Source-Side Fuse/Load-Side Recloser Coordination

Similar documents
How to Use Coordinaide to Protect Transformers Against Secondary-Side Arcing Faults.

Sectionalizing. Rick Seeling. Pete Malamen. Introduction Philosophy. Three Phase Reclosers High-Side Protection Specific Applications

Selection Guide S&C ELECTRIC COMPANY. For Transformer-Primary Fuses in Medium- and High-Voltage

3.2. Current Limiting Fuses. Contents

Selective Coordination

PROTECTION AND CONTROL

OVERALL LENGTH (B) " ( mm) " ( mm) " ( mm) " ( mm)

Power Quality and Protective Device Coordination: Problems & Solutions Part 1 Undersizing of Utility Main Service Transformers

Tolerance-Based Time-Current Coordination

S&C TripSaver II. Cutout-Mounted Recloser. For enhanced lateral circuit protection at 15 kv and 25 kv

Engineering Dependable Protection

www. ElectricalPartManuals. com Engineering Dependable Protection

Protective Device Coordination ETAP Star

Table 1.-Elemsa code and characteristics of Type K fuse links (Fast).

K-SEC 030. Fusing Equipment. Kearney Fuse Links GENERAL INTERNAL CONSTRUCTION SINGLE TIN ELEMENT

MOLDED CASE CIRCUIT BREAKER BASICS. David Castor, P.E.

Fusing Equipment. Kearney Fuse Links. general. Internal Construction. tin element

Secondaries. arc flash note Introduction. By Mike Lang, engineer and. Services Supervisor

Selective Coordination Enforcement:

Data Bulletin. Ground-Censor Ground-Fault Protection System Type GC Class 931

Figure 1. Non-removable buttonhead Edison Links. TABLE 1 Edison Link Fuse Designs. System Fuse Ampere Rating Type Rating

Kearney fuse links. Technical Data General. Effective March 2014 Supersedes December 2013

AutoLink Frequently Asked Questions

Recommended Procedures

Evaluating Selective Coordination Between

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 6

Economical Self-Powered Transformer Protection

MAGNETIC MOTOR STARTERS

Selective Coordination Requirements

Functional Overview and Operating Principles for the AR-OH and AR360 Overhead AutoRANGER Fault Indicators

Product Selection Guide

KFE10002-E. Reclosers. Type KFE and KFVE Electronically Controlled Vacuum Recloser Installation Instructions. Service Information

A NEW FUSE-SAVING PHILOSOPHY

Fusesaver specification form

Kearney fuse links. Technical Data General. Effective December 2013 Supersedes November 2009

Enhancing Short Circuit Selective Coordination with Low Voltage Circuit Breakers

ECET 211 Electric Machines & Controls Lecture 8 Motor Control Circuits (1 of 2) Lecture 8 Motor Control Circuits

Characteristics of LV circuit breakers Releases, tripping curves, and limitation

ECET Distribution System Protection. Overcurrent Protection

Transformer Protection

Evaluating Selective Coordination Between Current-Limiting Fuses And Non Current-Limiting Circuit Breakers

THE CURVE FOR DOUBLE PROTECTION TRANSFORMER & SYSTEM PROTECTION WITH CHANCE SLOFAST FUSE LINKS

Selective Coordination

Advanced Guide To Understanding Assembly Short-Circuit Current Rating WITH ENGINEERING SOLUTIONS AND OVERCURRENT PROTECTION DEVICES TO ENHANCE SCCR

Each of these factors, as they apply to the selection of Types CLE and CLS current limiting fuses, is briefly outlined on the following pages.

Motor Protection. Voltage Unbalance & Single-Phasing

Fuse Link Designation

Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards

Service Entrance Methods

Understanding Arc Flash Hazards. White Paper

The purpose of this lab is to explore the timing and termination of a phase for the cross street approach of an isolated intersection.

APPENDIX E. Electrical System Single Line Diagram Overcurrent Protection Study Overcurrent Protection Device Specifications

Medium Voltage Metal-Enclosed Switches

DIVISION 26 ELECTRICAL SECTION CIRCUIT BREAKERS

Application of Sepam Relays for Arc Flash Hazard Reduction at Low Voltage Switchgear

Application Note: Protection of Medium-Power Motors With SIPROTEC Compact 7SK80

Figure 1. Two and Three-phase MagneX.

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.

EE 741 Over-voltage and Overcurrent. Spring 2014

X-Limiter full-range current-limiting fuse

Equipment Protection. Transformers 600V or Less

Current Ratings. Standards & codes note 1. Introduction. interest. By Steve Hansen Sr. Field Engineer

Horizontal Circuit Switchers

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

Medium Voltage Metal-Enclosed Switches

Shippensburg University

Application Note. First trip test. A circuit breaker spends most of its lifetime conducting current without any

Expulsion Fuses. 2.2 Fuse Selection. 2.3 Application. 2.4 BA Type Fuses. 2.5 DBA Type Fuses. 2.6 DBU Type Fuses. 2.7 RBA and RDB Type Fuses

Quick Start Guide TS 910

Application of Primary Fuses

Medium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION

R-MAG. Vacuum Circuit Breaker with Magnetic Actuator Mechanism

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

2000 Cooper Bussmann, Inc. Page 1 of 9 10/04/00

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code:

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES

Lab 6: Wind Turbine Generators

FUSE TECHNOLOGY Ambient temperature

Quick Start Guide TS 910 & TS 920

R-MAG Vacuum Circuit Breaker with Magnetic Actuator Mechanism 15.5 kv - 27 kv; 1200 A A

A comparison of metal-enclosed load interrupter (ME) switchgear and metal-clad (MC) switchgear

Motor Protection. Presented By. Scott Peele PE

SECTION MICROPROCESSOR TRIP UNITS FOR LV CIRCUIT BREAKERS. This section is organized as indicated below. Select desired Paragraphs.

IN2 Enclosed Switches and Circuit Breakers

201 S. Anaheim Blvd. Page No Anaheim, CA RULE NO. 2 DESCRIPTION OF SERVICE

SafeGear Motor Control Center Arc Resistant Metal-Clad Construction Brochure

CHAPTER 4 PROTECTION REQUIREMENTS

NX indoor current-limiting fuses

Mica Element Support. Compacted Quartz Sand. Length B

White Paper. Ground Fault Application Guide. WL Low Voltage Power Circuit Breakers

S&C SMD -20 Power Fuses

Application of Hi-Tech Trans-Guard EXT and OS Shorty fuses

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant

2.1 Warnings & Agency Approvals Electrical Connections - Specifications Standard Wiring Configurations...2 4

1. Division 26 Section "Elevator Shunt-Trip Fused Disconnect Switches".

MIPSYCON 2014 Can a Grid be Smart without Communications? A Look at an Integrated Volt Var Control (IVVC) Implementation

Transcription:

How to Coordinate ransformer Primary-Side Fuses with Feeder Reclosers Using Coordinaide M he S&C Protection and Coordination Assistant Part I: Conservative Method his is the first in a series of articles explaining how to coordinate transformer primaryside fuses with a secondary-side automatic circuit recloser, such as in a utility substation. In this installment we ll use the conservative coordination method, which ignores the effects of fuse cooling during the reclosing time intervals (contacts open) of the recloser. Next month we ll repeat the exercise using the more precise Cooling Factor coordination method. Future articles will address source-side recloser/load-side fuse applications. Source-Side Fuse/Load-Side Recloser Coordination Automatic circuit reclosers sense overcurrents, interrupt them, and then automatically reclose to reenergize the feeder. Most faults on overhead distribution systems perhaps as many as 75 to 80% are temporary in nature, lasting only a few cycles to a few seconds. With their trip and reclose capability, reclosers eliminate prolonged outages on distribution systems due to such temporary faults. If a fault is permanent rather than temporary, however, the recloser will lock out after a preset number of reclosing attempts (usually three or four), thus isolating the faulted feeder from the system. Automatic circuit reclosers have dual timing capabilities, which help maintain coordination with other protective devices and limit the areas affected by permanent faults. ypically the first sometimes the first two fault-clearing operations are performed per the fast timing characteristic, clearing temporary faults before load-side protective devices operate. Subsequent operations incorporate a predetermined time delay which allows protective devices nearer the fault to interrupt permanent faults, thereby limiting the extent of the service interruption. his arrangement is often referred to as a fuse saving scheme, since fuses only respond to permanent faults within their zones of protection. For the application covered in this article, the transformer primary-side fuse is located upstream of the automatic circuit recloser. he goal is that the fuse not melt before the recloser operates to lockout in response to a permanent fault. he maximum fault current value up to which the fuse and the recloser will coordinate is generally the lower of: 1. he maximum interrupting capacity of the recloser or fuse, or 2. he intersection of the minimum-melting curve of the fuse and the maximumequivalent operating curve of the recloser (i.e., the lockout curve). In the conservative coordination method, cooling of the fuse during reclosing time intervals (contacts open) is ignored. You simply sum the heating effect, or heat input, of each recloser operation. hat is, the lockout curve of the recloser is developed by summing the total clearing times for the proper number of fast and slow operations, at various current levels, per the following equation:.

l = n j= 1 Rj 1 P Where: l = Point on the maximum equivalent lockout curve of the recloser, at selected current (I). P = Reduction in the melting time of the fuse due to preloading, expressed as a decimal part of its total melting time. Rj = Maximum clearing time at current (I) for the j th operation (contacts closed) of the recloser. n = Number of operations (contacts closed) of the recloser. Since the fuse must allow the recloser to operate to lockout without melting, the recloser s maximum equivalent lockout curve should be developed. Recloser fast curves (A) are typically published to maximum test points. But slow curves (B, C, and D) are published to nominal test points and must be adjusted (maximized) by the amount of the positive tolerance, which is assumed to be 10%. Example Consider a rural electric power substation having a single transformer, protected by fuses, with three or fewer feeder reclosers. Ratings for the primary-side fuse, the transformer, and the load-side reclosers are as follows: ransformer: he transformer has a base (OA) rating of 7500 kva three-phase, 115 kv primary, 13.2 kv secondary. It has a forced-air (FA) rating of 9375 kva (125%). he transformer impedance is 7.5%, and the maximum three-phase secondary fault current is 478 amperes (2000 MVA), as seen on the primary side of the transformer. he transformer is connected delta grounded-wye. Fuse: he primary-side fuse is a 65E-ampere Standard Speed S&C SMD-2B Power Fuse rated 115 kv. he full-load current of the transformer, based on its force-air rating is 47 amperes. At this level of transformer loading, the fuse will be loaded to 72% of rating (47 amperes 65 amperes = 0.72). he preload adjustment factor, as determined from S&C Data Bulletin 210-195, is 0.88. Feeder Recloser: he load-side recloser is a hydraulically-controlled Cooper ype W Recloser, rated 14.4 kv, 560 amperes continuous. he phase-trip pickup current is 280 amperes (140-ampere coil), and the operating sequence is one fast (A) and three slow (C) operations. he reclosing time interval between the fast operation and the first delayed operation is 0.5 second (instantaneous). Between the delayed operations, the reclosing time interval is 5 seconds.

Completing the Exercise Using Coordinaide o complete the coordination exercise, launch Coordinaide by clicking the appropriate link on the page of S&C s website you re visiting... A Coordinaide link is featured on the home page. Additional links are found under the drop-down menu labeled Support and also on applicable product pages; e.g., S&C ype SMD Power Fuses. hese tab-style links are on the left-hand side of the page, immediately below the For More Information label and above the CCs for [product] tab. After clicking on one of the links, you ll be directed to Coordinaide s opening page. It provides a brief description of the applications Coordinaide is designed to handle. When you launch the program, you ll be directed to a second page containing a brief Conditions of Use disclaimer, followed by a short note detailing minimum web browser requirements and a link to a Users Guide. One final click launches the program and takes you to the General Information page. Please follow these directions to select the primary-side fuse, the transformer, and the load-side recloser. Step 1 Enter General Information Project Name: Fuse-Recloser Coordination Exercise Date: [provided by Coordinaide] By: Optional Step 2 Enter System Information and Select Devices hree-phase Voltage, kv: 115 Available Fault Current, Amperes RMS Symmetrical: 10000 Device #1 Power Fuse Device #2 ransformer (Damage Curve) Device #3 Recloser Click Continue after entering system information and selecting the devices. You ll be directed to the first device page. Step #3 Select and Enter Device Parameters Device #1 ransformer-primary Fuse (Select Parameters) Manufacturer: S&C ype: SMD-2B Speed: Standard Voltage Range, kv: 115-138 Ampere Rating: 65E Click Continue after selecting the parameters for Device #1. he time-current characteristic curve for Device #1 will be displayed.

Device #2 ransformer (Select Parameters) hree-phase Primary Voltage, kv: 115 [Provided by Coordinaide] hree-phase Secondary Voltage, kv: 13.2 hree-phase Rating, kva: 7500 Impedance, %: 7.5 Fault Current, Amperes RMS Symmetrical: 10000 [Provided by Coordinaide] Display Magnetizing Inrush Points? Yes No (default) Connection: Delta Grounded-Wye Click Continue after selecting the parameters for Device #2. he time-current characteristic curve for Device #2 will be displayed. Device #3 Feeder Recloser (Select Parameters) Coordinates With: Source-Side Device Load-Side Device See Note 1 Coordination Method: Cooling Factor Conservative (default) See Note 2 Manufacturer: Cooper (McGraw): Hydraulic ype: W kv Range, kv: 14.4 [Provided by Coordinaide] Phase-rip Operating Sequence: 1 Fast / 3 Slow Fast Curve: A Slow Curve: C Coil Rating, Amperes: 140 Ground-rip Operating Sequence: Skip for this example Note 1: Since the recloser is on the load side of the primary-side fuse, select Coordinates with Source-Side Device (default in this example). Note 2: Select Conservative Method to disregard the effects of cooling of the primary-side fuse during reclosing time intervals (contacts open) of the recloser. You are encouraged to repeat this example using the more precise cooling-factor method, and then compare the results. Click Continue after selecting the parameters for Device #3. he time-current characteristic curve for Device #3 will be displayed. Step #4 Go to Results Page Click on the tab at the top labeled Results. You ll be directed to a log-log grid with CC curves of the devices you ve selected. If desired, you can change the current scale of the grid from the default, 5 to 100,000 amperes, to 0.5 to 10,000 amperes. You can also eliminate the hash-fill applied to the CC curves, to make the plot more readable. And you can zoom in on a particular section of the grid by entering the upper and lower current and time values in the appropriate cells. o see a full-size CC plot or full-size summary information, click on Printer Friendly Graph or Printer Friendly Summary, as applicable.

Now let s review the CC plot of the coordination example under consideration. Device #1, the 65E-ampere Standard Speed primary-side power fuse, is plotted in red. Device #2, the transformer damage curve, is plotted in black. And Device #3, the loadside recloser, is plotted in orange. he two thicker orange curves are the recloser fast curve (A) and slow curve (C), respectively, based on CC data published by the recloser manufacturer. he thin orange curve is the maximum-equivalent lockout curve of the recloser, reflecting positive tolerances. he 65E-ampere Standard Speed power fuse provided excellent protection for the transformer as evidenced by the fact the total-clearing curve of the fuse crosses the transformer damage curve at current levels less than the maximum values obtained for any type of fault. his fuse has a published peak-load capability of 107 amperes, which means that the transformer can be loaded to nearly 280% of nameplate well in excess of the desired OA/FA rating (125% of nameplate). Unfortunately, the primary-side fuse does not coordinate with the maximum-equivalent lockout curve of the recloser, since the minimum-melting time of the fuse at 478 amperes (0.42 second) is less than the maximum-equivalent lockout curve of the recloser at this current level (0.69 second). Note that the secondary-side recloser curves have been shifted to the right, by 15% in terms of current, to account for the primary-side to secondary-side current imbalance that would exist were a phase-to-phase ungrounded secondary-side fault to occur. When faced with this situation, the natural reaction is to select the next-larger-ampererated primary-side power fuse, a fuse with a slower time-current characteristic, or perhaps both... until coordination is achieved. While this solution may result in complete coordination between the fuse and the recloser, it does so at the expense of transformer protection not the optimal result. Before selecting a larger fuse, or one with a slower timecurrent characteristic, repeat this exercise using the more precise cooling-factor method (the subject of next month s article). You may find that the primary-side fuse initially selected provides complete coordination after all!

1000 Primary Fuse (65E-ampere standard speed) 100 10 Maximum equivalent recloser lockout curve using conservative method hrough-fault protection curve for delta-grounded-wye connected transformer ime in Seconds Recloser C Curve Miscoordination 1 0.1 Recloser A Curve 0.01 10 hree-phase secondaryside fault (478 amperes) 100 1000 10000 100000 Current in Amperes at 115 kv

How to Coordinate ransformer Primary-Side Fuses with Feeder Reclosers Using Coordinaide M he S&C Protection and Coordination Assistant Part 2: Cooling-Factor Method his is the second in a series of articles explaining how to coordinate transformer primary-side fuses with a secondary-side automatic circuit recloser, such as in a utility substation. In this installment we ll use the more precise cooling-factor coordination method, which takes into account the effects of fuse cooling during the reclosing time intervals (contacts open) of the recloser. In the last exercise (see article dated October 30, 2006) the less precise conservative coordination method was used. Future articles will address source-side recloser/load-side fuse applications. Source-Side Fuse/Load-Side Recloser Coordination Automatic circuit reclosers sense overcurrents, interrupt them, and then automatically reclose to reenergize the feeder. Most faults on overhead distribution systems perhaps as many as 75 to 80% are temporary in nature, lasting only a few cycles to a few seconds. With their trip and reclose capability, reclosers eliminate prolonged outages on distribution systems due to such temporary faults. If a fault is permanent rather than temporary, however, the recloser will lock out after a preset number of reclosing attempts (usually three or four), thus isolating the faulted feeder from the system. Automatic circuit reclosers have dual timing capabilities, which help maintain coordination with other protective devices and limit the areas affected by permanent faults. ypically the first sometimes the first two fault-clearing operations are performed per the fast timing characteristic, clearing temporary faults before load-side protective devices operate. Subsequent operations incorporate a predetermined time delay which allows protective devices nearer the fault to interrupt permanent faults, thereby limiting the extent of the service interruption. his arrangement is often referred to as a fuse saving scheme, since fuses only respond to permanent faults within their zones of protection. When coordinating a transformer primary-side fuse with an automatic circuit recloser, the fault current flowing through the primary-side fuse will be interrupted by the recloser and then restored as the recloser goes through its operating sequence. Initially the temperature of the fusible element in the primary fuse is determined by the pre-fault load current and by elevated (or reduced) ambient temperatures. When a fault is initiated, the temperature of the fusible element increases towards its melting point. If the recloser opens before the fuse reached its melting point, the fuse will cool during the reclosing time interval (contacts open). his current cycling will continue until: a) the fault is cleared by a fast operation of the recloser, followed by a successful reclose; b) a load-side fuse clears the fault during the recloser s delayed operation; or c) the recloser operates to lockout. For the application covered in this article, the transformer primary-side fuse is located upstream of the automatic circuit recloser. Clearly you would want the recloser to operate to lockout, in response to a permanent fault, before the primary-side fuse operates.

he maximum fault current value up to which the transformer primary-side fuse and the recloser will coordinate is generally the lower of: 1. he maximum interrupting capacity of the recloser or primary-side fuse, or 2. he intersection of the minimum-melting curve of the primary fuse and the maximum-equivalent operating curve of the recloser (i.e., the lockout curve). As just noted, when coordinating reclosers and fuses, the repeated heating and cooling of the transformer primary-side fuse must be considered. o achieve this end, adjustment factors( C ), also known as cooling factors, are applied to the total-clearing curves of the recloser rather than to the primary-side fuse to generate an equivalent recloser lockout curve as seen by the primary fuse. Cooling factors reflect the heat remaining in the fuse after preheating and cooling, in percent of preheating, for a specific reclosing time interval (cooling time). Cooling factors vary based on the ampere rating and speed characteristic of the fuse. Maximum equivalent lockout curves for the recloser, for various operating sequences, are obtained by use of the following equations: a. One operation of the recloser l R 1 = (1 P) b. wo operations of the recloser l R 1C1 + R = 1 PC ) ( 1 2 c. hree operations of the recloser l = R1 C1C 2 + R 2C2 + 1 PC C ) ( 1 2 R3 d. Four operations of the recloser l = R1 C C 1 2 C 3 + R2 C ( 1 PC1C2C3 ) 2 C 3 + R3 C 3 + R4 Where: l = Point on the maximum equivalent lockout curve of the recloser, at current (I). P = Reduction in the melting time of the transformer primary-side fuse due to preloading, expressed as a decimal part of its total melting time.

Rj = Maximum clearing time at current (I) for the jth operation (contacts closed) of the recloser. C k = Cooling factors for the k th reclosing time interval (contacts open) of the recloser. Since the transformer primary-side fuse must allow the recloser to operate to lockout without melting, the recloser s maximum equivalent lockout curve should be developed. Recloser fast curves (A) are typically published to maximum test points. But slow curves (B, C, and D) are published to nominal test points and must be adjusted (maximized) by the amount of the positive tolerance, which is assumed to be 10%. Example Consider a rural electric power substation having a single transformer, protected by primary-side fuses, with three or fewer feeder reclosers. Ratings for the primary fuse, the transformer, and the load-side reclosers are as follows: ransformer: he transformer has a base (OA) rating of 7500 kva three-phase, 115 kv primary, 13.2 kv secondary. It has a forced-air (FA) rating of 9375 kva (125%). he transformer impedance is 7.5%, and the maximum three-phase secondary fault current is 478 amperes (2000 MVA), as seen on the primary side of the transformer. he transformer is connected delta grounded-wye. Fuse: he transformer primary-side fuse is a 65E-ampere Standard Speed S&C SMD-2B Power Fuse rated 115 kv. he full-load current of the transformer, based on its force-air rating is 47 amperes. At this level of transformer loading, the primary-side fuse will be loaded to 72% of rating (47 amperes 65 amperes = 0.72). he preload adjustment factor, as determined from S&C Data Bulletin 210-195, is 0.88. Feeder Recloser: he load-side recloser is a hydraulically-controlled Cooper ype W Recloser, rated 14.4 kv, 560 amperes continuous. he phase-trip pickup current is 280 amperes (140-ampere coil), and the operating sequence is one fast (A) and three slow (C) operations. he reclosing time interval between the fast operation and the first delayed operation is 0.5 second (instantaneous). Between the delayed operations, the reclosing time interval is 5 seconds. Completing the Exercise Using Coordinaide o complete the coordination exercise, launch Coordinaide by clicking the appropriate link on the page of S&C s website you re visiting... A Coordinaide link is featured on the home page. Additional links are found under the drop-down menu labeled Support and also on applicable product pages; e.g., S&C ype SMD Power Fuses. hese tabstyle links are on the left-hand side of the page, immediately below the For More Information label and above the CCs for [product] tab. After clicking on one of the links, you ll be directed to Coordinaide s opening page. It provides a brief description of the applications Coordinaide is designed to handle. When

you launch the program, you ll be directed to a second page containing a brief Conditions of Use disclaimer, followed by a short note detailing minimum web browser requirements and a link to a Users Guide. One final click launches the program and takes you to the General Information page. Please follow these directions to select the primary-side fuse, the transformer, and the load-side recloser. Step 1 Enter General Information Project Name: Fuse-Recloser Coordination Exercise (Cooling-Factor Method) Date: [provided by Coordinaide] By: Optional Step 2 Enter System Information and Select Devices hree-phase Voltage, kv: 115 Available Fault Current, Amperes RMS Symmetrical: 10000 Device #1 Power Fuse Device #2 ransformer (Damage Curve) Device #3 Recloser Click Continue after entering system information and selecting the devices. You ll be directed to the first device page. Step #3 Select and Enter Device Parameters Device #1 ransformer-primary Fuse (Select Parameters) Manufacturer: S&C ype: SMD-2B Speed: Standard Voltage Range, kv: 115-138 Ampere Rating: 65E Click Continue after selecting the parameters for Device #1. he time-current characteristic curve for Device #1 will be displayed. Device #2 ransformer (Select Parameters) hree-phase Primary Voltage, kv: 115 [Provided by Coordinaide] hree-phase Secondary Voltage, kv: 13.2 hree-phase Rating, kva: 7500 Impedance, %: 7.5 Fault Current, Amperes RMS Symmetrical: 10000 [Provided by Coordinaide] Display Magnetizing Inrush Points? Yes No (default) Connection: Delta Grounded-Wye Click Continue after selecting the parameters for Device #2. he time-current characteristic curve for Device #2 will be displayed.

Device #3 Feeder Recloser (Select Parameters) Coordinates With: Source-Side Device Load-Side Device See Note 1 Coordination Method: Cooling Factor Conservative (default) See Note 2 Manufacturer: Cooper (McGraw): Hydraulic ype: W kv Range, kv: 14.4 [Provided by Coordinaide] Phase-rip Operating Sequence: 1 Fast / 3 Slow Fast Curve: A Slow Curve: C Coil Rating, Amperes: 140 Fuse Preload, %: 72 Cooling Interval #1, Sec.: 0.5 Cooling Interval #2, Sec.: 5 Cooling Interval #3, Sec.: 5 Ground-rip Operating Sequence: Skip for this example Note 1: Since the recloser is on the load side of the primary-side fuse, select Coordinates with Source-Side Device (default in this example). Note 2: Select Cooling-Factor Method to take into account the effects of cooling of the primary-side fuse during reclosing time intervals (contacts open) of the recloser. You are encouraged to repeat this example using the less precise conservative method, and then compare the results. See article dated October 30, 2006. Click Continue after selecting the parameters for Device #3. he time-current characteristic curve for Device #3 will be displayed. Step #4 Go to Results Page Click on the tab at the top labeled Results. You ll be directed to a log-log grid with CC curves of the devices you ve selected. If desired, you can change the current scale of the grid from the default, 5 to 100,000 amperes, to 0.5 to 10,000 amperes. You can also eliminate the hash-fill applied to the CC curves, to make the plot more readable. And you can zoom in on a particular section of the grid by entering the upper and lower current and time values in the appropriate cells. o see a full-size CC plot or full-size summary information, click on Printer Friendly Graph or Printer Friendly Summary, as applicable. Now let s review the CC plot of the coordination example under consideration. Device #1, the 65E-ampere Standard Speed primary-side power fuse, is plotted in red. Device #2, the transformer damage curve, is plotted in black. And Device #3, the loadside recloser, is plotted in orange. he two thicker orange curves are the recloser fast curve (A) and slow curve (C), respectively, based on CC data published by the recloser manufacturer. he thin orange curve is the maximum-equivalent lockout curve of the recloser, reflecting positive tolerances.

he 65E-ampere Standard Speed power fuse provided excellent protection for the transformer as evidenced by the fact the total-clearing curve of the fuse crosses the transformer damage curve at current levels less than the maximum values obtained for any type of fault. his fuse has a published peak-load capability of 107 amperes, which means that the transformer can be loaded to nearly 280% of nameplate well in excess of the desired OA/FA rating (125% of nameplate). And it provides complete coordination with the maximum-equivalent lockout curve of the recloser, since the minimummelting time of the fuse at 478 amperes (0.42 second) is well above the maximumequivalent lockout curve of the recloser at this current level (0.24 second). Note that the secondary-side recloser curves have been shifted to the right, by 15% in terms of current, to account for the primary-side to secondary-side current imbalance that would exist were a phase-to-phase ungrounded secondary-side fault to occur. As this exercise illustrates, including the effects of cooling of the transformer primaryside fuse during the reclosing time intervals (contacts open) may allow you to confirm that the fuse initially selected, in fact, coordinates with the recloser, even though the conservative coordination method (the subject of the article dated October 30,2006) might suggest otherwise. Furthermore, by using the cooling-factor coordination method, you may be able to select a smaller primary-side fuse rating, or a fuse having a faster speed characteristic, or both, for even better transformer protection.

1000 Primary Fuse (65E-ampere standard speed) 100 ime in Seconds 10 Maximum equivalent recloser lockout curve using coolingfactor method Recloser C Curve hrough-fault protection curve for delta-grounded-wye connected transformer 1 0.1 Recloser A Curve 0.01 10 hree-phase secondaryside fault (478 amperes) 100 1000 10000 100000 Current in Amperes at 115 kv