Disaster Prevention and Rehabilitation Project (Philippine-Japan Friendship Highway and Naguilian Road)

Similar documents
Ghana Kumasi-Paga Road Rehabilitation Project. Report date: March 2001 Field survey: July Project Profile and Japan s ODA Loan

Philippines Metro Manila Rail Commuter Maintenance Depot Construction Project

Report date: March 2001 Field survey: September Project Profile and Japan s ODA Loan

Locomotive Building Project

Ex-Ante Evaluation (for Japanese ODA Loan)

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1

Japanese ODA Loan. Ex-ante Evaluation

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

The Philippines. Manila

main type of locomotive in use, but over half of those had surpassed their durable lifespan. China Project Site Afghanistan Nepal Pakistan India

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT. 1. Sector Performance, Problems, and Opportunities

(1) Current State and Issues of the Electricity Sector in Indonesia

Rehabilitation of Diesel Railcars Project, Diesel Railcar Rehabilitation Project

ECONOMIC AND FINANCIAL ANALYSIS

Three Toll Roads Construction Project Report Date: October, 2002 Field Survey: August, Project Profile and Japan s ODA loan

Philippines Ex-post Monitoring for the ODA Loan Project South Luzon Expressway Construction Project

Feasibility Study for Promotion of International Infrastructure Projects in FY2011

Pakistan Second 220KV Guddu-Sibbi-Quetta Transmission Project

SECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT

TRAVEL DEMAND FORECASTS

China Dadong-Qinhuangdao Railway Construction Project (1)(2)

ECONOMIC AND FINANCIAL ANALYSIS

Introduction of tractor based rural road maintenance approaches in Zambia

Slovakia Ex-Post Evaluation of Japanese ODA Loan Project Motorway Construction Project (SLO-P1)

Study on Economic Partnership Projects. in Developing Countries in FY2010. Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY.

! " # $ % # & " ' % ( ' ) "

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)

Aim: Integration of Road Infrastructure of Georgia with European Standards and effective satisfaction of the Road User needs. Annual Report 2013

Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa

ASIAN DEVELOPMENT FUND (ADF) ADF XI REPLENISHMENT MEETING 7 9 March 2012 Manila, Philippines. Post-Conflict Assistance to Afghanistan

Urban Transport Development Investment Program (RRP MON 39256) SECTOR ROAD MAP

The Regional Municipality of York. Purchase of Six Battery Electric Buses

BASELINE STUDY ON VEHICLE INVENTORY AND FUEL ECONOMY FOR MALAWI (KEY FINDINGS)

Yukon Resource Gateway Project

Structure. Transport and Sustainability. Lessons from Past. The Way Forward

Energy Technical Memorandum

Battery Electric Bus Technology Review. Victoria Regional Transit Commission September 19, 2017 Aaron Lamb

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

Item

Findings from the Limassol SUMP study

AIR POLLUTION: Policy, actions and short term countermeasures to reduce air pollution of Ulaanbaatar city

Submission to Greater Cambridge City Deal

Statistical Annex. European Economic Forecast Autumn 2018

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

An Asset Management Plan for Transit And Access Transit Fleet

Statistical Annex. European Economic Forecast Spring 2018

Senate Standing Committees on Economics 27 June 2014 PO Box 6100 Parliament House CANBERRA ACT 2600 By

Austria. Advanced Motor Fuels Statistics

Public Transportation Problems and Solutions in the Historical Center of Quito

City of Palo Alto (ID # 6416) City Council Staff Report

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

FISCAL YEAR MARCH 2015 THIRD QUARTER FINANCIAL RESULTS. Updated Mazda CX-5 (Japanese specification model)

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

Proposal for a Traffic Management Policy. National Committee for Economic Development (NCED) 18 th August 2004

Performance Based Contracts (PBC) in Serbia

QUARTERLY REVIEW OF BUSINESS CONDITIONS: MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 4 TH QUARTER 2016

1.2 Objectives To rehabilitate C-BMPP and K-BMPP, which were constructed with funding from a Japanese ODA loan.

FISCAL YEAR MARCH 2015 FIRST HALF FINANCIAL RESULTS. New Mazda Demio

Considerations and Recommendations in Mine Closure Policy in Papua New Guinea

Tajikistan Ex-Post Evaluation of Japanese Grant Aid Project The Project for Improvement of Dusty Nijiny Pyandzh Road

Memorandum. To: The Arlington County Board Date: June 29, 2018 From: Subject:

Late Starter. Tuesday, November 6, 2018

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report

RIETI BBL Seminar Handout

Independence Institute Denver West Parkway, Suite 185 Golden, Colorado i2i.org/cad.aspx BRT = BTR

Economy. 38% of GDP in 1970; 33% of GDP in 1998 Most significant decline in Manufacturing 47% to 29%

The project faces a number of challenges:

Transport systems integration into urban development planning processes

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner

Road Map for Sustainable Transport Strategy for Colombo Metropolitan Region with Cleaner Air, through Experience

Our mission is to be the best public service transporter for passengers in the city of Kigali using modern, clean and safe urban city buses.

Pametno gospodarenje cestovnom infrastrukturom Smart Management of Road Infrastructure Christophe Nicodème, ERF

Metropolitan Council Budget Overview SFY

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

City Transfer Stations: Loading Services and Fees

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

IMPLEMENTATION OF TRACTOR BASED ROAD MAINTENANCE

ECONOMIC AND FINANCIAL ANALYSIS

RNG Production for Vehicle Fuel. April 4, 2018

Province of North-Brabant ELENA: Zero Emission Buses in the South of the Netherlands

Zorik Pirveysian, Air Quality Policy and Management Division Manager Policy and Planning Department

FISCAL YEAR MARCH 2015 FIRST QUARTER FINANCIAL RESULTS. Mazda Roadster 25 th Anniversary Model

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

2013/2014 Strategic Priorities Fund Application Overview

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

ECONOMIC AND FINANCIAL ANALYSIS

Considerations in Improving the International Connectivity in Asia-Pacific Region. China Academy of Information and Communication Technology Chen Hui

National Road Safety Action Plan in China

Downtown Lee s Summit Parking Study

PUBLIC TRANSPORTATION

MSRC CLEAN TRANSPORTATION FUNDING LOCAL GOVERNMENT PARTNERSHIP

Toward the Realization of Sustainable Mobility

NATIONAL REPORT: SPAIN. At 31/12/2015

Draft Marrickville Car Share Policy 2014

The Indian Infrastructure Industry

TORONTO TRANSIT COMMISSION REPORT NO.

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

EMERGING REQUIREMENTS

The Motorcycle Industry in Europe. Powered Two-Wheelers the SMART Choice for Urban Mobility

Transcription:

Philippines Disaster Prevention and Rehabilitation Project (Philippine-Japan Friendship Highway and Naguilian Road) 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Site Map: Luzon Island, the Republic of the Philippines Philippine-Japan Friendship Highway (1) Background Road transport in the Philippines has been developed and expanded as the country s core transport network. While progress has been made on the quantity of roads, deterioration of roads and bridges is advancing due to low rates of paving and an overall lack of maintenance, and the qualitative improvement and refurbishment of roads is inadequate. One of the road sections covered by this project was the Philippine-Japan Friendship Highway (the section between Calauag and Labo), which is a national trunk road. It is part of the main arterial road linking Southern Luzon, which is mainly agricultural and has a low regional domestic product, with the capital Manila. The road is intended to support the development of the region. The other section is the Naguilian Road, a grade two national route, which links the resort area of Baguio with Manila, and serves as a route to transport agricultural produce, mined materials and other produce of the surrounding area. Despite their importance, both roads have become dilapidated in the 20 years since they were built. Many areas suffered surface damage and hazardous embankments, and a JICA feasibility study indicated 55 locations in urgent need of repair or improvement. Repair was urgently required to improve safety on the roads. (2) Objectives The project was to implement rehabilitation and disaster prevention measures on hazardous locations on the Philippine-Japan Friendship Highway and the Naguilian Road, such as areas strewn with fallen stones and areas with collapsing embankments. These measures were intended to make trunk road transport on these roads safe and efficient. 1

(3) Project Scope The project scope covered the Philippine-Japan Friendship Highway (the section between Calauag and Labo) and the Naguilian Road, which were to receive the following improvements: [1] Road paving repair and improvement. [2] Embankment disaster prevention measures. [3] Bridge rehabilitation. [4] Consulting services (detailed designs and construction supervision). Within the above, the ODA loan covered 75% of the cost required for civil works and services, and the agreement was concluded in 1990. (4) Borrower/Executing Agency Republic of the Philippines / Department of Public Works and Highways (DPWH) (5) Outline of Loan Agreement Loan Amount/Loan Disbursed Amount 5,708 million / 5,378 million Exchange of Notes/Loan Agreement October 1989 / February 1990 Terms and Conditions Interest rate: 2.7%, Repayment period: 30 years (10 years for grace period), General Untied (However, consulting services are partial untied.) Final Disbursement Date May 1997 2. Results and Evaluation (1) Relevance Overall this project was in line with the Philippines strategy for the infrastructure sector, as stated in its medium-term development plan (1987~1992), which called for efforts to concentrate on the repair and improvement of existing facilities. Also, for the Philippine-Japan Friendship Highway, this project was preceded by another ODA loan to rehabilitate the road in Northern Luzon, making this project part of an ongoing effort to rehabilitate the road. In the current situation the portion of the Philippines limited road related budget which is allocated to repair and rehabilitation has a higher priority than road improvements and new construction. The plan for work on the Philippine-Japan Friendship Highway was subjected to extensive changes, such as reduction of the road length for paving repairs and an increase in the number of locations for embankment disaster prevention works. Nevertheless, the changes were based on the subsequent detailed design, natural conditions and other factors, and appear to have been appropriate. Thus the relevance of the project appears to have been maintained. (2) Efficiency The detailed design was completed five months behind the planned schedule, and the construction supervision, disaster prevention works and rehabilitation works were delayed by 20 months. The main reasons for the delay were changes in the paving design, inevitable accidents, namely typhoon damage, and public security problems. The total project cost was 778 million less than planned for reasons including 2

the bidding results and the fall in the value of the Peso 1. (3) Effectiveness (i) Effects of reductions in travel time and cost The DPWH calculated unit travel costs and time costs per kilometer for each model and year of automobile (private cars, jeepneys, buses, trucks, motorcycles and motor tricycles) on each type of road condition (good, normal, poor, very poor). Using the travel costs and costs associated with travel time for 1997, when the project was completed, an average weighted to account for traffic volume (estimated traffic volume in the case of road conditions was calculated according to the DPWH figures. Table 1 shows costs calculated using the average for the case where the project was implemented and where the project was not, to show the saving yielded by the project. Clearly the project yielded a substantial saving. Table 1: Project Effects in Saving Travel and Time Costs Units: Pesos/km (per vehicle) Travel cost Naguilian Road Philippine-Japan Friendship Highway Case where the project was not implemented (A) 9.3 9.1 Case where the project was implemented (B) 5.1 5.1 Saving effects in travel cost (A)-(B) 4.2 4.0 Units: Pesos/km (per vehicle) Time cost Naguilian Road Philippine-Japan Friendship Highway Case where the project was not implemented (A) 3.5 3.1 Case where the project was implemented (B) 1.5 1.3 Reduction effects in travel time (A)-(B) 2.0 1.8 Source: Calculated based on DPWH material. Note: The above costs per km do not include tax. (ii) Traffic volume The Naguilian Road runs from Buang on the road north of Manila to Baguio, which is a resort, tourism and cultural city. The DPWH has conducted a survey of traffic volume between Burgos and Sabilan on the Naguilian Road (the main route where traffic can be monitored on the inter-city sections beyond the suburbs of Baguio). The results are as shown in Figure 1 below. 1 Compared to the Peso-Yen exchange at the time of the appraisal, the exchange rate when loan disbursement was requested during project implementation was more than 27% lower. 3

Figure 1: Average Annual Daily Traffic Volumes by Vehicle Type for the Naguilian Road (between Burgos and Sabilan) (AADT) 2500 2000 Vehicles/day 1500 1000 500 Other Truck 0 1992 1993 1994 1995 1996 Year Source: DPWH material. Notes: 1) Units: Vehicles/ day 2) Motorcycles and motor tricycles are included in Other. Bus Jeepney Private car The traffic volume on the Naguilian Road grew every year during the implementation period of this project, and a forecast made by the DPWH in 1997 predicted annual growth rates over the 20 years to 2016 of 7% for automobiles, 6% for buses and jeepneys etc., 4~5% for trucks and 5% for motorcycles and motor tricycles. Figure 2: Traffic Volume Survey Results for the Philippine-Japan Friendship Highway (between Calauag and the border of Camarines Norte) 3500 Average daily traffic volume for each year (AADT: Vehicles/day) 3000 2500 2000 1500 1000 500 0 1992 1993 1994 1995 1996 1997 Year Other Truck Bus Jeepney Private car Source: DPWH material. Notes: 1) AADT = Average Annual Daily Traffic (units: vehicles/day). 2) Traffic volume surveys were not conducted between 1994 and 1996. 4

Recently recorded values (Figure 2, 1,913 vehicles/day in 1997) of average daily traffic for the Philippine-Japan Friendship Highway (between Calauag and the border of Camarines Norte) already exceed the traffic volume predicted for 2000 at the time of the appraisal 2. Furthermore it is estimated that the overall traffic volume 3, including the portion redirected to the Kirino Highway (a bypass road which joins Calauag and Shipokoto in a shorter distance than the equivalent stretch of the Philippine-Japan Friendship Highway), which was then in temporary use, is substantially higher than the recorded values stated in Figure 2. Traffic redirection via the Kirino Highway is thought to be the main reason why recorded traffic volume figures in Figure 2 for the Philippine-Japan Friendship Highway are lower for 1997 than for 1992~1993. Construction of the Kirino Highway began under the LISR (Luzon Island Strategic Island Network) Plan adopted by the DPWH in 1993, and at the time of the appraisal for this project (1990) it was not possible to predict the dispersion of traffic to that road. (iii) Economic Internal Rate of Return (EIRR) At the time of the appraisal the average EIRR for the Naguilian Road and the Philippine-Japan Friendship Highway (sections between Calauag and Matsunogu and between Allen and Calbayog) was calculated at 31.7%, based on benefits such as reduced detour road expenses, shorter travel times and reduced maintenance expenses. The increased work on embankment safety and bridge repair reduced the total length of road covered by the project to approximately one third of the planned distance, with a substantial reduction in expected benefits. However, when the recorded figures obtained in this survey for travel cost reductions, shorter travel times and maintenance cost reductions were used to recalculate EIRR, a value of 17.5% was obtained. This is a favorable result, considering the reduction in project benefits caused by the major alteration to the project scope. (4) Impact (i) Impact on regional economy As Figure 1 above showed, traffic volume on the Naguilian Road (the main section) was growing continuously, with movements of passengers and freight intensifying in both directions. Thus it appears that the project made a contribution to expanded economic development and employment opportunities in the region. For the Philippine-Japan Friendship Highway, there is no data for the usage of the road as a whole, for the benefits to the region as a whole, and for any inter-relation between benefits and road usage. Therefore it is impossible to gauge the impact of this portion of the project. (ii) Impact on environment This project is not believed to have had any notable negative impact, and it obtained a Certificate of Non-coverage from the Ministry of Environment and Natural Resources indicating that no initial 2 3 The prediction for average daily traffic in 2000 made at the time of the appraisal was that in the section between Saint Helena and Labo (between kilometer posts 270 and 320.2). The volumes at the 290km and 320km posts would be 1,778 vehicles/day and 1,198 vehicles/day, respectively. The entire route was formally opened to traffic in November 1998. 5

environmental survey is required. (5) Sustainability (i) Organization and staff Maintenance for this project on the Philippine-Japan Friendship Highway (between Calauag and Labo) is handled by the Camarines Norte District Office maintenance section, while the La Union District Office maintenance section is responsible for the Naguilian Road. For example, Camarines Norte District Office, which was visited by the field survey, divides the area for which it is responsible into two zones, each of which is allocated one engineer and one assistant engineer. Each zone has three maintenance crews, each consisting of one site foreman and seven maintenance workers, and maintenance work is conducted according to plans. Table 2 compares the planned and actual numbers of DPWH workers and the worker-days expended on maintenance for each of the zones with jurisdiction over the road sections covered by this project 4. Table 2: Comparison of Planned and Actual Workers and Work-days Provided for Maintenance Up to the third 1996 1997 1998 1999 quarter of 2000 No. of Worker No. of Worker No. of Worker No. of Worker No. of Worker workers days x1,000 workers days x1,000 workers days x1,000 workers days x1,000 workers days x1,000 Cordillera Administrative Plan 517 116 446 103 451 99 574 153 484 87 Region Actual 554 141 442 35 501 146 444 137 471 90 Region I Plan 365 84 397 91 295 70 277 71 249 41 Actual 274 341 397 27 350 146 276 74 316 62 Region IV-A Plan 578 133 552 127 528 120 632 157 544 93 Actual 383 97 411 52 444 122 505 132 494 86 Region V Plan 534 128 493 113 449 96 537 142 539 103 Actual 567 86 493 113 517 162 551 158 625 126 Total Plan 1,994 461 1,888 433 1,723 386 2,020 522 1,816 324 Actual 1,778 665 1,743 227 1,812 577 1,776 501 1,906 365 Source: DPWH In some years the number of worker days expended exceeds the initial plan, and in other years it falls short. In many cases the maintenance workers are short-term laborers 5, and we can infer that the district offices make worker allocations flexibly according to the spare budget and the necessary maintenance work. (ii) Maintenance costs The cost of ordinary repair and maintenance of national roads and bridges is calculated as the product of Equivalent Maintenance Kilometrage (EMK) and price per unit EMK. The Naguilian Road 6 which was covered by this project is under the jurisdiction of the Cordillera Administrative Region and Region I. The 4 5 6 The DPWH has been increasing the proportion of maintenance work it contracts out, from 50% in 1996~1998 to 70% after 1999. The recorded input of maintenance workers in Region 4-A for 2000 (up to the third quarter) was 86,400 worker-days, of which 64,800 worker-days was temporary employment. This project covered the 47km between Bauan and Baguio. 6

Philippine-Japan Friendship Highway between Calauag and Labo 7 is under the jurisdiction of Regions IV-A and V. The EMK values and budget allocations based on those values in the past 4 years are as shown in Table 3. Table 3 Maintenance Costs Amount: Unit 1,000 peso 1997 1998 1999 2000 EMK Amount EMK Amount EMK Amount EMK Amount Naguilian Road 72.91 4,873 73.45 5,179 73.91 5,211 74.18 5,597 Philippine-Japan Friendship Highway (Calauag ~ Labo) 192.60 12,872 192.95 13,605 193.02 13,610 193.06 14,566 EMK unit price (Peso) 66,835 70,511 70,511 75,447 Source: DPWH Notes: 1) The maintenance budget is calculated as the product of the EMK and the estimate price per unit EMK. 2) The maintenance cost for the Naguilian Road includes portions which were not covered by the ODA loan. The EMK for 2000 at the Camarines Norte District Office, which was visited for the study, was 320.7EMK for roads and 45.9EMK for bridges, totaling 366.6EMK, for which the maintenance budget is 27.7 million Pesos. The budget is to cover labor, materials, equipment and other costs. Actual budget allocations are made on a quarterly basis. Equipment required for maintenance work is borrowed from Area Equipment Services (AES), which is adjacent to the district office. AES lends out one dump truck, one road grader, one road roller and four cars, but most of its equipment, including that for loan, is extremely old. A 15% share of EMK is set aside for the maintenance of equipment (spare parts, tires, oil etc.). Where road facilities take major damage from typhoons or other natural disasters, the repairs cannot be covered by the ordinary maintenance budget, and funds must be allocated from the construction budget, but the construction budget also has limited funds. In 2000 a fund was established for the maintenance of national routes, as a countermeasure against the shortage of funding for road maintenance. The fund draws on a newly introduced car ownership tax (the Road Maintenance Tax, levied on all motor vehicle owners). This step is expected to yield an improvement in the road maintenance situation through earlier detection of problems and implementation of repairs. 7 This project covered the 88km between Calauag and Labo. 7

Comparison of Original and Actual Scope Item Plan Actual Project Scope 1.Road paving repair and improvement -Naguilian Road 47km 47.0km -Calauag ~ Matsunogu 313km 88.0km -Allen ~ Calbayog 40km 0.0km 2.Embankment disaster prevention measures -Naguilian Road Zero 3 bridges -Calauag ~ Matsunogu 13 bridges 13 bridges -Allen ~ Calbayog 2 bridges Zero 3.Bridge rehabilitation -Naguilian Road 15 points 84 points -Calauag ~ Matsunogu 19 points 43 points -Allen ~ Calbayog 14 points Zero 4.Consulting Service -Detailed design -Construction supervision Foreign: 41M/M Local: 595M/M Foreign: 110M/M Local: 1191M/M Foreign: 52M/M Local: 740M/M Foreign: 117.5M/M Local: 1279.5M/M The rehabilitation actually implemented on the Philippine-Japan Friendship Highway under this project was on the Calauag ~ Labo section (87.944km, packages 3 and 4). The section between Labo and Matsunogu received rehabilitation and disaster prevention works under a different ODA loan project (PH-P145 and PH-P164). Implementation Schedule 1989 ~ 1995 1990 ~ 1997 Project Cost Foreign currency Local currency Total ODA Loan portion Exchange rate 3,971 million 587 million peso 7,610 million 5,708 million 1 peso 6.2 5,378 million 323 million peso 6,832 million 5,378 million 1 peso 4.5 8

Bauang Naguilian Road (Baguio) Luzon Island Philippine-Japan Friendship Highway (Calauag ~ Matsunogu) Manila Philippine-Japan Friendship Highway (Allen ~ Calbayog) Samar Island Mindoro Island Project Site Map 9