RECONSTRUCTION OF THE 120-kV LINES

Similar documents
120/25-kV Gracefield Substation and 120-kV Lines

120/25-kV Gracefield Substation and 120-kV Lines

Net Metering Rate Option for Self-Generators

GUIDE TO NO TRUCK. roads

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Ville de Montréal. Parking Policy: A Mobility Management Tool

CUSTOMER SATISFACTION SURVEY. Conducted from November 1 to 10, 2017 and answered by 4,101 of the Electric Circuit s 17,644 members.

Proposed Dounreay - Mybster 275 kv / 132 kv

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Kettle River Transmission Project

Currant Lake Transmission Project

Bohn to Kettle River Transmission Project

Michigan Thumb Loop Transmission Line Project

INFORMATION AND DISCUSSION ON PLANNING THE TRANSMISSION SYSTEM

TERRACE TO KITIMAT TRANSMISSION (TKT)

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

Sectoral Profile. Transportation equipment manufacturing NAICS 336. Quebec

Certificate of Registration

Housing Market Information

The Ministère des Transports, de la Mobilité durable et de l Électrification des transports du Québec

Appendix D Black Hills Project Summary

- Press kit. RTE takes over Houillères du Bassin de Lorraine s high voltage electricity network

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Alberta Energy and Utilities Board. Application to Construct and Operate Transmission Facilities

Included in this Stakeholder Information Package:

Insolvency Statistics in Canada. Second Quarter of 2014

welcome to the BC Hydro community open house

Coalspur Mines (Operations) Ltd.

Black Hills Project Summary

Part 2 GAZETTE OFFICIELLE DU QUÉBEC, March 9, 2016, Vol. 148, No

Insolvency Statistics in Canada. Second Quarter of 2012

SPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations

File No February Prepared for: Prepared by:

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

TRANSPOWER PLANS, BUILDS, MAINTAINS AND OPERATES NEW ZEALAND S HIGH VOLTAGE ELECTRICITY TRANSMISSION NETWORK THE NATIONAL GRID.

Line using HTLS Conductors to increase

PANAMA OR CHEVRIER PANAMA OR CHEVRIER. Downtown terminal +0 min added to the 2018 time

West Station-West Cañon 115 kv Transmission Project

A Guide to Key Railroad Terminology for the Northeast Corridor

Bill 116 (2000, chapter 22) An Act to amend the Act respecting the Régie de l énergie and other legislative provisions

April 2009 Introducing ABB Mauritius. ABB Group July 1, 2009 Slide 1

Sub Regional RTEP Committee South

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

Tehachapi Renewable Transmission Project 3.1 OVERVIEW OF PROPOSED PROJECT

U.P. Energy Summit February 16, 2017

Electric Transmission 101 or Everything You Wanted to Know About the Grid But Were Afraid to Ask. Gerald Deaver Manager Regional Transmission Policy

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

Electric system improvements near you

INDEX. About Alltech Group. Who we are? Mission History Products Distributed. Products

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Mystic to Woburn Line Project. Town of Winchester Board of Selectmen Lincoln School Auditorium February 11, 2016

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Electromobility in Québec: strengths and interests. International Conference Electromobility Leipzig, 27 october 2014

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

The Grid Link Project. Summary of the Report for the Independent Expert Panel

STATIONNEMENT POUR LES ANCIENS COMBATTANTS LE JOUR DU SOUVENIR

NEW TREND ON TRANSMISSION POWER LINES AND RELATED STRINGING EQUIPMENT DEVELOPMENT

TRANSFORMING THE WAY OUR REGION MOVES

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

Naval Station Norfolk Transit Extension Study. October 2014

Frequently Asked Questions Leander-Round to Rock 138-kV Transmission Line Project Williamson County

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

ASSESSING TERRITORY READINESS FOR AUTONOMOUS TRANSPORT SERVICE AND EVALUATING MARKET SIZE. N. Faul S. Sadeghian B. Créno

Elia group. At the heart of the European Electricity grid

RENEWABLE ENERGY. Alcan cable solutions

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

Arlo Security Light System Quick Start Guide

Renewables & reliability: How Senvion s wind farms enhance grid stability in Canada

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Looking Towards the Future: Advantages of 765-kV Transmission Technology

RAILWAY OCCURRENCE REPORT

GRID INNOVATION CAUCUS CO-CHAIRS

Battery Electric Bus Technology Review. Victoria Regional Transit Commission September 19, 2017 Aaron Lamb

Montréal CMA. Highlights. August Montréal metropolitan area. Date Released: Table of Contents. Housing market intelligence you can count on

McArthur Avenue Cycling Lanes (between St. Laurent Boulevard and North River Road)

Track Information Le Circuit Mont Tremblant

Sub Regional RTEP Committee South

Housing Market Information

HOUSING NOW TABLES Quebec Region

A Stadtbahn for Quebec?

conversation SHAPE the May 2015 The AUC

Demand management emergency measures and their impact after the Highway 19 overpass collapse

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection

An Act respecting Ville de Mont-Saint- Hilaire

3IT L ÉNERGIE SOLAIRE ET LE QUÉBEC. Colloque AQPER Richard Arès SHERBROOKE UNIVERSITÉ DE

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Montréal CMA. Montréal Metropolitan Area. Housing Starts in April Subscribe Now! Table of Contents. Housing market intelligence you can count on

City of Montréal s strategies to move smarter

Vantage to Pomona Heights Transmission Project Frequently asked questions

ABB Next Level Big shift in power attractive opportunities

France-Spain. Public participation leaflet. across the Bay of Biscay. August interconnection.

K2 Wind Community Liaison Committee Meeting #2 Wednesday, May 28, 2014

Energy efficiency policy - an innovation-based policy of the state and civil society

Railway Transportation Safety Investigation Report R17Q0088

BOLT 3544 ANATOMY BOLT SPECIFICATIONS LIGHT SOURCE MODULE MODULE LUMENS PER FOOT DELIVERED LUMENS FIXTURE WATTAGE 40.3W 40.

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES

Transcription:

Note: kv is the abbreviation for kilovolt, which is equal to 1,000 volts. RECONSTRUCTION OF THE 120-kV LINES Between Vignan, Templeton and Interconnexion-Maclaren Substations INFORMATION ON SOLUTION SELECTED Spring 2017 Hydro-Québec plans to rebuild a number of lines located in the city of between Vignan, on Boulevard Gréber, and Interconnexion-Maclaren, in the Masson-Angers sector. One of the many benefits of this project is that two lines will be replaced by a single line over 4 km, greatly decreasing the number of support structures. In addition, the lines will be rebuilt in the existing right-of-way, except in three locations, and a number of the s will be installed at the same place as existing s. Finally, the project will allow Hydro-Québec to maintain and improve service quality. Hydro-Québec has selected the solution with the least impact based on the environmental, technical and economic studies carried out since 2014.

VIGNAN SUBSTATION TEMPLETON SUBSTATION PROJECT DESCRIPTION Following the consultation done in 2016, Hydro-Québec decided to keep the existing s for 3 km of the route, between the Erco Mondial tap and Interconnexion-Maclaren, where only the cables and fasteners will be replaced. Based on technical and economic criteria, the same decision was made for the five s between the Produits-Forestiers-Résolu and its tap line. SECTION 1 Vignan to Produits-Forestiers-Résolu Two 120-kV lines run parallel in this 4.1-km segment. Hydro-Québec will completely dismantle one of the two lines and rebuild the other, except in the stretch between the Produits-Forestiers-Résolu and its tap line, where only the conductors and fasteners will be replaced. Of the 42 s currently in place, 5 will be kept and the rest will be replaced by 10 new s. SECTION 2 From the Produits-Forestiers-Résolu tap to Templeton In this 6.4-km section, Hydro-Québec will replace the single-circuit line with a new double-circuit line between the tap, at the corner of Gouin and Laviolette streets, and Templeton, located on Montée Dalton. Towers will be rebuilt inside the right-of-way and, where possible, at their existing locations. However, part of the line must be slightly rerouted outside the existing right-of-way due to the presence of a zone subject to mass movements near the. One will have to be moved approximately 40 m from its current location. SECTION 3 From Templeton to Interconnexion-Maclaren INTERCONNEXION- MACLAREN SUBSTATION In this 13.6-km section, Hydro-Québec will replace the single-circuit line with a new double-circuit line over 10.6 km, between Templeton and the Erco Mondial tap. In the remaining 3 km, from the tap to Interconnexion-Maclaren, only conductors and fasteners will be replaced, as the existing s will be kept. Towers will mainly be rebuilt inside the right-of-way and, where possible, on their existing locations. To avoid erecting s in the median strip of Highway 50, Hydro-Québec needs to modify the angles at which the line crosses the highway, and must therefore reroute a total of 1.5 km of the line outside the existing right-of-way. 2 * kv = kilovolt, or 1,000 volts

Fichier : 7377_bu_hq_002_imgA_170223a.mxd 45 30' Montée Saint-Amour Municipality Regional county municipality (MRC) or equivalent territory (TÉ) (TÉ), V 75 40' 75 35' Chemin Saint-Columban Ruisseau Noueux Vignan Touraine Chemin de Bellechasse Boulevard de l'hôpital Section 1 Montée Paiement Produits-Forestiers- Résolu tap 75 40'! Chemin Saint-Thomas sector Boulevard Labrosse Produits-Forestiers-Résolu Section 2 Boulevard Saint-René Est Lac Beauchamp B oulevard Lorrain 148 C ours d'eau Montée Dalton Dalton-Bergeron Boulevard Maloney Est 75 35' Chemin Industriel Templeton Genesee & Wyoming Canada Inc. Baie McLaurin Chemin Proulx Aéropor de Gatine 0 100 200 m MTM, zone 9, NAD83 Montée Dalton X X X X X X Templeton Rue du Sous-Bois Section 2 Section 3 3

Petite rivière Blan Rivière Poste de B Chemin Proulx (TÉ) Les Collines-del'Outaouais (MRC) Chemin Filion Section 3 75 30' 45 30' Montée Saint-Amour Ruisseau Clément Interconnexion-Maclaren Maclaren interconnection 75 25' 45 33' t exécutif au-ottawa Montée Mineault Chemin de! Montréal Ouest Baie Clément Erco Mondial tap Masson-Angers sector Ruisseau Charbonneau 148 Baie Carpentier, V (TÉ) Rivière des Outaouais 75 30' Val-des-Monts, M Substations and transmission lines 120 kv 230 kv 315 kv Interconnection Cantley, M Lac Charbonneau Project components (120 kv) rebuilt in existing right-of-way (120 kv) modified (conductor replacement) Rivière Blanche 0 600 1 200 m MTM, zone 9, NAD83 7377_bu_dem_016_ic_170316a.mxd 75 25' Boundaries Municipality Regional county municipality (MRC) or equivalent territory (TÉ) Selected line route, line to be rebuilt outside existing right-of-way (120 kv) Les Collines-de-l'Outaouais (MRC) (TÉ) Val-des-Monts, M, V Chemin Saint-Columban 75 40' Ruisseau Noueux 75 35' Montée Mineault Vignan Touraine Chemin de Bellechasse d al Montée Paiement Section 3 Produits-Forestiers- Résolu tap sector Chemin Saint-Thomas Boulevard Labrosse 0 100 200 m MTM, zone 9, NAD83 Fichier : 7377_bu_hq_003_imgB_170303a.mxd Section 2 Boulevard Saint-René Est B oulevard Lorrain C ours d'eau Montée Dalton Dalton-Bergeron Chemin Industriel Templeton Genesee & Wyoming Canada Inc. 4 Chem

SECTION 1 Typical and right-of-way between Vignan and the Produits-Forestiers-Résolu tap TOWERS FOR THE 120-KV LINES TO BE REBUILT Planned reduced-footprint 76.2 m Current right-of-way 50 m Minimum right-of-way required 47 m 47 m 7377_bu_geq_004_pylonedement_160413.ai Minimum right-of-way required 50 m Current right-of-way 76.2 m 7377_bu_geq_004_pylonedement_160413.ai Planned reduced-footprint SECTIONS 2 AND 3 30 m 30.4 m Right-of-way Existing 20 m 20 m 30 m Existing Typical and right-of-way between the Produits-Forestiers-Résolu tap and the Erco Mondial tap 7377_bu_geq_003_pyloneproj_160413.ai Planned reduced-footprint Right-of-way 30.4 m 7377_bu_geq_003_pyloneproj_160413.ai 5

RESULTS OF THE PUBLIC PARTICIPATION PROCESS A favorable reception from local communities is one of the three essential conditions for Hydro-Québec projects. When developing each new project, the company seeks to balance the impacts associated with the three pillars of sustainable development: social, environmental and economic. In spring 2016, consultations were held with the municipality, affected landowners and various community organizations. Residents had a chance to express their concerns during open-house events. Since the new line will be built in an existing right-of-way, we were able to make only a few minor adjustments to the location of certain s. PROJECT BENEFITS Rebuilding the lines and replacing the conductors will allow Hydro-Québec to maintain and improve service quality. Rebuilding the lines mainly within the existing right-of-way reduces the impact on the landscape. The new line will be supported by steel lattice s. Most will be reducedfootprint models, with four-legged s in certain locations. STAGES UNDERWAY AND TO COME Information on solution selected Spring 2017 Permitting 2018-2019 Dismantling and construction 2019-2020 Commissioning 2020 www.hydroquebec.com/gatineau FOR MORE INFORMATION JULIE LÉONARD Advisor Community Relations Lanaudière, Laurentides, Laval and Outaouais Direction Affaires régionales et collectivités E-mail: leonard.julie@hydro.qc.ca Info-project line 1 8 0 0 4 6 5-1 5 2 1, ext. 6 0 2 2 Ce document est également publié en français. This document is a translation of the original French text. 2017E0515-A 100 %