statement and the accompanying schedules; enter into any necessary arrangements with National Grid Electricity Transmission (NGET) for use of the Transmission System unless SHEPD is informed by NGET that this is not required in any particular case; be a party to the Balancing and Settlement Code (BSC); and comply with the provisions of the Distribution Code (where applicable), Page 5 of 15

Subject to the Act, the Electricity Distribution Licence and any agreement between us, if the User and SHEPD fail to agree contractual terms, or any variation of contractual terms proposed by SHEPD, either party may request determination by the Authority. While the terms and conditions in the agreements will be consistent with those in this statement, the agreement will take precedence. Terms and conditions for connection of premises or other electrical systems to the SHEPD Distribution System are contained in our Licence Condition 13 document titled Statement of Methodology and Charges for Connection to Scottish Hydro Electric Power Distribution plc s Distribution System which is available from our website: www.ssepd.co.uk. Line Loss Factor Methodology SHEPD produces Line Loss Factors for use in Settlements following a Line Loss Factor Methodology, which is approved by Elexon and is compliant with Balancing and Settlement Code Procedure (BSCP) 128. Copies of the SHEPD Statement of Line Loss Factors Methodology for the Scottish Hydro Electric Power Distribution plc Electricity Distribution Network are available from our website: www.ssepd.co.uk. Contact Details This statement has been prepared in order to discharge SHEPD s obligation under Standard Licence Condition 13 of our Electricity Distribution Licence. If you have any questions about the contents of this statement please contact us at the address shown below. Also given below are contact details for Ofgem should Users wish to enquire separately on matters relating to this statement. Angus Rae Commercial Policy Manager Scottish Hydro Electric Power Distribution plc Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Tel: 01738 456609 Fax: 01738 456555 e-mail: angus.rae@sse.com Ofgem 9 Millbank London SW1P 3GE Tel: 020 7901 7000 www.ofgem.gov.uk Page 6 of 15

Use of System Methodology Common Distribution Charging Methodology (CDCM) for Designated HV and LV Properties SHEPD is obliged under Licence Condition 13A to ensure that the Common Distribution Charging Methodology (CDCM) is complied with when setting charges for Designated HV and LV Properties. The CDCM statement is a separate statement which describes the methodology under which the charges for Use of System will be calculated for most HV and LV Designated Properties. The CDCM is applicable for most HV and LV demand, generation and licensed embedded distribution network connections. The CDCM statement (Schedule 16) is embedded into and governed by the Distribution Connection and Use of System Agreement (DCUSA). This Schedule and the full DCUSA can be viewed or downloaded from the DCUSA website: www.dcusa.co.uk. The CDCM charging models prepared by SHEPD for the calculation of Use of System charges are available from our website: www.sepd.co.uk. Page 7 of 15

Use of System Methodology Extra High Voltage Distribution Charging Methodology (EDCM) for Designated EHV Properties SHEPD is obliged under Licence Condition 13B to ensure that the Extra High Voltage Distribution Charging Methodology (EDCM) is complied with when setting charges for Designated EHV Properties. The EDCM statement is a separate statement which describes the methodology under which the charges for Use of System will be calculated for Designated EHV Properties. The EDCM is applicable for most sites connected at EHV/HV substations and all sites connected at EHV including licensed embedded distribution network connections. The EDCM statement (Schedule 17) is embedded into and governed by the Distribution Connection and Use of System Agreement (DCUSA). There are two versions of the EDCM and SHEPD used the Forward Cost Pricing (FCP) version of the EDCM that is detailed in Schedule 17. The methodology also applies to users who are not party to DCUSA. This Schedule and the full DCUSA can be viewed or downloaded from the DCUSA website: www.dcusa.co.uk. Page 8 of 15

Export Use of System Charges for Pre 2005 Distributed Generation On 1 st April 2005 export distribution use of system (GDUoS) charges were introduced in relation to Distributed Generation (DG). GDUoS charges were initially applied only to generators which connected under the terms of the revised charging methodologies which came into effect on that date as Ofgem granted an exemption from GDUoS charges for: (a) DG which had connected under pre-april 2005 connection terms; and (b) DG which was contracted for connection to the Distribution System under pre-april 2005 terms, but which had not connected by 31 st March 2005. These categories of DG are generally known as pre 2005 DG. Ofgem decided subsequently that those pre 2005 DG covered by the CDCM would be subject to GDUoS with effect from 1 April 2010. CDCM covers DG classed as Designated Properties (typically connected at low voltage ( LV ) or high voltage ( HV )). However, pre 2005 DG export connections classed as Designated EHV Properties (typically at extra high voltage ( EHV ) but including some HV connections) continued to remain exempt from GDUoS charges. Ofgem issued a decision letter on 10 February 2012 which specified that, unless an ongoing exemption applies, GDUoS charges are to be applied to DG in this category. The implementation date for charging was subsequently confirmed as 1 April 2013. The charges for generators classed as Designated EHV Properties are calculated using the EDCM. Exemptions from GDUoS The implementation plan that Ofgem set out in their decision letter included exemptions from GDUoS charging of up to 25 years for qualifying pre 2005 DG connections. Where applicable, the exemption period commences from the individual connection date of each generator facility. No exemptions from use of system charges apply to demand (import) connections. Where a pre 2005 DG which is subject to exemption from GDUoS but was liable for annual O&M charges under pre 2005 charging arrangements, these charges will continue to apply until such time as GDUoS is applied. Exemptions From CDCM Charging In the case of pre 2005 DG covered by CDCM the default position is that GDUoS charges are applied. However, following the Ofgem decision letter, some generators in this category exercised a one-off option to opt out of GDUoS charging for the remaining period of their exemption. SHEPD had to be notified of exercise of this option in writing by 30 June 2012. Should a DG party decide at a later stage to discontinue a CDCM GDUoS exemption, this decision must be notified to us in writing by 1 November, in relation to the following Charging Year. It Page 9 of 15

is important to note that a choice to discontinue an exemption can only be exercised once and cannot thereafter be reversed. Exemptions From EDCM Charging In the case of pre 2005 DG covered by EDCM but where no exemption applies, GDUoS charges apply with effect from 1 April 2013. For those pre 2005 DG connections covered by EDCM but for which an exemption applies, the default position is that GDUoS charges will not be applied until the start of the Charging Year following the end of the exemption period. A generator with an EDCM charging exemption may choose to opt out of their exemption. In such a case, GDUoS charges will apply from the start of the Charging Year following our receipt of written notification of opting out of the GDUoS exemption. Should, at a later stage, a generator choose to discontinue their exemption from EDCM GDUoS charges, we must receive written notice of this decision by 1 November, in relation to the following Charging Year. It is important to note that a choice to discontinue an exemption can only be exercised once and cannot thereafter be reversed. Please note that this section summarises the main points of Ofgem decision letters in relation to pre 2005 DG GDUoS exemptions, but we reserve the right to apply additional terms on a case by case basis to enable us to implement the decision as it relates to specific connections. Page 10 of 15

Distribution Charging Methodologies Forum SHEPD along with the other Distribution Network Operators collectively hold a regular meeting known as the Distribution Charging Methodologies Forum (DCMF) to discuss and explain developments in the charging methodologies. This forum is also open to any interested party and gives the opportunity for all parties to raise and discuss any issues that they have with the charging methodologies. For more information on the DCMF please contact Electralink by email: dcmf@electralink.co.uk. Distribution Generation Network Unavailability SHEPD will make compensation payments to customers for network outages under two schemes. The majority of customers are compensated under the Guaranteed Standards arrangements. Customers who are off supply for greater than defined periods of time are entitled to a payment. This scheme applies to all demand customers and to all generators not included in the scheme described below. For customers with exporting generation which meets the qualification criteria the scheme known as Distribution Generation Network Unavailability (DGNU) will apply. Out of Area Networks SHEPD operates embedded distribution networks in all other DNO areas in England and Wales. The use of system charging methodology for these out of area networks is described in a separate statement. This statement can be obtained from our website: www.ssepd.co.uk Where Our Use of System Charges are Published SHEPD s Use of System tariffs are published in our Licence Condition 14 Statement. This statement can be obtained from our website: www.ssepd.co.uk. Hard copies are also available on request at a cost of 5 by following up the contact details on page 6. Page 11 of 15

GLOSSARY OF TERMS Term Definition Act The Electricity Act 1989 Authority BSC CDCM Charging Year CUSC Customer The Gas and Electricity Markets Authority (GEMA) the regulatory body for the gas and electricity industries established under the Section 1 of the Utilities Act 2000. The Balancing and Settlement Code, which contains the governance arrangements for electricity balancing and settlement in Great Britain. The Common Distribution Charging Methodology used for calculating charges to Designated Properties as required by Standard Licence Condition 13A of the Electricity Distribution Licence. Means a 12 month period starting from 1 April in any calendar year NGET s Connection and Use of System Code A person to whom a User proposes to supply, or for the time being supplies, electricity through an Exit Point, or from who, a User or any relevant exempt Supplier, is entitled to recover charges, compensation or an account of profits in respect of electricity supplied through an Exit Point. or a person from whom a User purchases, or proposes to purchase, electricity, at an Entry Point (who may from time to time be supplied with electricity as a Customer of that User (or another electricity supplier) through an Exit Point. CVA DCUSA Designated EHV Properties Central Volume Allocation as defined in the BSC; The Distribution Connection and Use of System Agreement (DCUSA), which is a multi-party contract between the licensed electricity distributors, suppliers and generators of Great Britain. It is a requirement that all licensed electricity distributors and suppliers become parties to the DCUSA. As defined in standard condition 13B of the Electricity Distribution Licence Page 12 of 15

Term Designated Properties DG Distribution Code, D Code Definition As defined in standard condition 13A of the Electricity Distribution Licence Distributed Generator / Distributed Generation, which is generation directly connected or embedded within the Distribution System. The Distribution Code of the Licensed Distribution Network Operators (DNOs) of Great Britain; produced in accordance with Condition 9 of the licence and approved by the Authority to define the technical aspects and planning criteria of the working relationship between the DNO and all those connected to its distribution system. The Distribution Code can be downloaded from: Distribution Area Services www.dcode.org.uk The area specified by the Authority that a DNO as Distribution Service Provider will operate. Distribution System The system consisting (wholly or mainly) of: Electric lines owned or operated by an authorised distributor that is used for the distribution of electricity from grid supply points or generation sets or other entry Points to the points of delivery to Customers or Users; or any transmission licensee in its capacity as operator of that licensee s transmission system or the GB transmission system; and includes any remote transmission assets (owned by a transmission licensee within England and Wales) that are operated by that authorised distributor and any electrical plant, electricity meters, and Metering Equipment owned or operated by it in connection with the distribution of electricity, but does not include any part of the GB transmission system. DNO EDCM Distribution Network Operator, an Electricity Distributor who operates one of the fourteen Distribution Services Areas and in whose Electricity Distribution Licence the requirements of Section B of the standard conditions of that licence have effect. The EHV Distribution Charging Methodology used for calculating charges to Designated EHV Properties as required by standard licence condition 13B of the Electricity Distribution Licence. Page 13 of 15

Term EHV Electricity Licence Distribution Definition Extra High Voltage 22,000 volts or higher voltage. The Electricity Distribution Licence granted or treated as granted pursuant to section 6(1) of the Act. Embedded network Entry Point Exit Point GDUoS HV LDNO Licence LLF LLFC LV Metering Point An electricity Distribution system operated by an LDNO and embedded within another distribution network. A boundary point at which electricity is exported onto a Distribution System to a connected installation or to another Distribution System, not forming part of the total system (boundary point and total system having the meanings given to those terms in the BSC). A point of connection at which a supply of electricity may flow from the Distribution System to the Customer s Installation or User s Installation or the Distribution System of another person. Generation Distribution Use of System charges High voltage 6,600 volts or 11,000 volts plus or minus 6% measured between any two-phase conductors. A Licensed Distribution Network Operator. The Electricity Distribution Licence granted to SHEPD under Section 6(1)(c) of the Act. Line Loss Factor (LLF), the factor which is used in Settlement to adjust the Metering System volumes to take account of losses on the Distribution System. Line Loss Factor Class (LLFC), an identifier assigned to an SVA Metering system which is used to assign the LLF and Use of System Charges. Low voltage 230 volts plus 10% or minus 6% measured between the neutral conductor and any two-phase conductor. The point at which electricity is exported to or imported from the licensee s Distribution System is measured, is deemed to be measured, or is intended to be measured and which is registered pursuant to the provisions of the MRA. (For the purposes of this statement Grid supply Points are not Metering Points ) Page 14 of 15

Term Metering System MPAN MPRS MRA NGET Ofgem Registrant Relevant DG SHEPD Settlement Supplier SVA User(s) Use of System charges Definition Particular commissioned metering equipment installed for the purposes of measuring the quantities of Exports and Imports at the Boundary Point. Meter Point Administration Number, a number relating to a Metering Point under the MRA. Meter Point Registration Service Master Registration Agreement, the multi-party agreement that all licensed Suppliers and Distributors enter into that governs the essential interactions between them. National Grid Electricity Transmission plc, the company which owns and operates the high-voltage electricity transmission network in England and Wales. The Office of Gas and Electricity Markets, governed by GEMA, which is responsible for the regulation of electricity distribution companies. means the person registered in accordance with the BSC as responsible for the Metering System Means Distributed Generation (except for standby generation operating in parallel with the SHEPD Distribution System for testing purposes only) which is subject to GDUoS. Scottish Hydro Electric Power Distribution plc The determination and settlement of amounts payable in respect of charges (including reconciling charges) in accordance with the Balancing and Settlement Code. An organisation with a Supply Licence which can register itself as supplying electricity to a Metering Point. Supplier Volume Allocation, as defined in the BSC. Someone who has a use of system agreement with SHEPD, e.g. a Supplier, Generator or LDNO. Charges for demand and generation customers which are connected to and utilising the distribution network. Page 15 of 15