City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

Similar documents
EV Charging Station Submittal Requirements

Permitting, Installation and Inspection Residential EV Chargers Be aware that there are different types of Electric Vehicle (EV) Chargers.

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT

City of Perris Development Services Building & Safety

RESIDENTIAL GUIDELINE FOR ELECTRICAL VEHICLE (EV) CHARGER INSTALLATION

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

City of Palo Alto (ID # 8028) City Council Staff Report

Expedited Permitting Process for Electric Vehicle Charging Stations

Electric Vehicle Charging System Guidelines for Residential Buildings

CHAPTER V RESIDENTIAL WIRING

ELECTRIC VEHICLE CHARGING FOR BUILDINGS

Title 24: Building Codes for Plug-in Electric Vehicles September 22, 2015 Webinar Questions

Spring Test 10 due 05/11/2013

Burnaby Electric Vehicle (EV) Charging Infrastructure Technical Bulletin Requirements and Guidelines for EV Charging Bylaw

Spring Test 7 due 05/03/2013

City of Manhattan Beach Community Development

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

City of Manhattan Beach Community Development

ADVANCED CALCULATIONS

2016 California Green Building Standards Code (CALGreen)

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

G R E E N B U I L D I N G R E A C H C O D E U P D A T E S

Application for Service Residential Subdivision / Development

Residential and Non-Residential Checklist for Permitting Electric Vehicles and Electric Vehicle Service Equipment (EVSE)

ORDINANCE NO WHEREAS, the City Council wishes to advance the use of electric vehicles; and

Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast

Technical Support for Electric Vehicle Charging Requirements in the Building Code that are in effect January 1, 2018

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

EV Charging Stations: Permitting and Inspection

Data Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT?

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

CITY COUNCIL OF THE CITY OF NOVATO ORDINANCE NO. 1620

Electric Vehicle Appendix Notes

Electrical Tech Note 106

City of San Juan Capistrano Agenda Repo_rt

Residential Photovoltaic (PV) Packet

Managing Electric Vehicle Supply Equipment (EVSE) Installations

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

A Look at the 2017 NEC Significant Changes

Technical Support for Electric Vehicle Charging Requirements in the Building Code that are in effect January 1, 2018

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

D. Operation and Maintenance Data. In addition to items specified in Division 1 Section "Operation and Maintenance Data," include the following:

Chapter CALIFORNIA GREEN BUILDING STANDARDS CODE. Palo Alto Municipal Code

Electrical Equipment and Terminology

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

Solar Power Installation Application

INSTALLATION AND OPERATING INSTRUCTIONS

Photovoltaic Solar Plan Review

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

Solar PV Standard Electrical Plan

1 [Building Code - Electric Vehicle Charging Stations - Expedited Permit Process]

TRANSMITTAL THE COUNCIL SEP THE MAYOR TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED. ERIC GARCET Mayor.

Electric Plug-In Vehicle/Electric Vehicle Status Report

2016 Photovoltaic Solar System Plan Review List

ERIC S. CASHER, CITY ATTORNEY WINSTON RHODES, AICP, PLANNING MANAGER

Solar PV Standard Electric Plan

ENGINEERING SPECIFICATION

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

Chapter 2 Wiring and Protection Article 200 Use and Identification of Grounded Neutral Conductor Chapter 1 General...9

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

mandates, including the California Governor's Executive Order S calling for an 80 percent

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

The City Council will consider new policies regulating Electric Vehicle (EV) readiness for new construction in the City of West Hollywood.

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

ELIGIBILITY CHECKLIST FOR EXPEDITED SOLAR POOL HEATING PERMITTING

Circuit Concepts (Residential)

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Electric Vehicle Charging Station Installation Best Practices: A Guide for San Diego Region Local Governments and Contractors

Instruction Manual. Blink HQ Charger. Charge on. a CarCharging Company

City of San Juan Capistrano Agenda Report

Line Gard. Underwriters Laboratories (UL) Applicable Code Notation

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

Electrical Tech Note 105 Agricultural Engineering Department Michigan State University

Installation and Construction Notes for EVSE4

Non-Residential Solar Energy Photovoltaic (PV) Packet

CHAPTER 7 ELECTRIC VEHICLE CHARGING FACILITIES

Bulletin Engineering Department 6911 No. 3 Road, Richmond, BC V6Y 2C1

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

California Department of Housing and Community Development (HCD) 2016 CALGreen

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

BUILDING PERMIT FEES BUILDING VALUATION DATA

Electrical Safety Program

Standby Electric Generators for Alaskan Residences. Advice & Installation

STREAMLINED SOLAR CHECKLIST Owner Name:

Applicant and Site Information Job Address: Permit #:

TERMS AND CONDITIONS

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

Have You Been Grounded Lately

The Council of the City of Palo Alto does ORDAIN as follows:

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Approved Meter Sockets and Cabinets

Transcription:

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA 94596 (925) 943-5834 phone (925) 256-3500 fax Issued September 30, 2017 Policy Bulletin No. PB-72 Background Residential Electric Vehicle (EV) Charger Guidelines The increased use of electric vehicles will greatly help reduce air pollutants to meet State and Federal emission targets. Efficient permitting and inspection for electric vehicle (EV) chargers will help encourage the use of electrical vehicles in California. The purpose of this guideline is to assist permit applicants in streamlining the permitting, installation and inspection process for the EV chargers installed inside private garages or carports of residential properties (single family, duplex, and townhouse). Definitions and Acronyms AC = Alternating Current, DC = Direct Current, HOA = Home Owners Association. Vehicle Charger = A device that converts household AC power to DC power and regulates the charging of the PEV batteries. Electronic Vehicle Service Equipment (EVSE) = This is the equipment that is installed between a source of electricity and the electric vehicle connection. PEV = A vehicle that either runs entirely on electricity, or a combination of electricity and another source of fuel (Plug-in Electric Vehicle). Level 1 EV chargers are smaller units (like a golf cart) that plug directly into a standard 120 volt receptacle outlet. These types of chargers typically require a longer period of time to recharge the vehicle. This method, which allows broad access to charge a PEV, permits plugging into a common, grounded 120 volt electrical receptacle (NEMA 5-15R or 5-20R). The maximum load on this receptacle is 12 amperes or 1.4 kva. The minimum circuit and overcurrent rating for this connection is 15 amperes for a 15- ampere receptacle and 20 amperes for a 20 ampere receptacle. Level 2 EV chargers require a 240 volt electrical circuit and charge the vehicle battery much faster than a Level 1 charger. This level is the primary and preferred method of EV charging at both private and public facilities. It requires special equipment and connection to an electric power supply dedicated to EV charging. The voltage of this connection is either 240 volts or 208 volts. The maximum load is 32 amperes (7.7 kva at 240 volts or Policy Bulletin No. PB-72 Page 1 of 6 Last Revised 11/1/17

6.7 kva at 208 volts). The minimum circuit and overcurrent rating for this connection is 40 amperes (32 x1.25 = 40 amperes). Electric vehicles are treated as continuous loads. Level 3 charger uses high-speed, high- power method which will charge an EV in about the same time it takes to refuel a conventional vehicle. Because of individual supply and available source voltages, exact voltage and load specifications for Level 3 charging have not been defined as Level 1 and Level 2. These power requirements are specified by the equipment. Permit Information 1. An electrical permit is required for the installation of an EV charger, charger receptacle outlet and branch circuit. The permit may be exempted where the EV charger will utilize an existing receptacle outlet without any modification of the existing circuit. 2. All work must comply with the 2016 California Residential Code (CRC), 2016 California Electrical Code (CEC), 2016 California Green Building Standards Code (CalGreen), and Walnut Creek Municipal Code (WCMC). 3. When the permit application is prepared according to the permit submittal requirements listed below, the review and approval will be performed over-the-counter or within a day or two depending upon workloads and staffing levels at the time of submittal. 4. The permit application can be submitted in person or by fax-back. Instructions of fax-back permitting can be found on City s website: http://www.walnut-creek.org/departmentservices/community-and-economic- development/building-division/contractor-s-fax-back-permitting 5. Where an EV charger is installed on a property governed by a Home Owner s Association (HOA), the applicant is recommended to consult with HOA prior to permit application submittal. Permit Submittal Requirements Please provide the following documents at application submittal: 1. Provide a completed building permit application. 2. Provide three sets of dimensioned site plans showing the location of new EV charger(s), scope of work, property address, and line diagram with existing and new electrical equipment identified. 3. Provide electrical load calculation for Level 2 or above charger(s) by using the worksheet included with this document. Note: Dedicated branch circuits from the central meter distribution panel to the charging station may be required. 4. Manufacturer s specifications and installation instructions shall be included as part of permit application documents 5. Electrical equipment exposed to weather shall be listed for such use. Policy Bulletin No. PB-72 Page 2 of 6 Last Revised 11/1/17

LEVEL 2 ELECTRIC VEHICLE CHARGER - SERVICE LOAD CALCULATION INSTRUCTIONS: Review the list of electrical loads in the table below and check (v) all that exist in your home (don t forget to include the proposed Level 2 EV Charger). For each item checked (v), fill-in the corresponding Watts used (refer to the Typical usage column for wattage information). Add up all of the numbers that are written in the Watts Used column and write that number in the TOTAL WATTS USED box at the bottom of the table, then go to the next page to determine if your existing electric service will accommodate the new loads. (Loads shown are rough estimates; actual loads may vary for a more precise analysis, use the nameplate ratings for appliances and other loads and consult with a trained electrical professional.) (v) Check All Applicable Loads Description of Load Typical usage Watts used GENERAL LIGHTING AND RECEPTACLE OUTLET CIRCUITS Multiply the Square Footage of House X 3 3 watts/sq. ft. KITCHEN CIRCUITS Kitchen Circuits 3,000 watts 3,000 Electric Oven 2,000 watts Electric Stove Top 5,000 watts Microwave 1,500 watts Garbage Disposal under Kitchen 1,000 watts Sink Automatic Dish W asher 3,500 watts Garbage Compactor 1,000 watts Instantaneous Hot W ater at Sink 1,500 watts LAUNDRY CIRCUIT Laundry Circuit 1,500 watts 1,500 Electric Clothes Dryer 4,500 watts HEATING AND AIR CONDITIONING CIRCUITS Central Heating (gas) and Air 6,000 watts Conditioning Window Mounted AC 1,000 watts Whole-house or Attic Fan 500 watts Central Electric Furnace 8,000 watts Evaporative Cooler 500 watts OTHER ELECTRICAL LOADS Electric W ater Heater (Storage 4,000 watts type) Electric Tankless Water Heater 15,000 watts Swimming Pool or Spa 3,500 watts Other: (describe) watts Other: watts Other: watts ELECTRIC VEHICLE CHARGER CIRCUIT Level 2 Electric Vehicle Charger Wattage Rating* (Add-up all of the watts for the loads you have checked) TOTALWATTSUSED-+ *Use name plate rating in watts or calculate as: (Ampere rating of circuit X 240 volts = Watts) Policy Bulletin No. PB-72 Page 3 of 6 Last Revised 11/1/17

INSTRUCTIONS: Using the TOTAL WATTS USED number from the previous page, check the appropriate line in column 1 and follow that line across to determine the minimum required size of the electrical service panel shown in column 3. In column 4, write-in the size of your existing service panel (main breaker size). If your Existing service panel (column 4) is smaller than the minimum required size of the existing service (column 3), then you will need to install a new upgraded electrical service panel to handle the added electrical load from the proposed Level 2 EV Charger. Table based on CEC 220.83(A), 230.42, and Annex D. 1 2 3 4 (v) Check the appropriate line Total Watts Used (from previous page) Minimum Required Size of Existing 240 Volt Electrical Service Panel (Main Service Breaker Size) up to 48,000 100 amps 48,001 to 63,000 125 amps 63,001 to 78,000 150 amps 78,001 to 108,000 200 amps 108,001 to 123,000 225 amps Identify the Size of Your Existing Main Service Breaker (Amps)** **Please note that the size of your Existing service (column 4) MUST be equal to or larger than the Minimum Required Size (column 3) or a new larger electrical service panel will need to be installed in order to satisfy the electrical load demand of the EV charger. STATEMENT OF COMPLIANCE Main Electric Service Upgrade Required ( )YES ( )NO By my signature, I attest that the information provided is true and accurate. Job Address: Signature: (Signature of applicant) (Print job address) (Date) In addition to this document, you will also need to provide a copy of the manufacturer s installation literature and specifications for the Level 2 charger you are installing. NOTE: This Statement of Compliance form is a voluntary compliance worksheet for general residential compliance only! You may wish to hire a qualified individual or company to perform a thorough evaluation of your existing electrical service capacity in lieu of using this worksheet. Use of this electrical load calculation estimate worksheet is at the user s risk and carries no implied guarantee or warranty. Users of this load calculation methodology and these forms are advised to seek professional assistance in determining the electrical capacity of a service panel. Policy Bulletin No. PB-72 Page 4 of 6 Last Revised 11/1/17

GENERAL INSTALLATION GUIDELINES FOR LEVEL 2 RESIDENTIAL EV CHARGERS All Electrical Vehicle Charging Systems shall comply with all applicable sections of the California Electrical Code, including Article 625. EQUIPMENT HEIGHT - The coupling means of the Electric Vehicle Supply Equipment shall be stored at a height of at least 18 inches above the finished floor level for indoor locations and at least 24 inches above grade level for outdoor locations. CEC 625.50. LISTED EQUIPMENT - All Electric Vehicle Supply Equipment shall be listed by a nationally recognized testing lab like Underwriters Laboratory (UL). MARKINGS - Level 2 Electric Vehicle Supply Equipment shall comply with CEC 625.15 (A) and (B) or (C). (A) "FOR USE WITH ELECTRIC VEHICLES" and (B) "VENTILATION NOT REQUIRED" or (C) "VENTILATION REQUIRED". PROTECTION FROM PHYSICAL DAMAGE - Electrical Vehicle Supply Equipment shall be protected against vehicle impact damage when located in the path of a vehicle. In order to avoid the installation of a substantial pipe bollard as an equipment guard, locate the Electrical Vehicle Supply Equipment on a garage side wall, out of vehicular path. (see sample drawing below) CEC 110.27(B) IF MORE THAN 60 AMPS- W hen EV charging equipment is rated at more than 60 amps, the disconnect means shall be provided and installed in a readily accessible location (CEC 625.42) and shall be capable of being locked on the open position (CEC 110.25) EXAMPLE ONLY NEW 40 AMP RATED LEVEL 2 ELECTRIC VEHICLE CHARGER SECURED IN PLACE NEW 3/4 CONDUIT WITH #10 CONDUCTORS PER CALIFORNIA ELECTRICAL CODE NEW 40 AMP CIRCUIT BREAKER INSTALLED IN THE EXISTING ELECTRIC METER PANEL INSTALLATION OF A NEW 40 AMP CIRCUIT FOR A LEVEL 2 ELECTRIC VEHICLE CHARGER PER MANUFACTURER S INSTALLATION INSTRUCTIONS CALIFORNIA GREEN BUILDING STANDARDS CODE, AND CALIFORNIA ELECTRICAL CODE VEHICLE BATTERIES LISTED AS SUITABLE FOR CHARGING INDOORS WITHOUT VENTILATION. MINIMUM SERVICE PANEL SIZE TO BE IN ACCORDANCE WITH THE EV CHARGER GUIDELINES. Policy Bulletin No. PB-72 Page 5 of 6 Last Revised 11/1/17

OTHER HELPFUL INFORMATION FOR EV CHARGER INSTALLATIONS: The Table below illustrates the type and size of conductor and conduit to be used for various Electric Vehicle Charger circuits. Size of Required Type and Size*** Rigid EV Charger minimum size Electrical Nonmetallic Flexible Metal Circuit Breaker of Conductors Metallic Tubing (THHN Wire) Copper (EMT) Schedule 40 (RNC) (FMC) 20 amp #12 1/2 1/2 1/2 30 amp #10 1/2 1/2 1/2 40 amp #8 3/4 3/4 3/4 50 amp #8 3/4 3/4 3/4 60 amp #6 3/4 3/4 3/4 70 amp #4 1 1 1 ***Based on 4 THHN wires in the conduit (2-current carrying conductors, 1- grounded conductor, 1-equipment ground). NOTE: New construction shall provide minimum 1" raceway per CEC 625.1.1 and CAL-GREEN 4.106.4.1 for future use and shall be clearly marked "EV CAPABLE". The Table below illustrates the required supports for various types of electrical conduit or cable. Support Support Interval Maximum Distance from Box to Support Electrical Metallic Tubing (EMT) Rigid Nonmetallic Schedule 40 (RNC) Flexible Metal (FMC) Nonmetallic Sheathed Cable (NMC) 10 3 4-1/2 4-1/2 3 3 1 1 In addition to the above noted requirements, the California Electrical Code contains many other provisions that may be applicable to the installation of a new electrical circuit. Installers are cautioned to be aware of all applicable requirements before beginning the installation. For additional information or guidance, consult with the Building Division staff or a qualified and experienced Licensed Electrical Contractor. Policy Bulletin No. PB-72 Page 6 of 6 Last Revised 11/1/17