What is essential for the decentralized waste water management? Experience of Japan, Malaysia, India

Similar documents
WWCH 2018 PROBLEM DESCRIPTION

Citywide Coordination & Regulation of Septage Management Services - Opportunities in Vizag, India

A systematic approach to scale up FSM services Case of Government of Maharashtra

Co-treatment of Septage with Municipal Wastewater in Medium Sized Cities in Vietnam

ADB Wastewater Management Program in Viet Nam

Scheduled Desludging Services in Indonesia

PORTER TOWNSHIP CASS COUNTY, MICHIGAN PUBLIC WORKS SECTION PART 60 SEPTAGE RECEIVING ORDINANCE ORDINANCE #

Septage Management (Capture to Disposal) - Regulations 2016

Co-Composting of Municipal Solid Waste and Faecal Sludge for Agriculture in Kushtia Municipality, Bangladesh

Approaches for Planning Wastewater and Septage Systems in the Philippines

LOW OPERATING COST LOW START-UP COST. Media TM has its own built-in. the initial savings over new mechanical

GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part I State of Andhra Pradesh

Sewerage Services.

CHAPTER 20.1 WASTEWATER HAULING. Section Definitions. For the purposes of this article, the following definitions shall apply:

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 645. SEPTAGE PUMPERS AND TRANSPORTERS

Citywide Inclusive Sanitation in Practice

CHATSWORTH WATER WORKS COMMISSION GREASE AND OIL CONTROL ORDINANCE

Septage Treatment at Small Wastewater Treatment Plants

Grease Inspection Program

Permitting and Tracking Waste Haulers

9Pollution reduction. For more technical information. The Boat Safety Scheme Essential Guide

City of Marlette. Wastewater Treatment Facility. Septage Receiving Plan

FSM is not just an urban issue Findings from a rapid assessment in rural Vietnam

Operationalising Septage Management guidelines in Tamilnadu. Municipal Administration and Water Supply Department Government of Tamilnadu

Septage Disposal Ordinance for Kent County

Sludge Management EENV Overview of Sludge Treatment & Disposal

PAS Project, CEPT University, INDIA

CITY OF DENTON TRANSPORT TRUCK DISCHARGE PERMIT AGREEMENT. January 1, 2019 through December 31, 2019

SEPTIC TANKS. Round septic tanks. Standard version ECO version. Rectangular septic tanks. ECO version

Operationalizing FSM regulations at city level: a case study of Warangal, India

CONTRACT TERM: APRIL 28, 2018 THROUGH APRIL 27, 2020 RES. NO

Sewerage Service Regulation, Fees and Charges Bylaw

When is Septage Really Septage? GLAD TO SEE YOU MADE THE MOVE!

DELPHIN cube. Reliable process Strong tanks Clever modules. Compact biological wastewater treatment plants with fixed-bed technology

Septage Land Application Module

1BGrease Traps and. Frequently Asked Questions About Grease:

Bhagawati International Limited

City of Alpena Septage Receiving Facility Operating Plan

A Visionary Review of the Land Treatment of Septage International Pumper & Cleaner Environmental Expo Louisville, Kentucky

Start a Franchise In 10 Steps

PAS Project 1 CITY SANITATION PLAN. for SINNAR Municipality. PAS Project, CEPT University, INDIA

Type of Containment Systems in select 30 cities

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT

Kentucky On-Site Septic Tank Servicing Regulations

Florida Community Services Corporation of Walton County d/b/a Regional Utilities (Regional) FOG Control Policy

We shall continuously satisfy our customers and stakeholders, delivering quality services to become a world class water utility provider

RAS & WAS Pumps (FLYGT Pump)

Faecal Sludge Management in Kushtia Municipality

Solid Waste Management

ACO Marine product catalogue ACO Clara Waste water treatment plant Sizes 3-240

ORDINANCE AN ORDINANCE RELATING TO ON-SITE SEWAGE

Faecal Sludge Treatment Technologies in India - Compendium

National Association of Wastewater Transporters (NAWT) Onsite Treatment Tank Pumping & Cleaning Code of Practice

RESEARCH PROPOSAL FOR DEVELOPMENT OF ON-SITE TREATMENT OF FAECAL SLUDGE

CITY OF NEWTON Septage and Grease Trap Waste Disposal Program TABLE OF CONTENTS

A guide to septage transfer stations

December Labko BioKem Wastewater Treatment Plants. Product brochure BATCH REACTORS FOR PROCESSING WASTEWATER OF 6-90 PERSONS

Although Indonesia has 150 septage treatment plants, 90 percent are no longer in operation and only four percent of collected septage is treated at a

LOW ENERGY AERATION AND PROBIOTICS RESOLVE SLUDGE MANAGEMENT ISSUES! Adam Wilson. Coffs Harbour Water

Septage treatment in Indonesia: lessons from field investigations in seven cities

CHARLES RIVER POLLUTION CONTROL DISTRICT. Requirements for Septage Receiving

WASH SYSTEM. Instructions for Use

PAS Project 1. SaniPlan Tool. PAS Project, CEPT University, Ahmedabad

National Agency for Energy Regulation

Secondary Digester Cleaning to Meet Ohio Sludge Rules. Timothy McCann AECOM Keith Bovard Rocky River WWTP

The City of Sturgis Wastewater Treatment Plant Septage Waste Receiving Facility Operating Plan

Air Pollution Control Law

Haryana Fecal Sludge & Septage Management (FSSM) Policy

APPLICABILITY This procedure applies to all Ogeechee Technical College employees who drive on State of Georgia business regardless of frequency.

TREATMENTOF PETROCHEMICAL WASTEWATERS

Transfer. CE 431: Solid Waste Management

Sectoral Perspective: Domestic Water and the Role of Metropolitan Waterworks and Sewerage System (MWSS) Rebecca R. de Vera Project Management Officer

Appendix A - Technical Specifications RFQ Emergency WasteWater Cleanup Services

CITY OF WESTON, a municipal corporation SEWERAGE AND SEWAGE DISPOSAL SERVICE

Urban pit waste management

Septage Management in India

APPENDIX I LIST OF WARD-WISE HOUSEHOLD AND POPULATION IN MYSORE CITY CORPORATION, Page 213

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

Workplace Transportation Improvements. April Hopps BUSB-433. Geographic Information Systems - Business Analyst Online - Course Project

PRETREATMENT OF SEPTAGE AND GREASE TRAP WASTES

Brownfields to Brightfields

Personalized Solutions. Personalized Service.

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

Urban Sanitation Strategies and City Sanitation Planning

The Batteries Regulations What You Should Know

building liveable cities

Japanese ODA Loan. Ex-ante Evaluation

Liquid Waste Haulers Stakeholders Meeting

Regulation of Commercial Waste Originators, Pumpers, Transporters, Processors, and Disposal Facilities

Ex-Ante Evaluation (for Japanese ODA Loan)

VEHICLE PREVENTIVE MAINTENANCE PROGRAM PURPOSE AND COMPONENTS OF A VEHICLE MAINTENANCE PROGRAM

Creative Commons License

Medical Waste Transporters

Town of Mansfield Board of Health Fats, Oils and Grease (FOG) Regulations

Brief Description SOLIDO. Fully biological SBR Small Wastewater Treatment Plant for 2 32 PE according to EN

NATIONAL COUNCIL OF INSURANCE LEGISLATORS (NCOIL)

GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT BYLAW NO. 307, A Bylaw to License Commercial Waste Haulers

Septage - Biosolids. Suggested Course Materials

Albany County Water Purification District. General Permit Rules and Regulations for Sanitary Hauled Waste

Dutch Alcohol Interlock Program. Desirée Schaap Projectmanager Alcohol Interlock Program Ministry of Infrastructure and the Environment

Transcription:

What is essential for the decentralized waste water management? Experience of Japan, Malaysia, India April 2, 2015 Kazushi HASHIMOTO Adviser Japan Sanitation Consortium 1 Decentralized Wastewater Treatment System (DEWATS) 1 Septic Tank 2 1

Decentralized Wastewater Treatment System (DEWATS) 2 BORDA DEWATS 3 Decentralized Wastewater Treatment System (DEWATS) 3 Packaged Aerated Wastewater Treatment Plant (PAWTP Johkasou in Japan) 4 2

Comparison of DEWATS Treatment Process Effluent Water Quality (BOD) Nitrogen removal CAPEX per person in developing countries Septic Tank BORDA DEWATS PAWTP (Johkasou) Anaerobic (Electricity not required) Anaerobic (Electricity not required) Aerobic (Electricity required) 100-200 mg/l 50 mg/l 20 mg/l Not removed Not removed Removed US$ 80-150 US$ 90-100 US$ 210-380 5 What happens, if DEWATS is not regularly desludged? Any wastewater treatment system ceases to treat and becomes a pollution source. 6 3

What happens, if Septic Tank is not regularly desludged? 1 If the septage volume exceeds one-third the capacity of the tank, solid-liquid separation decreases since the retention time of the wastewater decreases. BOD removal is hampered since the inflow of wastewater agitates the accumulated sludge causing inflow wastewater to pass through the tank without treatment. Moreover, a part of the accumulated sludge in the tank flows out together with the untreated wastewater, leading to further deterioration in the water quality of the effluent of the septic tank. (Source : USAID) 7 Black water only type 1 Black water only type 2 Black water only type 3 Black & Grey type 1 Black & Grey type 2 Black & Grey type 3 (Source : JICA) What happens, if Septic Tank is not regularly desludged? 2 No septic tank meets the effluent standard established by the Governor of Jakarta City Government for household septic tank (BOD75mg/l, COD100 mg/l). Irregular desludging may be one of the causes. Volume ( m3 ) Usage (persons) Effluent water quality Remarks BOD COD mg/l mg/l 6.0 15 145 421 Desludged once a year. 2.2 4 231 622 Desludged twice a year. 2.9 4 217 544 Never desludged. 7.4 4 206 419 Not desludged (4 years) 10.0 40 162 367 Not desludged (3 years) 10.0 18 213 401 Not desludged (3 years) 8 4

What happens, if PAWTP (Johkasou) is not regularly desludged? 1 Sludge accumulates quickly in a PAWTP since its wastewater treatment efficiency is high. It must be desludged once a year to maintain its performance standard. After one year After three years 9 What happens, if PAWTP (Johkasou) is not regularly desludged? 2 A research, conducted in 1984 for 70 PAWTPs (black water only type) in Japan, revealed that 24.6% of them had not been desludged for more than 1 year, and their average effluent water quality (BOD) was worse than the ones which had been desludged with less than 1 year intervals. 160 140 120 100 80 60 40 20 BOD COD SS NH4-N NO2,3-N 0 <6 Month 6-12Month 12-18Month 10 5

BORDA DEWATS I wonder how to desludge this system?? 11 What is essential for the decentralized wastewater management? Introduction of regular desludging system. Proper disposal of the sludge removed from DEWATS. Septage Management! 12 6

What is essential for the introduction of regular desludging system? Desludging must be the legal obligation of all the owners of any DEWATS. There must be the trained good desludging operators. Formalize them, if there are existing desludging operators. Let them make companies. Establish the licensing system and training system. Data base of all DEWATS in the City. Both the municipality and the desludging operators should have it. Use vacuum truck for the more efficient and hygienically safer de-sludging operation. Use the sludge relay tank to shorten hauling time. Improve the DEWATS for the efficient desludging. Necessity of Regulatory Framework for Septage Management Residents do not worry about the septic tank unless it becomes full of sludge, overflow and their toilet becomes unusable. Communication strategy is necessary but not enough. Regulation is necessary. 14 7

For good Septage Management, these peoples are the most important!!! Existing desludging operators in Mizoram State, India, who are conducting desludging of septic tanks using a pump and a water tank mounted on a truck. PAWTP De-sludging Technician PAWTP Inspector 15 Economics of Regular Desludging The most expensive item for septage management is not the DEWATS itself but the cost for desludging. Desludging of one septic tank (3 m3 ) costs US$30 in Jakarta, US$50 in India, US$70 in Malaysia, US$250 in Japan. In Japan, the desludging is considered not a profitable business unless at least 4 PAWTPs can be desludged by one vacuum truck. Efficiency matters. In Japan, many desludging operators cover 7 PAWTPs daily and make money. 8

Technology for the efficient Septage Management 1 Use of Vacuum Truck will ensure the efficient and hygienically safe desludging operation. Time required for emptying Discharge of the sludge Possibility of the human contact with the pathogen Vacuum Truck Septic tank (3m3) 40 minutes PAWTP (5PE) 30 minutes 10 minutes -Quick because the caliber of the hose is bigger (45-65mm) None Truck + pump Septic tank (3m3)-2 hours 30 minutes -Slow because the caliber of the hose is smaller (32mm) Possible at the time of connecting and disconnecting the hose to the tank. These vacuum trucks shall be leased to the existing desludging operators. (Photo taken in Mizoram State, India) Technology for the efficient Septage Management 2 Sludge relay tank will improve the efficiency of desludging operation by shortening the hauling time. 9

DEWATS must be desludging friendly It must be reachable for the desludging operators. (1) It must be installed in the open air space. (2) It must have manholes. It would be the most convenient if the partial desludging could effectively remove all the sludge without removing the water contents. In case of septic tank, you need to remove all the contents of the tank. 10

In case of PAWTP, the partial desludging effectively removes all the sludge. The water contents of the tank does not need to be removed. Proper disposal of the sludge removed from DEWATS (1) Local municipality s obligation to develop septage/sludge treatment facility. Central government s obligation to provide financial support to Local municipalities. (2) Sludge drying bed is an appropriate method if land is available. (3) If there is a Sewage Treatment Plant (STP) nearby, cotreatment at the excess sludge treatment section of a sewage treatment plant is the best option. Proper pretreatment facility is required to minimize the adverse effect on the operation of STP. (4) Independent septage/sludge treatment facilities - In Japan, there are 1,100 independent night soil/sludge treatment plants of various technologies. 22 11

Warning! Establishing a workable Septage Management may be the most difficult development agenda. Only two countries have a nation wide Septage Management System. Japan Malaysia (partial success) 23 Septage Management System based on PAWTP (Johkasou) Technology in Japan In Japan, PAWTPs (black water only type) had been widely difused since 1960s. In 1970s 1980s, water pollution of rivers and oceans had become a big issue. Particularly, the cause of eutrophication occurred in lakes and inland bays was attributed to the poor performance and maintenance of PAWTPs (black water only type). Only after the promulgation of PAWTP (Johkasou) Act in 1983, the maintenance of PAWTPs in Japan improved and eutrophication of lakes and inland bays in Japan stopped. The new installation of PAWTP (black water only type) was banned and PAWTP (both black water and grey water type) has become the standard DEWATS in Japan. 24 12

Main points in the PAWTP Act (1983) (1) Item Manufacturing and Installation of PAWTPs Maintenance of PAWTPs Desludging of PAWTPs Inspection of PAWTPs What does the PAWTP Act stipulate? The PAWTP (black + gray water type) is the standard on-site wastewater treatment facility in Japan. PAWTPs shall meet the technical standards for effluent water quality and the structural standards prescribed in the Building Standard Law. The owner of a PAWTP is designated as the PAWTP Manager who is legally responsible for the maintenance of the PAWTP. The PAWTP Manager shall make the PAWTP receive inspection, maintenance and desludging. The PAWTP Manager can outsource the work related to PAWTP management to a PAWTP vendor and/or a PAWTP desludging vendor. The PAWTP Manager shall ensure that the PAWTP receives desludging service once a year. The PAWTP Manager shall make the PAWTP receive an inspection for its water quality annually by the Specified Inspection Agency. 25 Main points in the PAWTP Act (1983) (2) Item Desludging Business Maintenance Business What does the PAWTP Act stipulate? A corporate body that intends to join the PAWTP desludging business shall get the approval from the mayor of the municipality for a limited period. The applicants need to conform to the standards for approval stipulated in the PAWTP Law. A corporate body that intends to join the PAWTP maintenance business shall register to the municipality concerned. The PAWTP maintenance vendor shall assign its staff qualified as PAWTP Operator who has passed a national examination or completed a training course conducted by a designated training agency, to the PAWTP maintenance work. 26 13

Number of people engaged in the Septage Management Business in Japan People with qualification (Number of registrants) PAWTP Operators PAWTP Installation Workers PAWTP Technical Supervisors PAWTP Desludging Technicians PAWTP Inspectors 72,521 Operation and maintenance 83,205 Installation/ Construction 26,658 Management of PAWTP with 501 PE or more 15,117 Desludging 1,210 Total 198,711 Number of vendors Specified inspection agencies PAWTP manufacturers PAWTP maintenance vendors PAWTP desludging vendors PAWTP installation vendors 65 PAWTP inspection and water quality examination 27 Research, development and manufacture 12,871 Operation and maintenance 5,375 Desludging 33,593 Installation/ construction 27 Malaysia s effort toward establishing effective Septage Management System 1 In 1993, Sewerage Services Act (SSA) federalized the sewerage assets, thus empowering the Malaysian Government to regulate this industry. SSA also provided the fundamental policies for septage management. In 1994, Indah Water Konsortium (IWK) was created as the private concessionaire who was responsible for O/M of all sewerage facilities, and septage management. By these reforms, Sewerage coverage ratio : 25% (1993) 70% (current) Desludging coverage ratio : 1% (1993) 12.4% (1999) On the other hand, the newly introduced sewerage charges (including desludging charges) for individuals and businesses caused complains from the Malaysian population and refusal to pay. As a result, tariffs were reduced at a level too low to cover operation expenditures. 28 14

Malaysia s effort toward establishing effective Septage Management System 2 In 2000, IWK was nationalized. In 2006, SSA was replaced by the Water Service Industry Act (WSIA). National Water Services Commission (SPAN) was created to regulate water and sewerage services. In the area of Septage Management, the IWK s responsibility for the desludging and maintenance of the individual septic tank was transferred to the owner or residents of a premise, who are legally responsible for engaging IWK (Service licensee) or a license permit holder both regulated by SPAN to desludge and maintain their septic tanks. Fines up to US$ 15,000 was established against the noncompliance, which have not been imposed yet. 29 Malaysia s effort toward establishing effective Septage Management System 3 The number of desludged septic tanks has substantially decreased since 2008. No IST IST DEMAND DESLUDGING No IST 450,000 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 IST SCHEDULED DESLUDGING 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Year 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Year Total Attempted Total Unsuccessful Total Desludged 30 15

No. of IST 2015/3/29 Malaysia s effort toward establishing effective Septage Management System 4 Desludging campaigns are being organized to incite septic tank owners/users to desludge within the legal interval. 160,000 140,000 148208 135982 Jumlah No. Tangki of IST Septik desludging yang dinyahenap done cemar 146524 Desludging Campaign at:- a) Taiping, Perak b) Kangar, Perlis c) Melaka d) Yong Peng, Johor e) Simpang Renggam, Johor 120,000 100,000 80,000 68548 60,000 70170 40,000 20,000 37018 47056 58406 Desludging Campaign at:- a) Muar, Johor b) Temerloh, Pahang c) Kubang Pasu, Kedah d) Port Dickson, Negeri Sembilan e) Sungai Besar, Selangor 0 2005 2006 2007 2008 2009 2010 2011 2012 Year Malaysia s effort toward establishing effective Septage Management System 5 Ms. Y. B. Dato Noriah Kasnon, Deputy Minister for Energy, Green Technology, and Water, joined a desludging campaign organized by SPAN and IWK and operated the lever of vacuum track. 32 16

Malaysia s effort toward establishing effective Septage Management System 6 Decrease of desludging activities has been affecting the river water quality. RIVER WATER QUALITY BASED ON BIOLOGICAL OXYGEN DEMAND Lessons from experiences of Japan and Malaysia Any on-site wastewater treatment facility becomes pollution source without proper Septage Management. In order to do Septage Management, you must be real serious. It is a highly political issue. In Septage Management, without proper regulation, nobody does the right thing. In Septage Management, the people who do the actual work are the most important. Regulate them. Formalize them. Respect them. Septage Management will create a lot of job opportunities. It is good for the economy at national and local levels. 34 17

Thank you for your attention! http://www.jsanic.org/ 35 18