American Recovery and Reinvestment Act of 2009 New Mexico Department of Transportation 1511 Certification Attachment

Similar documents
CHLAMYDIA CASES IN NEW MEXICO - BY YEAR, COUNTY AND RACE/ETHNICITY, Non- Hispanic Black Hispanic. Non- Hispanic White

New Mexico DWI Report 2014

New Mexico DWI Report 2012

NEW MEXICO TRAFFIC CRASH INFORMATION

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

New Mexico DWI Report 2016

Rural Planning. Highway Projects - CULLMAN COUNTY

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6

New Mexico DWI Report 2015

New Mexico DWI Report 2013

New Mexico Motorcycle. Crash Data. Safety Program Committee Meeting

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

Transportation Improvement Program (TIP) Candidate Project List for Public Review

NON-DFA EMPLOYER NUMBERS Div. Agency Dept. New#

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

New Mexico Transmission System Overview TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE

IMPROVEMENT CONCEPTS

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

Public Works. Capital Projects FY

PUBLIC INFRASTRUCTURE PROJECTS

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

Population Trends. US 12 Corridor Performance

Chapter 7: Corridor Visions

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

Develop ground transportation improvements to make the Airport a multi-modal regional

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

Revised Evaluation Scores. System Preservation

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

EXCEPTION TO STANDARDS REPORT

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

Wentzville Parkway South Phase 2 & 2A

State Avenue Corridor Bus Rapid Transit (BRT)

Capital Improvement Plan

The range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2015 Capital Improvement Plan

Dixie Transportation Planning Office

SCHEDULE OF CAPITAL PROJECTS BY FUND

US 10 Corridor Performance

Mobility Corridor Updates. Transit & Active Transportation Projects

Riverside County Transportation Department Summary of Bids

FREQUENTLY ASKED QUESTIONS

Current Corridor Characteristics. MN 62 Corridor Performance

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

Williamson County Projects

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

FY Projects

Recommended Transportation. Capital Improvement Program

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

City of San Juan Capistrano Agenda Report

Metro Highway Program

Traffic Engineering Study

FREQUENTLY ASKED QUESTIONS

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

South Dakota Transportation Improvement Program Economic Stimulus Package ( AND STIPs) Report Date 09/26/2011

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

Richmond Area MPO Regional Priority Transportation Projects

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Welcome. Please Sign In

800 Access Control, R/W Use Permits and Drive Design

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

ALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002

City of University Place

LIHTC Properties in New Mexico through 2015

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

Kentucky Highway District 6

Northeast Pavement Preservation Partnership Burlington, Vermont. Rhode Island DOT

ACTION TRANSMITTAL No

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

2040 Metropolitan Transportation Plan -- Table XVII-1

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

Public Works Right of Way Permit Application

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

I-394 Corridor Performance

Committee Report. Transportation Committee. Business Item No

Mobility Corridor Updates. Transit & Active Transportation Projects

Summary of the Alcoa Highway Redevelopment Project

TITLE VII: TRAFFIC CODE 70. GENERAL PROVISIONS 71. TRAFFIC REGULATIONS 72. PARKING REGULATIONS 73. TRAFFIC SCHEDULES 74.

Danger CAUTION - RR tracks (2 sets) Food SERVICES - Quik Mart on left

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

SC Highway 41 Existing Conditions

IH 35 FEASIBILITY STUDY

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

Transcription:

American Recovery and Reinvestment Act of 2009 New Mexico Department of Transportation 1511 Certification Attachment 4-23-09 CN Route, Location, Description Dist Eng s Est Bid Date Stimulus ESG4034 US 64 Raton to Clayton MP 378-390 4 30.0 May-09 30.0 ESG5b66 US 491 Tohatchi to Shiprock MP 59-67 6 31.2 May-09 31.2 ESG18a2 I-10, Texas State Line west MP 144-164 1 50.0 May-09 10.0

$1.1 M El Paso MPO District 1 Stimulus Funds 1 TPE 1 Elephant Butte Dona Ana Enhancement project NM 195 landscaping and mulituse trail $ 100,000 $ 100,000 NMDOT (for 2 TPE 1 Anthony) Dona Ana NM460/NM478 landscaping roundabout to Acosta $ 250,000 $ 250,000 3 TPE 1 Sunland Park Dona Ana Bus shelters/waste receptacles Variuos locations $ 71,000 $ 71,000 total $ 421,000 $ 421,000 $ - 4 TPM 1 Bayard Grant NM 356 Roadway Improvements NM 356 $ 350,000 $ 350,000 6 TPM 1 Hurley Grant Diaz Ave Roadway Improvements End of Street / Cul du sac/east St. $ 390,000 $ 390,000 7 TPM 1 Lordsburg Hidalgo 8 TPM 1 Mesilla, Town of Dona Ana Calle del Norte NM 494 (Motel Blvd) Roadway Improvements TBD $ 400,000 $ 400,000 Mill and Overlay total project cost $1,100,000 project also on TPO list $ 500,000 $ 500,000 total $ 1,640,000 $ 1,640,000 $ - 9 TPO 1 Deming Luna Spruce Street Reconstruction Reconstruction including sidewalk $ 850,000 $ 850,000 11 TPO 1 Las Cruces Dona Ana Del Rey Blvd/SandHill Arroyo Crossing Arroyo Crossing - Bridge $ 2,000,000 $ 2,000,000 12 TPO 1 Silver City Grant Mill and Overlay of 12th Street three phases $ 600,000 $ 600,000 13 TPO 1 Socorro Socorro California StreetRoadway Improvements End of California at I-25 $ 864,000 $ 864,000 14 TPO 1 T or C Sierra US85 Overlay Stateroute through Downtown $ 700,000 $ 700,000 total $ 5,014,000 $ 3,014,000 $ 2,000,000 16 TPU 1 NMDOT Dona Ana NM 213 Road Improvements Pavement Preservation $ 1,097,329 $ 1,097,329 total $ 1,097,329 $ - $ 1,097,329 District Target $11,022,329 Total $ 8,172,329 $ 5,075,000 $ 3,097,329 updated 4-23-09 Note: TPU funds are not at DOT Discretion. Funds go directly to the MPO area. Total funds $1.1 Million 1

District 2 Stimulus Funds 17 TPE 2 Alagordo Otero Sidewalks ADA corridors city wide Installation of sidwalks and ADA compliant corner ramps, driveway and alley aprons city wide to provide defined accessible corridors throughout the city. $ 249,747 $ 249,747 18 TPE 2 Cloudcroft Otero Mexican Canyon Trestle (MCT) Stabilization Existing contract will complete a structural evaluation, preservation of sound timbers, and replacement of decayed/missing timbers in bents 1-5. $ 249,747 $ 249,747 19 TPE 2 Eunice Lea 20 TPE 2 Hobbs Lea Downtown Enhancement/Beautification NM 18 Multi-Use Trail Project & Roadway Enhancement Surface Rehabilitation, Lighting, Crosswalks, Landscaping, Etc. $ 249,747 $ 249,747 10 foot wide concrete multi-use trail along NM 18 (Lovington Highway) along with landscaping, small shrubs and trees, pedestrian lighting and ADA intersection improvements. $ 249,747 $ 249,747 21 TPE 2 Portales Roosevelt US 70 $ 249,747 $ 249,747 25 TPO 2 Alagordo Otero 9th Street Bridge ( Rebuild ) Roadway and Drainage Reconstruction, Principal 27 TPO 2 Carlsbad Eddy Arterial total $ 1,248,735 $ 1,248,735 $ - Reval and replacement of bridge on 9th and Washington deemed unsafe for vehicular traffic by NMDOT. $ 150,000 $ 150,000 (US285) to Moore Drive including rehab of existing concrete pavement, rehab of curb and gutter and sidewalk, upgrade $ 831,489 $ 831,489 28 TPO 2 Chaves County Chaves Chaves County Pavement Preservation Project Roads included are E. Brasher Road (C1-184) from Southeast Main Street (US 285) to the Old Dexter Highway (NM 256), Red Bridge Road (C1-106) from US 380 to 19th Street, 19th Street (C1-125) from Red Bridge Road to Fowler Road, Fowler Road (C1-123) from 19 $ 830,000 $ 830,000 updated 4-23-09 2

District 2 31 TPO 2 Lea County Lea Carlsbad to Eunice By-Pass 32 TPO 2 Lovington Lea Ninth Street West Brasher Road 34 TPO 2 Roswell Chaves Reclamation Stimulus Funds Mill entire road; check sub-base; relay the road; and add 4 inches of asphalt. $ 831,489 $ 831,489 Ninth Street -- Completion of the Municipal Arterial Street $ 831,489 $ 831,489 roadway pavement and base course. New 4" PMBP overlay. $ 831,489 $ 831,489 35 TPO 2 Ruidoso Lincoln Resurface Paradise Canyon 2" overlay on Paradise Canyon with use of heater scarify/remix and resurface asphalt pavement. 11,500' x 23'. $ 352,651 $ 352,651 total $ 4,658,607 $ 2,995,629 $ 1,662,978 District Target $11,146,023 total $ 5,907,342 $ 4,244,364 $ 1,662,978 updated 4-23-09 3

$24.9 M Albuquerque District 3 Stimulus Funds Town of 36 TPE 3 Bernalillo Sandoval NM 529 Southern to US 550* Lighting Project along NM 528 $ 1,348,848 $ 1,348,848 total $ 1,348,848 $ - $ 1,348,848 38 TPM 3 Bosque Farms Valencia Bosque Loop Rd NM47 to NM47 $ 63,000 $ 63,000 total $ 63,000 $ 63,000 $ - 43 TPO 3 Los Lunas Valencia 44 TPO 3 Los Lunas Valencia 45 TPU 3 Albuquerque Bernalillo New Street Connection south of Courthouse Road Los Lunas Railroad Crossings I-40 Trail Crossing at the Rio Grande 46 TPU 3 Albuquerque Bernalillo ITS-Albuquerque Traffic Management System Bernalillo, Town 47 TPU 3 of Sandoval Camino Don Tomas 48 TPU 3 Rio Rancho Sandoval New Street from Rail Runner Station to Los Lentes asidentified in MRCOG TOD $ 1,092,715 $ 1,092,715 NM 314 at Otero Road; NM 314 at Daniel Fernandez Park; Construct at-grade crossings; identified as a safety need $ 1,092,715 $ 1,092,715 total $ 2,185,430 $ - $ 2,185,430 Construct bikeway/trail bridge over the Rio Grande $ 5,358,782 $ 5,358,782 Replace traffic signal controllers, communications, camera nitoring, other ITS $ 2,651,176 $ 2,651,176 Add/Improve Sidewalks. Add center double left turn lanes & add deceleration $ 2,914,579 $ 2,914,579 Paseo del Volcan (NE Section) Stage II Construct New 2 lane Roadway $ 14,000,000 $ 14,000,000 total $ 24,924,537 $ 24,924,537 $ - District Target $36,837,537 Total $ 28,521,815 $ 24,987,537 $ 3,534,278 updated 4-23-09 Note: TPU Funds are not at DOT DIscretion. Funds go directly to MPO area. Total Funds $24.9 M 4

District 4 US 64 Trail and Interpretive 49 TPE 4 Cimarron Colfax Sites Stimulus Funds Cimarron. Construction of Multi-Use Path with Interpretive Sites, etc. Project with $ 125,000 $ 125,000 Let Date 4-6 50 TPE 4 Las Vegas/ San Miguel County San Miguel Gallinas Riverwalk - Bicycle/Pedestrian Path Construction of bicycle/pedestrian path from Mills Avenue to the United World College (Approx. 5.15 miles). This trail will tie into the existing Gallinas Rvierwalk from Mills Ave. to Jackson Street. Total Cost $3,115,000 $ 937,015 $ 937,015 total $ 1,062,015 $ 1,062,015 51 TPM 4 Angel Fire Colfax North Angel Fire Road Pavement Resurfacing $ 762,000 $ 762,000 Guadalu Eddy Street - on 8th Street for 850 Feet 52 TPM 4 Santa Rosa pe 8th Street to NM91 and on Eddy Street for 630 Feet. $ 673,350 $ 673,350 53 TPO 4 Las Vegas San Miguel Mills Ave. (FL 4560) Roadway Improvements (Pavement Rehabilitation) Repave 1.47 miles on Mills Avenue in total Las $ 1,435,350 $ 1,435,350 Vegas, New Mexico between Grand Avenue (State Road 85) and New Mexico Avenue (State Road 329), to include milling of shoulders and striping. Total $ 1,946,300 $ 1,946,300 54 TPO 4 Raton Colfax 55 TPO 4 Raton Colfax 56 TPO 4 Tucumcari Quay I-25 Business Loop (L0017) Pavement Preservation Surface Treatment of PCCP Pavement. $ 1,000,000 $ 1,000,000 US 64/87 Pavement Preservation 2nd Street Road Improvements US 64/87, Tiger Drive to Exit 452. Pavmenent Preservation. $ 600,000 $ 600,000 City of Tucumcari 2nd Street from Tucumcari (Business 40) on the north and Charles Street on the south; including the first 150 feet of each cross street. $ 1,785,000 $ 1,785,000 total $ 5,331,300 $ 5,331,300 District Target $7,828,665 total $ 7,828,665 $ 7,828,665 updated 4-23-09 5

District 5 Stimulus Funds 57 TPE 5 Santa Fe Santa Fe Rodeo Road Median Landscaping Santa Fe 58 TPE 5 County Santa Fe Santa Fe Rail Trail ppy g p g y installed and existing medians on Rodeo Road from Galisteo St. to Camino Carlos $ 150,000 $ 150,000 Construct a paved multi use trail from I-25 to Rabbit Road $ 100,000 $ 100,000 total $ 250,000 $ 250,000 59 TPO 5 Aztec San Juan East Arterial Construction of a north/south route intersecting with US550 on the south and NM173 including improvements to NM173 and the intersection of US550 and NM173. $ 1,700,000 $ 1,700,000 60 TPO 5 Bloomfield San Juan West Maple St Reconstruction 61 TPO 5 Espanola Rio Arriba Industrial Park Road Reconstruction of approximately 1, 630 feet of roadway, starting at US 550 and heading west, subsurface utilities $ 900,000 $ 900,000 Added lanes, drainage, pedestrian facilities, access management $ 1,250,000 $ 1,250,000 62 TPO 5 Farmington San Juan Wildflower Parkway from Browning Parkway(NM 516) to Wildflower Mesa Roadway Widening Project $ 1,000,000 $ 1,000,000 Los Alas 63 TPO 5 County Los Alas Diand Drive Phase 3 San Juan 64 TPO 5 County San Juan Bridge #8116 on CR 2900 65 TPO 5 Santa Fe Santa Fe Airport Road Request was $5.759,876, lower aunt recommended by D5 $ 1,962,217 $ 1,962,217 The current bridge is in need of replacement due to a failing deck and severe corrosion of all steel elements. $ 1,000,000 $ 1,000,000 Safety Improvements Cerrillos Road to San Felipe Road $ 2,000,000 $ 2,000,000 total $ 9,812,217 $ 5,812,217 $ 4,000,000 District Target $10,062,217 Total $ 10,062,217 $ 5,812,217 $ 4,250,000 updated 4-23-09 6

District 6 66 TPE 6 Reserve Catron 67 TPM 6 Acoma Pueblo Cibola SP 36 half mile extension 68 TPM 6 69 TPM 6 Stimulus Funds Downtown Rehabilitation (Mainstreets) Road improvements along Main Street $ 1,033,609 $ 1,033,609 total g $ 1,033,609 $ 1,033,609 0 (Total Cost $5,225,000 ARRA to supplement GRIP 2 $4,387,538) $ 1,200,000 $ 1,200,000 Sandoval County Sandoval County Road 13 Bridge 8053 Rio Puerco $ 270,000 $ 270,000 Sandoval County Sandoval Horseshoe Springs Bridge 6056 San Antonio creek $ 198,000 $ 198,000 70 TPM 6 Zuni Pueblo McKinley Z-4(3)1, 2&4 Gallup Cut-Off Bridge widening (184 feet) $ 736,582 $ 736,582 total $ 2,404,582 $ 1,204,582 $ 1,200,000 71 TPO 6 Gallup McKinley Clay Street Bridge Construction Prj 72 TPO 6 Grants Cibola Nimitz Bridge Replace existing 5-ton load limit, railroad flatcar bridge with a new bridge structure that can carry school buses and other heavy commercial vehicles. $ 2,100,000 $ 2,100,000 Single Span 2-Lane Bridge over the Rio San Jose. $ 800,000 $ 800,000 total $ 2,900,000 $ 800,000 $ 2,100,000 District Target $6,338,191 Total $ 6,338,191 $ 3,038,191 $ 3,300,000 updated 4-23-09 7