Installation Instructions

Similar documents
COVER PAGE CUSTOM QUICK INSTALL MOUNTING KIT NOTE!

Installation Instructions **THIS RAIL MOUNTING KIT USES 11 BOLTS**

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions GOOSENECK MOUNTING KIT Toyota Tundra

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

INSTALLATION INSTRUCTIONS MOUNTING KIT FOR ELITE SERIES

Installation Instructions

INSTALLATION INSTRUCTIONS MOUNTING KIT 2010-CURRENT Dodge 2500 & 3500

Installation Instructions

INSTALLATION INSTRUCTIONS MOUNTING KIT FOR ELITE SERIES

Installation Instructions

16K and 19K Sidewinder TM Service Kit Instructions 86005

16K Revolution Service Kit Instructions 86016

5 th Airborne Sidewinder Service Kit Instructions 94316

Installation / Owners Manual

Cequent Performance Products, Inc. LIMITED LIFETIME WARRANTY.

Installation Instructions

INSTRUCTION MANUAL 16K - Fifth Wheel Hitch

Installation Instructions PART NUMBERS: 76128, 84128, CQT76128

Installation Instructions

16K Reese Revolution. Operating Instructions

Installation Instructions

20K - Fifth Wheel Hitch

Installation Instructions PART NUMBERS: 24954, 77336, CQT24954

20K - Fifth Wheel Hitch

Installation Instructions

Installation Instructions PART NUMBERS: 76145, 84145, CQT76145

Installation Instructions

Installation Instructions PART NUMBERS: 76192, 84192, CQT76192

Installation Instructions READ THOROUGHLY BEFORE BEGINNING Signature Series Rail Kit Dodge Ram Trucks-all, including Mega-cabs

Adjustable Shop Stool with Backrest

Dodge Ram 1500, Quad/Reg. Cab, w/6.4ft. & 8ft. Bed, 2 & 4 WD. For updates see PRODUCT SUPPORT tab at

Low Profile Creeper. Owner s Manual

Heavy-Duty Drywall Dolly Cart

6-TON DOUBLE LOCKING JACK STANDS OWNER S MANUAL

HEAVY-DUTY STEEL WAGON

Angle Grinder Holder

Push Trolley. Owner s Manual

Joy Rider Shock System Installation

3-TON DOUBLE LOCKING JACK STANDS OWNER S MANUAL

Assembly, Installation, Operation and Maintenance Instructions. Base Rail Bracket Kit. For updates see PRODUCT SUPPORT tab at

84in. Driveway Drag. Owner s Manual

2000-LB. ENGINE STAND

COVER PAGE BASE RAIL MOUNTING KIT 10 BOLT RAIL KIT NOTE!

4-Claw Log Lifting Tongs

Utility Cart. Owner s Manual

4400-Lb. Cargo Trolley

Drum Deheader. Owner s Manual

1000-LB. ENGINE STAND

55-Gallon Drum Cradle

INSTALLATION / OPERATING INSTRUCTIONS Reese Elite Series FIFTH WHEEL SLIDER HITCH

Dolly with Pneumatic Tires

DODGE / RAM 1500 *** DO NOT EXCEED VEHICLE MANUFACTURER'S RECOMENDED TOWING CAPACITY ***

Adjustable Steel Drum Dolly

60in. Acreage Rake. Owner s Manual

Auto-Locking Trailer Coupler

Machinery Skate. Owner s Manual

INSTRUCTION MANUAL 15K Fifth Wheel Hitch

3-Pt. Quick Hitch. Owner s Manual

Adjustable Steel Welding Table

Heavy-Duty Sawhorse. Owner s Manual

Push Trolley. Owner s Manual

Mini Manual Tire Changer

55-Gallon Drum Cradle

1000-Lb. Drum Truck. Owner s Manual

Low-Profile Drum Caddy

INSTALLATION INSTRUCTIONS MOUNTING KIT COMMERCIAL TRUCK FOR 34 OUTSIDE FRAME WIDTH ONLY. Front of vehicle

Sawhorse with Chainsaw Holder

600-lb. Trailer Dolly

Heavy-Duty Welding Fabrication Table

Poly Strapping Tensioner & Cutter

Quick-Install Push Trolley

Manual Tire Changing Station

Assembly, Installation, Operation and Maintenance Instructions. Base Rail Bracket Kit. For updates see PRODUCT SUPPORT tab at

1000 lb. Adjustable Gantry Crane

1500-lb Snowmobile Dollies

OPERATING INSTRUCTIONS. Elite Series 18K & 25K 5TH WHEEL HITCH END USER:

1000-LB. MOTORCYCLE LIFT TABLE OWNER S MANUAL

ASSEMBLY INSTRUCTIONS Reese Elite Series FIFTH WHEEL SLIDER HITCH

ATV Log Arch and Holder

INSTALLATION INSTRUCTIONS MOUNTING KIT GENERAL MOTORS Chevrolet Silverado Sierra, GMC 3500HD; Silverado

Hi-Rise 18K 5TH WHEEL CONVERSION HITCH

Manual Chain Hoist. Owner s Manual

INSTALLATION INSTRUCTIONS MOUNTING KIT GENERAL MOTORS Chevrolet Silverado/GMC Sierra 2500HD & 3500HD

3000-Lb. Vehicle Positioning Jacks. Owner s Manual

Auto-Locking Pintle Hook

16 Inch Hanging Pendant Barn Light

2000 lb Adjustable Gantry Crane

2-Pack Indoor Simulated Dome Security Cameras

Transcription:

Installation Instructions CUSTOM QUICK INSTALL MOUNTING KIT 2011 & UP Ford Super Duty F-250/F-350/F-50 2011 & UP Part Number: 50073 WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers recommended vehicle towing capacity. READ ALL INSTRUCTIONS BEFORE STARTING THE INSTALLATION Custom Quick Install mounting brackets only include the hardware to attach the custom brackets to the frame.. 10 Bolt System: Instructions for 58058 or 30035 on pages 1-. Fasteners that are not identified are supplied with rail kit 58058. ** Bolt System: Instructions for 3012 or 30095 on pages 5-7. Fasteners that are not identified are supplied with rail kit 3012. *** 10 BOLT INSTALLATION All Fasteners Typical Both Sides Equipment Required: Fastener Kit: 50073F Wrenches: 3/, 7/8, 15/16, 15 mm, 18mm Drill Bits: 1/8, 9/16 Other Tools: Center Punch, Measuring Tape Vehicle Forward 8 Figure 1 2011 & UP shown 3 2 1 USE THIS HOLE ON PASSENGERS SIDE frame bracket Fasteners listed below are supplied with this kit, all other mentioned fasteners are supplied with part number 30035, 58058, 30095 or 3012. Item Description Quantity 1 SPACER 1/" x 1 1/2" x 2" 8 2 BOLT AND WASHER M1 X 5 3 NUT AND RETAINER M1 WASHER FLAT 1/" (See FIG. 1c) 2 5 NUT, NYLOK 1/"-20 (See FIG. 1c) 1 6 BOLT, HEX HEAD 1/"-20 x 1 1/" GRADE 2 (See FIG. 1c) 1 7 L-BRACKET (See FIG. 1c) 1 8 SPACER 1/" x 1 " x 3" 2 Sheet 1 of 7 50073N 11/30/15 Rev. C

Installation Instructions CUSTOM QUICK INSTALL MOUNTING KIT 2011 & UP Ford Super Duty F-250 / F-350 / F-50 Part Numbers: 50073 Do not install mounting rails over plastic bed liners. Plastic bed liners must be cut out of the way to provide metal to metal contact. Mounting rails may be installed on spray in liners. Use only bolts, nuts, and washers supplied to install this kit. All bolts and nuts are Grade 5 unless otherwise specified. These instructions are guidelines only, actual installation is the responsibility of the installer and the owner. Always measure truck and trailer before installing hitch to be sure that there is clearance at the cab and at the bumper to allow for turns. 5 6 Tube holder Figure 1a Inside of Installation Instructions Vapor tube Figure 1b Figure 1c 7 1. Lower and remove spare tire if extra room is needed. 2. On 2011 and up Gas Engine Vehicles Only. The vapor tube running along the inside of the driver s side must be relocated prior to installing the driver s side bracket. See Figure 1a. Remove the from the outside of the frame and keep for later use. See Figure 1b. Rotate the tubes up and out of the way. Install the L-bracket (7) with 1/ hardware ()(5)(6), as shown in Figure 1c. Tighten the L-bracket (7) to the frame, but leave the tube holder loose to aid bracket installation. 3. Place the rear mounting rail in the box of the truck. Using your tape measure, center the rail between the weld seams on the length of the truck box floor and the proper distance from the rear edge of the truck box as illustrated in Figure 6. See page 1 for mounting the brackets to the rails and brackets to the frame.. Mark and center punch the holes as per the illustration in Figure 6. Move the rail out of the way and drill each position with a 1/8 drill bit. Warning: When drilling holes be aware of potential risks to vehicle components, such as brake lines and fuel tanks, and make appropriate safe guards to protect them from damage. 5. Temporarily position the frame brackets on the outside of the frame and check that the 1/8 drilled holes align with the slots of the frame bracket. Remove the frame bracket from the vehicle. 6. Enlarge the 1/8 drilled holes to 9/16 with the step drill. Warning: When drilling holes be aware of potential risks, such as brake lines and fuel tanks, to vehicle components and make appropriate safe guards to protect them from damage. 7. Loosely install the frame brackets by aligning the brackets with holes in the frame. Insert M1 bolt and washer (2) into slots in the bracket and through the holes in the frame. Install the M1 nut with retainer (3) on the bolt. Snug the bolts. Do not tighten. 8. Reposition the mounting rail over the holes. 9. Install the 1/2 x 2 long carriage bolts with the U-shaped spacer to be located in the corrugation between the box and the rails. Note: The U-shaped spacer will have to be installed before inserting the 1/2" carriage bolts through the mounting rail and box floor. This insures a metal to metal contact. Attach the carriage bolts on the ends of the rails with spacers (1), conical washers, and nuts as per Figure 1, and tighten snug to keep the mounting rail from moving. Attach the carriage bolt in the middle with a spacer (8) oriented as shown in Figure 1. below the truck bed, a conical washer and nut. The spacer (8) may need to slide under the bedsill. Sheet 2 of 7 50073N 11/30/15 Rev. C

10. Place the unassembled fifth wheel saddles/slider/goose into the already installed mounting rail. Position the second mounting rail with the saddles/slider/goose by inserting the tabs into the mounting rail and pushing the mounting rail tight towards the other mounting rail. Ensure that the mounting rail is centered between the weld seams on the length of the truck box floor. This will position the mounting rail in the correct location and ensure that the fifth wheel will have a snug fit to the truck. NOTE: If more than one hitch product will be used with the rails then both should be used at the same time to align the second rail. This will ensure that one product does not compromise the fit of the other. 11. Repeat steps & 6 thru 9 for the front mounting rail. 12. Tighten the fasteners in the following sequence: 1) torque the mounting rails to the frame brackets, 2) torque the frame brackets to the truck frame. Torque all 1/2" Grade 5 hardware to 72 ft-lbs (98 N-m), M1-10.9 hardware to 18 ft-lbs (201 N-m). 13. On 2011 and up Gas Engine Vehicles Only. Use the factory that was removed in Step 2 to tighten the tube holder onto the L-bracket as shown in Figure 1c. 1. Reinstall spare tire if it was removed. Sheet 3 of 7 50073N 11/30/15 Rev. C

OPTION 1 DIMENSION SPECIFIC FOR RAIL KIT 58058 32-1/ CENTER BOLT LOCATIONS FRONT OF TRUCK Figure 6 Sheet of 7 50073N 11/30/15 Rev. C

INSTRUCTIONS WHEN USING THE 3012 RAIL KIT WITH THE 2011 & UP FORD SUPER DUTY F-250, F-350, F-50 HARDWARE Do not install AND INSTALLATION mounting rails over IS THE plastic SAME bed FOR liners. BOTH Plastic THE DRIVERS bed liners SIDE must AND be PASSENGERS cut out of the SIDE way to provide metal to metal contact. Mounting rails may be installed on spray in liners. Use only bolts, nuts, and washers supplied to install this kit. All bolts are Grade 5 and nuts are Grade 5 unless otherwise specified. These instructions are guidelines only, actual installation is the responsibility of the installer and the owner. Always measure truck and trailer before installing hitch to be sure that there is clearance at the cab and at the bumper to allow for turns. Equipment Required: Fastener Kit: 50073F Wrenches: 3/, 7/8, 15/16, 15 mm Drill Bits: 1/8, 11/16 Other Tools: Center Punch, Measuring Tape 5/8 CARRIAGE BOLT BOLT INSTALLATION Figure 7 Hardware and installation shown is the same for the passengers side. 1-1/ TUBE SPACER 5/16 SPACER RAIL FRONT OF TRUCK 5/8 CONICAL WASHER 2 3 5/8 NUT FRAME BRACKET D.S. USE THIS HOLE ON PASSENGERS SIDE 6 5 HARDWARE ITEMS LISTED ARE FROM PAGE 1 CHART Figure 7A Inside of Tube holder Vapor tube Figure 7B Figure 7C L-bracket Sheet 5 of 7 50073N 11/30/15 Rev. C

BOLT INSTALLATION Installation Instructions 1. Lower and remove spare tire if extra room is needed. 2. On 2011 and up Gas Engine Vehicles Only. The vapor tube running along the inside of the driver s side must be relocated prior to installing the driver s side bracket. See Figure 7a on the previous page. Remove the from the outside of the frame and keep for later use. See Figure 7b. Rotate the tubes up and out of the way. Install the L-bracket (7) with 1/ hardware()(5)(6), as shown in Figure 7c. Tighten the L-bracket (7) to the frame, but leave the tube holder loose to aid bracket installation. 3. Place the rear mounting rail in the box of the truck. Using your tape measure, center the rail between the weld seams on the length of the truck box floor and the proper distance from the rear edge of the truck box as illustrated in Figure 8. See page 1 for mounting the brackets to the rails and brackets to the frame.. Mark and center punch the holes as per the illustration in Figure 8. Move the rail out of the way and drill each position with a 1/8 drill bit. Warning: When drilling holes be aware of potential risks to vehicle components, such as brake lines and fuel tanks, and make appropriate safe guards to protect them from damage. 5. Temporarily position the frame brackets on the outside of the frame and check that the 1/8 drilled holes align with the slots of the frame bracket. Remove the frame bracket from the vehicle. 6. Enlarge the 1/8 drilled holes to 11/16 with the step drill. Warning: When drilling holes be aware of potential risks, such as brake lines and fuel tanks, to vehicle components and make appropriate safe guards to protect them from damage. 7. Loosely install the frame brackets by aligning the brackets with holes in the frame as shown on page 1. Snug the bolts. Do not tighten. 8. Reposition the mounting rail over the holes. 9. Place a 5/16 thick spacer between the bed and the rail if the drilled hole in the bed is in the bottom of the corrugation. If the hole is in the top of the corrugation, place the spacer between the bottom of the bed and the bracket below the bed. 10. Place the 1-1/ tube spacers under the rails. 11. Insert the 5/8 carriage bolts through the rails and holes in the bed as shown in figure 7. 12. Install 5/8 conical washers and 5/8 nuts on the bolts. Snug up the hardware. 13. Place the unassembled fifth wheel saddles/slider/goose into the already installed mounting rail. Position the second mounting rail with the saddles/slider/goose by inserting the tabs into the mounting rail and pushing the mounting rail tight towards the other mounting rail. Ensure that the mounting rail is centered between the weld seams on the length of the truck box floor. This will position the mounting rail in the correct location and ensure that the fifth wheel will have a snug fit to the truck. NOTE: If more than one hitch product will be used with the rails then both should be used at the same time to align the second rail. This will ensure that one product does not compromise the fit of the other. 1. Repeat steps thru 12 for the front mounting rail. 15. Tighten the fasteners in the following sequence: 1) torque the mounting rails to the frame brackets, 2) torque the frame brackets to the truck frame. M1-10.9 hardware to 18 ft-lbs (201 N-m), 5/8 Grade 5 hardware to 150 ft-lbs (20 N-m). 16. On 2011 and up Gas Engine Vehicles Only. Use the factory that was removed in Step 2 to tighten the tube holder onto the L-bracket as shown in Figure 1c. 17. Reinstall spare tire if it was removed. LIMITED LIFETIME WARRANTY Part No: Date of Original Purchase: Original Owner: Original Installer: 1. Limited Lifetime Warranty ( Warranty ). Cequent Performance Products, Inc. ("We" or Us ) warrants to the original consumer purchaser only ("You") that the product will be free from material defects in both material and workmanship, ordinary wear and tear excepted; provided that installation and use of the product is in accordance with product instructions. There are no other warranties, express or implied, including the warranty of merchantability or fitness for a particular purpose. This warranty is not transferable. 2. Limitations on the Warranty. This Warranty does not cover: (a) normal wear and tear; (b) damage through abuse, neglect, misuse, or as a result of any accident or in any other manner; (c) damage from misapplication, overloading, or improper installation; (d) improper maintenance and repair; and (e) product alteration in any manner by anyone other than Us, with the sole exception of alterations made pursuant to product instructions and in a workmanlike manner. 3. Obligations of Purchaser. To make a Warranty claim, contact Us, at our principal address of 7912 Halyard Dr. Suite 100, Plymouth, MI 8170, 1-888-521-0510, identify the product by model number, and follow the claim instructions that will be provided. Any returned product that is replaced by Us becomes our property. You will be responsible for return shipping costs. Please retain your purchase receipt to verify date of purchase and that You are the original consumer purchaser. The product and the purchase receipt must be provided to Us in order to process Your Warranty claim.. Remedy Limits. Product replacement is Your sole remedy under this Warranty. We shall not be liable for service or labor charges incurred in removing or replacing a product or any incidental or consequential damages of any kind. 5. Assumption of Risk. You acknowledge and agree that any use of the product for any purpose other than the specified use(s) stated in the product instructions is at Your own risk. 6. Governing Law. This Warranty gives You specific legal rights, and You also may have other rights which vary from state to state. This Warranty is governed by the laws of the State of Michigan, without regard to rules pertaining to conflicts of law. The state courts located in Oakland County, Michigan shall have exclusive jurisdiction for any disputes relating to this Warranty. 2010, 2015 Cequent Performance Products, Inc. - Printed in Mexico Sheet 6 of 7 50073N 11/30/15 Rev. C

OPTION 2 DIMENSIONS SPECIFIC FOR RAIL KIT 3012 30-1/8 Figure 8 2010, 2015 Cequent Performance Products, Inc. - Printed in Mexico Sheet 7 of 7 50073N 11/30/15 Rev. C