American Recovery and Reinvestment Act of 2009 New Mexico Department of Transportation 1511 Certification Attachment 4-23-09 CN Route, Location, Description Dist Eng s Est Bid Date Stimulus ESG4034 US 64 Raton to Clayton MP 378-390 4 30.0 May-09 30.0 ESG5b66 US 491 Tohatchi to Shiprock MP 59-67 6 31.2 May-09 31.2 ESG18a2 I-10, Texas State Line west MP 144-164 1 50.0 May-09 10.0
$1.1 M El Paso MPO District 1 Stimulus Funds 1 TPE 1 Elephant Butte Dona Ana Enhancement project NM 195 landscaping and mulituse trail $ 100,000 $ 100,000 NMDOT (for 2 TPE 1 Anthony) Dona Ana NM460/NM478 landscaping roundabout to Acosta $ 250,000 $ 250,000 3 TPE 1 Sunland Park Dona Ana Bus shelters/waste receptacles Variuos locations $ 71,000 $ 71,000 total $ 421,000 $ 421,000 $ - 4 TPM 1 Bayard Grant NM 356 Roadway Improvements NM 356 $ 350,000 $ 350,000 6 TPM 1 Hurley Grant Diaz Ave Roadway Improvements End of Street / Cul du sac/east St. $ 390,000 $ 390,000 7 TPM 1 Lordsburg Hidalgo 8 TPM 1 Mesilla, Town of Dona Ana Calle del Norte NM 494 (Motel Blvd) Roadway Improvements TBD $ 400,000 $ 400,000 Mill and Overlay total project cost $1,100,000 project also on TPO list $ 500,000 $ 500,000 total $ 1,640,000 $ 1,640,000 $ - 9 TPO 1 Deming Luna Spruce Street Reconstruction Reconstruction including sidewalk $ 850,000 $ 850,000 11 TPO 1 Las Cruces Dona Ana Del Rey Blvd/SandHill Arroyo Crossing Arroyo Crossing - Bridge $ 2,000,000 $ 2,000,000 12 TPO 1 Silver City Grant Mill and Overlay of 12th Street three phases $ 600,000 $ 600,000 13 TPO 1 Socorro Socorro California StreetRoadway Improvements End of California at I-25 $ 864,000 $ 864,000 14 TPO 1 T or C Sierra US85 Overlay Stateroute through Downtown $ 700,000 $ 700,000 total $ 5,014,000 $ 3,014,000 $ 2,000,000 16 TPU 1 NMDOT Dona Ana NM 213 Road Improvements Pavement Preservation $ 1,097,329 $ 1,097,329 total $ 1,097,329 $ - $ 1,097,329 District Target $11,022,329 Total $ 8,172,329 $ 5,075,000 $ 3,097,329 updated 4-23-09 Note: TPU funds are not at DOT Discretion. Funds go directly to the MPO area. Total funds $1.1 Million 1
District 2 Stimulus Funds 17 TPE 2 Alagordo Otero Sidewalks ADA corridors city wide Installation of sidwalks and ADA compliant corner ramps, driveway and alley aprons city wide to provide defined accessible corridors throughout the city. $ 249,747 $ 249,747 18 TPE 2 Cloudcroft Otero Mexican Canyon Trestle (MCT) Stabilization Existing contract will complete a structural evaluation, preservation of sound timbers, and replacement of decayed/missing timbers in bents 1-5. $ 249,747 $ 249,747 19 TPE 2 Eunice Lea 20 TPE 2 Hobbs Lea Downtown Enhancement/Beautification NM 18 Multi-Use Trail Project & Roadway Enhancement Surface Rehabilitation, Lighting, Crosswalks, Landscaping, Etc. $ 249,747 $ 249,747 10 foot wide concrete multi-use trail along NM 18 (Lovington Highway) along with landscaping, small shrubs and trees, pedestrian lighting and ADA intersection improvements. $ 249,747 $ 249,747 21 TPE 2 Portales Roosevelt US 70 $ 249,747 $ 249,747 25 TPO 2 Alagordo Otero 9th Street Bridge ( Rebuild ) Roadway and Drainage Reconstruction, Principal 27 TPO 2 Carlsbad Eddy Arterial total $ 1,248,735 $ 1,248,735 $ - Reval and replacement of bridge on 9th and Washington deemed unsafe for vehicular traffic by NMDOT. $ 150,000 $ 150,000 (US285) to Moore Drive including rehab of existing concrete pavement, rehab of curb and gutter and sidewalk, upgrade $ 831,489 $ 831,489 28 TPO 2 Chaves County Chaves Chaves County Pavement Preservation Project Roads included are E. Brasher Road (C1-184) from Southeast Main Street (US 285) to the Old Dexter Highway (NM 256), Red Bridge Road (C1-106) from US 380 to 19th Street, 19th Street (C1-125) from Red Bridge Road to Fowler Road, Fowler Road (C1-123) from 19 $ 830,000 $ 830,000 updated 4-23-09 2
District 2 31 TPO 2 Lea County Lea Carlsbad to Eunice By-Pass 32 TPO 2 Lovington Lea Ninth Street West Brasher Road 34 TPO 2 Roswell Chaves Reclamation Stimulus Funds Mill entire road; check sub-base; relay the road; and add 4 inches of asphalt. $ 831,489 $ 831,489 Ninth Street -- Completion of the Municipal Arterial Street $ 831,489 $ 831,489 roadway pavement and base course. New 4" PMBP overlay. $ 831,489 $ 831,489 35 TPO 2 Ruidoso Lincoln Resurface Paradise Canyon 2" overlay on Paradise Canyon with use of heater scarify/remix and resurface asphalt pavement. 11,500' x 23'. $ 352,651 $ 352,651 total $ 4,658,607 $ 2,995,629 $ 1,662,978 District Target $11,146,023 total $ 5,907,342 $ 4,244,364 $ 1,662,978 updated 4-23-09 3
$24.9 M Albuquerque District 3 Stimulus Funds Town of 36 TPE 3 Bernalillo Sandoval NM 529 Southern to US 550* Lighting Project along NM 528 $ 1,348,848 $ 1,348,848 total $ 1,348,848 $ - $ 1,348,848 38 TPM 3 Bosque Farms Valencia Bosque Loop Rd NM47 to NM47 $ 63,000 $ 63,000 total $ 63,000 $ 63,000 $ - 43 TPO 3 Los Lunas Valencia 44 TPO 3 Los Lunas Valencia 45 TPU 3 Albuquerque Bernalillo New Street Connection south of Courthouse Road Los Lunas Railroad Crossings I-40 Trail Crossing at the Rio Grande 46 TPU 3 Albuquerque Bernalillo ITS-Albuquerque Traffic Management System Bernalillo, Town 47 TPU 3 of Sandoval Camino Don Tomas 48 TPU 3 Rio Rancho Sandoval New Street from Rail Runner Station to Los Lentes asidentified in MRCOG TOD $ 1,092,715 $ 1,092,715 NM 314 at Otero Road; NM 314 at Daniel Fernandez Park; Construct at-grade crossings; identified as a safety need $ 1,092,715 $ 1,092,715 total $ 2,185,430 $ - $ 2,185,430 Construct bikeway/trail bridge over the Rio Grande $ 5,358,782 $ 5,358,782 Replace traffic signal controllers, communications, camera nitoring, other ITS $ 2,651,176 $ 2,651,176 Add/Improve Sidewalks. Add center double left turn lanes & add deceleration $ 2,914,579 $ 2,914,579 Paseo del Volcan (NE Section) Stage II Construct New 2 lane Roadway $ 14,000,000 $ 14,000,000 total $ 24,924,537 $ 24,924,537 $ - District Target $36,837,537 Total $ 28,521,815 $ 24,987,537 $ 3,534,278 updated 4-23-09 Note: TPU Funds are not at DOT DIscretion. Funds go directly to MPO area. Total Funds $24.9 M 4
District 4 US 64 Trail and Interpretive 49 TPE 4 Cimarron Colfax Sites Stimulus Funds Cimarron. Construction of Multi-Use Path with Interpretive Sites, etc. Project with $ 125,000 $ 125,000 Let Date 4-6 50 TPE 4 Las Vegas/ San Miguel County San Miguel Gallinas Riverwalk - Bicycle/Pedestrian Path Construction of bicycle/pedestrian path from Mills Avenue to the United World College (Approx. 5.15 miles). This trail will tie into the existing Gallinas Rvierwalk from Mills Ave. to Jackson Street. Total Cost $3,115,000 $ 937,015 $ 937,015 total $ 1,062,015 $ 1,062,015 51 TPM 4 Angel Fire Colfax North Angel Fire Road Pavement Resurfacing $ 762,000 $ 762,000 Guadalu Eddy Street - on 8th Street for 850 Feet 52 TPM 4 Santa Rosa pe 8th Street to NM91 and on Eddy Street for 630 Feet. $ 673,350 $ 673,350 53 TPO 4 Las Vegas San Miguel Mills Ave. (FL 4560) Roadway Improvements (Pavement Rehabilitation) Repave 1.47 miles on Mills Avenue in total Las $ 1,435,350 $ 1,435,350 Vegas, New Mexico between Grand Avenue (State Road 85) and New Mexico Avenue (State Road 329), to include milling of shoulders and striping. Total $ 1,946,300 $ 1,946,300 54 TPO 4 Raton Colfax 55 TPO 4 Raton Colfax 56 TPO 4 Tucumcari Quay I-25 Business Loop (L0017) Pavement Preservation Surface Treatment of PCCP Pavement. $ 1,000,000 $ 1,000,000 US 64/87 Pavement Preservation 2nd Street Road Improvements US 64/87, Tiger Drive to Exit 452. Pavmenent Preservation. $ 600,000 $ 600,000 City of Tucumcari 2nd Street from Tucumcari (Business 40) on the north and Charles Street on the south; including the first 150 feet of each cross street. $ 1,785,000 $ 1,785,000 total $ 5,331,300 $ 5,331,300 District Target $7,828,665 total $ 7,828,665 $ 7,828,665 updated 4-23-09 5
District 5 Stimulus Funds 57 TPE 5 Santa Fe Santa Fe Rodeo Road Median Landscaping Santa Fe 58 TPE 5 County Santa Fe Santa Fe Rail Trail ppy g p g y installed and existing medians on Rodeo Road from Galisteo St. to Camino Carlos $ 150,000 $ 150,000 Construct a paved multi use trail from I-25 to Rabbit Road $ 100,000 $ 100,000 total $ 250,000 $ 250,000 59 TPO 5 Aztec San Juan East Arterial Construction of a north/south route intersecting with US550 on the south and NM173 including improvements to NM173 and the intersection of US550 and NM173. $ 1,700,000 $ 1,700,000 60 TPO 5 Bloomfield San Juan West Maple St Reconstruction 61 TPO 5 Espanola Rio Arriba Industrial Park Road Reconstruction of approximately 1, 630 feet of roadway, starting at US 550 and heading west, subsurface utilities $ 900,000 $ 900,000 Added lanes, drainage, pedestrian facilities, access management $ 1,250,000 $ 1,250,000 62 TPO 5 Farmington San Juan Wildflower Parkway from Browning Parkway(NM 516) to Wildflower Mesa Roadway Widening Project $ 1,000,000 $ 1,000,000 Los Alas 63 TPO 5 County Los Alas Diand Drive Phase 3 San Juan 64 TPO 5 County San Juan Bridge #8116 on CR 2900 65 TPO 5 Santa Fe Santa Fe Airport Road Request was $5.759,876, lower aunt recommended by D5 $ 1,962,217 $ 1,962,217 The current bridge is in need of replacement due to a failing deck and severe corrosion of all steel elements. $ 1,000,000 $ 1,000,000 Safety Improvements Cerrillos Road to San Felipe Road $ 2,000,000 $ 2,000,000 total $ 9,812,217 $ 5,812,217 $ 4,000,000 District Target $10,062,217 Total $ 10,062,217 $ 5,812,217 $ 4,250,000 updated 4-23-09 6
District 6 66 TPE 6 Reserve Catron 67 TPM 6 Acoma Pueblo Cibola SP 36 half mile extension 68 TPM 6 69 TPM 6 Stimulus Funds Downtown Rehabilitation (Mainstreets) Road improvements along Main Street $ 1,033,609 $ 1,033,609 total g $ 1,033,609 $ 1,033,609 0 (Total Cost $5,225,000 ARRA to supplement GRIP 2 $4,387,538) $ 1,200,000 $ 1,200,000 Sandoval County Sandoval County Road 13 Bridge 8053 Rio Puerco $ 270,000 $ 270,000 Sandoval County Sandoval Horseshoe Springs Bridge 6056 San Antonio creek $ 198,000 $ 198,000 70 TPM 6 Zuni Pueblo McKinley Z-4(3)1, 2&4 Gallup Cut-Off Bridge widening (184 feet) $ 736,582 $ 736,582 total $ 2,404,582 $ 1,204,582 $ 1,200,000 71 TPO 6 Gallup McKinley Clay Street Bridge Construction Prj 72 TPO 6 Grants Cibola Nimitz Bridge Replace existing 5-ton load limit, railroad flatcar bridge with a new bridge structure that can carry school buses and other heavy commercial vehicles. $ 2,100,000 $ 2,100,000 Single Span 2-Lane Bridge over the Rio San Jose. $ 800,000 $ 800,000 total $ 2,900,000 $ 800,000 $ 2,100,000 District Target $6,338,191 Total $ 6,338,191 $ 3,038,191 $ 3,300,000 updated 4-23-09 7